Amendment Number 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912BU-11-B-0022 Amend0001-Specs.PDF | ||
| W912BU-11-B-0022 Amend0001-Dwgs.pdf | ||
| W912BU-11-B-0022 Specs.pdf | ||
| W912BU-11-B-0022 Dwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Painting and Miscellaneous Repairs, Reedy Point Bridge, Inland Waterway, Delaware River to Chesapeake Bay, DE & MD
THIS AMENDMENT DOES NOT EXTEND THE BID OPENING DATE OF 21 SEPTEMBER 2011 AT 11:00 A.M.
CONTINUED ON NEXT PAGE
US Army Corps of Engineers, Philadelphia District Wanamaker Building, 100 Penn Square East Philadelphia, Pennsylvania 19107-3390
US Army Corps of Engineers, Philadelphia District Attn: Michelle Bertoline Wanamaker Building, 100 Penn Square East Philadelphia, Pennsylvania 19107-3390
W912BU-11-B-0022
09/15/2011
08/22/2011
This page was intentionally left blank for duplex printing.
Amendment No. 0002
IFB W912BU-11-B-0022
14. DESCRIPTION OF AMENDMENT (continued)
a. RFI’s with RESPONSES: RFI’s with responses, annotated Amendment No.0002 are attached to this amendment.
b. TECHNICAL SPECIFICATIONS VOLUME 1 OF 2:
(1) SECTION 00800 – SPECIAL CONTRACT REQUIREMENTS: Please delete page 00800-4 in its entirety and substitute the revised page 00800-4, annotated Amendment No. 0002, attached hereto.
(2) SECTION 01 33 00 – SUBMITTAL PROCEDURES: Please delete page 01 33 00-20 in its entirety and substitute the revised page 01 33 00-20, annotated Amendment No. 0002, attached hereto.
(3) SECTION 32 13 70 – STRIP SEAL JOINT REPLACEMENT: Please delete this section in its entirety and substitute the revised SECTION 32 13 70, annotated Amendment No. 0002, attached hereto.
c. Please indicate receipt of this amendment on Standard Form 1442(SOLICITATION, OFFER, AND AWARD) as Amendment No. 0002. Failure to acknowledge all amendments may be cause for rejection of the bid.
Requests For
Information
RFI
Spec Section/ Drawing Sheet Question/Comment Response
1 Section 32 13 70
On plan sheet 7 of 7 the detail regarding Strip Seal Joint Replacement indicates to “remove and replace elastomeric gland in kind”. The existing concrete, steel extrusion and armoring angles are “to remain”. Specification Section 32 13 70 has references to shop drawings for armoring angles and asks for submittal of welder qualifications. Can you confirm that the scope of work for this item includes only the removal and replacement of elastomeric glands and does not include any structural steel work? Or please clarify the scope.
See Amendment No 0002
SC-3 CONTRACT DRAWINGS, MAPS AND SPECIFICATIONS (AUG 2000)
a. The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
b. The Contractor shall—
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
c. In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
d. Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
e. The work shall conform to the specifications and the contract drawings provided, all of which are available in electronic bid set format on the internet at the following address: https://www.fbo.gov. Drawings are titled:
"Painting and Miscellaneous Repairs, Reedy Point Bridge, Inland Waterway, Delaware River to Chesapeake Bay, Delaware and Maryland" and have the drawing numbers, subtitles, and dates as indicated on the contract drawing Sheet 1, "Project Plan, Elevation, Vicinity Map and List of Drawings".
(DFARS 252.236-7001)
SC-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. (FAR 52.236-4)
a. The indications of physical conditions on the drawings and in the specifications are based on as-built record drawings and field inspections.
b. Weather Conditions. The climate of the area is referred to as "continental" by climatologists, characterized by cold winters and moderately hot summers. Complete weather records and reports may be obtained from the local U.S. Weather Bureau Office nearest to the work site. The Contractor shall satisfy himself as to the hazards likely to arise from weather conditions during the construction period.
Section 00800 Page 3
Amendment No 0002
c. Transportation Facilities. The work site is accessible from Delaware Route 9. Work on this and adjacent bridges may result in vehicle restrictions. The Contractor shall be responsible for all investigations of load carrying capacities of bridges and roadways.
d. Magnitude of the Contract Work. The estimated value of the contract work is between $5,000,000 and $10,000,000.
e. Hours of Work. The Contractor will be permitted to work 24 hours a day.
DELETED
f. Obstruction of Channel. The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. The Contractor will be required to conduct the work in such a manner as to obstruct navigation as little as possible, and in case the Contractor's containment so obstructs the channel as to make difficult or endanger the passage of vessels, said containment shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. The Contractor shall request the U.S.
Coast Guard to issue a Notice to Mariners advising navigation interests that the Contractor will be constructing containment which will hang from the bridge structure and possibly impact the project waterway. The Contractor shall submit a request to the U.S. Coast Guard, MSO/Group Philadelphia, 1 Washington Avenue, Philadelphia, PA 19147. The Contractor shall furnish a copy of this request to the Contracting Officer not less than five (5) days prior to the start of dredging. The Contractor shall also notify the U.S. Coast Guard of the approximate time required for completion of LBP work. Upon completion of the work, the Contractor shall promptly remove his containment placed by him under the contract in or above navigable waters or on shore.
g. Location. The location of the work is on the Reedy Point Hwy. Bridge carrying Delaware Route 9 over the Chesapeake and Delaware Canal, located in New Castle County, in Delaware City, DE. Vertical clearance above mean high water over the navigation channel is 134 feet elevation for ships transiting the canal.
h. Clearance. The bottom of the bridge elevation above mean high water over the navigation channel is 136.4 feet at centerline and 134.511 feet at the channel edges.
SC-5 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least twenty (20) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a
Section 00800 Page 4
$0
�2
3)
'4
"5$
6�
3)
�7
�7
3)
9, 9, 9, 9, 6�
9, 9, 3)
! 4
9, ! 4
4�
9, ! 4
�0
9, 3;
! 4
9, 3;
! 4
9, & 4
�2
�7
9, �6
& 4
! 4
3)
6�
SU
B
M
IT
TA
L
R
EG
IS
TE
R
�1
� 8 � � � � � ?
� � � 8 � � 8 �
� � 1
8 � � � � � � 8 � � � � �
� A �
� 8 � � � � 8 � � �
�1
A
� 8 � � � � 8 � � �
A
B
C� D
C0 D
C% D
C� D
C� D
C4D C#
D C6
D C D
CED
C/
D C&D
C7 D
C� D
C� D
C( D
CF
D
C" D
IFB W912BU-11-R-0022
Section 01 33 00 Page 19
9, F'
'4
"5$
�7
G(
! 4
SU
B
M
IT
TA
L
R
EG
IS
TE
R
� 8 � � � � � ?
� � � 8 � � 8 �
� � 1
8 � � � � � � 8 � � � � �
� A �
� 8 � � � � 8 � � �
�1
A
� 8 � � � � 8 � � �
A
B
C� D
C0 D
C% D
C� D
C� D
C4D C#
D C6
D C D
CED
C/
D C&D
C7 D
C� D
C� D
C( D
CF
D
C" D
Amendment No 0002
IFB W912BU-11-R-0022
Section 01 33 00 Page 20
SECTION 32 13 70
STRIP SEAL JOINT REPLACEMENT
PART 1 GENERAL
1.1 SCOPE OF SECTION
The work covered by this section consists of furnishing all labor, materials and equipment and performing all operations required for replacement of strip seal joints at locations indicated.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D 1149 (2007) Standard Test Method for Rubber Deterioration - Surface Ozone Cracking in a Chamber
ASTM D 2240 (2005; R 2010) Standard Test Method for Rubber Property - Durometer Hardness
ASTM D 395 (2003; R 2008) Standard Test Methods for Rubber Property - Compression Set
ASTM D 4070 (2008) Standard Specification for Adhesive Lubricant for Installation of Preformed Elastomeric Bridge Compression Seals in Concrete Structures
ASTM D 412 (2006a; E 2008) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
ASTM D 471 (2010) Standard Test Method for Rubber Property - Effect of Liquids
ASTM D 573 (2004) Rubber - Deterioration in an Air Oven
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
DELETED
SD-03 Product Data
Section 32 13 70 Page 1
Equipment; G, DO.
List of proposed equipment to be used in the performance of construction work, including descriptive data, 14 days prior to use on the project.
Manufacturer's Instructions; G, DO.
Printed copies of method of installation and manufacturers' product information for Wabo Strip Seal Expansion Joint System.
Deleted
DELETED
SD-04 Samples
Expansion Joint Seals; G, DO
Regardless of testing responsibility, 1 foot long samples of the materials. Printed directions from the manufacturer on recommended installation criteria shall be furnished with the samples plus the manufacturer's certification that the selected seal is recommended for the installation on this project.
SD-07 Certificates
Work Plan; G, DO.
Submit a plan showing and describing detailed procedure for the replacement of strip seal joints at locations indicated, including tools and equipment to be used. The plan shall include the proposed sequence of work, deleted, and proposed method for protection of work area.
DELETED
DELETED
DELETED
1.4 EQUIPMENT
Machines, tools, and equipment used in the performance of the work required by this section shall be approved before the work is started and shall be maintained in satisfactory condition at all times.
1.4.1 Sealing Equipment
Equipment used to install the expansion joint seal shall place the seal to the prescribed depths within the specified tolerances without cutting, nicking, twisting, or otherwise damaging the seal. The equipment shall be capable of placing the seal with not more than two percent longitudinal stretch or compression of the seal during installation. The equipment shall at all times be operated by an experienced operator.
Section 32 13 70 Page 2
1.5 DELIVERY AND STORAGE
Deliver materials in the original, intact manufacturer labeled containers.
Materials delivered to the jobsite shall be inspected for defects, unloaded, and stored with a minimum of handling to avoid damage. Storage facilities shall protect materials from weather and shall maintain materials at temperatures between 40 and 90 degrees F.
1.6 ENVIRONMENTAL CONDITIONS
The ambient temperature and the pavement temperature within the joint wall shall be at least 35 degrees F and rising at the time of installation of the materials. Sealant installation will not be allowed if moisture or foreign material is observed in the joint.
PART 2 PRODUCTS
2.1 EXPANSION JOINT SEALS
Expansion joint seal shall be part of a Wabo Strip Seal Expansion Joint Sealing System, as designed and manufactured by Watson Bowman Acme Corp, or approved equal. This joint seal is a polychloroprene (neoprene) elastomer, preformed by extrusion and vulcanized into its definitive shape. The joint seal shall have the following properties:
PROPERTY: ASTM METHOD: REQUIREMENT:
Tensile Strength, min ASTM D 412 2000 psi Elongation at Break ASTM D 412 250 percent Hardness, Shore A ASTM D 2240 55 plus or minus 5 Oven Aging, 70 hrs at 212 degrees F Tensile Strength, max loss ASTM D 573 20 percent Elongation at Break, max loss ASTM D 573 20 percent Change in Hardness ASTM D 573 0 to 10 points Oil Swell, 70 hrs at 212 degrees F Weight Change, max ASTM D 471 45 percent Ozone Resistance, 70 hrs at 104 degrees F ASTM D 1149 No Cracks Low Temperature Stiffening, 7 days at 14 degrees F Change in Hardness ASTM D 2240 0 to 15 points Compression Set, ASTM D 395, 40 percent 70 hrs @ 212 degrees F Method B
2.2 ADHESIVE
Adhesive used for the Strip Seal Expansion Joint Sealing System shall be WaboPrimaLub, one part moisture curing polyurethane and aromatic hydrocarbon solvent mixture which complies with ASTM D 4070.
Section 32 13 70 Page 3
2.3 DELETED
2.4 DELETED
2.5 DELETED
2.6 DELETED
PART 3 EXECUTION
3.1 INSTALLATION OF EXPANSION JOINT SEALS
Applies to all strip seal joint replacement locations.
3.1.1 Time of Installation
Strip seal joint system shall be set to the proper width for the ambient temperature at the time of installation in accordance with manufacturer's recommendations. The environment shall be free of dust, oil, grease, wax, moisture, and frost. The gap wall surfaces must be thoroughly cleaned.
Joints shall be sealed immediately following the final cleaning of the joint walls. No installation may be performed in rainy weather, or when rain is expected within one hour before installation. All surfaces must be completely dry prior to applying adhesive. Personnel shall read the Material Safety Data Sheet for all components before beginning the installation.
3.2 SEALING OF JOINTS
All expansion joint systems are to be installed in strict accordance with the manufacturer's instructions by manufacturer's approved installers or under the supervision of manufacturer's technicians. The joint seal shall be cut to the correct length of the appropriate gap for installation, without pulling or exerting excess tension. The seal shall be installed in the longest practicable lengths.
Clean and abrade sides of joint seal per the manufacturer's instruction.
Mix adhesive according to manufacturer's directions only after all preparation of gap and joint seal are complete. Apply adhesive according to manufacturer's recommendations. Joint seal shall be gradually inserted into the gap, without stress or compression. The in-place joint seal shall be in an upright position and free from twisting, distortion, and cuts.
Adjustments shall be made to the installation equipment and procedure, if the stretch exceeds 1 percent. Any seal exceeding 2 percent stretch shall be removed and replaced. The installer shall maintain the joint seal at the depth desired, by hand or by any convenient means. The expansion joint seal shall be placed so that the top of seal is 1/2 inch, plus or minus 1/8 inch, below the pavement surface. No part of the seal shall be allowed to project above the surface of the pavement. Clean away excess adhesive.
Clean all excess adhesive around the edges and top of the joint with a trowel or scraping tool.
3.3 DELETED
3.4 PROTECTION
Contractor shall perform all work with care so that any material which is to remain in place will not be damaged. If any of these materials are
Section 32 13 70 Page 4 damaged, the damaged material shall be repaired or replaced in a manner satisfactory to the Government at no extra cost to the Government.
3.5 CLEAN-UP
Upon completion of the work, all unused materials shall be removed from the site, any adhesive on the pavement surface shall be removed, and the pavement shall be left in clean condition. Any damage to the seal or joint during cleaning shall be repaired by the Contractor at no cost to the Government.
3.6 QUALITY CONTROL PROVISIONS
3.6.1 Application Equipment
The application equipment shall be inspected to assure uniform application of adhesive to the sides of the expansion joint seal or the walls of the joint. If any equipment causes cutting, twisting, nicking, excessive stretching or compressing of the seal, or improper application of the adhesive, the operation shall be suspended until causes of the deficiencies are determined and corrected.
3.6.2 Procedures
3.6.2.1 Quality Control Inspection
Quality control provisions shall be provided during the joint cleaning process to prevent or correct improper equipment and cleaning techniques that damage the concrete in any manner. Cleaned joints shall be approved by the Government prior to installation of the adhesive and expansion joint seal. In-place joint seal which fails to meet the specified requirements shall be removed and replaced with new joint seal at no cost to the Government.
3.6.2.2 Conformance to Stretching and Compression Limitations
Conformance to stretching and compression limitations shall be determined.
The top surface of the expansion joint seal shall be marked at 1 foot intervals in a manner clear and durable to enable length determinations of the seal. After installation, the distance between the marks shall be measured on the seal. If the stretching or compression exceeds 2 percent, the seal shall be removed and replaced with new joint at no additional cost to the Government. The seal shall be removed up to the last correct measurement. The seal shall be inspected at each location for compliance to the shrinkage or compression requirements. Measurements shall also be made at the same interval to determine conformance with depth and width of installation requirements. Expansion joint seal that is not in conformance with specification requirements shall be removed and replaced with new joint seal at no additional cost to the Government.
3.6.2.3 Pavement Temperature
The pavement temperature shall be determined by placing a thermometer in the joint adjacent to the pavement and the reading shall be recorded. The thermometer shall remain in the joint for an adequate time to provide a control reading.
Section 32 13 70 Page 5
3.6.3 Final Inspection
The expansion joint seal and adhesive shall be inspected for proper rate of cure, deleted, cuts, twists, nicks and other deficiencies. Seals exhibiting any defects, at any time prior to final acceptance of the project, shall be removed from the joint, wasted, and replaced in a satisfactory manner at no additional cost to the Government.
3.7 MEASUREMENT AND PAYMENT
3.7.1 Strip Seal Joint Replacement
The work specified in this section for Strip Seal Joint Replacement will not be measured for payment and all costs in connection therewith shall be paid for at the contract price for each strip seal replacement location.
Payment for Option 2, Bid Item No. 12, entitled "Strip Seal Joint Replacement" shall include all work specified herein.
-- End of Section --
Section 32 13 70 Page 6
| SF30 |
| AMENDMENT DESCRIPTION |
| REQUEST FOR INFORMATION |
| 00800 PAGE 4 |
| 01 33 00 SUBMITTAL REGISTER Page 20 |
| SECTION 32 13 70 |