Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
0002 26 May 2009
W912BU
U.S. Army Engineer District, Philadelphia Contracting Division, Room 643 Wanamaker Building, 100 Penn Square East Philadelphia, Pennsylvania 19107-3390
E5CTCMNE
U.S. Army Engineer District, Philadelphia POC: Michele Evans Wanamaker Building, 100 Penn Square East Philadelphia, Pennsylvania 19107-3390
W912BU-09-B-0014
11 May 2009
Reline Gutters & Leaders, VA Medical Center, FDR Campus, Montrose, New York
Technical Provisions 02 41 00 through 33 40 00 as noted on MTOC-1 & MTOC-2 are added to the Specifications.
THIS AMENDMENT DOES NOT EXTEND THE 11 JUNE 2009 BID OPENING DATE AT 11:00 A.M.
Please indicate receipt of this amendment on Standard Form 1442 (SOLITATION, OFFER, AND AWARD) as Amendment No. 0002. Failure to acknowledge all amendments may be cause for rejection of the bid.
THIS PAGE WAS INTENTIONALLY LEFT BLANK.
Department of Veterans Affairs VA Montrose Campus, NY Reline Gutters & Leaders
02 41 00 - 1
SECTION 02 41 00
DEMOLITION
PART 1 - GENERAL
1.1 DESCRIPTION:
This section specifies demolition and removal of portions of buildings, and debris.
1.2 RELATED WORK:
A. Safety Requirements: Section 00 72 00, GENERAL CONDITIONS, Article, ACCIDENT PREVENTION.
B. Asbestos Removal: Section 02 82 11, ASBESTOS ABATEMENT.
C. Environmental Protection: Section 01 57 19, TEMPORARY ENVIRONMENTAL
CONTROLS.
1.3 PROTECTION:
A. Perform demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures. Comply with requirements of Section 00 72 00, GENERAL CONDITIONS, Article, ACCIDENT
PREVENTION.
B. Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations.
Comply with requirements of Section 01 00 00, GENERAL REQUIREMENTS, Article 1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES AND IMPROVEMENTS.
C. Maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled.
D. Prevent spread of flying particles and dust. Sprinkle rubbish and debris with water to keep dust to a minimum. Do not use water if it results in hazardous or objectionable condition such as, but not limited to; ice, flooding, or pollution. Vacuum and dust the work area daily.
E. In addition to previously listed fire and safety rules to be observed in performance of work, include following:
1. No wall or part of wall shall be permitted to fall outwardly from structures.
2. Wherever a cutting torch or other equipment that might cause a fire is used, provide and maintain fire extinguishers nearby ready for immediate use. Instruct all possible users in use of fire extinguishers.
Reline Gutters & Leaders
02 41 00 - 2
3. Keep hydrants clear and accessible at all times. Prohibit debris from accumulating within a radius of 15 feet of fire hydrants.
F. Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the Medical Center; any damaged items shall be repaired or replaced as approved by the Resident Engineer. The Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The
Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition or removal works. Repairs, reinforcement, or structural replacement must have Resident Engineer’s approval.
G. The work shall comply with the requirements of Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS.
H. The work shall comply with the requirements of Section 01 00 00, GENERAL
REQUIREMENTS, Article 1.7 INFECTION PREVENTION MEASURES.
PART 2 - PRODUCTS (NOT USED)
PART 3 – EXECUTION
3.1 DEMOLITION:
A. Debris, including brick, concrete, stone, metals and similar materials shall become property of Contractor and shall be disposed of by him daily, off the Medical Center to avoid accumulation at the demolition site. Materials that cannot be removed daily shall be stored in areas specified by the Resident Engineer. Contractor shall dispose debris in compliance with applicable federal, state or local permits, rules and/or regulations.
3.2 CLEAN-UP:
On completion of work of this section and after removal of all debris, leave site in clean condition satisfactory to Resident Engineer.
Clean-up shall include off the Medical Center disposal of all items and materials not required to remain property of the Government as well as all debris and rubbish resulting from demolition operations.
- - - E N D - - -
Reline Gutters and Leaders
02 82 11- 1
SECTION 02 82 11
ASBESTOS ABATEMENT
TABLE OF CONTENTS
ARTICLE TITLE
PART I - GENERAL
1.1 SUMMARY OF THE WORK
1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS
1.1.2 EXTENT OF WORK
1.1.3 RELATED WORK
1.1.4 TASKS
1.1.5 CONTRACTORS USE OF PREMISES
1.2 VARIATION IN QUANTITIES
1.3 STOP ASBESTOS REMOVAL
1.4 DEFINITIONS
1.4.1 GENERAL
1.4.2 GLOSSARY
1.4.3 REFERENCE STANDARD ORGANIZATIONS
1.5 CODES AND REGULATIONS
1.5.1 GENERAL APPLICABILITY OF CODES, REGULATIONS AND STANDARDS
1.5.2 CONTRACTOR RESPONSIBILITY
1.5.3 FEDERAL REQUIREMENTS
1.5.4 STATE REQUIREMENTS
1.5.5 LOCAL REQUIREMENTS
1.5.6 STANDARDS
1.5.7 EPA GUIDANCE DOCUMENT
1.5.8 NOTICES
1.5.9 PERMITS
1.5.10 LICENSES
1.5.11 POSTING AND FILING OF REGULATIONS
1.6 PROJECT COORDINATION
1.6.1 PERSONNEL
1.6.2 CONTINGENCY PLANS AND ARRANGEMENTS
1.6.3 SECURITY
1.7 RESPIRATORY PROTECTION
1.7.1 GENERAL
1.7.2 RESPIRATORY PROTECTION PROGRAM(RPP)
1.7.3 WRITTEN STATEMENT OF COMPANY POLICY
1.7.4 THE RPP COORDINATOR
1.7.5 WRITTEN RPP PROCEDURE FOR SELECTION AND USE OF RESPIRATORS
1.7.6 RESPIRATORS FOR ABATEMENT OPERATIONS
1.7.7 RESPIRATORS FOR PRE-ABATEMENT AND OTHER LOW LEVEL EXPOSURE
OPERATIONS
1.7.8 SPECIAL CONSIDERATIONS FOR RESPIRATOR WEARERS
1.7.9 WORKER AND SUPERVISOR TRAINING
1.7.10 RESPIRATOR FIT TEST
1.7.11 CLEANING DISINFECTION, INSPECTION, REPAIR AND STORAGE
1.7.12 REGULAR PROGRAM EVALUATION AND SPECIAL PROBLEM OF USE
1.7.13 PROPER RESPIRATOR USE PROCEDURES
1.7.14 SUBMITTALS BEFORE START OF WORK
1.7.15 BREATHING AIR SYSTEMS
1.8 WORKER PROTECTION
1.8.1 TRAINING PRIOR TO ENGAGE IN ABATEMENT WORK
1.8.2 MEDICAL EXAMINATION
1.8.3 PROTECTIVE CLOTHING
1.8.4 ENTERING AND EXITING PROCEDURES
1.8.5 DECONTAMINATION PROCEDURES
1.8.6 LIMITATIONS WITHIN WORK AREA
02 82 11- 2
1.9 DECONTAMINATION FACILITIES
1.9.1 DESCRIPTION
1.9.2 GENERAL REQUIREMENTS
1.9.3 PERSONNEL DECONTAMINATION FACILITIES (PDF)
1.9.4 EQUIPMENT DECONTAMINATION FACILITIES (EDF)
1.9.5 TEMPORARY UTILITIES TO PDF AND EDF
1.9.6 EQUIPMENT DECONTAMINATION PROCEDURES
1.10 NEGATIVE PRESSURE FILTRATION SYSTEMS
1.10.1 SUBMITTALS
1.10.2 NEGATIVE AIR MACHINE (HEPA UNITS)
1.10.3 PRESSURE DIFFERENTIAL
1.10.4 MONITORING
1.10.5 AUXILIARY GENERATOR
1.10.6 SUPPLEMENTAL MAKE-UP AIR INLETS
1.10.7 TESTING THE SYSTEM
1.10.8 DEMONSTRATION OF NEGATIVE AIR SYSTEM OPERATION
1.10.9 USE OF SYSTEM DURING ABATEMENT OPERATIONS
1.10.10 DISMANTLING THE SYSTEM
1.11 CONTAINMENT BARRIERS AND COVERINGS OF WORK AREA
1.11.1 GENERAL
1.11.2 PREPARATION PRIOR TO SEALING OFF
1.11.3 CONTROL ACCESS TO WORK AREA
1.11.4 CRITICAL BARRIERS
1.11.5 PRIMARY BARRIERS
1.11.6 EXTENSION OF WORK AREA
1.11.7 SECONDARY BARRIERS
1.11.8 FIRESTOPPING
1.12 MONITORING, INSPECTION AND TESTING
1.12.1 GENERAL
1.12.2 OUTLINE SCOPE OF SERVICES OF THE V.P.I.H. CONSULTANT
1.12.3 MONITORING, INSPECTION AND TESTING BY ABATEMENT
CONTRACTOR
1.13 STANDARD OPERATING PROCEDURES (SOP)
1.14 SUBMITTALS
1.14.1 PRE CONSTRUCTION SUBMITTALS
1.14.2 SUBMITTALS DURING ABATEMENT
1.14.3 SUBMITTALS AT COMPLETION OF ABATEMENT
PART 2 - PRODUCTS AND MATERIALS
2.1 MATERIALS AND EQUIPMENT
2.1.1 PREPARATION
2.1.2 PACKAGING OF MATERIALS AND EQUIPMENT
2.2 ENCAPSULANTS
2.2.1 TYPES OF ENCAPSULANTS
2.2.2 PERFORMANCE REQUIREMENTS
2.2.3 CERTIFICATES OF COMPLIANCE
2.3 RECYCLABLE PROTECTIVE CLOTHING
PART 3 - EXECUTION
3.1 PRE ABATEMENT ACTIVITIES
3.1.1 PRE ABATEMENT MEETING
3.1.2 PRE ABATEMENT INSPECTION AND PREPARATION
3.1.3 PRE ABATEMENT CONSTRUCTION AND OPERATIONS
3.2 REMOVAL OF ACM AND ACE
3.2.1 WETTING MATERIALS
3.2.2 SECONDARY BARRIERS AND WALKWAYS
3.2.3 WET REMOVAL OF ACM OTHER THAN AMOSITE
02 82 11- 3
3.2.4 WET REMOVAL OF AMOSITE AND DRY REMOVAL OF ACM AND OTHER
SPECIAL PROCEDURES
3.2.5 DRY REMOVAL OF ACM AND OTHER SPECIAL PROCEDURES
3.2.6 LIMITED REMOVAL OF GUTTER DOWNSPOUT/PIPE FITTING INSULATION WITH
GLOVEBAG
3.2.7 REMOVAL OF GUTTER DRAIN FLASHING
3.3 ENCLOSURE OF ACM
3.3.1 MONITORING OF ENCLOSURE WORK
3.3.2 DELIVERY AND STORAGE
3.3.3 QUALITY ASSURANCE
3.3.4 ACCEPTABLE ENCAPSULANTS
3.4 REPAIR OF ACM INSULATION AND LAGGING
3.4.1 DESCRIPTION OF WORK
3.4.2 PRODUCTS
3.4.3 PROCEDURES
3.5 LOCK BACK ENCAPSULATION
3.5.1 GENERAL
3.5.2 DELIVERY AND STORAGE
3.5.3 WORKER PROTECTION
3.5.4 PIPING
3.5.5 SEALING EXPOSED EDGE
3.6 DISPOSAL OF ACM AND ACE WASTE MATERIAL
3.6.1 GENERAL
3.6.2 PROCEDURES
3.7 PROJECT DECONTAMINATION
3.7.1 GENERAL
3.7.2 WORK AREA CLEARANCE
3.7.3 WORK DESCRIPTION
3.7.4 PRE DECONTAMINATION CONDITIONS
3.7.5 FIRST CLEANING
3.7.6 PRE CLEARANCE INSPECTION AND TESTING
3.7.7 LOCK BACK ENCAPSULATION OF WORK SURFACES
3.7.8 SECOND CLEANING
3.7.9 THIRD CLEANING
3.7.10 FINAL CLEANING
3.8 FINAL INSPECTION AND TESTING
3.8.1 GENERAL
3.8.2 FINAL INSPECTION
3.8.3 FINAL TESTING
3.8.4 FINAL TESTING PROCEDURES
3.8.5 SCHEDULE OF AIR SAMPLES WITH PCM
3.8.6 TEM SAMPLING
3.8.7 LABORATORY TESTING FOR PCM
3.8.8 LABORATORY TESTING FOR TEM
3.9 ABATEMENT CLOSE OUT AND CERTIFICATE OF COMPLIANCE
3.9.1 COMPLETION OF ABATEMENT WORK
3.9.2 CERTIFICATE OF COMPLETION BY CONTRACTOR
ATTACHMENTS:
1. CERTIFICATE OF COMPLETION
2. CERTIFICATE OF WORKER`S ACKNOWLEDGMENT
3. AFFIDAVIT OF MEDICAL SURVEILLANCE AND RESPIRATORY PROTECTION
4. ABATEMENT CONTRACTOR/COMPETENT PERSON(S) REVIEW AND ACCEPTANCE OF THE VA’S
ASBESTOS SPECIFICATION
02 82 11- 4
02 82 11- 5
ASBESTOS ABATEMENT SPECIFICATION
SECTION 01569
ASBESTOS ABATEMENT
PART 1 - GENERAL:
1.1 SUMMARY OF THE WORK:
1.1.1 CONTRACT DOCUMENTS AND RELATED DOCUMENTS:
Drawings, general provision of contract, including general and supplementary conditions and other division 1000 specifications, apply to the work of this section. The contract documents show the work of the contract and related requirements and conditions impacting the project. Related requirements and conditions include applicable codes and regulations, notices and permits, existing site conditions and restrictions on use of the site, requirements for partial owner occupancy during work, coordination with other work and phasing of work. In the event the asbestos abatement contractor discovers an ambiguity or conflict in or between the contract documents and related requirements and codes, that issue must be immediately brought to the attention of the contracting officer for resolution. Any action taken without obtaining such guidance from the contracting officer shall be the sole risk and responsibility of the abatement contractor.
1.1.2 EXTENT OF WORK:
A brief written summary of the extent of the work and non-binding to the contract documents is as follows and is shown on the attached drawings.
A. Below is a brief description of the estimated quantities of asbestos-containing materials to be removed. This data is provided for informational purpose only, and is based on the best information available at the time of specification preparation. Nothing in this section may be interpreted as limiting the scope of work otherwise required by this contract and related documents.
B. Asbestos-containing gutter drain flashing and gutter drain/downspout pipe fitting insulation is to be abated in accordance with New York State Industrial Code Rule 56, OSHA and USEPA regulations. Gutter drain/downspout pipe fittings are insulated with asbestos-containing materials at locations within several of the building attics. Not all gutter drain/downspouts have pipe fittings that are insulated with asbestos.
C. Gutter drain flashing shall include all cements, gaskets, caulks and bedding compounds impacted by the removal and replacement of the gutter drains. The contractor is to remove the gutter drain flashing so that the removal of the existing gutter drain and installation of the new gutter drain and lining does not disturb surrounding asbestos-containing materials.
D. All gutter drain/downspout pipe fitting insulation asbestos abatement within attics shall be performed using glovebags within HEPA-filtered negative air pressure tent enclosures. Tent enclosures shall be erected allowing enough room for workers, equipment and negative air machines.
The tent enclosures shall be braced and supported so that the negative air pressure created by the HEPA-filtered negative air machines does not cause them to collapse throughout the duration of asbestos abatement including clearance air sampling. All gutter drain/downspout pipe fitting insulation asbestos abatement shall be performed within a HEPA-filtered negative pressure tent enclosure. In areas of public access, the entire tent enclosure shall be sheathed with ½ inch fire retardant rigid sheathing for safety. All indoor abatement areas shall have an airlock entrance. In areas of public access the airlock shall be sheathed for safety with a lockable door. The contractor shall construct a decontamination unit in the attic of each building requiring gutter
02 82 11- 6 drain/downspout pipe fitting insulation asbestos abatement.
E. The asbestos abatement contractor shall coordinate the exact location of the removals with the mechanical contractor. The asbestos abatement contractor shall coordinate his work with the mechanical contractor so that the building is not exposed to water damage. The mechanical contractor shall make every effort to perform his work without disturbing asbestos-containing materials.
F. A minimum settling period of two (2) hours shall be observed before clearance air sampling is performed in all indoor work areas. The contractor must allow for a minimum two (2) hour settling period following removal before clearance air testing is performed and twenty-four (24) hours for air sample collection and analysis in all indoor work areas. Additionally, the contractor must allow time to breakdown each tent. Gutter drain work areas shall not require clearance air samples. The gutter drain work areas will be considered abated when there is no visible debris or dust remaining and the VPIH has performed a successful visual inspection. Gutter drain/downspout pipe fitting insulation tents will require clearance air sampling.
F. The location of the remote decontamination unit and waste dumpster shall be mutually agreed upon during the preconstruction meeting by the VAMC and asbestos abatement contractor. Each building shall have its own personal and waste decontamination units located within twenty-five feet (25’) of the building. Decontamination units shall be constructed at the front and rear of each building so that the workers do not have to walk through or around the building to decontaminate.
G. Asbestos abatement shall be coordinated to avoid interruptions to the normal activities of the VAMC and the removal may be scheduled after normal business hours at no additional cost to the VAMC.
H. The entire gutter and adjacent roof shall be considered the asbestos abatement work area. Only NYSDOL certified asbestos workers and authorized visitors shall be permitted in the work area. The asbestos abatement contractor and mechanical contractor must maintain a twenty-five foot (25’) minimum distance when working on the same building.
I. The contractor is required to use either fixed or moveable scaffolding for access to the gutter work areas. Ladders will not be allowed.
J. Mechanical work is to be performed on the drainpipes within the buildings crawl spaces and basements. The drain pipes are not insulated with asbestos in these locations. However, there is asbestos pipe insulation on the steam and domestic water pipes in these areas. It is the VAMC policy to require personal protective equipment including disposable suits, gloves and P100 respirators when working in these areas. The mechanical contractor must understand that the asbestos-containing pipe insulation within the crawl spaces and basements will not be abated as part of this work and incidental contact with the asbestos pipe insulation may occur during the removal and installation of the drain pipes and associated mechanical work. Therefore the contractor shall construct a decontamination unit at the entrance to each buildings crawl space and/or basement where mechanical work is to be performed. Workers are to enter and exit the buildings crawl space and/or basements through this decontamination unit.
K. The mechanical contractor must be a licensed asbestos abatement contractor employing New York State Department of Labor Restricted Asbestos Handler-Allied Trades to perform the mechanical work within the basements and crawl spaces. The mechanical contractor’s employees will utilize a personal decontamination enclosure system that complies with Industrial Code Rule 56 following all work within the basements, crawl spaces and mechanical rooms. The decontamination enclosure shall be constructed contiguous to the work areas. A tape barrier shall be installed at an appropriate distance from the perimeter of the work area
02 82 11- 7 to isolate the work area. Uncertified workers shall be prohibited from all work areas. Workers are to wear personal protective equipment including disposable suits, respirators, gloves, hardhats, and boots during mechanical work within the basements, crawl spaces and mechanical rooms.
L. Removal and disposal of asbestos-containing materials and asbestos-contaminated materials is present in the following approximate quantities:
LOCATION MATERIAL QUANTITY
Building 1-Gutters Gutter Drain Flashing
28 Gutter Drains (Approximately 2 Square Feet Each)
Building 2-Gutters Gutter Drain Flashing
4 Gutter Drains (Approximately 2 Square Feet Each)
Building 3-Gutters Gutter Drain Flashing
20 Gutter Drains (Approximately 2 Square Feet Each)
Building 3-Attic Gutter Drain/Downspout Pipe Fitting Insulation
6 Fittings 4-8”
Building 4-Gutters Gutter Drain Flashing
20 Gutter Drains (Approximately 2 Square Feet Each)
Building 4-Attic Gutter Drain/Downspout Pipe Fitting Insulation
7 Fittings 4-8”
Building 6-Gutters Gutter Drain Flashing
20 Gutter Drains (Approximately 2 Square Feet Each)
Building 6-Attic Gutter Drain/Downspout Pipe Fitting Insulation
8 Fittings 4-8”
Building 7-Gutters Gutter Drain Flashing
20 Gutter Drains (Approximately 2 Square Feet Each)
Building 7-Attic Gutter Drain/Downspout Pipe Fitting Insulation
18 Fittings 4-8”
Building 12- Gutters
Gutter Drain Flashing
20 Gutter Drains (Approximately 2 Square Feet Each)
Building 12-Attic Gutter Drain/Downspout Pipe Fitting Insulation
2 Fittings 4-8”
Building 13- Gutters
Gutter Drain Flashing
22 Gutter Drains (Approximately 2 Square Feet Each)
Building 13-Attic Gutter Drain/Downspout Pipe Fitting Insulation
4 Fittings 4-8”
Building 14- Gutters
Gutter Drain Flashing
22 Gutter Drains (Approximately 2 Square Feet Each)
02 82 11- 8
Building 14-Attic Gutter
Drain/Downspout Pipe Fitting Insulation
2 Fittings 4-8”
Building 15- Gutters
Gutter Drain Flashing
22 Gutter Drains (Approximately 2 Square Feet Each)
Building 15-Attic Gutter Drain/Downspout Pipe Fitting Insulation
1 Fitting 4-8”
Building 27- Gutters
Gutter Drain Flashing
6 Gutter Drains (Approximately 2 Square Feet Each)
Building 28- Gutters
Gutter Drain Flashing
8 Gutter Drains (Approximately 2 Square Feet Each)
Building 29- Gutters
Gutter Drain Flashing
14 Gutter Drains (Approximately 2 Square Feet Each)
O. The contractor shall abate all the materials listed above in accordance with this specification and applicable codes, rules and regulations. All asbestos-containing materials within the contract limits must be removed and disposed of as asbestos-contaminated waste unless specifically excluded in these specifications or on the drawings.
P. In areas of public access, the contractor shall erect isolation barriers that separate the work areas from the remainder of the building. The barriers shall be constructed of a sheathing material of at least 1/2" thickness. The isolation barrier shall be plasticized with two (2) layers of 6-mil plastic sheeting. The isolation barriers shall be caulked at the sheathing seams and where the sheathing meets the floor, walls and ceiling. The isolation barrier shall be constructed using 2"x4" framing, 16 inches center-to-center, and caulked at all seams.
All utilities and piping shall be locked out and tagged before the contractor is to begin abatement activities.
1.1.3 RELATED WORK:
A. Section 09 96 60 In-Situ Epoxy Coating For Metallic Pipe
B. Section 22 14 00 Facility Storm Drainage
1.1.4 TASKS:
Work can be briefly summarized as follows:
A. Preabatement activities including preabatement meeting, inspection, notification, permits, submittal approvals, preparations, emergency arrangements and standard operating procedures.
B. Abatement activities including removal, encapsulation, enclosure, disposal of contaminated waste, record keeping, security, inspection, and monitoring.
C. Cleaning and decontaminating activities including final inspection and testing and certification of decontamination.
D. Reinsulation activities including reinsulation of all thermal and mechanical insulation removed during the abatement process.
1.1.5 CONTRACTORS USE OF PREMISES:
A. Cooperate fully with the VA's representative to minimize conflicts and
02 82 11- 9 to facilitate the VA's safe and smooth usage of the buildings. Perform the work in accordance with the specifications, drawings, and phasing plan.
B. Use existing facilities in occupied building strictly within the limits shown in contract documents and the approved preabatement plan of action.
1.2 VARIATION IN QUANTITIES:
The quantities and location of ACM indicated on the drawings and the extent of work included in this section are only best estimates which are limited by the physical constraints imposed by occupancy of the buildings. Accordingly minor variations of plus or minus 10% of the estimated quantities of ACM within the limits of containment for abatement are considered as having no impact on contract price and time of this contract. Locations of ACM different than that indicated on the drawings but within the limits of containment are considered as having no impact on contract price and time of this contract.
Where additional asbestos abatement work is required beyond the above variations, the contract price and time will be adjusted under provisions of applicable clause in the contract. Additional or reduced abatement work beyond the variations stated will be a basis for adjustment of the contract price.
1.3 STOP ASBESTOS REMOVAL:
If the contracting officer or his field representative presents a written stop asbestos removal stop all work and initiate fiber reduction activities. Do not resume asbestos removal until authorized in writing by VA. A stop asbestos removal order will be issued at any time VA determines abatement conditions are not within specifications requirements. Stoppage will continue until conditions have been corrected. Standby time and cost required for corrective action is at the contractor`s expense. The occurrence of the following events shall be reported in writing to the VA representative and shall require the contractor to immediately stop asbestos removal and initiate fiber reduction activities.
A. Excessive airborne fibers outside containment area (0.01 f/cc or greater, or levels that are statistically greater than preabatement as determined by Phase Contrast Microscopy utilizing NIOSH 7400 Method).
B. Break in either the primary or secondary containment barriers.
C. Loss of negative air pressure (at or below 0.02 inches of water).
D. Serious worker injury within the containment area which necessitates interruption of the normal decontamination procedures.
E. Presence of a fire and/or safety emergency.
F. Respiratory protection system failure.
G. Power failure.
H. Excessive airborne fibers inside containment area (0.5 f/cc or greater when wet methods are employed).
1.4 DEFINITIONS:
1.4.1 GENERAL:
Definitions and explanations here are neither complete nor exclusive of all terms used in the contract documents, but are general for the work to the extent they are not stated more explicitly in another element of the contract documents. Drawings must be recognized as diagrammatic in nature and not completely descriptive of the requirements indicated thereon.
02 82 11- 10
1.4.2 GLOSSARY:
ABATEMENT: A general term used to refer to the various processes used to control asbestos materials in buildings. Three alternative methods for ACM and/or ACE abatement are removal, encapsulation and enclosure.
ACE: Asbestos contaminated elements.
ACM: Asbestos containing material.
ACS: Asbestos contaminated soil.
AEROSOL: Solid or liquid particles, suspended in air.
AGGRESSIVE SAMPLING: EPA defined clearance sampling method using air moving equipment such as fans and leaf blowers to stir the air.
AHERA: Asbestos Hazard Emergency Response Act. Asbestos regulations issued by EPA in 1987.
AIR CELL: Type of pipe or duct insulation comprised of corrugated cardboard which frequently contains asbestos combined with cellulose or refractory binders.
AIR MONITORING: The process of collecting and analyzing air samples to determine the number of fibers present per cubic centimeter of air. This overall monitoring procedure is also called Air Testing, or testing.
AIR SAMPLE COLLECTION FILTER: Membrane filter used to collect fibers/particulates which are counted and/or analyzed. Membrane is usually made of mixed cellulose material for PCM, (phase contrast microscopy) and polycarbonate or mixed cellulose for TEM (transmission electron microscopy).
AMENDED WATER: Water to which a surfactant has been added.
ASBESTOS: The general name for a group of fibrous mineral forms including but not limited to chrysotile, amosite, crocidolite, anthophyllite, actinolite and tremolite.
ASBESTOS WASTE DECONTAMINATION FACILITY: Airlock system consisting of drum/bag washing facilities and temporary storage area for cleaned containers.
Used as exit for waste and equipment leaving the abatement area. May be used in an emergency to evacuate personnel.
ASBESTOS CONTAINING MATERIAL (ACM): Any material containing more than 1% (one percent) by weight of asbestos of any type or mixture.
ASBESTOS CONTAMINATED ELEMENTS (ACE): Building elements such as ceilings, walls, lights and ductwork that are contaminated by asbestos.
ASBESTOS CONTAINING WASTE MATERIAL: Materials removed from an abatement area which is or is suspected of being contaminated with an asbestos containing material.
AUTHORIZED VISITOR: Any person approved by VA, the contractor or any government agency which has proven jurisdiction over asbestos related work.
BARRIER: Any surface that seals the work area to inhibit the movement of fibers. Containment Barrier - An airtight barrier, consisting of walls, floors and/or ceilings of sealed plastic sheeting, surrounding and sealing the outer perimeter of the work area. Critical barrier - the barrier responsible for isolation of the work area from adjacent spaces, typically constructed of polyethylene sheeting secured in place at penetrations such as doors, windows or another opening into the work area. Primary barrier - Barriers assembled over critical barrier and exposed directly to decontamination work. Secondary Barrier - Any additional sheeting to collect and provide protection from debris during abatement.
02 82 11- 11
BREATHING ZONE: A hemisphere forward of the shoulders with a radius of approximately 6 to 9 inches.
BRIDGING ENCAPSULANT: An encapsulant that forms a discrete layer on the surface of an asbestos matrix.
BULK TEST: The collection and analysis of samples of suspected asbestos materials. A small amount, or bulk, of the material is physically removed from the structure and placed in a rigid airtight container for transportation to an accredited lab for analysis.
CHANGING AREA: Normally the first chamber of the personnel decontamination facilities. i.e., the "clean room".
CLEARANCE SAMPLE: An area sample taken to a certain airborne fiber levels after removal clean-up and final inspection have been completed. Performed by the VA`s I.H. consultant (VPIH).
COUNT: Refers to "fiber count" or the average number of asbestos fibers greater than five micrometers in length per cubic centimeter of air.
C.P.I.H.: Asbestos abatement contractor`s industrial hygienist. I.H. must meet qualification requirements of P.I.H.
DEMOLITION: The removal of any building component, system, finish or assembly of a facility. Wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations or the intentional burning of any facility. Standards for demolition involving ACM are as defined in NESHAPs 40 CFR 61.145.
DISPOSAL BAG: Six mil thick, air liquid leak proof plastic bag used for transporting asbestos waste from abatement areas to disposal site. Each is labelled in accordance with OSHA regulations.
DRUM: A rigid, impermeable container made of cardboard, metal or plastic which can be sealed in an air and watertight manner.
ENCAPSULANT: A material that surrounds or embeds asbestos fibers in an adhesive matrix and prevents release of fibers.
ENCAPSULATION: Treatment of ACM with an encapsulant.
ENCLOSURE: The construction of an air tight, impermeable, permanent barrier around ACM to control the release of asbestos fibers into the air.
ENTRANCE PORT: A name sometimes used for main entrance airlock in an OSHA defined negative air containment area.
EDF: Equipment Decontamination facility.
f/cc: Abbreviation for fibers per cubic centimeter of air and standard measurement units used to measure the level of asbestos contamination in the air.
FILTER: A media component used in respirators or other equipment to remove solid or liquid particles from the air.
FIRE-STOP: Material used to close open parts of a structure and prevent the spread of fire.
FRIABLE ASBESTOS CONTAINING MATERIAL (F-ACM): Material that contains more than 1.0% asbestos by weight, which can be crumbled, pulverized, or reduced to powder by hand pressure when dry.
GLOVE BAG: A sack (typically constructed of 6 mil transparent polyethylene or polyvinylchloride plastic) with two inward projecting long sleeve gloves, 02 82 11- 12 which are designed to enclose an object from which ACM is to be removed.
HIGH-EFFICIENCY PARTICULATE AIR (HEPA) FILTER: A filter which removes from the air 99.97% or more of monodisperse dioctyl phthalate (DOP) particles having a mean diameter of 0.3 micrometer.
HEPA FILTER VACUUM CLEANER: High efficiency particulate (absolute) vacuum collection equipment with a HEPA filter system capable of collecting and retaining asbestos fibers.
INDUSTRIAL HYGIENIST (I.H.): A person with a college degree in engineering, chemistry, physics, medicine or related physical and biological science and a competence in industrial hygiene acquired through special studies and training. Meets all definition requirements of the American Industrial Hygiene Association (AIHA).
I.H. TECHNICIAN: A person working under the supervision of the I.H. with special training, experience, certifications and licenses required for the industrial hygiene work assigned to perform. Requires a minimum experience as I.H. technician on three projects of similar size and complexity to this project.
LOCK-BACK: Encapsulation of all surfaces involved in abatement at the conclusion of ACM removal and before removal of primary barriers.
MCEF: Mixed cellulose ester filter.
NEGATIVE PRESSURE: Air pressure lower than surrounding areas, created by exhausting air from a sealed space (work area).
NEGATIVE PRESSURE RESPIRATOR: A respirator in which the air pressure inside the respiratory-inlet covering is positive during exhalation in relation to the air pressure of the outside atmosphere and negative during inhalation in relation to the air pressure of the outside atmosphere.
NEGATIVE PRESSURE SYSTEM: A local exhaust system, utilizing HEPA filtration capable of maintaining a negative pressure inside the work area and a constant air flow from adjacent areas into the work area and exhausting that air outdoors.
NESHAP: National Emission Standards for Hazardous Air Pollutants.
NON-FRIABLE ASBESTOS CONTAINING MATERIAL (NF-ACM): Material that contains more than 1% (one percent) asbestos by weight but can not be crumbled, pulverized, or reduced to powder by hand pressure when dry. Non friable asbestos materials can release asbestos fibers when power tools such as grinders, drills, sanders, etc. are used on them.
OV: Organic Vapor
PAPR: Powered air Purifying Respirator.
PCM: Abbreviation for phase contrast microscopy. Phase contrast microscopy utilizes a light microscope for the purpose of counting fibers. Reference NIOSH 7400 method.
PDF: Personnel Decontamination Facilities.
PENETRATING ENCAPSULANT: Encapsulant that is absorbed by the asbestos matrix without leaving a discrete surface layer.
PERSONAL AIR SAMPLING: Air sample collected with a special battery-powered portable pump unit which is fitted on the body of the monitored person. The collection device (filter cassette) is located within the individual`s breathing zone.
PERSONAL MONITORING: Sampling of the asbestos fiber concentration within the
02 82 11- 13 breathing zone of a person.
PLASTIC SHEETING: Barrier material not as strong as polyethylene.
PLM: Abbreviation for polarized light microscopy with dispersion staining utilizing light microscopy and refractive indices to identify type of asbestos present.
POLYETHYLENE SHEETING: Strong plastic barrier material usually transparent and made flame resistant in compliance.
POSITIVE/NEGATIVE FIT TEST: A negative-pressure respirator fit check, performed by placing the palm of one hand over the exhalation valve and exhaling (positive pressure) and feeling for face piece-to-face fit leakage or, covering the filters cartridges with the palms of the hand and inhaling (negative pressure) while feeling for face piece-to-face fit leakage.
PRESSURE DIFFERENTIAL SYSTEM: System which restricts airflow from adjacent areas into work area and continuously refilters air from the HEPA filtration machine. Minimal exhaust ventilation is utilized by maintaining a pressure differential of 0.02" of water.
P.I.H.: Professional (Qualified) I.H. who meets all the definition requirements of AIHA and OSHA of a "competent person" under 29 CFR 1926.1101, has completed at least three specialized courses on asbestos abatement, supervision and management in EPA endorsed training programs, and formal training in respiratory protection and waste disposal, and has a minimum experience of (5) projects of similar complexity with this project of which at least three (3) projects serving as the supervisory I.H. licensed when required by the state or local law.
PROTECTION FACTOR: The ratio of the ambient concentration of an airborne substance inside the respirator to the concentration at the breathing zone of the wearer. The protection factor is a measure of the degree of protection provide by a respirator.
QNFT: Quantitative Fit test.
QLFT: Qualitative fit test.
REMOVAL: Means removal of ACM and ACE. Accomplished with tools such as scrapers, chisels, and nylon brushes.
REMOVAL ENCAPSULANT: A penetrating encapsulant specifically designated for removal of ACM rather than encapsulation.
RENOVATION: Alteration of a facility or one or more facility components in any way, including the striping or removal of ACM are as defined in NESHAPs 40 CFR 61.145.
RESPIRATOR: A device designed to protect the wearer from the inhalation of harmful atmospheres.
RESPIRATORY PROTECTION PROGRAM COORDINATOR (RPPC): Individual who is authorized and responsible for all aspects of the contractor's respiratory protection program (RPP).
RPP: Respiratory Protection Program.
RPPC: Respiratory Protection Program Coordinator.
SAR: Supplied Air Respirator.
SCBA: Self Contained Breathing Apparatus.
SEALANT: Another name for encapsulating material. This term also refers to the approved coating which is used to cover brown coat ceilings after asbestos
02 82 11- 14 surfaces have been removed.
SEALED WORK AREA: Refers to work area after containment barriers and decontamination facilities have been erected and a negative pressure air system has been installed.
SHOWERS: Shower stalls installed in the Personnel Decontamination Facilities and used as part of the decontamination process required for every person leaving the sealed work areas. Also used in the Equipment Decontamination Facilities to wash disposable bags.
S.O.P.: Standard Operating Procedures required to be submitted by contractor.
STATION SAMPLE OR AREA SAMPLE: Refers to air samples collected at a specific spot or station using high volume air pumps.
SURFACTANT: A chemical wetting agent added to water to improve penetration, thus reducing the quantity of water required for a given operation or area.
TEM: Abbreviation for transmission electron microscopy. TEM is used for the purpose of fiber counting and it has the analytical capacity of identifying asbestos fibers.
TESTING: One or two types of testing done in relation to asbestos bulk and air testing.
VA REPRESENTATIVE: VA official responsible for on-going project work. For central office projects, the A/E is the representative and has the authority to delegate the abatement responsibilities to the V.P.I.H. for station level work, any official or V.P.I.H. in charge of the project is the representative.
VAT: Vinyl-asbestos tile.
VISIBLE EMISSIONS: Any emission containing particulate asbestos material that are visually detected without the aid of instruments. This does not include condensed uncombined water vapor.
V.P.I.H.: Department of Veterans Affairs retained Industrial Hygienist.
WET CLEANING: The process of thoroughly eliminating asbestos contamination from building surfaces and objects by using cloths, mops, or other cleaning utensils which have been dampened with amended water or diluted removal encapsulant.
WETTING AGENT: See Surfactant.
WORK AREA: Area where asbestos related work or removal operations are performed which is defined and isolated to prevent the spread of asbestos dust, fibers or debris, and the entry of unauthorized personnel. Work area is a regulated area as defined by OSHA Regulation 29 CFR 1926.1101, also called Containment Area.
WORKER DECONTAMINATION FACILITY (WDF): Another name for the main entrance/exit airlock system consisting of clean/change room, shower facilities, and equipment (dirty room). Intended to be used exclusively for worker access to/from abatement area.
1.4.3 REFERENCED STANDARD ORGANIZATIONS:
A. The following acronym or abbreviations as referenced in contract documents are defined to mean the associated names. Both names and addresses are subject to change, and are believed to be, but are not assured to be, accurate and up to date of contract documents.
B. V.A. Department of Veterans Affairs 810 Vermont Avenue,N.W.
Washington, D.C. 20420
02 82 11- 15
C. AIHA American Industrial Hygiene Association 2700 Prosperity Avenue. Suite 250 Fairfax, VA 22031
D. ANSI American National Standards Institute 1430 Broadway New York, NY 10018
E. ASTM American Society for Testing and Materials 1916 Race Street Philadelphia, PA 19103
F. CFR Code of Federal Regulations available from
Government printing office;
Washington, DC 20420 (Usually first published in federal register)
G. CGA Compressed Gas Association 1235 Jefferson Davis Highway Arlington, VA
H. CS Commercial Standard of NBS (U.S. Dept. of Commerce)
I. EPA Environmental Protection Agency 401 M Street, S.W.
Washington, DC 20460
J. MIL-STD Military Standard/Standardization Division Office of the
Assistant Secretary of Defense Washington 25, DC
K. MSHA Mine Safety and Health Administration (Respiratory Protection division) Balston Tower #3 Department of Labor Arlington VA 22203
L. NIST National Institute of Standards and Technology (U.S. Dept of Commerce) Gaithersburg, MD 20234
N. NEC National Electrical Code (By NFPA)
M. NEMA National Electrical Manufacturers Association 2101 L Street, N.W.
Washington, DC 20037
O. NFPA National Fire Protection Association Batterymarch Park Quincy, MA 02269
P. NIOSH National Institute of Occupational Safety and Health 4676 Columbia Parkway Cincinnati, OH 45226
Q. NYSDOL New York State Department of Labor State Office Building Campus Asbestos Control Program Room 511 Albany, New York 12240
R. OSHA Occupational Safety and Health Administration (U.S. Dept. of
Labor) Government Printing Office Washington, DC
02 82 11- 16
S. UL Underwriters Laboratories 333 Pfingsten Rd.
Northbrook IL 60062
T. USA United States Army-Army Chemical Corps Department of Defense
1.5 CODES AND REGULATIONS:
1.5.1 GENERAL APPLICABILITY OF CODES, REGULATIONS AND STANDARD:
Except to the extent that more stringent requirements are written directly into the contract documents, all applicable codes, regulations, and standards have the same force and effect (and are made a part of the contract documents by reference) as if copied directly into the contract documents, or as if published copies are bound herewith.
1.5.2
CONTRACTOR RESPONSIBILITY:
The Asbestos Abatement Contractor shall assume full responsibility and liability for the compliance with all applicable Federal, State, and local regulations pertaining to work practices, hauling and disposal of ACM and ACE, and protection of workers, visitors to the site, and persons occupying areas adjacent to the site. Contractor is responsible for providing medical examinations and maintaining medical records of personnel as required by the applicable Federal, State and local regulations. Contractor shall hold the VA and VPIH consultants harmless for failure to comply with any applicable work, hauling, disposal, safety, health or other part of himself, his employees, or his subcontractors. Contractor incurs all costs of the C.P.I.H. including all sampling/analytical costs for sampling to comply with OSHA regulation.
Abatement Contractor shall determine the applicability of any process patents he/she may be employing and be responsible for paying any fees, royalties or licenses that may be required for the use of patented processes.
1.5.3 FEDERAL REQUIREMENTS:
Federal requirements which govern asbestos abatement work or hauling and disposal of asbestos waste material include but are not limited to the following regulations.
A. U.S. Department of Labor, Occupational Safety and Health Administration, (OSHA).
1. Occupational Exposure to Asbestos, Tremolite, Anthophyllite, and
Actinolite; Final Rules Title 29, Part 1926, Section 1101 of the Code of Federal Regulations and Respiratory Protection Title 29, Part 1910, Section 134 of the Code of Federal Regulations Construction Industry Title 29, and Section 103, Part 1926, of the Code of Federal Regulations.
2. National Emissions Standards for Hazardous Air Pollutants
(NESHAP), Section 112 of the Clean Air Act; and those asbestos standards contained in Title 40 Code of Federal Regulations, Part 61, Subpart M.
3. Asbestos Hazard Emergency Response Act (AHERA), Public law 99-519, and Title II, Sec. 201, et, seq., of the Toxic Substance Control Act, 15 USC 2601.
4. Access to Employee Exposure and Medical Records Title 29, Part
1910, Section 2 of the Code of Federal Regulations.
5. Hazard Communication Title 29, Part 1910, Section 1200 of the Code of Federal Regulation.
6. Specification for Accident Prevention Signs and Tags Title 29, Part 1910, Section 145 of the Code of Federal Regulations.
02 82 11- 17
B. U.S. Environmental Protection Agency (EPA)
1. Asbestos Abatement Projects Rule 40 CFR Part 762 CPTS 62044, FRL
2843-9 Federal Register, vol.50 No. 134, July 12, 1985 P-28540.
2. Regulation for Asbestos, Title 40, Part 61, Sub-part A of the Code of Federal Regulations.
3. National Emission Standard for Asbestos Title 40, Part 61, Sub-part M (Revised Sub-part B) of the Code of
Federal Regulations
1.5.4 STATE REQUIREMENTS:
State requirements which govern asbestos abatement work or hauling and disposal of asbestos waste materials include but are not limited to the following:
A. State of New York Asbestos Regulations Title 12, NYCRR Part 56 and subsequent amendments
B. New York State Department of Environmental Conservation Title 6, NYCRR
1. NYCRR Part 360 - Solid Waste Management Facilities
2. NYCRR Part 364 - Waste Transporter Permits
C. New York Code of Rules and Regulations Chapter II, Title 10, Part 73: Asbestos Safety Program Requirements
1.5.5 LOCAL REQUIREMENTS:
Abide by all local requirements if these requirements are more stringent than state and federal requirements which govern asbestos abatement work or hauling and disposal of asbestos waste materials.
1.5.6 STANDARDS:
A. Standard which govern asbestos abatement work or hauling and disposal of asbestos waste materials include but are not limited to the following:
1. American National Standards Institute (ANSI) Z-79 Fundamental
Governing the Design and Operation of Local Exhaust Systems
2. Z88.2 Practices for Respiratory Protection
3. Underwriters Laboratories (UL)586-90 UL Standard for Safety High
Efficiency, Particulate Air Filters Units, Seventh Edition
B. Standards which govern encapsulation work include but are not limited to the following:
American Society for Testing and Materials (ASTM) 1916 Race Street Philadelphia, PA 19103
(215) 299-5400
1. Specification for Encapsulants for Friable Asbestos-containing
Materials Proposal P-189
2. Safety and Health Requirements Relating to Occupational Exposure to Asbestos-E-849-82
02 82 11- 18
C. Standards which govern the fire and safety in the asbestos containment areas:
National Fire Protection Association (NFPA)
1. NFPA 241 - Standard for safeguarding Construction, Alteration and
Demolition Operations
2. NFPA 701 - Standard Methods of Fire Tests for Flame Resistant
Textiles and Film
3. NFPA 101 - Life Safety Code
1.5.7 EPA GUIDANCE DOCUMENTS:
EPA guidance documents which discuss asbestos abatement work or hauling and disposal of asbestos waste materials are listed below. These documents are made part of this section by reference. EPA maintains an information number (800)334-8571 and publications can be ordered from (800)424-9065 (554-1404 in Washington DC).
A. Guidance for Controlling Asbestos Containing Materials in Buildings
(Purple Book) EPA 560/5-85-024
B. Asbestos Waste Management Guidance. EPA 530-SW-85-007
C. A Guide to Respiratory Protection for the Asbestos Abatement Industry, EPA…
This is the start of the file's text. The full file is on GovTribe.