W912BU-10-R-0010.pdf

PDF 2 MB Posted

Attached to
RECOVERY--19--INLAND RIVER TOWBOAT to replace the CESAM - M/V CAMPBELL
Solicitation number
W912BU-10-R-0010
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Reference Drawings.zip ZIP file
Contract Drawings.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services and Prices

PRICE SCHEDULE

Final Design, Construct, Test and Deliver one inland river towboat for the Corps of Engineers, Mobile District, for use in the support of the navigation, hydropower and natural resource missions on the Apalachicola-Chattahoochee- Flint (ACF) River System.

ITEM

NUMBER ITEM QTY. UNIT

UNIT

PRICE

TOTAL

PRICE

0001 INLAND RIVER TOWBOAT 1 Vessel

0001AA ENGINEERING AND SCHEDULING (The submittals required for “Engineering and Scheduling are listed in contract Clause H02.). This item is initiated only by a Notice To Proceed issued by the Contracting Officer.

1 JOB XXXX $ _________

0001AB CONSTRUCT, TEST, AND DELIVER the vessel (The submittals for “Construct, Test and Deliver” are listed in contract Clause H02.). This item is initiated only by a Notice To Proceed issued by the Contracting Officer. The Contractor may not start this item until he receives a Notice To Proceed for this item.

1 JOB XXXX $_________

TOTAL ITEM 0001 1 VESSEL $_________

W912BU-10-R-0010

INSERT LOCATION OF THE SHIPYARD WHERE THE WORK WILL BE PERFORMED:

The Government may reject an offer as non-responsive if it is materially and mathematically unbalanced as to price for any offered item or combination of offered items. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.

Refer to contract Section M for EVALUATION FACTORS FOR AWARD criteria.

Section C - Descriptions and Specifications

SCOPE OF WORK

C000 GENERAL

C001 GENERAL STATEMENT

The Marine Design Center (MDC) of the U.S. Army Corps of Engineers (USACE) has issued this Request for Proposal, to acquire a self-propelled inland river towboat intended to serve the U.S. Army Corps of Engineers, Mobile District (CESAM) in support of its missions.

The towboat shall be a twin-screw, open propeller diesel powered vessel with an all-welded steel hull and deckhouse superstructure.

The configuration of the hull, deck arrangements and the superstructure shall be as shown on the Contract Drawings.

The Contractor assumes complete responsibility for building the towboat according to this specification and the documents that are called for in this procurement, to meet the requirements of this contract. Should the Contractor determine at any time that he is unable to fulfill his contract responsibilities, he shall notify the COR immediately of the problem experienced and his proposed manner of correction.

C002 MISSION STATEMENT

The new towboat, designated the CESAM M/V CAMPBELL REPLACEMENT, will be a new vessel that will provide operational and maintenance support of the Mobile District’s navigation, hydropower and natural resource missions on the Apalachicola-Chattahoochee-Flint (ACF) River System. The vessel will be used for general towing and pushing Derrick Barge No.1.

The mission area is the Apalachicola-Chattahoochee-Flint (ACF) River System within the Mobile District’s area of responsibility. The vessel will be assigned to the Apalachicola-Chattahoochee-Flint (ACF) Project Management Office, Ft. Gaines, GA.

The vessel shall be suitable for year-round operation, day and night, in both shallow and drift-strewn rivers of the Apalachicola-Chattahoochee-Flint (ACF) River System. The towboat shall be designed to withstand the ambient temperature range as stated by ASHRE for Columbus, GA and Albany, GA (see Clause C685).

The towboat will pass under bridges. The highest fixed point on the vessel shall not exceed 35’-0” above the main deck.

C003 DESIGN STANDARDS

The towboat shall be designed and constructed in accordance with the latest edition and interpretations of the rules, regulations, and requirements and standards of the Legislation, Regulatory Agencies and technical organizations listed as follows or as stipulated in respective specification clauses:

American Bureau of Shipping (ABS) “Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways”.

American Bureau of Shipping (ABS) “Rules for Building and Classing Steel Vessels”:

o Part 2 – Rules for Materials and Welding.

American Bureau of Shipping (ABS) “Guide for Shipbuilding and Repair Quality Standard for Hull Structures During Construction”.

American Welding Society (AWS) “Guide for Steel Hull Welding”, AWS D3.5.

33 CFR, Subchapter E - USCG, Inland Navigation Rules.

40 CFR, Subchapter C, Part 89 – Protection of Environment: Control of Emissions from New and

In-Use Nonroad Compression Ignition Engines 40 CFR, Subchapter C, Part 94 – Protection of Environment: Control of Emissions from Marine

Compression Ignition Engines

46 CFR, Subchapter C – Uninspected Vessels (not for electrical). USCG inspection and certification is not required.

46 CFR, Subchapter C, Part 28, Subpart E – Stability 46 CFR, Subchapter G, Part 69 – Measurement of Vessels 46 CFR, Subchapter S, Part 170, Subpart E – Weather Criterion

46 CFR, Subchapter J - Electrical Engineering.

U.S. Coast Guard, Navigation Rules and Regulations, International and Inland, COMDTINST

M16672.2D

U.S. Maritime Administration Schedule for Pipes, Joints, Valves and Fittings.

U.S. Army Corps of Engineers, Publication No. EM 385-1-1, “Safety and Health Requirements

Manual.” This publication can be downloaded from http://www.usace.army.mil/CESO/Pages/EM385-1-1,2008NEW!.aspx Please note that the time of this solicitation, the latest revision of the manual is 15 September 2008.

The National Shipbuilding Research Program (NSRP 0490), January 1998, “Industrial Standards for Hull Structural Penetration Design Criteria and Details.”

Institute of Electrical and Electronic Engineers Standards, Publication No. IEEE Standard 45-

2002, “Recommended Practice for Electrical Installation on Shipboard.”

Illuminating Engineering Society, “Recommended Practice for Marine Lighting”.

National Electric Code (NEC).

U.S. Public Health Service (USPHS), Publication No. 393 “Handbook on Sanitation of Vessel

Construction”.

Environmental Criteria (Temperature): the vessel shall be designed in accordance with ASHRAE temperature standards, which prescribe an ambient temperature range of 21 to 97 degrees F for Columbus and Albany, Georgia.

Environmental Criteria (River Current): The typical river currents in the area of operation are 1.5-mph, with extremes up to 3.2-mph.

C004 CLASSIFICATION AND CERTIFICATION

The Contractor shall be responsible for obtaining necessary regulatory body reviews and approvals, obtaining necessary inspections and surveys during construction and for the certification and classing of the vessel as follows:

ABS classification for “Maltese Cross ✠A-1 Towing Vessel, River Service with Maltese Cross

✠ AMS”.

Certificate of Measurement issued by the measuring organization, per 46 CFR, Part 69.

The recommended ABS point of contact is Mr. Rich Delpizzo, who can be reached by phone, email or mail, at: (703) 519-9233, RDelpizzo@eagle.org, or 1321 Prince Street, Suite 200, Alexandria, VA 22314.

For the ABS certificate of classification, the owner shall be listed as “U.S. Army Corps of Engineers, Mobile District”. The owner’s address for record shall be listed as:

US Army Corps of Engineers Appalachicola Chattahoochee Flint (ACF) Project Management Office 427 Eufaula Road Fort Gaines, GA 39851

(229) 768-2516

This procurement is based on a towboat currently being built for the U.S. Army Corps of Engineers, Kansas City District. The M/V STEPHENSON REPLACEMENT, Marine Design Center hull number 737, project number 2729, is currently under construction at Patti Marine Enterprises (PME) in Pensacola, FL.

The Contractor should reference the builder’s (PME) hull number (737) and ABS ID #YY210324 when contacting ABS for review and certification of this vessel.

If the Contractor intends to launch, test, operate or tow the vessel “out of class”, the Contractor must specifically advise ABS of such intent and incorporate any and all modifications required by that agency for such operation at no additional cost to the Government and at no additional contract time. Any such modifications which, in the opinion of the COR, affects the arrangements, operability, or suitability of the vessel shall be removed from the vessel by the Contractor at no additional cost or time and the vessel returned to new condition prior to Final Acceptance.

The Contractor shall be responsible for all costs associated with applications, plan submittals, and inspections required to obtain such certification\documentation. When steel construction commences, the Contractor shall coordinate with ABS to ensure the frequency of onsite inspections are not less than once every two weeks. Copies of all plans, submittals and correspondences to and from ABS shall be provided to the Government.

The Contractor shall ensure that, as a part of its contract with ABS the Contractor authorizes ABS to disclose to and discuss with the Army Corps of Engineers any Rule or certification criteria issues, design assumptions and their impact on classification and certification, and any other technical considerations on which classification is to be based or which may affect future classification or certification of the vessel. The Contractor shall authorize ABS to provide the Army Corps of Engineers at its request with a copy of all correspondence related to classification, statutory certification or other compliance verification for which ABS is responsible as it is promulgated and initially distributed. This is to include drawings and other engineering work requiring ABS approval as well as correspondence generated which relates to such approvals, including all such correspondence dealing with vendors. In addition, the Contractor shall copy the Army Corps of Engineers with correspondence regarding classification, statutory certification and other compliance verification for which ABS is responsible. The Contractor shall also authorize ABS to establish and maintain contact with other certification, verification and compliance agents involved on the vessel being built.

C006 VESSEL IDENTIFICATION AND PRINCIPAL CHARACTERISTICS

A. VESSEL IDENTIFICATION

The vessel to be acquired through this solicitation has been assigned the following name and Marine Design Center hull and project numbers:

MDC Hull Number MDC Project Number Vessel Name ..................................................To be determined

The vessel name has not been selected at this time. For the purpose of initial documents and drawing preparation, the title used shall be:

“CESAM M/V CAMPBELL REPLACEMENT”

Upon selection of the official name for the vessel by the Government, the Contractor shall incorporate the name into all “As-Built” documents and the construction drawing of the nameboard and hull markings. The MDC hull number shall be used in lieu of an “Official Number”.

B. PRINCIPAL CHARACTERISTICS

This specification is intended to describe the Contract Design for one inland river towboat. The principal dimensions of the vessel are:

Length (Molded) ............................................................. 58’-0” Beam (Molded) ............................................................. 22’-0” Molded Depth ................................................................. 7’-0”

C010 DEFINITIONS

The following definitions are applicable to phrases and acronyms used throughout this contract:

ABS - American Bureau of Shipping.

KO - Contracting Officer - A person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings.

COR - Contracting Officer’s Representative - A member of the contract management and quality assurance team authorized by the Contracting Officer to perform certain administrative and managerial duties.

MDC - Marine Design Center.

QC - Quality Control. Quality Control is a function of the Contractor. Quality Assurance (QA) is a function of the Government.

SNAME – Society of Naval Architects and Marine Engineers.

USACE - United States Army Corps of Engineers.

USCG – United States Coast Guard.

C025 CONTRACTOR QUALITY STANDARDS

A. GENERAL

The Contractor shall be responsible for the construction of a complete and functioning vessel.

Inspection by the Marine Design Center is for the purpose of verifying the proper function of the Contractor’s quality control measures and is not to be used as a substitute for control of quality by the Contractor.

Every effort shall be made during production planning to construct the vessel in an efficient sequence minimizing re-work and repair. Care shall be taken to assure the latest revisions of the Final Design plans are being used.

B. STRUCTURAL MATERIALS

Unless otherwise specified or noted on the Contract Drawings, all structural hull material shall be in accordance with the following specifications:

American Bureau of Shipping (ABS), “Rules for Building and Classing Steel Vessels” and “Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways”.

Welding Materials - ABS “Approved Welding Electrodes, Wire-Flux and Wire Gas

Combination.”

Bolts, nuts and screws – ASTM A307-07b, “Standard Specifications for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength.”

C. STANDARD PARTS AND MATERIALS

All articles, fittings, equipment, machinery, supplies, and materials used in the construction and outfitting of the vessel shall be new, of the highest grade, free from defects and imperfections, and be the standard product of reputable manufacturers, to the maximum extent practicable. Any material not specified shall be the best of their kind for the purpose intended. All items shall be suitable for inland river workboat application and meet the latest requirements of standard specifications published by National Agencies. No salvaged materials shall be used in the works. Spare parts and service shall be readily obtainable.

D. WORKMANSHIP

All labor shall be especially skilled for each kind of work and under competent direction.

Where work of one trade joins, passes through, or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damage of previously acceptable construction shall be cause for rejection. All parts of the vessel intended to join or bear upon other parts shall have complete and solid contact and shall fit together without excessive cold work during erection. All faying surfaces shall be painted and be clean and smooth before bolting up. Shims or liners shall not be used for the purpose of overcoming a bad fit.

All frames and longitudinal members, where applicable, shall be provided with limber holes and/or snipes of adequate size to allow water in bilges to flow to the lowest point of each compartment. Limber holes shall also be provided to allow for the passage of air in tanks. Limber holes shall be located at the plate edge.

Ends of outstanding flanges shall be cropped. Lighting holes may be punched or flame-cut and all edges shall have burrs removed.

All holes for machinery mounting bolts shall be drilled or punched; burning is not acceptable. Holes in members having sharp curvature shall be avoided.

All hull casting shall be machined or ground to bear solidly against the connecting structure.

E. WELDERS

All welding under this contract shall be done only by welders who have successfully passed qualification tests accepted by the American Bureau of Shipping or other regulatory agency acceptable to ABS. The Contractor shall bear the expense of conducting these tests and shall certify, by name to the Contracting Officer, welders who have successfully passed the prescribed tests and hold current, valid certifications.

The Contractor shall require any welder to repeat these tests when in the opinion of the Contracting Officer’s Representative, the work of the welder indicates a reasonable doubt of his proficiency. In such cases the welder shall be re-certified as above if he successfully passed the retest; otherwise, he shall be disqualified until he has successfully passed the retest.

The Contractor shall maintain records of the individual welder’s certification during the course of the contract. The records are to be available for examination upon request of the Contracting Officer or his representative.

F. WELDING

All welding shall be in accordance with the current rules of the American Bureau of Shipping, except where stated otherwise. All welding equipment used on the work shall be of a modern type subject to close control.

The electrodes used throughout the work shall be suitable for use with the parent metal at each weld, and be approved by ABS.

Welding procedures, as to direction, length, numbers and sequence of beads, shall be carefully planned to minimize lock-up stresses. Care shall be exercised to produce smooth even beads, especially on all exposed plating and fittings. Beads shall be ground where directed by the Contracting Officer or his authorized representative.

The Contractor shall employ appropriate welding procedures and grounding connections to preclude the possibility of anodic erosion of the hull after launching.

A detailed description of all welding procedures being employed in the construction shall be available to the Contracting Officer or his authorized representative.

G. INSTALLATION

Materials and equipment shall be installed in accordance with the approved recommendations of the manufacturer, and in compliance of this specification and the contract documents. The installation shall be accomplished by workmen especially skilled for each kind of work and under competent direction.

H. PLATE FAIRNESS

Steel plating shall be installed using proper welding procedures and sequences to insure fair, undistorted plating panels. The use of filler materials to surface unfair areas is not acceptable.

Maximum allowable plating distortion is depicted in the “Guide For Shipbuilding And Repair Quality Standard For Hull Structure During Construction” from ABS. Distortion shall not exceed the amounts in this guide.

I. CONSTRUCTION STANDARDS

All material, machinery and equipment shall be new, of current manufacture and suitable for the marine service intended. Spare parts and service shall be readily obtainable.

All material, unless otherwise specified in this specification or in the drawings, shall be of commercial quality to ASTM, ANSI, or SAE specifications.

During construction and before delivery, the Contractor shall be responsible for protection of all material, equipment, etc., intended for the vessel.

The overweight tolerance of members shall be within the limits defined by the specifications of the American Society for Testing and Materials.

All materials shall be free of imperfections due to manufacturing processes and from defects which adversely affect appearance or serviceability.

All plating shall be neatly cut, fitted and welded. All sharp edges or projections which constitute a personnel hazard shall be removed or ground smooth. All notches shall have a radius to prevent stress concentrations.

Where aluminum must be attached to dissimilar metals or between dissimilar alloys of aluminum, fasteners shall be of stainless steel of an approved design with insulation as required to eliminate metal to metal contact.

All galvanizing shall be done after fabrication by the hot dip process, and the zinc shall be not less than 98% pure. In instances where some types of metals cannot be hot dip galvanized, zinc silicate coating may then be substituted.

C040 SCOPE OF WORK

A. CONTRACT INTENT

This specification, in conjunction with the Contract Drawings listed in Section J, Clause J01, “Contract & Reference Drawings”, of this contract contain the requirements for the construction of an inland river towboat, and describe the essential features, functions, and arrangements of the design. The intent is to procure an inland river towboat utilizing the Construction Phase drawings of the M/V STEPHENSON REPLACEMENT, a vessel currently under construction. It is intended that the Contractor shall be able to bid, and perform further design development as required from the Construction Phase drawings, the specifications, and the Reference Drawings.

During the Engineering and Scheduling Phase of the contract, the Contractor shall prepare a “Final” Design of the vessel.

During the Construction Phase of the contract, the Contractor shall construct the vessel, prepare “As-Built” drawings of the vessel, and test and delivery the vessel.

All design documentation identified in Sections C, E and H shall be provided by the Contractor during the appropriate contract phase (see Section H, Clause H02, “Contractor Submittals”). All documentation required to be submitted with the offered proposal is listed in Section L.

Due to the unpredictable nature of the steel price environment, the Contractor shall be authorized to purchase plate and structural steel on the day the Notice to Proceed for Phase I is issued. The structural drawings for the M/V STEPHENSON REPLACEMENT have been reviewed and approved by the American Bureau of Shipping (ABS). These drawings constitute the structural Contract Drawings. The Contractor shall be authorized to purchase the plate and structural steel detailed in the Contract Drawings listed in Clauses C301 and C315.

The Government is responsible for all engineering and design for the vessel describe within this specification and shown on the Contract Drawings. The Contractor shall not be responsible for design issues found in this specification or any discrepancies between this document and the Contract Drawings or between related Contract Drawings. Should the Contractor find any issues with the engineering and design of this vessel as it relates to this specification and the Contract Drawing package, the Contractor shall bring it to the attention of the COR for resolution. An appropriate contract modification will be developed to address the issue.

B. CONTRACTOR’S RESPONSIBILITY

The Contractor shall further develop the Contract Design of this contract into a Final Design, thus completing the design process for the vessel and then construct the vessel to those designs and achieve the classing and certification requirements of this contract. The Final Design shall be based on this specification and the Contract Drawings listed in Section J, Clause J01, “Contract & Reference Drawings”, of this contract. Once the final design is completed, it shall be submitted to the Government for approval and to ABS for classification. A list of the required engineering drawings/reports/calculations that the Contractor shall submit during Phase I of the contract is provided in Section H, Clause 13, “Engineering & Drawings.”

The Contractor shall be required to perform design and engineering such as development of piping and cable routings, miscellaneous details, secondary structure and foundation details, detailed arrangements, system schematics and arrangements; complete material lists, purchase specifications, shop drawings, construction details, Detailed Design Drawings (refer to SNAME definition), regulatory body submittals, “as-built” drawings, and other technical details necessary to support his administration, operation, and production practices. Refer to Section H, Clause H03, “Design Requirements”, for further clarification.

The Contractor assumes complete responsibility for building the towboat according to this specification and the documents that are called for in this procurement, to meet the requirements of this contract. Should the Contractor determine at any time that he is unable to fulfill his contract responsibilities, he shall notify the COR immediately of the problem experienced and his proposed manner of correction.

This project is funded from the American Recovery and Reinvestment Act (ARRA) of 2009. The Contractor shall comply with the reporting requirements that are outlined in Section I of this specification.

C. CONTRACT PHASES

After the contract is awarded, the services to be provided by the Contractor shall be structured and managed by the Marine Design Center, in the two phases as follows:

Phase I.......................................... Engineering and Scheduling Phase II ..........................................Construct, Test and Deliver

Please refer to Section H, Clause H02, “Contractor Submittals”, of this contract for an outline of the deliverables required in each phase of the contract.

During all phases of this contract, the Contractor is authorized to use the services of Subcontractors performing under his direction and supervision; however, the Contractor shall assume the full responsibility for the Subcontractors’ work.

D. DRAWINGS PROVIDED & REQUIRED

1. Contract & Reference Drawings

Contract Drawings and Reference Drawings that are part of the design package are listed in Section J, Clause J01, “Contract & Reference Drawings”. All Contract and Reference drawings will be available to the winner bidder in CADD format.

Contract Drawings are provided with the specifications for bid purposes as well as to develop the final design. The Contractor shall comply with all features of the Contract Drawings.

The Reference Drawings that are part of the design package are intended to provide general guidance to the Contractor. The exact details presented in the Reference Drawings may not reflect the specific needs of the vessel, but present the Contractor with a methodology to develop a specific system or design feature as identified in the specification. The Contractor shall not build from any Reference Drawing. It is the responsibility of the Contractor to use this written specification and the Contract Drawings to properly develop the engineering drawings and construct the vessel.

2. Drawings Required

The minimum drawings required to be completed during the Engineering and Scheduling Phase of the contract in order to complete the final design are listed in Section H, Clause H13, “Engineering & Drawings”. The requirements for developing the final design drawings are delineated in Section H, Clause H03, “Design Requirements”, with any specific requirements for structural, mechanical or electrical changes defined in their relevant contract clauses.

The requirements for “As-Built” drawings of the completed vessel are defined in Section H, Clause H14, “As-Built Drawings, Calculations & Reports.”

E. SUMMARY OF CHANGES TO EXISTING DESIGN/CONTRACT DRAWINGS

The following list is a brief consolidated summary of all of the changes to be made to the existing design/Contract Drawings during the engineering and scheduling phase of this contract. The changes have been separated into their appropriate elements using the Marine Design Center Work Breakdown Structure (WBS). The intent of this list is to provide a complete, central synopsis of all the changes.

For each change, a detailed description of the work to be performed has been provided in the appropriate WBS clause of this specification package.

WBS DESCRIPTIVE SUMMARY

C317 Please note that the mast/navigation light arrangement provided with the Reference

Drawings are for a vessel that operates solely on a “Western River.” Per 33 CFR, Part 89, Section 89.27(b), while transiting the Gulf Intracostal Waterway (GIWW), the vessel is required to display the standard inland lights for a vessel pushing ahead or towing alongside. This lighting arrangement is not shown on the Reference Drawings. The Contractor shall be responsible for designing and installing the navigation light masts in accordance with the U.S. Coast Guard Navigation Rules (COMDTINST M16672.2D) and 33 CFR, Subchapter E - USCG, Inland Navigation Rules.

C410 The Contract Drawings depict two rows of 8-inch split pipe rub rails. This vessel shall be outfitted with one row of 10”x12” split tire fendering on the sides and across the transom.

The double row of the split pipe rub rails are also depicted on the following Contract &

Reference Drawings:

737-C205-01 OUTBOARD PROFILE

737-C215-01 GENERAL ARRANGEMENTS

737-C245-01 MACHINERY ARRANGEMENT

737-C410-03 PIPE RAIL & RUBBER FENDERING

737-C415-01 DOORS, WINDOWS, HATCHES & MANHOLE

SCHEDULE

737-C679-01 FIRE CONTROL PLAN

737-C730-01 LIGHTING & RECEPTACLE PLAN

737-C730-02 NAVIGATION LIGHTING ARRANGMENT

C437 The Contract Drawings only depict a chart table and settee in the pilothouse. The

Contractor shall provide and install a microwave and mini-refrigerator in the pilothouse as well.

C612 Drain plugs for the rudders are not shown on the Contract Drawings, but are required for this vessel.

C635/C636 The Contract Drawings for these clauses depict one FLOCS type portable pump for both systems. The Contactor shall provide and install a total of two FLOCS type portable pumps, one for each system.

C678/C679 Carbon Monoxide (CO) detectors are not shown on Reference Drawing 737-C679-01, but are required in the deckhouse cabin/storage space and the pilothouse.

C100 SCIENTIFIC

C105 HULL GEOMETRY

A. CONTRACT DRAWING

737-C105-01 REV B LINES & OFFSETS - HULL

B. PRINCIPAL CHARACTERISTICS

The hull geometry is defined as shown on the above Contract Drawing. The vessel’s principal characteristics are as follows:

Length Overall (Molded) .............................................................................58’-0” Beam (Molded) ............................................................................................22’-0” Depth (Molded)..............................................................................................7’-0” Draft (Full Load – 1275 gal fuel)...................................................................4’-6” Total Propulsion Power @ Continuous Rating................................ 750-800 BHP Maximum Fuel Capacity....................................................................1275 gallons Deck Edge Radius (where present)................................................................0’-6”

C115 WEIGHT ESTIMATE

A. REFERENCE DRAWING

737-A115-01 REV - WEIGHT ESTIMATE SUMMARY

B. WEIGHT ESTIMATE

The vessel’s full load draft is designed to not exceed 4’-6”. To ensure the concept design on the M/V STEPHENSON REPLACEMENT was practical, the Government developed a detailed weight estimate based around the primary hull and superstructure plating and scantlings, and outfitting. The Government does not require the Contractor to develop a weight estimate or institute a weight monitoring procedure.

C. INCLINING AND DEADWEIGHT SURVEY

Upon completion of all work, with the vessel in the lightship condition, the Contractor shall conduct an inclining test and deadweight survey under the direction of the Government. The inclining test shall be carried out in accordance with ASTM F1321-92. The Contractor shall be responsible for providing all inclining weights, pendulum setups, support equipment and personnel. The Government will direct the inclining experiment, record all data and complete the inclining test report.

The Government will prepare all stability calculations and submittals per the inclining and deadweight survey results.

C125 HYDROSTATICS

The Government will prepare all hydrostatic calculations and submittals.

C130 TANK CAPACITIES

The vessel shall be supplied with tanks with the minimum capacities:

Fuel Oil ................................................................. 1275 gallons Lube Oil .................................................................. 150 gallons Waste Oil ................................................................ 150 gallons

The Government will prepare all tank capacity tables and submittals.

C145 TONNAGE MEASUREMENT

The Contractor shall develop the necessary drawings to obtain a Certificate of Measurement issued by the measuring organization (ABS), per 46 CFR, Part 69.

C150 DAMAGE STABILITY

The vessel is designed to meet a one compartment Damage Stability Standard. The subdivision of the hull shall not be altered.

The Government will prepare all damage stability calculations and submittals.

C155 INTACT STABILITY

The vessel is designed to meet the intact stability standards listed in Clause C003.

The Government will prepare all intact stability calculations and submittals.

C170 DRY DOCKING PLAN

The Contractor shall develop a dry docking plan for the vessel, after the completion of the Inclining Experiment and the determination of the vessel’s lightship weight. The plan shall be submitted for review and approval by the COR prior to final acceptance.

The dry docking plan shall be developed to show the blocking arrangement. The blocks used for the docking shall be designed to hold the vessel in the fully loaded condition.

The plan shall show all major hull structure on the bottom, all hull penetrations, all grid coolers, the transducer well, the sea chest, and other features which could interfere with the setting and shifting of the blocks.

The plan shall include the vessel’s lightship and full load weight and centers of gravity. The plan shall also list the total amount of square foot coverage and the maximum load on the blocks.

The dry docking plan shall also include an alternate blocking arrangement to allow for the servicing of all areas of the bottom of the vessel.

C180 NOISE AND VIBRATION

These control measures shall be used throughout the design and construction to minimize noise and vibration:

Provide effective noise barrier around high noise spaces to prevent noise transmission to adjacent spaces, and sound absorbing material around high noise spaces, to reduce contribution of reverberant noise within the space. See Clause C436 for details.

Install vibration isolators for the diesel generator and all rotating machinery such as pumps and fans in order to reduce noise and vibration transmission through the structure.

Provide flexible mounting of ventilation and other service lines.

Ensuring that all pipe and duct joints are tight and that all penetrations through spaces are sealed.

All pipe connections to the engines and gears shall be of the flexible type.

Use of low noise components, e.g. tighter tolerances etc.

All diesel engine and generator exhaust lines and exhaust silencers shall be mounted using vibration isolators. All exhaust pipe hangers and silencer mounting isolators shall be “Cable Mounts”. Both mount types above shall be similar to those available from BARRY CONTROLS, Hopkinton, MA, (508-417-7000). Silencer and exhaust mounting shall be sized for no greater than 20% transmissibility.

C185 TEST AND TRIALS

This vessel and its component parts shall undergo testing and trials in accordance with Section E, Clause E05, “Trials, Tests and Demonstrations.”

C200 ARRANGEMENTS

C201 GENERAL

A. CONTRACT DRAWINGS

737-C205-01 REV C OUTBOARD PROFILE

737-C215-01 REV D GENERAL ARRANGEMENT

737-C245-01 REV B MACHINERY ARRANGEMENT

B. GENERAL

The configuration of the superstructure, the hull and the decks shall be as shown on the Contract Drawings and as stated within this specification. The bulkheads, subdivisions and tanks within the hull shall be as shown on the Contract Drawings and as stated within this specification.

All equipment and machinery shall be positioned to avoid interference, and to provide easy and adequate access from all sides for inspection, maintenance and repair.

To facilitate removal for repair, every piece of equipment shall be mounted on a foundation by means of fasteners. Equipment connected to a piping system shall be provided with a means to readily disconnect the equipment from the piping system (i.e. unions or flanges), located as close as possible to the equipment.

Clear finished headroom in the deckhouse cabin/storage space and the pilot house shall not be less than 7’-

6” while accommodating all necessary equipment, ducting, wiring and piping.

Where equipment, machinery or furnishings have not been shown on the drawings, the Contractor shall provide locations and include that information on subsequent revisions of the above drawings.

C255 CONSOLE ARRANGEMENT

A. REFERENCE DRAWING

611-D255-01 REV 0 CONSOLE ARRANGEMENT

The console as installed in the M/V SANDERFORD is shown on the above Reference Drawing. The console in the new vessel shall be similar and incorporate updated versions of equipment and the changes in the controls. The console shall contain all controls, alarms, monitoring equipment, communication, and navigation equipment necessary for the vessel’s operation. The console shall be shallower at the center so that the operator, from a standing position, can see the headlog of the vessel without leaning forward.

The actual position and location of the equipment on the console and in the overhead shall be determined during the Construction Phase. A mock-up of the console shall be created for inspection. The console arrangement shall be accepted by the COR prior to fabrication.

C300 STRUCTURE

C301 STRUCTURAL REQUIREMENTS

A. CONTRACT DRAWINGS

737-C105-01 REV B LINES & OFFSETS – HULL

737-C205-01 REV C OUTBOARD PROFILE

737-C215-01 REV D GENERAL ARRANGEMENT

737-C301-01 REV A MIDSHIP SECTION

737-C307-01 REV A DECK & BOTTOM PLATING STRUCTURE

737-C307-02 REV A SIDE PLATING STRUCTURE

737-C309-01 REV B TRANSVERSE BULKHEADS, FRAMES & DETAILS

737-C311-01 REV A LONGITUDINAL STRUCTURE

B. GENERAL REQUIREMENTS

The hull shall be transversely framed at 24-inch intervals, of all welded steel construction and divided into watertight compartments with transverse and longitudinal bulkheads as shown on the Contract Drawings. The Contractor shall construct the hull as shown on the Contract Drawings. The hull steel shall be ABS Grade A Steel.

The shell and main deck plating shall be constructed of longitudinal strakes of lengths consistent with accepted practice for hulls. All seams shall be connected with full penetration welds. Seams shall not be aligned directly over bulkhead plating or over the webs of stiffeners and transverses.

All welding shall be performed in accordance with AWS and ABS specifications and procedures.

C. INSERT PLATES

All deck fittings and deck equipment shall be mounted on ½-inch insert plates welded continuously to the deck with headers or brackets below. Plates shall have 6-inch radius corners and extend a minimum of 6-inches beyond the item in all directions. All deck fittings shall be welded to the insert plates with combination fillet and single bevel groove welds.

D. OVERBOARD DISCHARGES

All overboard discharge openings through the shell plating shall be located at least 12-inches above the 4’- 6” full load waterline.

All discharge penetrations shall be flush with the exterior hull plating and shall be of extra strong pipe welded to a circular insert shell plate. Insert plates shall be of equal or greater thickness than the wall of the attached spool piece. No insert plate shall be less than the hull plate in the area of the penetration plus 1/8-inch.

Any pipe penetrating the hull below the full load water line shall be fitted with schedule 80 spool pieces and sea valves. The inboard end of the spool piece shall have a 150-lb pipe flange to bolt to the sea valve. The sea valve shall be located less than 6-inches from the hull opening.

Openings shall be located well clear of draft marks and other hull markings.

C315 DECKHOUSE STRUCTURE

A. CONTRACT DRAWINGS

737-C105-02 REV A LINES & OFFSETS – DECK HOUSE

737-C205-01 REV C OUTBOARD PROFILE

737-C315-01 REV A DECKHOUSE STRUCTURE

B. GENERAL REQUIREMENTS

The deckhouse and pilot house structure shall be of all welded steel construction with transverse and longitudinal bulkheads. The deckhouse and pilot house shall be transversely framed to coincide with the hull structure and house dimensions as shown on the Contract Drawings.

All steel shall conform to ABS requirements.

C317 MASTS

A. REFERENCE DRAWINGS

737-C205-01 REV C OUTBOARD PROFILE

611-D317-01 REV 0 MAST CONSTRUCTION

737-C730-02 REV A NAVIGATION LIGHTING ARRANGEMENT

B. DESCRIPTION OF WORK

The Contractor shall develop drawing 778-C317-01 MAST CONSTRUCTION and submit it to the Government for review and approval.

The Contractor shall provide and install a navigation light mast aft of the pilot house, a navigation light mast with gaff and yardarm on top of the pilot house, a forward navigation light mast on top of the pilot house, and a radar antenna mast on top of the pilot house. The Reference Drawings are provided as guidance on the masts design and installations.

Please note that the mast/navigation light arrangement provided with the Reference Drawings are for a vessel that operates solely on a “Western River.” Per 33 CFR, Part 89, Section 89.27(b), while transiting the Gulf Intracostal Waterway (GIWW), the vessel is required to display the standard inland lights for a vessel pushing ahead or towing alongside. This lighting arrangement is not shown on the Reference Drawings. The Contractor shall be responsible for designing and installing the navigation light masts in accordance with the U.S. Coast Guard Navigation Rules (COMDTINST M16672.2D) and 33 CFR, Subchapter E - USCG, Inland Navigation Rules.

The pilot house top mounted navigation light mast(s) shall hinge forward/aft. When in the hinged down position, the mast shall be located such that all lights may be serviced from the pilot house top. A mast rest cradle(s) shall be provided to support the mast(s) when it is in the down position. Navigation light cables shall be located such that the mast(s) may be lowered to the cradle without disconnecting the cables.

The pilot house top mounted navigation light mast shall incorporate a gaff and a yardarm. Both gaff and yardarm shall be fitted with staples, sheaves and halyards for flying both the USA and USACE ensigns. Galvanized cleats approximately 6 inches in length shall be provided to secure the halyards.

The radar antenna shall be mounted on a hinged mast, mounted on the pilot house top, with a support cradle positioned such that the antenna housing is below the height of the fixed searchlight. The radar mast shall be designed and fabricated for wind loading. The electrical connections shall be located such that they do not have to be disconnected when the mast is in the cradle.

Masts shall be designed to minimize vibration transmitted to mounted equipment.

C320 TANKS

A. CONTRACT DRAWINGS

737-C320-01 REV A LUBE OIL & WASTE OIL TANK CONSTRUCTION

The towboat includes both integral and non-integral tanks. The integral tank is the centerline fuel oil tank.

All other tanks are non-integral.

Tanks shall be complete with manholes, access ladders, filling connections, sounding tubes, tank level indicators, drains, vents, and all necessary connecting piping, gauges, and controls as required by the various clauses of this specification.

All tanks shall be welded steel construction.

Tanks shall be constructed in accordance with ABS Rules.

The top of the fuel tank shall be the main deck. The fuel oil tank shall have a capacity of 1275 gallons. All tank bulkheads shall be labeled in accordance with Clause C460.

A water tap shall be installed for the fuel oil tank. The water tap shall consist of ¾-inch black pipe, a gate valve, plug, and street elbow. The Contractor shall locate the water tap during construction to permit unobstructed access.

The fuel oil tank access shall be from the main deck, with the manhole located between Frame #10 and

Frame #12. A vertical ladder shall be installed to allow tank access via the manhole. The manhole shall be flush, oil-tight, steel, bolted type, similar to FREEMAN 300 Series, Drawing No. 310, 18-inch diameter clear opening, bolted plate covers. To avoid a tripping hazard, the screws or bolts shall not protrude above the main deck level.

The lube oil and waste oil tanks shall be located and constructed as shown on the Contract Drawings.

Access to the lube and waste oil tanks shall be through an 8-inch bolted cleanout located on the inboard side of each tank.

C325 SEA CHEST INSTALLATION

A. CONTRACT DRAWING

737-C325-01 REV A SEA CHEST INSTALLATION

The sea chest shall be constructed and installed in accordance with the above Contract Drawing. All sea valves shall be provided with “Open/Close” indicator. The sea chest shall also include a blow-down line and valve connected to the compressed air system. The blow-down connection shall be located on the sea chest vent line.

Gate valves shall be located on either side on the blow-down connection.

The sea chest well shall extend from the bottom of the hull up to a hatch in the main deck. Please refer to

Clause C415 for details on the sea chest deck hatch.

C326 TRANSDUCER WELL

737-C326-01 REV B TRANSDUCER WELL

A transducer well shall be constructed and installed in accordance with the above Contract Drawing. The requirements for the depth sounder are in Clause C770.

The transducer well shall extend from the bottom of the hull up to a hatch in the main deck. Please refer to

Clause C415 for details on the sea chest deck hatch.

C330 FOUNDATIONS

737-C330-01 REV A FOUNDATIONS & MISCELLANEOUS DETAILS

737-C330-02 REV A ENGINE & GEAR MOUNTING DETAILS

Foundations shall be constructed and installed in accordance with the above Contract Drawings.

Please note that not all foundations are shown in the above Contract Drawings. The Contractor shall be responsible for providing suitable foundations under all units of equipment, machinery, tanks, deck fittings, winches, and other heavy concentrations of weight in order to properly mount the item, to distribute the loads to the structure, and to avoid undue stresses and vibrations in the hull.

Foundations shall be fabricated from structural steel shapes and plates. Foundation members shall be lightened and openings provided to permit access to all parts of the foundation for inspection, drainage, and maintenance. Web plates of foundations shall be stiffened at holding-down bolts and other points of load concentration.

Bolting surfaces on foundations shall be made coplanar by the use of machined steel shims or poured-in type chocking material. Bolt holes in foundations shall be templated from the unit.

Foundation top flanges/plates shall be level.

All equipment bolted to foundations shall have mounting bolt holes accurately bored (not burned) and reamed to provide a no-slop fit.

Where dripping of water or oil can be expected, the top plates of foundations shall be tight and project slightly beyond the edges of bedplates or bases of units to be supported. Flat bar shall be seal-welded around the edges of the top plates to retain any leakage of oil or water and quick disconnect fittings provided for drainage.

C. FASTENERS

Unless otherwise specified by the manufacturer, Grade #8 fasteners shall be used for all bolted connections for equipment and machinery holddowns. The threaded portion of bolts shall be clear of the foundation or equipment pads, and heavy flat and lock washers used under all nuts. Elastic stop nuts may be substituted for lock washers, except for main engines, gears and the generator.

C399 STRUCTURAL CALCULATIONS

Any structural detail developed by the Contractor shall be supported with appropriate structural calculations. When requested by the COR, structural calculations shall be furnish to support details developed by the Contractor.

C400 OUTFIT

C401 GENERAL

Due to the nature of the operation, the vessel may be moored, unmanned, and unattended for extended periods of time. To the maximum extent possible, all materials, equipment, and outfit shall be vandal or tamper proof and theft-proof.

All deck fittings and deck equipment shall be properly mounted on dedicated foundations or insert plates welded continuously to the deck, with local support stiffeners backing up the regular deck structure as required.

C404 CORROSION PREVENTION

The choice of materials, the fabrication procedures, and the coating systems to be used in the fabrication of the vessel, shall indicate that careful consideration was given by the Contractor to improve corrosion resistance and life expectancy.

As an example, the structure shall be designed and fabricated to avoid corrosion, by effectively:

Insulating the contact surfaces between two dissimilar metals against galvanic corrosion.

Preventing the entrapment of water (facilitate drainage and avoid pockets where water can accumulate).

Facilitating the application of paint coatings (i.e. eliminate non accessible voids).

C406 COATING SYSTEM

A. SURFACE PREPARATION

Surface preparation for all structural steel shall be in accordance with Steel Structures Painting Council Standards SSPC-SP10-85 (Near White Metal Blast) throughout. Profile blasting shall be 1½ to 2½-mils in depth and jagged. All mill scale, weld spatter, dirt, oil and grease shall be removed.

Immediately upon completion of surface preparation, all steel shall be coated with the coating system described in this clause.

The Contractor can use either pre-construction primer or limit initial coating to base coat only. If initial coating with base coat is selected, prior to application of subsequent coats, all steel shall be sand swept clean (light blast) or water blasted and any damaged areas repaired prior to application of the remainder of the system. All areas needing repair shall be cleaned to bare metal, spot blasted to restore profile and re-coated with the base coat.

B. PAINT REQUIREMENTS

Paint shall be delivered in sealed containers with labels to indicate manufacturer, contents , expirations dates and any special instructions. Paints and painting materials shall be stored under cover and protected from extreme temperatures.

Paints shall not be used if they have exceeded the closed shelf or pot life, recommended by the manufacturer. Additionally, paints shall not be applied in weather or humidity conditions not recommended by the manufacturer.

C. APPLICATION OF COATINGS

Surface preparation and paint application shall be in strict compliance with the coating manufacturer’s recommendations. The Contractor shall take particular care to ensure that coating system requirements are met in all areas, especially those difficult to coat, such as flange undersides. All painting on both the interior and exterior surfaces below the main deck shall be accomplished prior to launching of the vessel.

D. COATING SYSTEM

The system is composed of the following coating types:

Self priming epoxy base coat Abrasion resistant epoxy barrier coat Fade…