US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC MARIA T. EVANS

100 PENN SQUARE EAST

PHILADELPHIA PA 19107

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

THIS AMENDMENT DOES NOT EXTEND THE BID OPENING DATE OF 21 JUNE 2011 AT 11 A.M. EST

Continued on Next Page...

1. CONTRACT ID CODE PAGE OF PAGES

J 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-11-B-0009

X 9B. DATED (SEE ITEM 11)

06-Apr-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) PHILADELPHIA NAVY SHIPYARD FLOOD REDUCTION PROJECT (SEAWALL REPAIR), PHILADELPHIA, PENNSYLVANIA

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jun-2011

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912BU

FACILITY CODE CODE

EMAIL: TEL:

Amendment No. 0008 Invitation for Bids

W912BU-11-B-0009

14. DESCRIPTION OF AMENDMENT (continued)

a. SECTION 01 33 00 - SUBMITTAL REGISTER – Although the description of Amendment 0006 (Item 14 of the SF 30) calls for the replacement of the submittal register, the associated pages were left out of the amendment document. As described in Amendment 0006, please delete the original submittal register in its entirety and substitute the new submittal register attached hereto. All pages have been annotated with “Amendment No. 0008” in the header and all revisions are shown in bold italics.

b. SECTION 32 92 19 – SEEDING – Although the pages of the new section were issued with Amendment 0006, the section number and title were left out of the list of sections and/or pages identified for replacement in the amendment description.

To clarify, bidders are expected to replace the originally advertised section with the new section provided in Amendment 0006.

c. Please make the following pen and ink changes to the specifications:

(1) SECTION 03 01 32 – CONCRETE SEAWALL REPAIRS – In Paragraph 1.3, MEASUREMENT AND PAYMENT, third sentence, please change “(Option 6)” to “(Option 5).”

(2) SECTION 31 00 00 – EARTHWORK – In Paragraph 1.5.4, Soil Management Plan and Health and Safety Plan, please change “Section 0855” to “Section 00855.”

d. Please indicate receipt of this amendment on Standard Form 30 (AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT) as Amendment No. 0008. Failure to acknowledge all amendments may be cause for rejection of the offer.

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 8 PAGES

Navy Yard Seawall Repairs

00700 SD-01 Preconstruction Submittals Statement and Acknowledgement Form (SF 1413)

Payroll Basic Records & Statements of Compliance

Affirmative Action Compliance Plan

Certificate of Insurance 00800 SD-01 Preconstruction Submittals

Copy of Request to USCG for Notice to Mariners

Copy of Request to USCG for Movement of Navigation Aids

Copy of Request to USCG for Placing Submerged Pipelines Across Channel

Evidence of Insurance 01 32 01 SD-01 Preconstruction Submittals

3.4 G DOProject Schedule

01 32 33 SD-07 Certificates

G CORPhotography Plan G CORPre-Construction Photographs G CORConstruction Photographs G CORPost-Construction Photographs

01 33 00 SD-01 Preconstruction Submittals

1.7 G CORSubmittal register

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Section 01 33 00 Page 13 IFB W912BU-11-B-0009

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 8 PAGES

01 35 26 SD-01 Preconstruction Submittals G DOQualifications of Safety

Personnel

1.8 G AAccident Prevention Plan (APP)

1.8 G AContractor Accident

Prevention Plan (APP) Checklist

1.9 G AActivity Hazard Analysis (AHA)

1.8.1 G ACrane Critical Lift Plan

1.7.1.3 G ACrane Operators

SD-06 Test Reports 1.15Reports 1.15.1Accident Reports 1.15.3OSHA 300 Log

Monthly Record of Work-Related Injuries/Illnesses & Exposure

1.15.5Monthly Exposure Reports 1.15.6Crane Reports

Gas Protection SD-07 Certificates

1.11Confined Space Entry Permit 1.11Hot work permit

License Certificates 1.15.7Certificate of Compliance

01 35 50 SD-07 Certificates Diving Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

Section 01 33 00 Page 14 IFB W912BU-11-B-0009

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 8 PAGES

01 35 50 Activity Hazard Analysis Plan Emergency Management Plan Diving Operations Manual Dive Personnel Qualifications Air Quality Certifications Daily Logs

01 50 00 SD-01 Preconstruction Submittals G CORTemporary Facilities Plan

01 57 20 SD-01 Preconstruction Submittals

1.7 G DOEnvironmental Protection Plan

G DOSoil Erosion and Sediment Control

01 57 50 SD-01 Preconstruction Submittals G DOQualifications G DONatural Gas Line Monitoring Plan G DOMonitoring Report

01 74 19 SD-01 Preconstruction Submittals

1.6 G DOWaste Management Plan

SD-11 Closeout Submittals 1.7Records

01 78 00 SD-07 Certificates G CORProgress Prints

SD-11 Closeout Submittals G CORAs-Built Drawings

03 01 32 SD-01 Preconstruction Submittals G DOWork plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

Section 01 33 00 Page 15 IFB W912BU-11-B-0009

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 8 PAGES

03 01 32 SD-03 Product Data G DOMachine Applied Mortar

SD-06 Test Reports G DOMaterial G DOConcrete Tests

SD-07 Certificates G DOOperator Qualification G DOCement Materials

SD-08 Manufacturer’s Instructions G DOMaterial Safety Data G DOWelded Wire Fabric and Steel

Rebar Anchors 03 30 53 SD-03 Product Data

2.1.3.1Air-Entraining Admixture 2.1.3.2Accelerating Admixture 2.1.3.3Water-Reducing or Retarding

Admixture 2.1.8Curing Materials 2.1.5Reinforcing Steel

Batching and Mixing Equipment 3.2Conveying and Placing Concrete 2.1.6Formwork 2.4Forms 1.6Installation Drawings 1.6Concrete Placement 2.2Ready-Mix Concrete

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

Section 01 33 00 Page 16 IFB W912BU-11-B-0009

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 8 PAGES

03 30 53 2.2Mix Design Data 2.2Air-Entraining Admixtures 2.3Steel Reinforcement 2.5Accessories 2.5.1Curing Compound

Concrete SD-06 Test Reports

2.1.2Aggregates 1.4.3Concrete Mixture Proportions

Compressive Strength Testing Slump

SD-07 Certificates 2.1.1Cementitious Materials

CPG for recycled materials or appropriate Waiver Form

2.1.2Aggregates 04 92 00 SD-02 Shop Drawings

G DOStone Seawall SD-03 Product Data

G DOStone G DOCold Weather Installation

SD-04 Samples G CORStones

SD-07 Certificates G DOQualifications and Experience G DORepair Work Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

Section 01 33 00 Page 17 IFB W912BU-11-B-0009

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 8 PAGES

04 92 00 G DOMortar 06 13 33 SD-01 Preconstruction Submittals

G DOWork plan SD-04 Samples

G DOShims and Nails SD-06 Test Reports

G DODaily Report SD-07 Certificates

G DOMaterials 09 97 13 SD-07 Certificates

2.1.1.1Epoxy-polyamide 31 00 00 SD-01 Preconstruction Submittals

3.2.3 G DOShoring

1.5.3 GDewatering Work Plan

G DOEarthwork Plan G DOSoil Management Plan

SD-06 Test Reports Testing

SD-07 Certificates Testing

31 11 00 SD-01 Preconstruction Submittals G CORWork Plan

31 32 20 SD-01 Preconstruction Submittals G DOWork plan G DOTest Section Plan

1.5 G DOQualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

Section 01 33 00 Page 18 IFB W912BU-11-B-0009

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 8 PAGES

31 32 20 SD-03 Product Data G DOJet Grouting Equipment

SD-05 Design Data G DOGrout Mix Design

SD-06 Test Reports G DOSoil-Cement Samples

31 41 16 SD-01 Preconstruction Submittals G DOWork plan G CORQualifications

SD-02 Shop Drawings G DOSheet Piling G DOEquipment Descriptions G DOContinuous Permanent Seal

SD-03 Product Data 3.2.2.2Driving

3.2.5 G DOPulling and Redriving

G DOStorm Drainage Pipe Coupling G DOContinuous Permanent Seal

SD-06 Test Reports 2.3.1Materials Tests

SD-11 Closeout Submittals 3.3Pile Driving Record

32 31 00 SD-02 Shop Drawings G DOHandrail

SD-03 Product Data G DOHandrail

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

Section 01 33 00 Page 19 IFB W912BU-11-B-0009

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 8 PAGES

32 31 00 SD-07 Certificates G DOHandrail

32 92 19 SD-07 Certificates G DOseed

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

Section 01 33 00 Page 20 IFB W912BU-11-B-0009

STANDARD FORM 30
Amendment Description
SUBMITTAL REGISTER

67GFAFKRI: Amendment No. 0008

File details come from the government source that posted it. Updated .