11B0026-SPECS-AM10.PDF
PDF 639 KB Posted
- Solicitation number
- W912BU-11-B-0025
About this file
Modified Specs
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: MICHAEL TOTH
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
THIS AMENDMENT HEREBY EXTENDS THE BID OPENING TO 03 MAY 2012 AT 11:00 AM EST.
CONTINUED ON NEXT PAGE
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-11-B-0025
X 9B. DATED (SEE ITEM 11)
29-Sep-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Apr-2012
CODE
CONTR DIV-CONTRACTS BR
USAED, PHILA DISTRICT
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912BU
FACILITY CODECODE
EMAIL:TEL:
This page was intentionally left blank for duplex printing.
Amendment No. 0010
IFB W912BU-11-B-0025
14. DESCRIPTION OF AMENDMENT (continued)
a. SPECIFICATIONS:
(1) Section BID SCHEDULE – WAGE RATES: Please delete section 00815 in its entirety and substitute revised section 00815, annotated Amendment No. 0010, attached hereto.
(2) Section 00815 – WAGE RATES: Please delete section 00815 in its entirety and substitute revised section 00815, annotated Amendment No. 0010, attached hereto.
(3) Section 01500 – TEMPORARY CONSTRUCTION: Please delete section 01500 in its entirety and substitute revised section 01500, annotated Amendment No.
0010, attached hereto.
(4) Section 01720 – SURVEY REQUIREMENTS: Please delete section 01720 in its entirety and substitute revised section 01720, annotated Amendment No. 0010, attached hereto.
(5) Section 02271 – RIPRAP: Please delete section 02271 in its entirety and substitute revised section 02271, annotated Amendment No. 0010, attached hereto.
(6) Section 02300 – EARTHWORK: Please delete section 02300 in its entirety and substitute revised section 02300, annotated Amendment No. 0010, attached hereto.
b. CONTRACT DRAWINGS:
(1) Please delete drawings C-101 in its entirety and substitute revised drawing of the same numbers, with the latest revision date of 11 Apr 2012, attached hereto.
c. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0010. Failure to acknowledge all amendments may be cause for rejection of the offer.
Invitation for Bids
W912BU-11-B-0025
00010-3
BIDDING SCHEDULE
(To be attached to SF 1442)
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount
1. All work not included in Items 1 JOB LS $ 2 through 6 below
2. Wire Mesh Gabions and Marine 1 JOB LS $ Mattresses
3. Excavation 1,900 CY $ $
4. Imported No. 57 Stone 275 CY $ $
5. Imported General Fill 1,039 CY $ $
6. Imported Surface Fill 358 CY $ $
TOTAL ESTIMATED BID AMOUNT $_________
NOTE: Bidders must bid on all items.
SECTION 00815
WAGE RATES
THIS PAGE INTENTIONALLY LEFT BLANK
Section 00815 Page 1
General Decision Number: NJ120051 03/16/2012 NJ51
Superseded General Decision Number: NJ20100056
State: New Jersey
Construction Type: Heavy
County: Cumberland County in New Jersey.
HEAVY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 01/06/2012 1 02/17/2012 2 03/16/2012
CARP0006-013 11/01/2011
Rates Fringes
CARPENTER (Including Form Work)............................$ 40.18 55%
The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
CARP0454-009 07/01/2009
Rates Fringes
PILEDRIVERMAN....................$ 37.55 26.63
PAID HOLIDAYS:
New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day; provided that the worker works any of the three days in the five-day work week preceding the holiday and the first work day after the holiday.
CARP0715-007 11/01/2011
Rates Fringes
Millwright.....................$ 40.97 55%
Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
ELEC0351-013 10/01/2011
Rates Fringes
Section 00815 Page 2
Electricians:
Cable splicer on lead cable.$ 47.36 62.82%+.50 Electrician and cable splicer.....................$ 43.90 74.16% + .50
ENGI0825-019 07/01/2010
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 41.02 25.75
GROUP 2.....................$ 39.43 25.75
GROUP 3.....................$ 37.52 25.75
GROUP 4.....................$ 35.89 25.75
GROUP 5.....................$ 34.18 25.75
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.
PAID HOLIDAYS:
New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided
1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.
DEFINITION OF GROUPS:
GROUP 1:
Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);
Elevating Grader; Excavator; Front End Loader (5 cu. yd.
and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable)
GROUP 2:
Concrete Pumper; Grader/Blade (Finish); Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom
GROUP 3:
Asphalt Spreader; Bulldozer; Compressor(2 or 3) (in Battery) (within 100 ft.); Crusher; Forklift; Front End Loader (1
cu. yd. and over but less than 2 cu. yd.); Lull; Mechanic;
Paver, Asphalt; Roller, Blacktop; Tractor;
Section 00815 Page 3
GROUP 4:
Broom; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Roller, Grade; Pump
GROUP 5:
Oiler
* IRON0350-008 07/01/2011
CUMBERLAND COUNTY (east of a line drawn from the Delaware Bay through the town of Cedarville and north to the point where the county lines of Atlantic, Cumberland and Gloucester Counties meet)
Ironworkers:
Reinforcing.................$ 43.62 25.75 Structural and Ornamental...$ 44.62 25.75
IRON0399-006 07/01/2009
CUMBERLAND COUNTY (west of a line drawn from the Delaware Bay through the town of Cedarville and north to the point where the county lines of Atlantic, Cumberland and Gloucester Counties meet)
IRONWORKER (Structural, Reinforcing and Ornamental)......$ 31.46 29.70
LABO0172-007 03/01/2011
Rates Fringes
Laborers:
Landsacpe Laborer, Power Tool Operator...............$ 32.20 21.55 Pipelayer...................$ 32.90 21.55
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is required to wear Level A, B or C personal protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, where the worker is not required to wear Level A, B, or C personal protection: $1.00 per hour additional.
PAID HOLIDAYS:
New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided
Section 00815 Page 4 that the worker works three days for the same employer within a period of ten working days consisting of five working days before and five working days after the day upon which the holiday falls or is observed.
LABO0222-013 05/01/2009
Rates Fringes
LABORER
MASON TENDER:
Cement/Concrete.............$ 28.55 19.42
PAIN0711-023 05/01/2009
Rates Fringes
Painters:
Work on bridges (Major Bridges Designed for Commercial Navigation)......$ 46.50 19.13
PAIN0711-024 11/01/2008
Rates Fringes
Painters:
New Construction Brush and roller...........$ 34.47 16.14 Spray......................$ 37.92 16.14 Steel......................$ 35.81 16.30 Repaint work, on projects on which no major alterations occur.
Brush and roller...........$ 26.67 13.80 Spray......................$ 29.34 13.80 Steel......................$ 27.74 13.93
PLAS0592-036 11/01/2010
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 38.37 25.51
PLUM0322-010 05/01/2011
Rates Fringes
PIPEFITTER.......................$ 42.02 30.24
SUNJ2004-027 01/02/2009
Rates Fringes
LABORER: Common or General......$ 25.30 11.92
OPERATOR: Backhoe Loader
Section 00815 Page 5
Combo............................$ 31.28 20.79
TEAM0676-005 05/01/2011
Rates Fringes
Truck drivers:
Dump Truck Drivers; Pickup Truck.......................$ 29.70 19.485 Off the Road Truck;
Flatbed Truck...............$ 30.05 19.485
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required:
$1.00 per hour additional.
SHIFT WORK:
An owner mandated irregular shift staring any time other than between 6:00 am and 8:00 am to receive $1.00 per hour, for each hour worked, in addition to the regular rate of pay.
PAID HOLIDAYS:
New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day (or the day after Thanksgiving, at the option of the contractor), Thanksgiving Day, the afternoon of the day before Christmas (Dec. 24) provided that the worker works in the morning, and Christmas Day, provided that the worker works or is available for work on at least two days in the week in which the holiday occurs.
BEREAVEMENT PAY:
In case of a death in the worker's immediate famiy (mother, father, wife, husband, children, brother, sister, current mother-in-law, current father-in-law, grandparents), the worker shall be allowed leave not to exceed three (3) days straight-time pay, provided that he or she shall receive no pay unless the day of death and the burial day falls on a regular work day, and not on days off, holidays, vacation, Saturdays or Sundays.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within
Section 00815 Page 6 the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
Section 00815 Page 7 be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
SECTION 01500
TEMPORARY CONSTRUCTION
PART 1 GENERAL
1.1 SCOPE OF SECTION
The work covered by this section consists of furnishing all labor, materials, plant and equipment, and performing all operations required for the construction of storage areas, and service facilities needed for execution and completion of the work, including the provision of a Contractor field office, weather instruments and project and safety signs at the work site. Also, included is a traffic control plan.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
NEW JERSEY DEPARTMENT OF TRANSPORTATION (NJDOT)
NJDOT Specifications (1989 Edition) Standard Specifications for Road and Bridge Construction
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01330 SUBMITTAL PROCEDURES:
NOTE: Any submittals classified as "SD-01 Preconstruction Submittals" are submittals required to be submitted to, and approved by, the office indicated prior to mobilization to the contract work site. All other submittals, classified as "SD-02" through "SD-11," shall be submitted to, and approved or reviewed by, the office indicated prior to commencing the particular task to which the submittal is associated.
SD-01 Preconstruction Submittals
Temporary Facilities Plan; G,COR.
The Contractor shall submit to the Contracting Officer for approval its plans showing the layout and details of all temporary facilities to be used for this contract, including proposed alignment of all safety fencing.
Traffic Control Plan; G,COR.
The Contractor shall develop and submit for approval a traffic control plan incorporating the herein specified requirements in accordance with section 110 of the NJDOT Specifications. The plan shall include, but not be limited to, location of ingress and
Section 01500 Page 1 egress points from the site, temporary and regulatory warning signs layout, and the traffic routes used to move equipment to the site and to remove debris from the site to the disposal area.
PART 2 PRODUCTS
2.1 WEATHER INSTRUMENTS
2.1.1 Rain and Snow Gage
National Weather Service standard gage with stand and wind screen. The gage shall be designed to measure both rain and snow, shall be manufactured of copper and brass, and shall contain a funnel, inner tube, outer cylinder and dipstick.
2.1.2 Thermometer
Minimum/maximum outdoor type with instrument shelter. The thermometer shall be mercury filled and designed to indicate minimum, maximum, and current temperatures from -40 to 130 degrees F.
[DELETION.]
2.2 PROJECT AND SAFETY SIGNS
The Contractor shall provide and erect at locations designated by the Contracting Officer, the project and safety signs shown on the sketches included at the end of this specification section. The Contractor shall include "The State of New Jersey" as the project sponsor.
PART 3 EXECUTION
3.1 TEMPORARY CONSTRUCTION
3.1.1 General
The Contractor may construct within the work area indicated on the contract drawings, subject to the approval of the Contracting Officer, stockpile areas and on-site plant and facilities as needed for the execution of the work.
3.1.2 Restoration of Work Site
Removal of all temporary construction and restoration of the work site upon completion of the contract shall be in accordance with the requirements of Section 01355 ENVIRONMENTAL PROTECTION.
3.2 CONTRACTOR'S PROJECT OFFICES
The Contractor shall establish at the work site a project office equipped and staffed to efficiently conduct the work under this contract and provide essential information to the Contracting Officer or its authorized representative. The Contractor shall keep at all times at its office a copy of all drawings, specifications, and other pertinent information, and shall at all times give the Contracting Officer access thereto. The Contractor's office shall be equipped with telephone facilities which shall be available
Section 01500 Page 2 for use by the Contracting Officer.
[DELETION.]
3.3 UTILITIES
Utilities are not available at the project site. Provide temporary utilities as required for the work. Materials may be new or used, must be adequate for the required usage, not create unsafe conditions, and not violate applicable codes and standards. Bidders shall be responsible for investigating the availability of utilities in the project area and the requirements for making any necessary connections and metering. The Contractor shall coordinate all utility requirements with local officials and utility companies and make all necessary connections and associated disconnections.
3.4 WEATHER INSTRUMENTS
The Contractor shall provide and maintain at the work site in locations determined by the Contracting Officer, weather instruments consisting of a rain and snow gage with stand and a thermometer with instrument shelter.
The Contractor shall take daily readings of precipitation and the minimum and maximum temperatures, and shall record such information on the Contractor Quality Control Reports as required under Section 01450 CONTRACTOR QUALITY CONTROL. This information will be used by the Contracting Officer as the basis for determining if the Contractor is entitled to a time extension for unusually severe weather in accordance with Special Clause: "Time Extensions for Unusually Severe Weather." The Contracting Officer will also consider other climatological factors such as abnormally high tides and excessive sustained wind velocities when evaluating possible time extensions.
3.5 MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work specified in this section and all costs in connection therewith shall be included in the costs of all the bid items.
-- End of Section --
Section 01500 Page 3
SECTION 01720
SURVEY REQUIREMENTS
PART 1 GENERAL
1.1 SCOPE OF SECTION
The work covered by this section consists of furnishing all labor, materials, plant and equipment, and performing all operations required in conducting surveys and survey data submittals.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (COE)
EM 1110-1-1005 (2007) Engineering and Design: Control and Topographic Surveying
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01330 SUBMITTAL PROCEDURES:
NOTE: Any submittals classified as "SD-01 Preconstruction Submittals" require approval prior to mobilization to the contract work site. All other submittals, classified as "SD-02" through "SD-11," require approval prior to commencing the particular task to which the submittal is associated.
SD-01 Preconstruction Submittals
Surveying Procedures and Equipment; G,DO.
All surveying procedures, methods, and equipment shall be reviewed and approved by the Government Survey Point of Contact prior to the start of any type of surveying work.
Qualifications; G,DO.
Provide qualifications of the independent licensed surveyor(s), including copies of licenses.
SD-03 Product Data
Before- and After-Surveys; G,DO.
Before and after surveys as required herein, including raw data collector files and all data and plotted cross sections as specified herein, shall be submitted to the COR within 48 hours of
Section 01720 Page 1 completion of each survey performed.
Metadata; G, DO
Metadata shall be submitted within 14 business days after completion of final survey operations.
SD-07 Certificates
[DELETION]
1.4 TOPOGRAPHIC SURVEYS
All topographic or land based surveys performed in conjunction with this Contract shall meet all criteria outlined in EM 1110-1-1005.
1.5 SURVEYING PROCEDURES, METHODS AND EQUIPMENT
All surveying procedures, methods and equipment for surveys shall be reviewed and approved by the Government Survey Point of Contact prior to the commencement of any type of surveying work. This review process shall also include the review and acceptance of the Surveyor's Qualifications and licenses. Wherever physically possible, total stations, digital levels and data collectors shall be used for the survey data collection in this project. The Contractor will be permitted to use the global positioning system (GPS) to verify initial survey control points.
1.6 QUALIFICATIONS OF SURVEYOR
All surveys must be performed by an independent survey company. All surveys shall be performed under the direction and supervision of a Professional Licensed Surveyor registered in the State of New Jersey, with a minimum of 10 years recent experience.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 SURVEY REQUIREMENTS
The Contractor shall be responsible for conducting all surveys required to demonstrate that the construction is in compliance with the specified tolerances and the lines, grades, and elevations shown on the drawings and as required to measure quantities for payment and compliance.
These surveys shall consist of cross-sections taken before and after the following work items:
a. Excavation.
b. Placement of No. 57 stone.
c. Placement of imported general fill.
d. Placement of reused onsite material for restoration of beach surface (for compliance).
Section 01720 Page 2
e. Placement of imported surface fill.
The surveys shall be completed as specified herein and in Section 00800 SPECIAL CLAUSES: QUANTITY SURVEYS and elsewhere in this section.
3.2 CONTROL
Survey control will be established from the existing survey baseline control description data information as shown on the contract drawings and listed in Section 00840 SURVEY DESCRIPTION SHEETS. The Contractor shall utilize North American Vertical Datum (NAVD) 1988 as the vertical datum.
The Contractor shall utilize the New Jersey State Plane Coordinate System (NAD 1983) as the horizontal reference datum.
3.3 INTERVALS
Survey intervals for the cross sections shall be taken at the starting and ending stations of each work item and every 25 feet. The survey control to be used for vertical control are shown on the Contract Drawings and as described in Section 00840 SURVEY DESCRIPTION SHEETS Elevations along the cross-sections shall be taken at a maximum of 10 foot intervals, with additional elevations taken as necessary to describe all hydrographic features.
3.4 TOLERANCES
All surveys shall utilize surveying procedures and methodology that meet or exceed accuracy tolerances of +/- 0.10 feet in the vertical and +/- 0.50 feet in the horizontal, with a 95% confidence level. All topographic or land based surveys performed in conjunction with this Contract shall meet all criteria outlined in EM 1110-1-1005.
All surveying procedures, methods and equipment shall be reviewed and approved by the Government Survey Point of Contact prior to the conduct of any type of surveying work. This review process shall also include the review and acceptance of the Surveyor's Qualifications, as defined in the Paragraph entitled: "Qualifications of Surveyor".
3.5 DATA SUBMISSION
3.5.1 General
All survey cross section data shall be reduced and tabulated as a series of offset and elevation pairs. When looking in the direction of increasing stations along a baseline, horizontal distances of each survey point shall be referenced as positive to the right of the established Corps baseline, and negative to the left of the baseline. In addition, all survey points shall be recorded in three dimensions, using the New Jersey State Plane Coordinate System, NAD83 and NAVD88 for elevations. All survey data shall be recorded digitally on CD-ROM in ASCII text format. All survey cross section data shall be submitted in each of the following file formats:
a. ASCII files showing distance offset from baseline format, as shown on the attached sheets.
b. ASCII files XYZ format, as shown on attached sheets.
c. BMAP Free Format ASCII files using distances offset from the
Section 01720 Page 3 baseline (X) and elevation (Z), as shown on attached sheets.
In addition to the above files, hard copy and digital versions of plotted cross section drawings in AutoCAD 2006 format shall also be submitted for all cross section surveys taken. The grid spacing shall be 5 feet in the vertical and 10 feet in the horizontal. Each drawn cross section shall show the station that it was taken from and shall be presented on the grid with the existing and proposed cross sections shown on the contract drawings. Digital drawing files shall be submitted on CD and electronically transmitted to the ftp site specified in Part 1.
3.5.2 Timely Submission of Survey Data
Survey data, unless specified otherwise, shall be submitted to the COR within 48 hours of collection of the survey data. The Government will review and respond within 7 calendar days of receipt of the hard copy submittal of the surveys. The Contractor proceeds at his own risk when work is built-upon that is determined to not be in compliance with the contract. Work not in compliance with the contract, and all overlying features, shall be removed and replaced at the Contractor's expense.
3.5.3 Notification
The COR shall be notified a minimum of 24 hours prior to the performance of surveying in any particular area.
3.6 DISCREPANCIES
In the event of any discrepancies that cannot be resolved by the District Office quality assurance review of the Contractor's data, the COR may request an additional survey be performed by the Philadelphia District Survey Section. The results of the Government survey will be considered in the final determination made by the Contracting Officer to resolve any conflicts.
3.7 METADATA SUBMISSION
The data provided by the Contractor is not considered complete without Federal Geographic Data Committee (FGDC) compliant metadata file(s).
Metadata Generation Software, Corpsmet95, can be downloaded via http://corpsgeo1.usace.army.mil. The Contractor shall provide metadata file(s) for all geospatial data produced under this Contract. Geospatial data is defined as information that identifies the geographic location and characteristics of natural or constructed features and boundaries on the earth, which also includes aerial photography. Geospatial data affected by these requirements are those generated for use in a: Geographic Information System (GIS); Land Information System (LIS); remote Sensing or Image processing system; Computer-Aided Design and Drafting (CADD) system;
Automated Mapping/Facilities (AM/FM) system and other computer systems that employ or reference data using either absolute, relative or assumed coordinates.
The metadata file(s) must comply with Federal Geographic Data Committee (FGDC) Content Standards for Digital Geospatial Metadata Version 1.0 or higher. Corpsmet95 generates final metadata files in a ".met" file type.
If the contractor chooses to use the Corpmet95 Metadata Generation Software, in addition to the ".met" file, metadata files should be provided as ".txt" or ".html". If another generation tool is used other than Corpsmet95, the ".txt" or ".html" file type would be sufficient.
Section 01720 Page 4
Section 01720 Page 5
SURVEY DATA FORMATS
a. Distance offset from Baseline Format (Comma Delimited)
7202.13 Station in feet (Do not include "+")
s sf1 Program requirement (Shall be the same for all stations) -58,5.9 Offset Left, Elevation -50,6.3 " -30,7.5 " -17,6.0 " -10,4.6 " -5,4.0 " 15,1.7 Offset Right, Elevation 25,0.7 " 40,-0.8 " 50,-0.9 " 100,-1.1 " 250,-0.4 " 600,-0.7 " 1500,-3.2 " E End of Cross section
7729.45 Station in feet (Do not include "+")
s sf1 Program requirement (Shall be the same for all stations) Etc.
b. XYZ Format or Easting, Northing and Elevation Format (Comma Delimited)
7202.13 Station in feet (Do not include "+")
382475.74,30975.42,1137.3 Easting, Northing, and Elevation 382475.85,30974.85,1137.3 " 382476.06,30973.78,1137.4 " 382476.16,30973.25,1137.4 " 382476.28,30972.59,1137.5 " 382476.38,30972.10,1137.5 " 382476.50,30971.45,1137.4 " 382476.60,30970.98,1137.6 " 382476.73,30970.35,1137.4 " 382476.83,30969.84,1137.6 " 382476.96,30969.22,1137.3 " 382477.07,30968.68,1137.5 " 382477.20,30968.06,1137.3 " 382477.30,30967.52,1137.4 " 382477.40,30966.88,1137.2 " 382477.48,30966.32,1137.1 "
7729.45 Station in feet (Do not include "+")
382475.74,30975.42,1137.3 Easting, Northing, and Elevation 382475.85,30974.85,1137.3 " Etc.
c. BMAP Free Format
GET 00400 071706 Line Name: PRD for Prompton Dam; Station; Date 20 Number of points in cross section
827.40009.6200 Offset Distance from baseline Elevation (No space)
840.30008.6100 "
Section 01720 Page 6
848.60006.6000 "
859.70005.4900 "
871.40004.2900 "
883.30003.1700 "
894.10002.4200 "
906.40001.6700 "
918.60000.6100 " 929.8000-0.6700 " 942.9000-1.8200 " 955.3000-2.7400 " 956.0000-2.8600 " 967.8000-3.0100 " 980.0000-2.9900 " 992.4000-3.1800 " 1004.3000-3.6000 " 1016.5000-3.6900 " 1028.4000-4.2000 " 1047.8000-4.4200 "
Section 01720 Page 7
SECTION 02271
RIPRAP
PART 1 GENERAL
1.1 SCOPE OF SECTION
The work covered by this section consists of furnishing all labor, materials, plant, and equipment, and performing all operations required for placing riprap and stone structures, as specified herein and as shown on the drawings.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM C 127 (1988) Standard Test Method for Specific Gravity and Absorption of Coarse Aggregate
ASTM C 131 (1989) Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion in the Los Angeles Machine
ASTM C 295 (1990) Standard Guide for Petrographic Examination of Aggregate for Concrete
CRD-C-144 (1992) Standard Test Method for Resistance of Rock to Freezing and Thawing
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01330 SUBMITTAL PROCEDURES:
NOTE: Any submittals classified as "SD-01 Preconstruction Submittals" are submittals required to be submitted to, and approved by, the office indicated prior to mobilization to the contract work site. All other submittals, classified as "SD-02" through "SD-11," shall be submitted to, and approved or reviewed by, the office indicated prior to commencing the particular task to which the submittal is associated.
SD-01 Preconstruction Submittals
Work Plan; G,COR.
The Contractor shall submit for approval his proposed plan for transportation, handling, storage, and placement of riprap.
Section 02271 Page 1
SD-03 Product Data
Sources for Riprap; G,COR. Gradation Curves; G,COR.
The Contractor shall submit to the Contracting Officer for approval, prior to delivery, his proposed source for the riprap. The test data specified herein for those sources shall be submitted. In the event such data is unavailable, the Contractor shall procure the services of an industry-recognized testing laboratory to perform the required acceptance tests. The results of all acceptance tests shall be furnished to the Contracting Officer at least 30 days prior to the delivery of the stone to the work site. All testing shall be entirely at the Contractor's expense.
The Contractor shall submit gradation curves to verify that the riprap meets the requirements specified herein.
PART 2 PRODUCTS
2.1 RIPRAP
2.1.1 Quality
Riprap stone shall be either cobbles or crushed stone. The stone shall be sound, durable and of suitable quality to ensure performance in the work and in the climate in which it is to be used. Stone shall be free from cracks, seams, and other defects that would tend to increase its deterioration from the elements. The stone shall be blocky and angular quarried material, with the least dimension not less than one-third the greatest dimension. Flat slabs, boulders, and parts of boulders will not be acceptable. The inclusion of objectionable quantities of dirt, sand, clay, and rock fines will not be permitted.
2.1.2 Testing
The following test results will be used by the Government to determine the acceptability of the stone sources selected by the Contractor.
PROPERTY TEST METHOD ACCEPTABLE TEST RESULTS
Petrographic ASTM C 295 Fresh, interlocking, crystalline, with few vugs, no clay minerals and no soluble minerals.
Specific Gravity and Absorption ASTM C 127 Minimum Unit Weight (dry) of 160 pounds per cubic foot. Absorption less than 1%.
Abrasion Resistance ASTM C 131 Less than 20% loss for 500 revolutions.
Freezing/ Thawing CRD-C-144 Less than 10% loss for 12 cycles.
Section 02271 Page 2
Additional testing shall be required if results from the tests, specified above, are close to the limits of acceptability. In the event test reports are not available, as in the case of newly operated sources, the Contractor shall perform such tests as are necessary to determine the acceptability of the stone for use in the work. Approval of a source of stone is not to be construed as approval of all material from that source. The right is reserved to reject materials from certain localized areas, zones, strata, or channels, when such materials are unsuitable for use as determined by the Contracting Officer. Individual stones or loads or parts of loads may be rejected if material does not meet the specifications.
2.1.3 Gradation
Riprap shall have the following gradation:
% Percent Rock size (inches) Passing
100 24 15 - 50 12 0 - 15 4
NOTE: The Contractor shall hand sort the stone received from the quarry if the stone does not meet the minimum sizes, specified herein.
PART 3 EXECUTION
3.1 FOUNDATION PREPARATION
In the area at the end of the gabions (Area 2), the foundation areas for the riprap shall be drained, dewatered, excavated, filled, and stable in accordance with Section 02300 EARTHWORK. The geotextile shall be installed on the prepared surfaces in accordance with Section 02373 GEOTEXTILE.
3.2 RIPRAP
3.2.1 Method of Placement
3.2.1.1 Gap between Concrete Debris and Gabion Revetments (Area 1)
In the gap between the Concrete Debris Revetment and the New Gabion Revetment (area 1), the riprap shall be carefully placed against the gabions and the concrete debris in such a manner as to avoide displacing the concrete debris or damaging the gabions.
3.2.1.2 End of Gabions (Area 2)
[DELETION]
In the area (area 2) where riprap is to be placed at the end of the gabions, riprap materials shall be carefully placed on the bedding stone to the lines and grades shown on the drawings or as directed. The riprap shall be placed in such a manner as to produce a reasonably well-graded mass of rock with the minimum practicable percentage of voids. Placement shall also
Section 02271 Page 3 be performed in such a manner as to avoid displacing the underlying bedding stone and geotextile. The riprap shall not be dropped onto the bedding stone from a height greater than 1 foot. Any damage to the bedding stone layer or to the geotextile resulting from riprap placement shall be repaired as directed by the Contracting Officer before continuing with the work. Compaction of the riprap materials is not required, however, the rearranging of individual riprap stones by mechanical equipment or by hand shall be required to the extent necessary to obtain a reasonably even finished surface. Placement of riprap shall start at the toe and proceed up-slope. Riprap placement equipment, or any other heavy equipment, will not be permitted on the geotextile or riprap.
3.2.2 Distribution of Stone Size
Placing the riprap by dumping into chutes or by similar method likely to cause segregation of the various sizes will not be permitted. The desired distribution of the various sizes of stone throughout the mass shall be obtained by selective loading of the material at the quarry, by controlled placement of successive loads during final placement, or by other methods of placement which will produce the specified results.
NOTE: The Contractor shall hand sort the stone received from the quarry if the stone does not meet the minimum sizes, specified herein.
3.2.3 Maintenance of Riprap
The Contractor shall maintain the riprap until accepted by the Government and any material displaced by any cause shall be replaced at no additional cost to the Government, to the lines and grades shown on the drawings.
Section 02271 Page 4
SECTION 02300
EARTHWORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO T 180 (1997) Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and an 457 mm (18-in) Drop
AASHTO T 224 (1996) Correction for Coarse Particles in the Soil Compaction Test
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM C 136 (1996a) Sieve Analysis of Fine and Coarse Aggregates
ASTM D 422 (1963; R 1998) Particle-Size Analysis of Soils
ASTM D 1140 (1997) Amount of Material in Soils Finer than the No. 200 (75-micrometer) Sieve
ASTM D 1535 (2008e1) Specifying Color by the Munsell System
ASTM D 1556 (1990; R 1996el) Density and Unit Weight of Soil in Place by the Sand-Cone Method
ASTM D 1557 (1991; R 1998) Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/cu. ft. (2,700 kN-m/cu. m.))
ASTM D 2487 (1998) Classification of Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D 2922 (1996el) Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth)
ASTM D 3017 (1988; R 1996el) Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth)
ASTM D 4318 (1998) Liquid Limit, Plastic Limit, and
Section 02300 Page 1
Plasticity Index of Soils
NEW JERSEY DEPARTMENT OF TRANSPORTATION (NJDOT)
NJDOT Specifications (2007 Edition) Standard Specifications for Road and Bridge Construction
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01330 SUBMITTAL PROCEDURES:
SD-04 Samples
Native Material; G Imported General Fill; G Imported Surface Fill; G
Submit all samples collected for approval prior to testing.
SD-06 Test Reports
Testing; G,DO
Within 24 hours of conclusion of physical tests, test results, including calibration curves and results of calibration tests.
SD-07 Certificate
Earthwork Work Plan; G,DO
Include a detailed description inclusive of but not limited to personnel, equipment, and methods to be used for excavation, backfill, and fill contract work, including staging areas and storage areas; and, diversion and dewatering.
Sources for Imported Fill Material; G,DO
Prior to delivery, submit the proposed source(s) for imported coarse aggregate and imported fill materials. Submit a certificate or affidavit signed by a legally authorized official of the supplier(s) of the imported fill materials that each material (aggregate, general and surface fill), meets the quality and color required, and the gradation limits specified, and that the material is free from contamination. In the event such data is unavailable, procure the services of an industry-recognized and Corps of Engineers-validated testing laboratory to perform the required acceptance tests. The results of all acceptance tests shall be furnished to the Contracting Officer at least 30 days prior to the delivery of the material to the work site. All testing shall be at no additional cost to the Government.
Testing; G,DO
Section 02300 Page 2
Qualifications of the Corps of Engineers-validated commercial testing laboratory or Contractor's testing facilities.
1.3 DEFINITIONS
1.3.1 Satisfactory Materials
1.3.1.1 Satisfactory Material for Reuse as Surface Material for Beach Restoration
The seaward portion of the project will require restoration of the beach.
The existing material comprising the beach seaward of the proposed wall shall be replaced and regraded to its pre-construction condition using imported and satisfactory onsite material. Therefore, excavated materials that will be acceptable for reuse in restoring the top 6 inches of the surface, provided they meet the requirements specified in this paragraph, shall be only those obtained from the top 12 inches of material below Elevation 5.5 feet NAVD, seaward of the proposed face of the gabion wall, and within the limits of excavation. This material shall also match the quality, color and composition of the surrounding, undisturbed, surficial material comprising the beach seaward of the gabion wall. These requirements shall be verified by testing as described in paragraph entitled "INITIAL TESTS," below.
1.3.2 Unsatisfactory Materials
Materials which do not comply with the requirements for satisfactory materials are unsatisfactory. Unsatisfactory materials also include man-made fills; trash; rubble; refuse; debris; backfills from previous construction; and material classified as satisfactory which contains deleterious, root and other organic matter or frozen material. The Contracting Officer shall be notified of any contaminated materials.
1.3.3 Cohesionless and Cohesive Materials
Cohesionless materials include materials classified in ASTM D 2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM and SM will be identified as cohesionless only when the fines are nonplastic. Testing required for classifying materials shall be in accordance with ASTM D 4318, ASTM C 136, ASTM D 422, and ASTM D 1140.
1.3.4 Degree of Compaction
Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D 1557 abbreviated as a percent of laboratory maximum density. Since ASTM D 1557 applies only to soils that have 30 percent or less by weight of their particles retained on the 3/4 inch sieve, the degree of compaction for material having more than 30 percent by weight of their particles retained on the 3/4 inch sieve shall be expressed as a percentage of the maximum density in accordance with AASHTO T 180 Method D and corrected with AASHTO T 224. To maintain the same percentage of coarse material, the "remove and replace" procedure as described in the NOTE 8 in Paragraph 7.2 of AASHTO T 180 shall be used.
Section 02300 Page 3
1.4 SUBSURFACE DATA
Subsurface soil boring logs are shown in specification Section 00850.
[DELETION.] These boring logs represent the best subsurface information available; however, variations may exist in the subsurface between boring locations. In addition, construction debris and remnant timbers were visible at the surface throughout the site. It should be anticipated that these materials will likely be encountered both at the surface and in the subsurface during construction operations.
1.5 CLASSIFICATION OF EXCAVATION
Excavation specified shall be done on an unclassified basis, and shall include the satisfactory removal and disposal of all materials, both soil and debris.
1.6 INITIAL TESTS
One of each of the following tests shall be performed on both onsite and imported materials proposed for use as fill or backfill, prior to commencing construction to demonstrate that the proposed material meets all specified requirements when furnished. If materials from more than one source are going to be utilized, this testing shall be completed for each source. NOTE: Tests a through c are required for 1 sample of each imported material. Test d is required only for import material proposed for surface beach restoration. Tests a, b and d will be required for 2 representative samples of the native undisturbed surface soils comprising the beach at the time of construction. The COR shall verify the locations of these 2 samples prior to Contractor testing.
a. Sieve Analysis.
b. Liquid limit and plasticity index.
c. Moisture-density relationship.
d. Munsell Color System in accordance with ASTM D 1535 (performed for surface material for beach restoration only)
1.7 UTILIZATION OF EXCAVATED MATERIALS
Excavated materials shall be used to maximum extent…