W912BU-10-T-0020.pdf
PDF 118 KB Posted
- Solicitation number
- W912BU-10-T-0020
About this file
Solicitation Water Distribution and Sewage Collection System Blue Marsh Lake
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
UNDER DPAS (15 CFR 700)
11. DELIVERY FOR FOB
RFQ
SEE SCHEDULE
14. METHOD OF SOLICITATION
IFB RFP
CODE
SEE ADDENDUM
BLOCK IS MARKED
DESTINATION UNLESS
12. DISCOUNT TERMS
(No Collect Calls)
$14.0
MILLION
13b. RATING
13a. THIS CONTRACT IS A RATED ORDER
X
CODE
W912BU-10-T-0020 23-Feb-2010
b. TELEPHONE NUMBER
215-656-6762
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 16 Mar 2010
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV 3/2005)
Prescribed by GSA
FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY
CODE 10. THIS ACQUISITION IS
UNRESTRICTED
FAX: NAICS:
TEL:
CODE 18a. PAYMENT WILL BE MADE BYOFFEROR
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TEL.
W912BU
SIZE STD:
9. ISSUED BY
FACILITY
CODE
17a.CONTRACTOR/
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
15. DELIVER TO CODE E570000 16. ADMINISTERED BY
LOGISTICS MGMT OFFICE
USAED, PHILA DISTRICT WANAMAKER BUILDING
PHILADELPHIA PA 19107-3390
TEL: FAX:
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
HELENA R DINOFA
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES
SEE SCHEDULE
238220
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
SB
HUBZONE SB
SET ASIDE: % FOR
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W25PHS00116774
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
TEL: EMAIL:
2 COPIES
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
.OFFER DATED YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
X
8(A)
SVC-DISABLED VET-OWNED SB
EMERGING SB
X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
SEE SCHEDULE
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT
PAGE 2 OF
23. UNIT PRICE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV 3/2005) BACK
Prescribed by GSA
FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
W912BU-10-T-0020
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lump Sum
BASE YR
FFP
CONTRACTOR SHALL OPERATE AND MAINTAIN THE WATER
DISTRIBUTION AND COLLECTION SYSTEM FOR THE DRY BROOKS
DAY USE AND DRY BROOKS BOAT RAMP AREAS AT BLUE MARSH
LAKE, PA, IN ACCORDANCE WITH THE ATTACHED SCOPE OF WORK
FOR THE PERIOD 15 APRIL 2010 THROUGH 14 APRIL 2011. WORK
PERIOD OF PERFORMANCE IS 15 APRIL 2010 THROUGH 15 OCTOBER
2010.
FOB: Destination
MILSTRIP: W25PHS00116774
PURCHASE REQUEST NUMBER: W25PHS00116774
NET AMT
0002 1 Lump Sum
BASE YR
FFP
EMERGENCY CALL OUT FOR LINE ITEM 001 FOR THE PERIOD 15 APR
2010 THROUGH 14 APRIL 2011. PERIOD OF PERFORMANCE 15 APRIL
2010 THROUGH 15 OCTOBER 2010.
WAGE DETERMINATION NO WD 05-2447 REV 9 DATED 12 JANUARY
2010 IS INCORPORATED AS PART OF THIS ACTION.
RFQ MAY BE FAXED TO HELENA DINOFA AT 215-656-6780 OR
EMAILED TO HELENA.R.DINOFA@USACE.ARMY.MIL
FOB: Destination
MILSTRIP: W25PHS00116774
PURCHASE REQUEST NUMBER: W25PHS00116774
0003 1 Lump Sum
OPTION OPT YR 1
FFP
CONTRACTOR SHALL OPERATE AND MAINTAIN THE WATER
DISTRIBUTION AND SEWAGE COLLECTION SYSTEM FOR THE DRY
BROOKS DAY USE AND DRY BROOKS BOAT RAMP AREAS AT BLUE
MARSH LAKE, PENNSYLVANIA IN ACCORDANCE WITH THE
ATTACHED SCOPE OF WORK FOR THE PERIOD OF 15 APRIL 2011
THROUGH 14 APRIL 2012. WORK PERIOD OF PERFORMANCE IS 15
APRIL 2011 THROUGH 15 OCTOBER 2011.
FOB: Destination
0004 1 Lump Sum
OPTION OPT YR 1
FFP
OPTION YEAR 1 EMERGENCY CALL OUT FOR LINE ITEM 0003 FOR THE
PERIOD 15 APRIL 2011 THROUGH 14 APRIL 2012. PERIOD OF
PERFORMANCE 15 APRIL 2011 THROUGH 15 OCTOBER 2011.
0005 1 Lump Sum
OPTION OPT YR 2
FFP
CONTRACTOR SHALL OPERATE AND MAINTAIN THE WATER
DISTRIBUTION AND SEWAGE COLLECTION SYSTEM FOR THE DRY
BROOKS DAY USE AND DRY BROOKS BOAT RAMP AREAS AT BLUE
MARSH LAKE, PENNSYLVANIA IN ACCORDANCE WITH THE
ATTACHED SCOPE OF WORK FOR THE PERIOD OF 15 APRIL 2012
THROUGH 14 APRIL 2013. WORK PERIOD OF PERFORMANCE IS 15
APRIL 2012 THROUGH 15 OCTOBER 2012.
0006 1 Lump Sum
OPTION OPT YR 2
FFP
OPTION YEAR 2 EMERGENCY CALL OUT FOR LINE 0005 FOR THE
PERIOD 15 APRIL 2012 THROUGH 14 APRIL 2013. PERIOD OF
PERFORMANCE 15 APRIL 2012 THROUGH 15 OCTOBER 2012.
0007 1 Lump Sum
OPTION OPT YR 3
FFP
CONTRACTOR SHALL OPERATE AND MAINTAIN THE WATER
DISTRIBUTION AND SEWAGE COLLECTION SYSTEM FOR THE DRY
BROOKS DAY USE AND DRY BROOKS BOAT RAMP AREAS AT BLUE
MARSH LAKE, PENNSYLVANIA IN ACCORDANCE WITH THE
ATTACHED SCOPE OF WORK FOR THE PERIOD OF 15 APRIL 2013
THROUGH 14 APRIL 2014. WORK PERIOD OF PERFORMANCE IS 15
APRIL 2013 THROUGH 15 OCTOBER 2013.
0008 1 Lump Sum
OPTION OPT YR 3
FFP
OPTION YEAR 3 EMERGENCY CALL OUT FOR LINE ITEM 0007 FOR THE
PERIOD 15 APRIL 2013 THROUGH 14 APRIL 2014. PERIOD OF
PERFORMANCE IS 15 APRIL 2013 THROUGH 15 OCTOBER 2013.
0009 1 Lump Sum
OPTION OPT YR 4
FFP
CONTRACTOR SHALL OPERATE AND MAINTAIN THE WATER
DISTRIBUTION AND SEWAGE COLLECTION SYSTEM FOR THE DRY
BROOKS DAY USR AND DRY BROOKS BOAT RAMP AREA AT BLUE
MARSH LAKE, PENNSYLVANIA IN ACCORDANCE WITH THE
ATTACHED SCOPE OF WORK FOR THE PERIOD OF 15 APRIL 2014
THROUGH 14 APRIL 2015. WORK PERIOD OF PERFORMANCE IS 15
APRIL 2014 THROUGH 15 OCTOBER 2014.
0010 1 Lump Sum
OPTION OPT YR 4
FFP
OPTION YEAR 4 EMERGENCY CALL OUT FOR LINE ITEM 0009 FOR THE
PERIOD OF 15 APRIL 2014 THE 14 APRIL 2015. PERIOD OF
PERFORMANCE 15 APRIL 2014 THROUGH 15 OCTOBER 2014.
CLAUSES INCORPORATED BY REFERENCE
52.212-1 Instructions to Offerors--Commercial Items JUN 2008 52.212-4 Contract Terms and Conditions--Commercial Items MAR 2009 52.217-4 Evaluation Of Options Exercised At The Time Of Contract
Award
JUN 1988
52.217-5 Evaluation Of Options JUL 1990 52.222-3 Convict Labor JUN 2003
52.222-21 Prohibition Of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity MAR 2007 52.222-36 Affirmative Action For Workers With Disabilities JUN 1998 52.222-50 Combating Trafficking in Persons FEB 2009 52.225-18 Place of Manufacture SEP 2006 52.225-20 Prohibition on Conducting Restricted Business Operations in
Sudan--Certification
AUG 2009
52.232-28 Invitation to Propose Performance-Based Payments MAR 2000 52.232-33 Payment by Electronic Funds Transfer--Central Contractor
Registration
OCT 2003
52.237-3 Continuity Of Services JAN 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
JAN 2009
252.203-7002 Requirement to Inform Employees of Whistleblower Rights JAN 2009 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A Central Contractor Registration (52.204-7) Alternate A SEP 2007 252.233-7001 Choice of Law (Overseas) JUN 1997 252.243-7001 Pricing Of Contract Modifications DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL ITEMS (DEC 2009) (DEVIATION)
(a) Comptroller General Examination of Record. The Contractor agrees to comply with the provisions of this paragraph (a) if the contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to the right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times, the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(b)(1) Notwithstanding the requirements of any other clause in this contract, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (b)(i) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (DEC 2008) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note).
(ii) 52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $550,000 ($1,000,000 for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) Reserved.
(iv) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).
(v) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (SEP 2006) (38 U.S.C. 4212).
(vi) 52.222-36, Affirmative Action for Workers with Disabilities (June 1998) (29 U.S.C. 793).
(vii) Reserved.
(viii) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).
(ix) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).
Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(x) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.).
(xi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services-- Requirements (FEB 2009) (41 U.S.C. 351, et seq.).
(xii) 52.222-54, Employment Eligibility Verification (JAN 2009).
(xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (MAR 2009) (Pub. L. 110-247).
Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause)
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 60 days to exercise the option before the contract expires.
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 60 days in which the Contracting Officer may exercise the option); provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.
52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 1989)
In compliance with the Service Contract Act of 1965, as amended, and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
This Statement is for Information Only:
It is not a Wage Determination
Employee Class Monetary Wage -- Fringe Benefits
PLUMBER, MAINTENANCE $20.93
(End of Clause)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://www.arnet.gov/far http://farsite.hill.af.mil
(End of provision)
252.212-7001 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS APPLICABLE TO DEFENSE ACQUISITIONS OF COMMERCIAL ITEMS (JUL 2009)
(DEVIATION)
(a) In addition to the clauses listed in paragraph (b) of the Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items clause of this contract (FAR 52.212-5) (Apr 2009) (DEVIATION), the Contractor shall include the terms of the following clause, if applicable, in subcontracts for commercial items or commercial components, awarded at any tier under this contract:
252.237-7019 Training for Contractor Personnel Interacting with Detainees (SEP 2006) (Section 1092 of Pub. L. 108-375).
252.247-7003 Pass-Through of Motor Carrier Fuel Surcharge Adjustment to the Cost Bearer (JUL 2009) (Section 884 of Public Law 110-417)
252.247-7023 Transportation of Supplies by Sea (MAY 2002) (10 U.S.C. 2631) 252.247-7024 Notification of Transportation of Supplies by Sea (MAR 2000) (10
U.S.C. 2631)
SCOPE OF WORK
SCOPE OF WORK
MAINTENANCE OF WATER DISTRIBUTION
AND
SEWAGE COLLECTION SYSTEM
1. Purpose. The purpose of this specification is to provide a completely operational water distribution and sewage collection system for the Dry Brooks Day Use and Dry Brooks Boat Ramp Areas.
2. Government Furnished Items. The Government will furnish all replacement parts necessary to keep the system operating. If a breakdown occurs, the contractor will check immediately with the Natural Resources Manager as to item(s) required. The contractor shall be responsible for advising the Natural Resources Manager of the adequacy of the inventories of the Government furnished items. The contractor shall maintain a detailed record of all parts used during the season that shall be furnished to the Natural Resources Manager at the completion of the contract. The inventory will be maintained at a site designated by the Natural Resources Manager.
http://www.arnet.gov/far http://farsite.hill.af.mil/
3. Scope. The contractor shall furnish all labor, tools, equipment, and vehicles required to operate and maintain the water distribution system, force main and gravity sanitary sewage systems, grinder pump stations, and lift station with 10,000-gallon storage tank. Performance of any tests required by State and Federal agencies shall be the responsibility of the contractor. If any tests are required, the contractor is responsible for proper testing procedures, whether performed off or on site. The Government does not provide equipment for any testing which may be required. The system to be maintained is shown on Drawing No. 53401, attached.
Comfort Stations B, D, and E, utilize a water borne gravity system direct to the 10,000 gallon holding tank at the lift station in the Day Use Area. The Concession and Bathhouse complex utilizes pumps and force main to a gravity point above Parking Area "F" in the Day Use Area. Dry Brooks Boat Ramp comfort station utilizes pumps and force main to an intercept point with the sewage main, from the Day Use Area, about 850 feet east of the comfort station.
3.1 Activation
3.1.a. The contractor shall activate all water supply lines secured for the winter season, and flush all lines until a chlorine residual is present at the end of the line.
3.1.b. Initial inspection of all water closets, hot water heaters, Concession grease trap, water fountains, faucets at pavilions, urinals, shower apparatus, lavatories and service sinks in the five (5) comfort stations, bathhouse and concession buildings, first aid room, pump stations located at the Dry Brooks Day Use and Boat Ramp Areas, and lift station in the Day Use Area will be made to ascertain readiness for operation. All fixtures and valves shall be assembled, adjusted and made ready for operation. In the event any repairs are needed, the contractor shall notify the Park Manager. Inspect the Lift Station to ascertain readiness for use. Check the level of the 10,000-gallon storage tank.
3.2 After Winterization Start Up of System
3.2.a. After the Government activates the water supply, flush all water lines and check for chlorine residual at Comfort Station E, which is the most distant point.
3.2.b. Start Up of Lift Station
3.2.b.(1) Replace drain plugs in Moyno Pumps and reassemble check valves. Prime both Moyno pumps and start. Check belts and valve settings.
3.2.b. (2) Check electrical control for proper operation.
3.2.b. (3) Inspect 10,000-gallon storage tank and float controls to ensure proper operation..
3.2.c. Dry Brooks Boat Ramp and Bathhouse /Concession Pump Pits.
3.2.c. (1) Close gate valve (center) on discharge line.
3.2.c. (2) Restore electrical power to pump station.
3.2.c. (3) Perform operational check as follows:
Tip lowest float (stop float), all pumps should remain off.
Tip second float (and stop float), one pump comes on.
Tip third float (and stop float), both pumps on.
Tip fourth float (and stop float), high level alarm on.
3.2.c. (4) When influent is at sufficient levels for pump operation inspect slide couplings for leakage, adjust as needed.
3.2.d. Comfort Stations - Dry Brooks Day Use Area, First Aid Room, Bathhouse/Concession Stand, and Dry Brooks Boat Ramp.
3.2.d. (1) Install valve stems on shut-off valves to all water closets, urinals, sinks and hose bibs.
3.2.d. (2) Replace water fountain valve parts.
3.2.d. (3) Replace plug on hot water faucet inlet. (Concession and First Aid Room areas).
3.2.d. (4) Turn off drain faucets and sink and hose faucets in the water closets in comfort stations.
3.2.d. (5) Make sure petcock valves are closed on lines supplying toilet valves in the bathhouse pipe chase.
3.2.d. (6) Turn on water to comfort stations at two-inch corporation cocks located in the manholes at the edge of comfort stations. Turn on water supply to pavilions. Make sure faucets are shut off at pavilions.
3.2.d. (7) Check for water leaks and repair same. For leaks on wall mountings for toilet and urinal fixtures, asses whether new gaskets are required before over-tightening the fixtures.
3.2.d. (8) Close water heater drains in Concession Building and Storage Room.
3.2.d. (9) Close drain valve on outside water fountain at the Shower Area of the Bathhouse.
3.2.d. (10) Flush all water closets and urinals to remove antifreeze. Run water sufficiently until chlorine residual is present.
3.3 Operations. Operate and maintain the water distribution, sewage collection, and drinking fountain system commencing on 1 May terminating on 30 September. It is recommended that the contractor have personnel at the site seven (7) to ten (10) days prior to the starting date to prepare all equipment and reassemble valves for operation. During the length of the contract period all valves, pumps, ejector pumps, pipes, fittings, grinder pumps, compressors, motors, and drinking fountains shall be maintained in operating condition.
3.4 Deactivation. Procedures for winterization of comfort stations. Fifteen (15) days after operation of the system has ceased, the contractor will deactivate the sanitary sewage collection system, water fountains, and water distribution system. Winterization procedures for all fixtures, pumps, motors and other equipment are contained in the Operation and Maintenance Manual. The following procedures shall be used in the order given to close down the comfort stations and perform overall winterization:
3.4.a. Comfort Stations at Areas B, D, and E.
3.4.a. (1) Close the valves located in the meter box manhole outside the comfort stations.
3.4.a. (2) Drain the water fountains by:
Removing the valve stem from the shut off valve on each fountain.
Disconnecting all water lines and draining. Using pressurized air, blow the remaining water out of the supply valves and lines.
Disassemble the trap, or add antifreeze.
3.4.a. (3) Open all water drain valves in the pipe chase between the men's and women's side.
3.4.a. (4) Open the faucet in the sink in the pipe chase.
3.4.a. (5) Open the faucets located on the wall between the pipe chase door and the exterior wall in both men's and women's bathrooms.
3.4.a. (6) Drain the sinks in the men's and women's sides by removing the valve stem from the shut off valve. Open the faucet for a few seconds to drain all water.
3.4.a. (7) Activate the flush valves on the urinals and toilets to drain the lines from the valves to the fixture. Vacuum (with wet/dry vacuum) the remaining water from the trap. Add antifreeze to each urinal and toilet trap as a precaution to prevent freezing. Urinals may be winterized by opening drain valves at the bottom of the urinal traps. In the pipe chase, close the valve supplying the toilet/urinal, remove the regulator, and then open the supply valve again.
Place parts in bags and label the bags with locations of where all parts go. Blow pressurized air through all the lines.
3.4.a. (8) Add antifreeze to the floor drains.
3.4.a. (9) Add antifreeze to the pipe chase slop sink drain.
3.4.b. Picnic Pavilion Procedure. Make sure corporation cock valve in the main pit outside of Comfort Station D (Lakeview Pavilion) and Comfort Station B (Hillside Pavilion) is in open position. Open the hydrant valve at the pavilions to allow water in the line to drain back into the water pits.
3.4.c. Concession Area and First Aid Station.
3.4.c. (1) Close two-inch valve in meter box manhole located in the concession enclosure
(at back door).
3.4.c. (2) Open all water drain valves in pipe chase between concession and first aid station.
3.4.c. (3) In the concession kitchen:
Open sink valves in room with hot water heater and drain hot water.
Disconnect toilet water supply shut off valve stem in bathroom and flush to remove all water. Remove water and add antifreeze as a precaution. Also, remove sink water supply shut off valves and drain fixture and lines. In the pipe chase, close the supply valve to toilet fixtures (concession and first aid room), remove the regulator, and then open the valve.
Place parts in a bag and label location of the parts. Blow pressurized air through all lines.
Open sink faucets in the kitchen and drain.
Open four (4) hose bibs located on wall, left of serving windows, and drain.
Open drain plug in grease trap at end of wash sinks, drain out, use a siphon pump to drain any excess water. Remove grease trap lid, clean out accumulated grease.
Put antifreeze in the floor drains.
Add antifreeze to the slop sink drain in the hot water heater room.
3.4.c. (4) In the First Aid Room.
Drain the hot water heater located in the storage room next to the first aid station.
Remove shut off valves from sink in first aid room and drain lines and sink fixture.
Remove toilet water supply shut off valve stem in bathroom and flush. Remove water from trap and add antifreeze as a precaution. Also, remove shut off valve from sink in bathroom and drain sink fixtures.
Open valves for the shower (shower room).
Add antifreeze to the shower trap.
In the front office room open the two faucets.
3.4.c. (5) Open outside faucet in front of the building between the first aid office room and concession stand.
3.4.c. (6) Place all parts in bags and label the locations of the parts.
3.4.d. Comfort Station at Bathhouse. The winterization of the bathhouse comfort station requires the same procedures as used at comfort stations B, D, and E in addition to the following:
3.4.d. (1) Remove valve stem from the water shut off valve on the water supply to each toilet. Drain each valve and water line by operating each toilet through a flush cycle. In the pipe chase, close the supply valve to the toilets and urinals, remove the regulator and open the supply valve. Also, open the petcocks to drain the supply lines to the toilet and urinal fixtures.
3.4.d. (2) Operate the shower valves through at least two (2) cycles (with the water off) to drain all fixtures.
3.4.d. (3) Open the valve on the water fountain at the shower area and allow the water line to back drain to the shower manhole. Using pressurized air, blow out remaining water in supply valves and lines.
3.4.d. (4) Remove flush valves from the urinals and drain.
3.4.d. (5) Add antifreeze to the floor drains, women's and men's side.
3.4.d. (6) Add antifreeze to the slop sink drain located in the pipe chase.
3.4.e. Bathhouse/Concession Pump Pit.
3.4.e. (1) Pump down station wet wells operating grinder pumps in the "hand" position.
3.4.e. (2) Open gate valve (center) on discharge line.
3.4.e. (3) Disconnect electrical power to pump station.
3.4.e. (4) Lift pumps (to facilitate inspection) utilizing guide rail and hang by existing chain.
3.4.e. (5) Wash down interior of wet well using potable water.
3.4.e. (6) Use a vacuum truck to remove wash down water and remaining solids.
3.4.e. (7) Check grinder pumps for build up of solids or ground up material and clean.
3.4.e. (8) Check motor housing oil levels.
3.4.e. (9) Inspect cord sets for tears or cuts in rubber jackets and repair defects.
3.4.e. (10) Exercise pump discharge gate valves and discharge line gate valve to closed position.
3.4.e. (11) Open pump discharge and discharge line gate valves.
3.4.f. Lift Station Winterization. Proceed after all flow to the station is off.
3.4.f. (1) Put sewage force main pumps on "hand mode" and pump down the 10,000-gallon storage tank. Be sure to turn pumps off when the tank is dry. DO NOT RUN THE FORCE MAIN PUMPS DRY. Put pumps in "off" position when pumping is complete. Finish pump down of 10,000-gallon storage tank with a portable pump.
3.4.f. (2) Close discharge plug valves on force main and remove caps on brass check valves. Open plug valves and drain force main.
3.4.f. (3) Remove drain plugs on force main pumps and drain.
3.4.f. (4) Cut off electrical power to all equipment at the main breaker.
3.4.f. (5) Sweep out interior floor space.
3.4.f. (6) Open interior hose bib after water supply has been shut down, and allow water line to drain back.
3.4.f. (7) Use a vacuum truck to remove any remaining water standing in the force main that has drained to the 10,000-gallon storage tank.
3.4.g Winterization of Dry Brooks Boat Ramp Comfort Station.
3.4.g. (1) Shut off two-inch water supply valve located in manhole at rear of comfort station. (Note: It is recommended that portions of 3.4.h. be accomplished before water supply is shut down)
3.4.g. (2) Open and drain all water line drain valves located in pipe chase between the men's and women's sides.
3.4.g. (3) Open faucet in sink in pipe chase and two (2) faucets behind pipe chase doors in men's and women's sides.
3.4.g. (4) Remove cap from hot water faucet on sinks and shut off valve stem on sink cold water. Open sink faucets and drain fixture.
3.4.g. (5) Remove water shut off valve stem on all toilets and drain lines by operating toilet through a flush cycle. Remove water in trap and add antifreeze as a precaution.
3.4.g. (6) Drain water fountain fixture by removing the valve stems from both shut off valves and disconnecting all water lines and draining. Using pressurized air; blow all remaining water out of supply valves and lines.
3.4.g. (7) Remove flush valves from the urinal and drain. In the pipe chase, on the waterline to the toilets and urinals, close the valve, remove the regulator, and then open the valve. All parts should be placed in a bag and labeled with their location.
3.4.g. (8) Add antifreeze to the trap of the slop sink located in the pipe chase.
3.4.g. (9) Add antifreeze to the floor drain traps.
3.4.h. Dry Brooks Ramp Pump Pit Deactivation.
3.4.h (1) Pump down pump station wet wells using grinder pumps in the "hand" position.
3.4.h. (2) Open gate valve (center) on discharge line.
3.4.h. (3) Disconnect electrical power to pump station.
3.4.h. (4) Lift pumps (to facilitate inspection) utilizing guide rail and hang by existing chain.
3.4.h. (5) Wash down interior of wet well using potable water.
3.4.h. (6) Use a vacuum truck to remove wash down water and remaining solids.
3.4.h. (7) Check grinder pumps for build up of solids or ground up material and clean.
3.4.h. (8) Check motor housing oil levels.
3.4.h. (9) Inspect cord sets for tears or cuts in rubber jackets and repair defects.
3.4.h. (10) Exercise pump discharge gate valves and discharge line gate valve to closed position.
3.4.h. (11) Open pump discharge and discharge line gate valves.
3.4.h. (12) Shut off all electrical power except that to the building security lights and ramp light.
3.4.i. Inspection and Reports. Deactivation shall include an inspection of the comfort stations, bathhouse and concession/first aid building, lift station, grinder pump stations, and Dry Brooks Boat Ramp comfort station with the Natural Resources Manager. Provide a written report of all deficiencies and repairs of the system and dates on which they occurred, to include a list of parts needed for the next operating season.
4. Special Requirements.
4.1 Work Schedule. The contractor shall meet with the Natural Resources Manager ten
(10) days before commencement of system activation to provide a work schedule to meet requirements of the contract, and a safety plan containing methods for dealing with bloodborne pathogens and contagious disease.
4.2 Inspections and Reports. The Natural Resources Manager is the Contracting Officer's site representative. The contractor shall maintain a daily summary of activities and present it to the Natural Resources Manager upon request, or at the end of the operating week.
Legible handwritten reports will suffice; any other reports required shall be attached to the daily report. Malfunctions to the system will be reported immediately to the Natural Resources Manager, or his representative.
4.3 Contractor Responsibilities/Scope of Service. From 1 May through 30 September, the contractor shall have personnel on-site 7:00 - 9:00 p.m. Monday through Friday; and 12:00 - 9:00 p.m. Saturday, Sunday, and Holidays. There is a one-hour break between 6:00 - 7:00 p.m.
Additionally, the site representative will report to the Bathhouse at 2:00 - 2:30 p.m. on Saturday, Sunday, and Holidays, when the Janitorial Contractor reports, to verify that toilets are working properly for the afternoon cleaning. Problems detected during the evening inspection shall be repaired at that time, or no later than 10:00 a.m. Monday through Friday, or 9:00 a.m. on Saturday, Sunday, and Holidays.
Routine inspections shall include, but are not limited to, checks of the pump pits, lift station, water line leak repair, toilet and urinal flush valve operation, water fountain maintenance, Bathhouse shower operation, removal of clogs in sewage lines, toilets and urinals, and maintenance of sinks/faucets. Any requirement for repairs beyond the above scheduled service times will be on a time and material basis. The contractor shall be available for emergency calls via a pager or cell phone, with response time within one (1) hour of notification.
4.4. Drawings and Manuals.
4.4.1. Manuals. Maintenance manuals on system components are kept at the Administration Building and are available to the contractor for use. These manuals shall be maintained in good condition and returned to the Natural Resources Manager upon completion.
4.4.2. Drawings. Drawings on the system to be operated and maintained are attached.
Additional drawings are kept at the Administration Building and are available to the contractor for use.
4.5 Final Inspection. The contractor shall meet with the Natural Resources Manager as soon after 30 September as is practicable, but no later than 30 October, upon completion of the winterization process to arrange for final inspection of the system.
PAYMENT INFORMATION
The contractor will be paid after presentation of his invoices to the Natural Resources Manager.
For purpose of payment the lump sum contract price will be divided into four payments of 35 percent after 30 May; 15 percent after 31 July, 15 percent after 31 August and 35 percent after 30 September.
WAGE RATES
WD 05-2447 (Rev.-9) was first posted on www.wdol.gov on 01/12/2010
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2005-2447 Shirley F. Ebbesen Division of | Revision No.: 9 Director Wage Determinations| Date Of Revision: 01/07/2010 State: Pennsylvania
Area: Pennsylvania Counties of Berks, Cumberland, Dauphin, Juniata, Lancaster, Lebanon, Mifflin, Montour, Northumberland, Perry, Snyder, Union **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 14.81 01012 - Accounting Clerk II 16.64 01013 - Accounting Clerk III 18.60 01020 - Administrative Assistant 21.90 01040 - Court Reporter 20.46 01051 - Data Entry Operator I 11.57 01052 - Data Entry Operator II 13.16 01060 - Dispatcher, Motor Vehicle 17.56
01070 - Document Preparation Clerk 13.34 01090 - Duplicating Machine Operator 13.34 01111 - General Clerk I 11.55 01112 - General Clerk II 12.62 01113 - General Clerk III 14.16 01120 - Housing Referral Assistant 19.71 01141 - Messenger Courier 10.87 01191 - Order Clerk I 12.19 01192 - Order Clerk II 14.87 01261 - Personnel Assistant (Employment) I 15.01 01262 - Personnel Assistant (Employment) II 17.35 01263 - Personnel Assistant (Employment) III 19.36 01270 - Production Control Clerk 18.11 01280 - Receptionist 12.17 01290 - Rental Clerk 11.76 01300 - Scheduler, Maintenance 15.61 01311 - Secretary I 15.61 01312 - Secretary II 17.68 01313 - Secretary III 19.71 01320 - Service Order Dispatcher 16.34 01410 - Supply Technician 21.90 01420 - Survey Worker 13.98 01531 - Travel Clerk I 11.46 01532 - Travel Clerk II 12.29 01533 - Travel Clerk III 13.17 01611 - Word Processor I 14.25 01612 - Word Processor II 15.84 01613 - Word Processor III 17.68 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 18.68 05010 - Automotive Electrician 18.12 05040 - Automotive Glass Installer 17.37 05070 - Automotive Worker 17.37 05110 - Mobile Equipment Servicer 15.88 05130 - Motor Equipment Metal Mechanic 18.68 05160 - Motor Equipment Metal Worker 17.37 05190 - Motor Vehicle Mechanic 18.68 05220 - Motor Vehicle Mechanic Helper 15.12 05250 - Motor Vehicle Upholstery Worker 16.62 05280 - Motor Vehicle Wrecker 17.37 05310 - Painter, Automotive 18.12 05340 - Radiator Repair Specialist 17.37 05370 - Tire Repairer 14.53 05400 - Transmission Repair Specialist 18.68 07000 - Food Preparation And Service Occupations 07010 - Baker 12.53 07041 - Cook I 10.87 07042 - Cook II 11.90 07070 - Dishwasher 8.54 07130 - Food Service Worker 9.19 07210 - Meat Cutter 15.48 07260 - Waiter/Waitress 8.06 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 17.16 09040 - Furniture Handler 13.15 09080 - Furniture Refinisher 17.16 09090 - Furniture Refinisher Helper 14.32 09110 - Furniture Repairer, Minor 15.74 09130 - Upholsterer 17.76 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 10.21 11060 - Elevator Operator 10.21 11090 - Gardener 14.73 11122 - Housekeeping Aide 11.22 11150 - Janitor 12.29 11210 - Laborer, Grounds Maintenance 12.18 11240 - Maid or Houseman 9.04 11260 - Pruner 11.32 11270 - Tractor Operator 13.89 11330 - Trail Maintenance Worker 12.18 11360 - Window Cleaner 12.61 12000 - Health Occupations 12010 - Ambulance Driver 13.21 12011 - Breath Alcohol Technician 16.44
12012 - Certified Occupational Therapist Assistant 20.56 12015 - Certified Physical Therapist Assistant 20.19 12020 - Dental Assistant 15.04 12025 - Dental Hygienist 25.84 12030 - EKG Technician 20.41 12035 - Electroneurodiagnostic Technologist 20.41 12040 - Emergency Medical Technician 13.21 12071 - Licensed Practical Nurse I 15.15 12072 - Licensed Practical Nurse II 16.94 12073 - Licensed Practical Nurse III 18.91 12100 - Medical Assistant 12.98 12130 - Medical Laboratory Technician 14.94 12160 - Medical Record Clerk 13.99 12190 - Medical Record Technician 14.00 12195 - Medical Transcriptionist 14.08 12210 - Nuclear Medicine Technologist 27.14 12221 - Nursing Assistant I 9.38 12222 - Nursing Assistant II 10.54 12223 - Nursing Assistant III 11.51 12224 - Nursing Assistant IV 13.78 12235 - Optical Dispenser 16.46 12236 - Optical Technician 14.97 12250 - Pharmacy Technician 12.29 12280 - Phlebotomist 13.78 12305 - Radiologic Technologist 24.57 12311 - Registered Nurse I 22.46 12312 - Registered Nurse II 27.48 12313 - Registered Nurse II, Specialist 27.48 12314 - Registered Nurse III 33.27 12315 - Registered Nurse III, Anesthetist 33.27 12316 - Registered Nurse IV 38.98 12317 - Scheduler (Drug and Alcohol Testing) 18.87 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 17.32 13012 - Exhibits Specialist II 21.46 13013 - Exhibits Specialist III 26.26 13041 - Illustrator I 17.32 13042 - Illustrator II 21.46 13043 - Illustrator III 26.26 13047 - Librarian 23.79 13050 - Library Aide/Clerk 10.50 13054 - Library Information Technology Systems 21.46 Administrator 13058 - Library Technician 13.77 13061 - Media Specialist I 15.49 13062 - Media Specialist II 17.32 13063 - Media Specialist III 19.32 13071 - Photographer I 17.17 13072 - Photographer II 19.67 13073 - Photographer III 21.87 13074 - Photographer IV 26.75 13075 - Photographer V 32.37 13110 - Video Teleconference Technician 17.53 14000 - Information Technology Occupations 14041 - Computer Operator I 15.89 14042 - Computer Operator II 17.77 14043 - Computer Operator III 19.81 14044 - Computer Operator IV 22.00 14045 - Computer Operator V 24.38 14071 - Computer Programmer I (see 1) 21.66 14072 - Computer Programmer II (see 1) 26.62 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 15.89 14160 - Personal Computer Support Technician 17.62 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 27.61 15020 - Aircrew Training Devices Instructor (Rated) 33.42 15030 - Air Crew Training Devices Instructor (Pilot) 39.56 15050 - Computer Based Training Specialist / Instructor 27.61 15060 - Educational Technologist 27.95
15070 - Flight Instructor (Pilot) 39.56 15080 - Graphic Artist 18.23 15090 - Technical Instructor 21.93 15095 - Technical Instructor/Course Developer 26.85 15110 - Test Proctor 17.72 15120 - Tutor 17.72 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 8.96 16030 - Counter Attendant 8.96 16040 - Dry Cleaner 11.51 16070 - Finisher, Flatwork, Machine 8.96 16090 - Presser, Hand 8.96 16110 - Presser, Machine, Drycleaning 8.96 16130 - Presser, Machine, Shirts 8.96 16160 - Presser, Machine, Wearing Apparel, Laundry 8.96 16190 - Sewing Machine Operator 12.25 16220 - Tailor 12.94 16250 - Washer, Machine 9.80 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 18.47 19040 - Tool And Die Maker 20.95 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 14.59 21030 - Material Coordinator 19.92 21040 - Material Expediter 19.92 21050 - Material Handling Laborer 15.44 21071 - Order Filler 11.42 21080 - Production Line Worker (Food Processing) 14.59 21110 - Shipping Packer 13.40 21130 - Shipping/Receiving Clerk 13.40 21140 - Store Worker I 12.55 21150 - Stock Clerk 15.71 21210 - Tools And Parts Attendant 14.59 21410 - Warehouse Specialist 14.59 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 23.48 23021 - Aircraft Mechanic I 21.53 23022 - Aircraft Mechanic II 23.48 23023 - Aircraft Mechanic III 23.73 23040 - Aircraft Mechanic Helper 17.43 23050 - Aircraft, Painter 20.51 23060 - Aircraft Servicer 19.16 23080 - Aircraft Worker 20.03 23110 - Appliance Mechanic 20.77 23120 - Bicycle Repairer 14.53 23125 - Cable Splicer 27.90 23130 - Carpenter, Maintenance 19.13 23140 - Carpet Layer 17.11 23160 - Electrician, Maintenance 22.89 23181 - Electronics Technician Maintenance I 20.48 23182 - Electronics Technician Maintenance II 22.01 23183 - Electronics Technician Maintenance III 26.64 23260 - Fabric Worker 17.95 23290 - Fire Alarm System Mechanic 19.93 23310 - Fire Extinguisher Repairer 16.94 23311 - Fuel Distribution System Mechanic 23.48 23312 - Fuel Distribution System Operator 19.02 23370 - General Maintenance Worker 16.76 23380 - Ground Support Equipment Mechanic 21.53 23381 - Ground Support Equipment Servicer 19.16 23382 - Ground Support Equipment Worker 20.03 23391 - Gunsmith I 16.94 23392 - Gunsmith II 18.95 23393 - Gunsmith III 20.94 23410 - Heating, Ventilation And Air-Conditioning 19.24 Mechanic 23411 - Heating, Ventilation And Air Contditioning 21.24 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 22.31 23440 - Heavy Equipment Operator 19.46 23460 - Instrument Mechanic 19.93 23465 - Laboratory/Shelter Mechanic 19.96 23470 - Laborer 14.89 23510 - Locksmith 18.32
23530 - Machinery Maintenance Mechanic 20.20 23550 - Machinist, Maintenance 20.59 23580 - Maintenance Trades Helper 14.32 23591 - Metrology Technician I 19.93 23592 - Metrology Technician II 20.86 23593 - Metrology Technician III 21.82 23640 - Millwright 22.58 23710 - Office Appliance Repairer 21.44 23760 - Painter, Maintenance 18.98 23790 - Pipefitter, Maintenance 22.50 23810 - Plumber, Maintenance 21.17 23820 - Pneudraulic Systems Mechanic 20.94 23850 - Rigger 20.94 23870 - Scale Mechanic 18.95 23890 - Sheet-Metal Worker, Maintenance 21.46 23910 - Small Engine Mechanic 16.45 23931 - Telecommunications Mechanic I 26.92 23932 - Telecommunications Mechanic II 27.98 23950 - Telephone Lineman 22.87 23960 - Welder, Combination, Maintenance 17.69 23965 - Well Driller 20.28 23970 - Woodcraft Worker 20.94 23980 - Woodworker 15.04 24000 - Personal Needs Occupations 24570 - Child Care Attendant 11.43 24580 - Child Care Center Clerk 16.23 24610 - Chore Aide 11.03 24620 - Family Readiness And Support Services 15.66 Coordinator 24630 - Homemaker 16.73 25000 - Plant And System Operations Occupations 25010 - Boiler Tender 20.94 25040 - Sewage Plant Operator 18.13 25070 - Stationary Engineer 20.94 25190 - Ventilation Equipment Tender 15.45 25210 - Water Treatment Plant Operator 18.13 27000 - Protective Service Occupations 27004 - Alarm Monitor 15.58 27007 - Baggage Inspector 11.38 27008 - Corrections Officer 22.18 27010 - Court Security Officer 22.18 27030 - Detection Dog Handler 16.29 27040 - Detention Officer 22.18 27070 - Firefighter 20.45 27101 - Guard I 11.38 27102 - Guard II 16.29 27131 - Police Officer I 26.75 27132 - Police Officer II 29.73 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 10.15 28042 - Carnival Equipment Repairer 11.17 28043 - Carnival Equpment Worker 8.66 28210 - Gate Attendant/Gate Tender 14.00 28310 - Lifeguard 11.03 28350 - Park Attendant (Aide) 14.24 28510 - Recreation Aide/Health Facility Attendant 11.10 28515 - Recreation Specialist 12.57 28630 - Sports Official 11.65 28690 - Swimming Pool Operator 18.30 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer 18.35 29020 - Hatch Tender 18.35 29030 - Line Handler 18.35 29041 - Stevedore I 17.49 29042 - Stevedore II 19.07 30000 - Technical Occupations 30010 - Air Traffic Control Specialist, Center (HFO) (see 2) 35.15 30011 - Air Traffic Control Specialist, Station (HFO) (see 2) 24.24 30012 - Air Traffic Control Specialist, Terminal (HFO) (see 2) 26.69 30021 - Archeological Technician I 16.75 30022 - Archeological Technician II 19.39 30023 - Archeological Technician III 22.84 30030 - Cartographic Technician 22.84 30040 - Civil Engineering Technician 22.90
30061 - Drafter/CAD Operator I 16.48 30062 - Drafter/CAD Operator II 18.82 30063 - Drafter/CAD Operator III 20.58 30064 - Drafter/CAD Operator IV 23.96 30081 - Engineering Technician I 14.87 30082 - Engineering Technician II 16.68 30083 - Engineering Technician III 18.66 30084 - Engineering Technician IV 23.17 30085 - Engineering Technician V 28.33 30086 - Engineering Technician VI 34.27 30090 - Environmental Technician 22.67 30210 - Laboratory Technician 21.22 30240 - Mathematical Technician 22.84 30361 - Paralegal/Legal Assistant I 17.56 30362 - Paralegal/Legal Assistant II 23.32 30363 - Paralegal/Legal Assistant III 28.53 30364 - Paralegal/Legal Assistant IV 34.52 30390 - Photo-Optics Technician 22.90 30461 - Technical Writer I 17.74 30462 - Technical Writer II 21.68 30463 - Technical Writer III 26.25 30491 - Unexploded Ordnance (UXO) Technician I 22.34 30492 - Unexploded Ordnance (UXO) Technician II 27.03 30493 - Unexploded Ordnance (UXO) Technician III 32.40 30494 - Unexploded (UXO) Safety Escort 22.34 30495 - Unexploded (UXO) Sweep Personnel 22.34 30620 - Weather Observer, Combined Upper Air Or (see 2) 20.15 Surface Programs 30621 - Weather Observer, Senior (see 2) 22.40 31000 - Transportation/Mobile Equipment Operation Occupations 31020 - Bus Aide 11.27 31030 - Bus Driver 14.49 31043 - Driver Courier 13.24 31260 - Parking and Lot Attendant 9.56 31290 - Shuttle Bus Driver 14.08 31310 - Taxi Driver 9.00 31361 - Truckdriver, Light 14.08 31362 - Truckdriver, Medium 18.05 31363 - Truckdriver, Heavy 18.55 31364 - Truckdriver, Tractor-Trailer 18.55 99000 - Miscellaneous Occupations 99030 - Cashier 8.36 99050 - Desk Clerk 9.81 99095 - Embalmer 25.36 99251 - Laboratory Animal Caretaker I 9.46 99252 - Laboratory Animal Caretaker II 10.04 99310 - Mortician 27.87 99410 - Pest Controller 14.44 99510 - Photofinishing Worker 9.57 99710 - Recycling Laborer 13.41 99711 - Recycling Specialist 15.28 99730 - Refuse Collector 12.45 99810 - Sales Clerk 11.34 99820 - School Crossing Guard 10.31 99830 - Survey Party Chief 19.81 99831 - Surveying Aide 13.57 99832 - Surveying Technician 17.47 99840 - Vending Machine Attendant 13.35 99841 - Vending Machine Repairer 15.35 99842 - Vending Machine Repairer Helper 13.35
ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:
HEALTH & WELFARE: $3.35 per hour or $134.00 per week or $580.66 per month
VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor; and 3 weeks after 8 years. Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same
Federal facility. (Reg. 29 CFR 4.173)
HOLIDAYS: A minimum of ten paid holidays per year, New Year's Day, Martin Luther King Jr's Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans' Day, Thanksgiving Day, and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4174)
THE OCCUPATIONS WHICH HAVE NUMBERED FOOTNOTES IN PARENTHESES RECEIVE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .