3010 Industry Day 01192022 V5.pptx

PPTX presentation 3 MB Posted

Attached to
Industry Day-W912BU Medium Class Hopper Dredge Replacement Federal contract opportunity
Solicitation number
W912BU
Issued by
Department of the Army Corps of Engineers Engineering District Philadeplhia

About this file

This document provides information for an upcoming Industry Day event and draft solicitation to procure a new Medium Class Hopper Dredge for the U.S. Army Corps of Engineers, Philadelphia District. The Industry Day will be held virtually on February 3, 2022 to provide an overview of requirements for the anticipated April 2022 solicitation. Interested shipyards, dredge designers, and suppliers must register by February 1st with company information and a maximum of three attendees per organization. The new dredge must be able to perform all planning, design, engineering, and shipyard construction work. It will operate within the USACE minimum fleet and have a hopper capacity of 6,000 cubic yards, dredge to depths of 35-65 feet, and meet other performance requirements outlined. The anticipated procurement timeline includes proposal evaluation from February to December 2022, award in February 2023, design from May 2023 to June 2024, construction from June 2024 to June 2026, and testing/warranty periods thereafter.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3010 McFARLAND REPLACEMENT

INDUSTRY DAY

03 FEBRUARY 2022

Good morning team This morning I will be providing an update on the MCHD acquisition Before we get started, I just wanted to again take the time to say thank you to everyone on the call that has helped us roll with the punches since April so that we can come back out swinging and complete this procurement Is there any opening comments from the team?

Opening Remarks Purpose Goals Project Operational background Operational requirements Design philosophy & requirements Performance requirements Procurement timeline Source selection overview Q&A

AGENDA

Agenda for today will cover the acquisition status, lessons learned, our strategy changes moving forward, budget, and way forward.

HQs, USACE Contracting Officer

OPENING REMARKS

Agenda for today will cover the acquisition status, lessons learned, our strategy changes moving forward, budget, and way forward.

purpose Allow Government the opportunity to provide a brief overview of the McFARLAND Replacement project.

Seek shipyard and dredge designer industry input to help set optimal conditions to ensure the McFARLAND Replacement solicitation in calendar year 2022.

Capture and thoroughly understand specific questions relating to the McFARLAND Replacement procurement and draft solicitation.

Provide overview of timeline.

GOALS

Work proactively with Industry.

Exchange ideas and Information with Industry.

Receive early technical spec, required submittals, and evaluation feedback.

Incorporate feedback prior to solicitation release.

Sustain a common understanding of the McFARLAND Replacement procurement.

Open dialogue about path forward informed by government requirements.

Identify constraints/ limitations or competing procurements.

Operational Background The McFARLAND is one of two USACE Minimum Fleet Hopper Dredges that is in Ready Reserve Status.

Ready Reserve since 31 December 2009.

Periodically performs readiness exercises that are project funded and are currently limited to the Delaware River and Bay.

The McFARLAND remains poised to respond within 72 hours to any urgent or emergency dredging requirements.

Current Area of Responsibility (AOR): Primary emergency callouts have been in the Southwest pass of the Mississippi River and South Atlantic. Training exercises are conducted in the Delaware River and Bay.

Operational Requirements

Capacity:

The McFARLAND Replacement will have a hopper capacity of 6,000 cubic yards (by volume).

Industry standard, non-recessed hopper doors will be employed with modern technology to provide for safe unloading in shallow water conditions.

Pump out:

The McFARLAND Replacement will be able to pump ashore at a maximum geodetic height of 75 feet above water level with a discharge pipeline length of 1.5 miles.

The McFARLAND Replacement will be able to discharge through hopper doors, pump ashore at current discharge sites on the Delaware River, and all other current and anticipated locations within its AOR.

Power and Depth:

The design performance dredging power and depth requirements will effectively and efficiently respond to Ready Reserve emergency callout missions throughout the AOR including Southwest Pass.

To meet mission requirements, minimum thruster power of the McFARLAND Replacement will allow for a drag head speed of 2 knots into a current of 6 knots at a 65-foot dredging depth.

Endurance The McFARLAND Replacement will be designed to provide space for enough consumables to support operations for 18 days, 24 hours a day, 7 days week with 26 personnel on board while sailing at 12 knots with an unloaded hopper.

These requirements will allow the McFARLAND Replacement to be capable of responding to emergency red flag callouts and begin immediate dredging operations upon arrival without need to resupply.

Design Philosophy & Requirements Leverage modernized industry standard designs and features in conjunction with current technology applications.

Use of nonstandard design features will be minimized to reduce the risk associated with attaining the operational vessel requirements within budget.

Identified Performance Requirements:

Length Overall: Less than 320 ft.

Beam: As best suits current designs.

Air-draft: 110 ft. maximum.

Max Loaded Draft: 26 ft.

Hopper capacity by volume: 6,000 cubic yards.

Dredging depth range: 35-65 feet.

Power System: Diesel electric.

Speeds:

Transit speed, hopper empty, minimum 12 knots.

Transit speed hopper full, minimum 10 knots.

Dredging @ 65’, full hopper, minimum 2 knots over a 6-knot current.

MCHD Performance Requirements Dredge pumps: one inboard dredge pump per drag arm. 2 Drag arms.

Dredging operation in 6-foot significant wave height (max wave ht. 12 foot).

Bow Thrusters – at least one variable speed bow thruster.

Diesel Electric Power System.

Z or L-Drive Propulsion.

Crew Size – Sufficient for USCG manning certification, environmental observer(s), and 24-hour operation. 26 persons.

Endurance: 18 days, 24 hours a day, 7 days a week Range: Capable of transiting from Philadelphia to the Southwest pass without refueling or resupply.

Dynamic tracking and positioning – will not require Dynamic Positioning notation per ABS Rules.

Dragheads with jetting water, excavator teeth, and turtle deflectors.

Turtle monitoring of dredge discharge of potential turtle parts.

Ballast water treatment can be included if ballast is needed per Offeror’s design.

Performance Requirements The McFARLAND Replacement will require ABS and USCG certification.

Vessel must be Jones Act compliant – must be built in U.S. Shipyard.

MAJOR SOLICITATION UPDATES

Draft technical specifications are currently available for review and comment.

Projected $300,000 stipends for all Offerors providing a technically acceptable proposal, but not selected for award (Subject to stipend pool).

20% Performance and Payment Bonding.

16 weeks for Proposal Development Time (Requests for additional time may be submitted and will be considered dependent upon the significance of the Request for Information and corresponding Amendment).

Published target budget to support tradeoff process.

Early ordering of supplies will be allowed to reduce risk associated with market volatility.

PROCUREMENT TIMELINE

Solicitation

April 2022Advertise MCHD Solicitation
August 2022-December 2022Evaluate MCHD Proposals
February 2023Award MCHD Contract

Design & Construction.

February* 2023-April 2023MCHD Planning Phase (120 Calendar Days)May 2023- May 2024MCHD Design Phase (365 Calendar Days)
June 2024 –June 2026MCHD Construction Phase (730 Calendar Days)
June 2026 – August 2026MCHD Testing Phase (120 Calendar Days)

Warranty Period.

September 2026 – September 2027 Warranty Period (365 Calendar Days)

3010 SOURCE SELECTION OVERVIEW

All non-price factors when combined (Factors, 1,2,3,4, & 5) are approximately equal to Price (Factor 6).

The five non-price factors are listed below in descending order of importance:

Factor 1 –Hopper Capacity (Based on weight of 1.8 S.G. material) Factor 2 –Hopper Loading Time & Propulsion Factor 3 –Hopper Pump Out Time & Propulsion Factor 4 – Past Performance Factor 5 – Small Business Participation

Factor 1 (Hopper Capacity) is more important than Factor 2 (Hopper Load Time & Propulsion). Factor 2 (Hopper Load Time & Propulsion) is more important than Factor 3 Hopper Pump Out Time & Propulsion). Factor 3 (Hopper Pump Out Time & Propulsion) is more important than Factor 4 (Past Performance). Factor 4 (Past Performance) is more important than Factor 5 (Small Business).

To receive consideration for award, a rating of no less than “Acceptable” must be achieved for all non-price Factors except Past Performance. Past Performance must be rated other than “No Confidence.”