About this file

This document is a Request for Proposal (RFP) for the procurement of one new kingpost or pedestal (swing bearing) mounted crane to be installed on a barge platform. The crane shall have a rated hook load capacity of 1,000,000 lbs. at a radius of 50 feet from the center of rotation.

The RFP is being issued by the Marine Design Center of the U.S. Army Corps of Engineers (USACE) and will use a negotiated, best-value procurement process. Proposals will be evaluated on technical considerations, past performance, and price. The Government may award a contract on the basis of initial proposals without discussions. Liquidated damages, bid guarantee, payment, and performance bonding will be required. The contractor must be registered in the System for Award Management (SAM) and the Department of Veterans Affairs Center of Veterans Enterprise Vet Biz Registry if applicable.

View the file

Other files for this federal contract opportunity

Other files attached to New Heavy Lift Floating Crane, newest first.
File Type Posted
SF 24.pdf PDF
SF 1416.pdf PDF
USACE Form PPQ-0.pdf PDF
ENG Form 2454.pdf PDF
SF 1418.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912BU24R0041 06-Jun-2024

b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME

03:00 PM 10 Jul 2024

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912BU9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

AMANDA BELLNIER

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: AMANDA BELLNIER, CONTRACTING DIVISION, 1

TREET, 4TH FLOOR

PHILADELPHIA PA 19103-2004

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 477208 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

GSA LOUISIANA WAREHOUSE

400 EDWARDS AVENUE, BAY B-1

HARAHAN LA 70123

TEL: FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,250

NAICS:

333120

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF119

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

SECTION B

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS.

Design, construct, test, install, assemble, and barge test one Heavy Lift Crane for the Corps of Engineers, Detroit District for use in support of its maintenance mission on the Great Lakes, in accordance with the attached specifications. In addition, optional line items may be awarded for the storage of the crane.

ITEM UNIT TOTAL

NUMBER ITEM

QTY.

UNIT PRICE PRICE

0001 HEAVY LIFT CRANE 1 EACH XXXX XXXX

0001AA PLANNING, SCHEDULING, AND ENGINEERING (The submittals required for Planning, Scheduling, and Engineering are listed in contract Clause H02.).

1 JOB XXXX $ _________

0001AB CONSTRUCT AND TEST the crane (The submittals for “Construct and Test” are listed in contract Clause H02.).

1 JOB XXXX $_________

0001AC DELIVERY of the crane to shipyard.

0001AD INSTALLATION, ASSEMBLY, BARGE TESTING,

TRAINING, AND FINAL ACCEPTANCE the crane. (The submittals for “Installation, Assembly, Barge Testing, Training, and Final Acceptance” are listed in contract Clause H02.).

TOTAL ITEM 0001 (Total of 0001AA, 0001AB, 0001AC, 0001AD) 1 JOB XXXX $_________

0002 STORAGE (OPTION) for the crane, its components, materials, and spares as specified in Clause C912.

20 MONTHS $_____ $_________

TOTAL FOR ALL LINE ITEMS INCLUDING OPTION(S)

INSERT ADDRESS OF THE FACILITY WHERE THE WORK WILL BE PERFORMED:

W912BU24R0041

The Government may reject an offer as non-responsive if it is materially and mathematically unbalanced as to price for any offered item or combination of offered items. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.

Refer to contract Section M for EVALUATION FACTORS FOR AWARD criteria.

SECTION C

PART I – THE SCHEDULE – SECTION C

DESCRIPTION/SPECIFICATION/WORK STATEMENT

C000 GENERAL

C001 PROJECT OVERVIEW

The Marine Design Center (MDC) of the U.S. Army Corps of Engineers (USACE) has issued this Request for Proposal, to procure a new heavy-lift crane. The crane acquired under this solicitation will be used in heavy-lift applications while mounted on a barge.

The heavy-lift crane acquired under this solicitation is one part of a two-part project to build a new floating crane for the Detroit District of the U.S. Army Corps of Engineers for the Great Lakes. The floating crane will have a primary mission of performing heavy lift work associated with lock and dam maintenance and repair activities. Secondary limited light lift work with auxiliary line will be performed for routing navigation maintenance support work.

The heavy-lift crane acquired by this solicitation, will be supplied in the second part of the project as Government Furnished Equipment (GFE) to a shipyard to be mounted on a new purpose-built barge to form a new floating crane barge. Specific information on the crane (crane geometry and crane weight data) is required to validate the adequate performance of the integrated floating crane design (barge intact stability and crane load handling stability).

The new barge will be approximately 300 feet long by 68 feet wide, with a hull depth of 14 feet, and draft waterline approximately 7 feet. The crane shall be located on the barge centerline, approximately 33 to 35 feet forward of the aft end of the barge.

When completed, the new floating crane shall be capable of lifting a minimum of 1,000,000 lbs. (500 short tons) at a radius of 50 feet over the end of the barge.

C002 SCOPE OF WORK

The contract consists of four phases:

Phase I Planning, Scheduling and Engineering Phase II Construct and Test Phase III Delivery to Shipyard Phase IV Installation, Assembly, Barge Testing, Training and Final Acceptance

In accordance with the four phases and the contract specifications, it is intended for the contractor to engineer, fabricate, test, and deliver a heavy-lift crane, as well as obtain API and ABS verification through ABS. Should the contractor determine at any time that he is unable to fulfill those responsibilities, he shall notify the COR immediately of the problem experienced and his proposed manner of correction.

For this contract, the contractor shall include all costs to provide and deliver the following:

One heavy-lift crane in accordance with the specifications of this contract.

o Including crane pedestal (or base, or kingpost) for welding to the barge.

Testing for the items specified under this contract including the pedestal, the crane, its components and materials.

Technical support and guidance to the shipyard contractor for the assembly of the crane on the barge, the integration of the crane to the barge, and the start-up of the crane after installation on the barge at the shipyard facility.

Technical support and guidance to the shipyard contractor for operational performance testing and trials of the crane after integration on the barge at the barge shipyard facility.

Final Acceptance Demonstrations in conjunction with the shipyard contractor at the Corps’ designated point of Final Acceptance of the completed floating crane barge.

Training to Corps personnel after delivery of the floating crane.

The crane contractor shall have representation onsite at the shipyard facility to ensure that the installation and assembly are executed properly (by the shipyard contractor), and according to his (the crane contractor’s) approved procedures and practices. For bidding purposes, the Offeror shall assume that the representative from the crane manufacturer shall make six trips for a total of 120 days including travel to the Gulf region, within 100 miles of New Orleans, LA.

Once the crane is assembled and installed on the barge, the crane contractor shall provide the services of crane operators and other qualified personnel to demonstrate proper operation and proper performance of the crane. Prior to start of Phase IV, the crane contractor shall coordinate with the shipyard in order for the shipyard to provide suitable weights for testing as defined in contract Clause E05 Section D.

C003 STANDARDS

The crane shall be designed and fabricated in compliance with the latest edition(s) of the following:

U. S. Army Corps of Engineers, Publication No. EM 385-1-1, “Safety and Health Requirements Manual.”

American Bureau of Shipping (ABS) “Rules for Building and Classing Steel Barges.”

American Bureau of Shipping (ABS): “Guide for Certification of Lifting Appliances” American Petroleum Institute (API) Specification 2C “Offshore Pedestal-mounted Cranes” Institute of Electrical and Electronic Engineers Standards, Publication No. IEEE-45 – “Recommended

Practice for Electrical Installation on Shipboard.”

Illuminating Engineering Society, “Recommended Practice for Marine Lighting.”

National Electric Code (NEC).

46 CFR Subchapter J - Electrical Engineering

C004 API MARKING and ABS REVIEW & CERTIFICATIONS

The crane and pedestal (or kingpost) shall meet the requirements of both the American Petroleum Institute (API), and the American Bureau of Shipping (ABS).

The contractor shall design and manufacture the crane in complete compliance with the following API and ABS requirements.

A. API SPECIFICATION 2C COMPLIANCE

The crane (including kingpost or pedestal) shall be designed and constructed in accordance with all requirements of the API Specification 2C, current edition. The crane shall be provided with a permanent stainless steel name plate, bearing the API Monogram, per API Specification 2C.

Per API, purchaser furnished information is found in Clause C005.

B. ABS CRANE CERTIFICATION

The crane will be installed on an ABS Classed Barge. The barge will be classed:

“Maltese Cross ✠A-1 Floating Crane, Great Lakes Service for use as a Government Floating Crane Other ABS Notations: CRC (Crane Register Certificate) Great Lakes Load Line

The crane contractor shall retain ABS to provide all services needed for the ABS Certification of the crane as required for the ABS Class (per above) of the completed floating crane barge, with the crane installed.

The crane (including kingpost or pedestal) shall meet ABS requirements for a Heavy Lift crane in accordance with the ABS Guide for Certification of Lifting appliances.

The crane contractor shall provide the ABS Certificate for the crane, prior to crane delivery.

Note – the Shipyard Contract for the barge part of the project will be responsible for coordination and final approval from ABS on the integration of the crane design into the barge, the surveyor satisfaction of the crane integration into the barge, and the final approval and issuance of the ABS Class certificates.

C. ABS VERIFICATION OF COMPLIANCE WITH API SPECIFICATION 2C

The crane contractor shall retain ABS to provide all services required for ABS verification of compliance with API Specification 2C, current edition.

The crane shall be provided with a permanent stainless steel name plate, bearing the API Monogram, per API Specification 2C.

The crane contractor shall provide from ABS a Statement of Fact and/or certifications for:

The crane is designed, constructed, and tested in accordance with the ABS Guide for Certification of Lifting Appliances.

ABS has performed an Independent Third-Party verification and the design of the crane and mounting/integration satisfies the API Specification 2C requirements.

ABS has performed an Independent Third-Party verification and the construction and testing of the crane satisfies the API Specification 2C requirements.

D. CERTIFICATES OF TESTING

All crane component certificates of tests shall be provided to the COR during Phase II (see contract Clause H01). The certificates shall be organized in a 3-ring binder of durable material. Electronic copy shall also be provided.

C005 PURCHASER SUPPLIED INFORMAGION PRIOR TO PURCHASE

For design considerations, the crane will be installed on a barge that will be operated on the Great Lakes. Lifting operations will be limited to near calm conditions with significant wave heights of 1 foot or less. All loads and load factors shall be based on this lifting operating mode. Loads will be both onboard and offboard. The crane lifting offlead and sidelead angles are generated by static barge inclinations, with no additional influence from significant wave heights.

The barge, with the crane secured for towing, will transit open waters on the Great Lakes in all conditions. The crane shall be designed to withstand transit conditions up to Beaufort Scale Sea State 6. During transit the boom will be designed to be placed in a boom rest and secured as recommended by the contractor. All brakes, gears, rigging, etc.

shall be designed to ensure the crane remains secured in the stowed condition during transit.

The following information is supplied to the Offeror for correctly sizing the crane sought in this solicitation:

a) Minimum Net Safe Working Load (SWL):

o 12-Part Main Line – Fully revolving heavy hook lifts:

1,000,000 lbs. @ 50 ft. radius 3-degree Machine List (Offlead) / 5-degree Machine Trim (Sidelead) o 10-Part Main Line – Fully revolving heavy hook lifts:

840,000 lbs. @ minimum radii 840,000 lbs. @ 65 ft. radius 300,000 lbs. @ 170 ft. radius All at 5-degree Machine List (Sidelead) / 7-degree Machine Trim (Offlead) o 2-Part Auxiliary Line - Fully revolving:

15,000 lbs. @ all radii All at 5-degree Machine List (Sidelead) / 7-degree Machine Trim (Offlead) o 1-Part Fast Line – Fully revolving 55,000 lbs. @ all radii All at 5-degree Machine List (Sidelead) / 7-degree Machine Trim (Offlead) o 1-Part Personnel rating on Fast Line:

20,000 lbs. @ all radii All at 5-degree Machine List (Sidelead) / 7-degree Machine Trim (Offlead) o Net SWL – main block, aux block, fast line block and wire rope deducted.

b) Machine List (Sidelead) and Machine Trim (Offlead) o 1,000,000 lbs. capacity load chart: 3-degree Machine List (Sidelead); 5-degree Machine Trim (Offlead) o All other load charts: 5-degree Machine List (Sidelead); 7-degree Machine Trim (Offlead)

c) Type of Lifts:

o Fully revolving and fixed over the end (stiff-leg derrick style) heavy lifts of lock gates and structures at 50 feet to 100 feet (radius) o Fully revolving lifts supporting maintenance activities and work.

o Personnel lifts with Fast Line

d) Boom Length and Configuration:

o Approximately 170 ft. of main boom as measured from the center of the boom heel pin to the center of the main hoist sheaves.

Maximum lift outreach not less than 170 ft. from center of rotation o Removable bolted boom tip extension for fast line and auxiliary line. Minimum offset from main hook sheave to fast line hook sheave is 9 ft. or less. Minimum offset from main hook sheave to aux hook sheave is 14 ft. to 17 ft.

o Minimum lifting not more than 40 ft. with 170 ft. boom.

e) Counterweight o Approximately 500,000 lbs.

f) Type of Vessel the Crane is Installed on:

o Barge dimensions 300 ft. long 68 ft. wide 14 ft. hull depth 7 ft. draft waterline

g) Crane Elevation:

o Tail Swing:

Shall not exceed 30 ft. radius.

o Crane Deck Clearance:

Minimum 3 ft. 9 in. clearance between the deck of the barge and any rotating point on the crane o Air Draft:

Maximum air draft of 90 ft. above the deck to the highest fixed point with the crane in the stowed transit position.

o Cab Height:

Operator eye level of approximately 25 feet above main deck of barge

h) Significant Wave Height(s) for Crane Operation: 1 ft.

i) Wind Speed for Crane Operation:

o Maximum wind speed for safe crane operation: 25 mph

j) Crane Calculation and Ratings Method:

o General Method

k) Crane Duty Cycle Classification:

o Construction Duty

l) Hazardous Area Classification:

o None

m) Type of Hoists:

o Main Block Maximum number of parts for full capacity: 12 parts of line Ability to operate at reduced parts of line to increase hook speed with reduced hook load capacity.

o Fast Line

Single part line to cylindrical weight and swivel hook o Auxiliary Line

2 or 3-Part line to block and duplex swivel hook.

n) Crane Self Weight Moment:

o Crane weight of less than 1,550,000 lbs.

Weight includes:

Full pedestal/kingpost (above and below the deck) 170 ft. boom Counterweight Boom tip extension Blocks & Rigging All fluids All hoists, lines, wire rope and pendants o Overturning moment of crane weight (in condition described above, boom set for pick at 60 ft.

radius) no less than 3,500,000 lb-ft applied towards the counterweight end.

o Vertical Center of Gravity (condition above minus pedestal/kingpost, boom and blocks): 14.5 ft.

above the barge deck or less.

o) Transit: with the boom lowered into the boom rest, Beaufort Scale Sea State 6.

p) Out-of-Service: no transit, barge moored, boom lowered in boom rest: 100 mph adverse wind.

C010 DEFINITIONS

The following definitions are applicable to phrases and acronyms used throughout this contract:

ABS – American Bureau of Shipping

API – American Petroleum Institute

COR - Contracting Officer’s Representative - a member of the contract management and quality assurance team authorized by the Contracting Officer to perform certain administrative and managerial duties. A copy of the COR’s authority letter is furnished to the contractor.

K.O. - Contracting Officer - A person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings.

MDC – Acronym for the Marine Design Center.

NTP – Acronym for Notice to Proceed – is issued by a Contracting Officer or COR to commence work on a specific contract line item.

QC - Quality Control - Quality Control is a function of the contractor. Refer to clause E03. Quality Assurance

(QA) is a function of the Government.

USACE – Acronym for United States Army Corps of Engineers.

Crane Machine List: is the inclination of the crane perpendicular to the vertical plane containing the boom.

The same angle can be measured between the axis of rotation of the crane (vertical when the crane is in the reference horizontal position) and the axis of rotation with an inclination to the left or to the right of vertical when looking at the boom tip from the cab. API terminology is “Sidelead”.

Crane Machine Trim: Is the inclination of the crane forward (boom down and load swinging out to a larger effective radius reach) or after (boom up), about the vertical axis of rotation when the crane is in the reference horizontal position. API terminology is “Offlead”.

360-Degree Lift (or Capacity), Unrestricted Rotation (or Fully Revolving): given a pre-lift single barge condition, a lift can be made at single radius, for any crane swing/azimuth position. The crane can safely swing/rotate the hook load, at the same radius, 360-degrees without changing the barge setup (ballast, deck loads, etc.) and satisfying the lifting and stability requirements.

C100 SCIENTIFIC

All scientific data shall be provided in United States Customary System units of measurement (pounds and feet). Data provided in other units will not be evaluated or considered.

C105 CRANE MOUNT AND PRINCIPAL DIMENSIONS

The crane shall comply with the following requirements:

A. CRANE MOUNT TYPE

The crane shall be a type of offshore pedestal-mounted crane as defined in API Specification 2C. The crane shall be either:

King post mounted wire luffed crane or Swing bearing mounted (pedestal) wire luffed crane.

The term pedestal will be used throughout. Pedestal refers to a pedestal, base and/or kingpost structure.

The crane manufacturer shall provide the crane pedestal for welding to the barge.

The barge dimensions are 300 feet by 68 feet by 14 feet with 7 feet of draft. The bottom of the pedestal will sit on a reinforced double bottom, approximately 3 feet above the bottom of the barge hull, with reinforced structure. As a result, approximately 11 feet of pedestal will be contained within the hull of the barge in addition to the extent of the pedestal above the main deck level of the barge.

B. CRANE PEDESTAL DESIGN CRITERIA

The crane manufacturer shall design and fabricate the pedestal. The design shall be developed based on the following barge structural design in way of the pedestal:

Reinforced bottom plating as necessary.

Barge centerline longitudinal bulkhead, full hull depth.

Barge transverse bulkhead, full hull depth, aligned with the center of the pedestal.

Barge radial bulkheads, full hull depth, arranged at 45-degree intervals between the longitudinal and transverse bulkheads.

The barge will have 4 inches of camber from the centerline to the barge sides. The depth of the pedestal shall account for the camber to maintain the minimum 3 ft. 9 in. of clearance. The design and attachment to between the barge deck structure and the pedestal shall account for the camber.

The pedestal shall be a single piece structure, running from the foundation at the double bottom of the barge up through the hull. The pedestal shall be equipped with two, diametrically located, manholes to provide interior access to the bottom of the structure. See contract Clause C415 for details on the manholes.

The pedestal shall provide top-down watertight integrity to prevent water ingress to the barge via the inside of the structure of the crane.

The pedestal shall incorporate a slip ring required to support the shipboard generator providing power to the crane and data cable connections.

The crane manufacturer shall provide the Government with a detailed Finite Element Analysis (FEA) detailing the loads and forces on the pedestal during crane operations. This analysis shall identify the peak and design loads imparted upon and by the pedestal.

The contractor’s FEA will be utilized by the Government as part of the barge design effort and modeling. The contractor’s FEA shall incorporate mesh development to allow direct integration with the barge hull FEA model at the pedestal interface areas (deck, transverse, longitudinal, bottom, radial and foundation structure/bulkheads).

The contractor shall submit the results and model of the Finite Element Analysis to the Government no later than 90 days after the receipt of the Notice to Proceed with Phase I of the contract. The electronic version of the FEA model submitted to the Government shall be submitted with file extension .MODFEM or .MOD .

The final design drawings of the pedestal shall be submitted to the Government as AutoCAD (2012 or higher) files for incorporation into the barge design. To ensure proper integration of the pedestal into the barge structure, the pedestal drawing shall identify weld seems and the intended orientation into the barge.

The Government requires the contractor to deliver the engineering defined above in order to proceed with the detailed design of the barge. Should the contractor fail to deliver the pedestal design as required above, this will delay the Government’s engineering design effort, and subsequently delay the availability of shipyard storage for the completed crane. Therefore, for each day, in excess of the 90 days allotted for the design, the crane Contractor shall store the crane, its components, materials, and spares at his expense for one day (day for day).

During the Government’s barge integration design, the contractor shall be available for design meetings and technical support surrounding the barge structural design and incorporation of the crane pedestal.

C. CRANE TAIL SWING

The tail swing of the crane (including counterweight) shall not exceed a 30 ft. radius from the center of rotation of the crane.

D. CRANE DECK CLEARANCE

In order to reduce the crush and pinch hazards present with rotating equipment, the crane shall provide a minimum 3 feet - 9 inches clearance between the deck of the barge and any rotating point on the crane. This clearance shall take into account the barge camber design and impact (e.g., less clearance near the centerline of the barge).

E. AIR DRAFT REQUIREMENTS

The crane shall have a maximum air draft requirement of 90 feet above the deck with the boom stowed for transport.

If crane components need to be lowered to meet the stowed height requirement, the components shall be self-lowering and raising, with no aid from other lift equipment, except for small lighting and/or flag masts.

F. CAB HEIGHT

The cab shall be located on the right side of the boom. The cab height shall be such that the operator eye level sitting on the chair at approximately 25 feet above the main deck of the barge.

G. BOOM LENGTH

The crane shall be provided with a 170-foot boom as measured from the center of the boom heel pin to the center of the main hoist sheaves. The maximum outreach of the main hoist of the crane shall not be less than 170 feet from the center of crane rotation. The minimum lift radius shall be not more than 40 feet from the center of crane rotation.

H. BOOM TIP CONFIGURATION

Forward of the main block sheaves, a removable bolted boom tip extension shall be provided and shall accommodate a fast line and auxiliary hoists. The auxiliary hoist shall be as follows:

The FAST LINE hoist shall be a single part line to a cylinder weight and hook. It shall be offset from the main hoist sheave by 9 ft. or less.

The AUXILIARY LINE shall be a 2 or 3-Part line to a block and hook. It shall be offset from the main hoist sheave between 14 ft. and 17 ft. to prevent tangling of all lines at maximum boom elevation.

The offset of hoists shall be sufficient to prevent tangling of lines at maximum boom elevation.

I. CRANE ENVIRONMENTAL OPERATING CONDITIONS

Crane operating conditions are as follows:

Lifting in calm water, maximum significant wave height 1 foot.

Transit on Great Lakes in conditions up to Beaufort Scale Sea State 6.

Out-of-Service: no transit, barge moored, boom lowered in boom rest: 100 mph adverse wind.

On board and off board lifts with no deck or boom tip velocity.

Crane operating temperature range ranging from -20 degrees F to 100 degrees F.

Crane lift offlead and sidelead angles are generated by barge static inclinations.

o Fixed over end: 3-degree Machine List (Sidelead), 5-degree Machine Trim (Offlead) o Fully revolving: 5-degree Machine List (Sidelead), 7-degree Machine Trim (Offlead)

The maximum lift operations wind speed shall be 25 mph adverse wind.

o Note – for the NAA, 40 mph of adverse wind will be applied.

The crane is not required to conduct a lift with the main line and auxiliary line simultaneously.

J. CRANE DESIGN & OEPRATIONAL CHARACTERISTICS DRAWINGS

The Contractor shall develop and submit a drawing detailing all of the primary design and operational characteristics of the crane during Phase I. The drawing shall be submitted to the Government for review and approval.

C110 CRANE SELF WEIGHT MOMENT

This solicitation is based on a similar design with in-service proven track record. Based on a similar crane and barge design, the Naval Architectural Analysis to meet barge stability criteria has identified a maximum crane weight, and a crane self-overturning moment, so that the mission required lifts can be performed during crane load handling operations.

Based on the Naval Architectural analysis, with the crane on a horizontal platform (pedestal in the vertical position), and with the boom positioned over the deck for a 60 ft. ready to lift radius from the center of the crane rotation, the following requirements shall be met:

The crane weight is defined as the weight of the pedestal (including the 11 ft. section below the main deck of the barge), the rotating works, approximately 500,000 lbs. counterweight, 170 ft. boom, boom tip extension, blocks and lines. The total crane weight in the completed condition with full fluid tanks on board shall not exceed 1,550,000 lbs.

The overturning moment of the crane weight, in a condition above, including the entire pedestal (no load under the hook) shall be no less than 3,500,000 lbs.-ft., applied towards the counterweight end.

The vertical center of gravity (VCG) of the crane rotating works (including counterweight; no pedestal or boom), shall be no greater than 14.5 feet above the barge deck level. This VCG does include full fluid tanks.

C115 CRANE WEIGHT AND COUNTERWEIGHT

The proposal shall provide the amount of counterweight used to meet the self-overturning moment limit requirement.

A crane counterweight of approximately 500,000 lbs. may be necessary to meet the self-overturning moment requirement.

The counterweight shall be comprised of solid steel or iron segments. No other types are acceptable.

The counterweight shall be entirely contained within the maximum tail swing dimension of no more than 30 feet. In addition, the counterweight shall comply with the deck clearance requirement of paragraph D of Clause C105.

After contract award, and during crane construction, the contractor shall revise the calculated weights and provide actual measured weights.

The contractor shall submit a drawing(s) during Phase I containing weight and center of gravity information for:

Pedestal or Kingpost Upper Works, full operating liquids, without Counterweight Counterweight 170 ft. boom Boom tip extension Blocks and hooks

Horizontal/longitudinal and lateral/transverse centers of gravity are to be measured from the center of rotation, with an identified vertical reference (i.e., vessel baseline, vessel deck, boom pin, etc.), expect boom components. Boom components shall be measured from the boom pin.

C155 REQUIRED LIFT CAPACITY AND LIST AND TRIM AND LOAD CHARTS

A. LIFT CAPACITY AND LIST AND TRIM

The crane shall be capable of lifting a minimum of 1,000,000 lbs. (500 short tons), below the hook, at a radius of 50 feet with a 12-part line. The crane shall be capable of performing this lift and rotating it through 360 degrees. In order to perform this lift, the crane shall be capable of operations with up to 3-degrees machine list (sidelead) and 5-degrees machine trim (offlead) with the hook load of 500 short tons at a 50-foot radius.

The following main hoist, auxiliary hoist, and fast line hoist minimum capacities are required up to a 5-degrees machine list (sidelead) and 7-degrees machine trim (offlead) condition:

The main hoist with a 10-part line, the crane shall be capable of lifting a minimum of:

840,000 lbs. (420 short tons) @ 40 ft.

840,000 lbs. (420 short tons) @ 65 ft.

300,000 lbs. (150 short tons) @ 170 ft.

The 2 or 3-part auxiliary hoist line shall be capable of lifting at least 150,000 lbs. (75 short tons), at all radii.

The fast line shall be capable of lifting at least 55,000 lbs. (27.5 short tons), at all radii.

The fast line hoist line shall also be certified for personnel lifting of at least 20,000 lbs. (10 short tons), at all radii.

The lift requirements above are for lifting in winds up to 25 miles per hour, and 1-foot significant wave heights.

B. FLOATING SERVICE LOAD CHARTS

The Contractor shall provide the following load charts for the crane with the proposal as required by Section L of this specification:

3-Degree Machine List (Sidelead) / 5-Degree Machine Trim (Offlead) o 12-Part Main Hoist o 10-Part Main Hoist o 2-Part Auxiliary Hoist o 1-Part Fast Line Hoist o 1-Part Personnel Rated Hoist on Fast Line

5-Degree Machine List (Sidelead) / 7-Degree Machine Trim (Offlead) o 12-Part Main Hoist o 10-Part Main Hoist o 2-Part Auxiliary Hoist o 1-Part Fast Line Hoist o 1-Part Personnel Rated Hoist on Fast Line

Floating service load charts shall include the following information as required by EM385-1-1:

Safe Working Load (below the hook) vs. boom angle and radius Maximum allowable machine list (sidelead) and machine trim (offlead)

Maximum allowable wind speed Mode of operations and configuration to include boom length, amount of counterweight, parts of wire and block size.

Information on the wire ropes and blocks

The load charts identified above shall be for lifting in winds up to 25 miles per hour, and 1-foot significant wave heights. In addition, the contractor shall produce a full second set of ‘derated’ load charts, in the configurations above, for lifting in winds up to 30 miles per hour, and 2-foot significant wave heights.

The floating service load charts delivered by the crane Manufacturer/Contractor shall be stamped by a Registered Professional Engineer (RPE).

C180 NOISE AND VIBRATION CONTROL AND ABATEMENT

There shall be an effective, integrated noise and vibration control and transmission abatement program for the crane.

The noise level inside the crane cab shall not exceed 70 dbA.

The noise level shall not exceed 80 dbA on the main deck of the barge, at 30 ft. radius around the crane center of rotation, with the crane operating at full power.

To accomplish this requirement, the contractor shall provide the necessary noise attenuation treatments.

Noise attenuation treatments may include vibration isolators, critical grade silencers, acoustic louver(s) and proper insulation in the machinery compartment(s) as required.

The contractor shall develop a drawing(s) detailing the noise and vibration control treatments. The drawing(s) shall be submitted to the Government for review and approval during Phase I.

C200 CRANE ARRANGEMENT

C215 GENERAL ARRANGEMENT

A General Arrangement drawing of the crane shall be provided, to include plan and profile views of the crane in the operating configuration and in the stowed configuration. The stowed position shall clearly indicate the location (along the boom) for the boom support on the deck of the barge.

All principal dimensions shall be indicated.

Should the crane need to be collapsed to a “stowed position” to meet the air draft requirement of paragraph E of contract Clause C105 of the specification, it shall be both self-erecting and self-stowing. The controls for both erection and stowage of the crane shall be installed within the operator’s cab.

The drawing(s) shall be submitted to the Government for review and approval during Phase I.

The design drawings of the crane pedestal, profile and arrangement shall be submitted to the Government as AutoCAD (2012 or higher) files for incorporation into the barge design.

C235 CRANE CAB

The crane cab shall be located on the right side of the boom.

A drawing representing the location of the controls and instrumentation with respect to the operator’s chair shall be provided.

The arrangement of the crane cab shall incorporate the following:

Cab furniture and furnishings – per contract Clause C437 of the specification.

Instrumentation and communication equipment – per contract Clause C470 of the specification.

Load moment indicator and data logger – per contract Clause C540 of the specification.

Fire extinguishers - per contract Clause C677 of the specification.

Lighting and receptacles – per contract Clause C730 of the specification.

Video camera displays – per contract Clause C780 of the specification.

The Bill of Materials shall include a list of equipment controls and instrumentation, indicating the manufacturer or vendor source, part/name description and number/model identification.

The drawing(s) shall be submitted to the Government for review and approval during Phase I.

C245 MACHINERY SPACE

A drawing representing the arrangement of the machinery spaces of the crane shall be provided.

The Bill of Materials shall include a list of equipment, indicating the manufacturer or vendor source, part/name description and number/model identification.

The drawing(s) shall be submitted to the Government for review and approval during Phase I.

C300 STRUCTURE

C301 WELDING DETAILS

During the Government’s barge design effort, barge structure supporting the pedestal and crane will be developed.

Once the barge design is developed, details of the barge structure attaching to the pedestal will be provided to the contractor. The contractor shall review these details and provide the welding design of the pedestal to the barge structure for the Government to incorporate. The Government will utilize this information to finalize the barge design and obtain regulatory approval.

C317 MAST AND ANTENNA

The contractor shall provide and install a navigation light mast with gaff and yardarm on top of the crane cab.

The crane cab top mounted navigation light mast shall hinge forward. When in the hinged down position, the mast shall be located such that all lights may be serviced from the top crane platform. A mast rest cradle shall be provided to support the mast when it is in the down position. Navigation light cables shall be located such that the mast may be lowered to the cradle without disconnecting the cables.

The crane top mounted navigation light mast shall incorporate a gaff and a yardarm. Both gaff and yardarm shall be fitted with staples, sheaves and halyards for flying both the USA and USACE ensigns. Galvanized cleats approximately 6-inches in length shall be provided to secure the halyards.

The Contractor shall provide and install one (1) counter-weighted flagpole on the tip of the boom. This flag shall be airport warning orange and white and shall not obscure the red aviation warning light.

C320 TANKS

The fuel oil tank and hydraulic oil tank supplied for the crane shall have the following features:

Constructed of 316 stainless steel Each tank fitted for stick sounding.

Each tank provided with raised, bolted, manhole access to allow for clean out of the interior of each tank.

The bottom of each tank shall be sloped to the drain for ease of clean up and to reduce maintenance.

Each tank shall be equipped with digital level indicators with audible low-level alarms. The digital displays shall be mounted in the operator’s cab within sight of the operator’s position.

The fuel oil tank shall be of adequate capacity to provide for at least 50 hours of continued operation of the crane at 75% engine power. The crane manufacturer shall provide to the Government the required tank gallon size to meet the above requirements.

The tank drawing(s) shall be submitted to the Government for review and approval during Phase I.

C399 GROSS OVERLOAD – FAILURE MODE ASSESSMENT

The contractor shall provide Failure Mode Calculations and Charts in accordance with API Specification 2C, current edition.

The crane shall be designed such that, in the case of a gross overload, the crane operator’s station will remain attached on board the barge.

The calculations/report shall be submitted to the Government for review and approval during Phase I.

C400 OUTFIT

C402 CORROSION PREVENTION

The choice of materials, the fabrication procedures and the coating systems to be used in the crane, shall bare evidence that careful consideration was given by the contractor to improve corrosion resistance and life expectancy of the paint system. Dissimilar metals shall be avoided to the greatest extent possible. Where required, dissimilar metals shall be isolated through bolt sleeves and isolator gasketing.

The structure shall be designed and fabricated to avoid corrosion, by effectively:

Preventing the entrapment of water, avoiding pockets where water can accumulate and facilitating drainage.

Facilitating the application of paint coatings.

Insulating the contact surfaces between two dissimilar metals against galvanic corrosion.

C405 PAINTING

The interior and exterior paint systems shall be heavy duty marine paint, providing good chemical resistance, good abrasion resistance and good impact resistance.

The last coat shall have a glossy finish with excellent resistance to chemical cleaning agents. The exterior coating shall be resistant to fading when exposed to sunlight. Fade resistant urethane topcoats are preferred.

All paints shall be free of lead and chrome.

The paint system shall be recommended and certified by the paint manufacturer to have a life expectancy of 5 years.

The paint manufacturer shall witness the paint application and ensure that the paint and surface prep are in accordance with the manufacturer’s recommended best practices.

The contractor is required to provide the DFT (Dry Film Thickness) recommended by the paint manufacturer. The thickness applied per coat may not exceed the paint manufacturer's recommended maximum thickness.

The paint colors shall be the manufacturer’s standard color scheme.

Prior to packaging for shipping, all interior and exterior painting shall be thoroughly inspected. Any defects in the coating shall be repaired by the Contractor, as required, to restore the integrity of the paint system.

The pedestal shall be coated with a pre-construction primary only.

The crane contractor is responsible for delivering the crane with all painted surfaces in new condition.

A paint schedule shall be developed and submitted to the Government for review and approval during Phase I.

C408 PAINT PROTECTION AND REPAIR

The crane contractor shall package the crane, its components, materials, and spare parts such that the paint is protected for all of these items during storage and shipment to the Government’s designated place of delivery.

All interior and exterior painting shall be re-inspected upon delivery by the crane manufacturer, and any damage to the coating system during shipment shall be repaired by the crane manufacturer to restore the integrity of the paint system.

All interior and exterior painting shall be re-inspected upon installation completion by the crane manufacturer, and any damage to the coating system during installation shall be repaired by the shipyard contractor to restore the integrity of the paint system, with paint provided by the crane manufacturer.

C415 DOORS, WINDOWS, HATCHES AND MANHOLES

All crane doors shall be weathertight, and fabricated of stainless steel, with a large, fixed window. Doors shall be provided for the cab and machinery space.

All crane cab windows shall be safety or tempered glass and provide good visibility to the boom point and the hook at all times. In addition to front and side windows, the cab shall be outfitted with bottom front (near foot pedals), top front and top windows. Windshield wipers and defroster shall be installed on the cab front windows. The sides of the cab, to the left and right of the operator, shall each have a window capable to open, and be held secure in the open position. Mylar sunshades shall be provided for the side and top windows in the cab, with the shades mounted on clutch springless rollers.

All window glass shall be medium tint.

The fuel oil tank and other tanks shall each be outfitted with raised, bolted plate, oil tight, clean out hatches (manholes) with clear opening of 15 inches by 23 inches. The manholes and the bolts shall be made of stainless steel 316, (same material as the tanks) and supplied with gaskets.

The pedestal shall be outfitted with two, raised, bolted plate, watertight, hatches with clear opening of 18 inches x 24 inches. The hatches shall be supplied with gaskets. The hatches shall allow for access to the bottom of the pedestal from the inside of the barge, with the bottom of each hatch located 24 inches above the bottom of the pedestal.

The crane machinery space shall be provided with removable bolted plates, large enough to remove the engine(s) and major components. The bolted plates shall be weather tight and supplied with gaskets.

Access shall be provided to the slip ring for maintenance and repairs.

C416 LOCKS AND KEYS

The exterior doors to the machinery space and to the cab shall be fitted with suitable locks. All locks shall be lever type and suitable for marine service.

Two keys and two blank keys shall be furnished for each door lock. The keys shall be equal so that the same key can open all doors.

The keys shall be delivered in a box, installed in the cab, with numbered hooks, one for each door lock, with cross reference compartment designation stenciled on the inside cover of the box.

C425 WALKWAYS AND RAILINGS

All walkways and railings shall conform to the fall protection rail requirements of EM385-1-1 Section 19.E and Section 21.

A minimum 30-inch-wide access ladder/walkway with guardrails shall be provided to the cab. The walkway shall provide easy access to clean all cab windows besides the front window.

A walkway in front of the cab shall also be provided to clean and maintain the front window and wipers. The walkway in front of the cab shall be 18 inch wide “see through” grating for visibility.

The front walkway handrail shall be chain. It shall be removable to provide the best visibility when the walkway is not in use. There shall be a chain closure across the front rail access for protection when the railing is removed.

The boom, from the heel pins to the boom tip, shall be provided with an 18-inch wide (minimum) walkway grating.

Easy access from the deck of the barge to this walkway shall be provided. The walkways shall provide easy access to all grease points for maintenance. Handrails shall be provided along both sides of the walkway.

Walkways shall be provided to the machinery enclosure, and to locations on the rotating works that require routine access (winches, sheaves, fold-down structure, etc.).

Access platforms located on the rotating upper works, pedestal, boom pin areas and boom tip areas for maintenance activities shall have perimeter guardrail protection as required by EM385-1-1.

A walkways and railings drawing(s) shall be developed and submitted to the Government for review and approval during Phase I.

C427 LADDERS

A ladder(s) for access from the barge deck to the crane is required and shall be permanently installed on the crane.

This ladder, when stowed for crane operation, shall be able to meet the deck clearance requirement of 3 ft. 9 in minimum. This ladder shall be retractable with spring assist.

Two sets of ladder rungs shall be provided on the inside of the pedestal or king post providing access all the way to the top of the structure. Clip in points shall be provided as required for personnel fall protection devices.

Vertical ladders and incline ladders shall be provided on the rotating works as necessary to access machinery, maintenance and inspection points. All vertical and inclined ladders shall be in accordance with ASTM F1166 and EM385-1-1, Sections 19 and 21, including design, fall protection, guardrails and handrails.

A ladders drawing(s) shall be developed and submitted to the Government for review and approval during Phase I.

C430 DECK COVERINGS

Non-skid surfaces shall be provided on all crane decks and platforms, including the crane housetop. This can be accomplished through the use of non-skid paint additives. All grating used on walkways shall have non-skid serrated edges or grit-top surfaces.

C436 INSULATION

The machinery compartments and the operator cab, shall be insulated to meet the noise abatement requirements of Clause C180 of this specification. The operator cab insulation shall meet the temperature/HVAC requirements of Contract Clause C685.

All piping not located in a heated space shall be insulated.

The exhaust pipe from the engines, and any pipe that may present a temperature hazard shall be insulated.

C437 CAB FURNITURE AND FURNISHINGS

One (1) padded chair for the cab operator shall be provided with adjustments for height, inclination and sliding fore and aft. The chair shall have heated seat capability and shall be provided with an on/off switch for this function.

A rotating arm with shelf 14 inches by 20 inches wide shall be provided, for the crane operator to place a lap-top computer and use it while seated in the operator’s chair.

Suitable storage for the crane’s operations manual, the crane logbook, and the crane’s floating service load charts, shall be provided in the cab, within reach of the operator when seated.

Stowage for one life preserver shall be provided in the cab plus two coat hooks.

An articulated (similar to an automobile) large sun visor shall be provided for use by the operator seated in the chair.

A fire extinguisher shall be installed in the cab in accordance with contract Clause C677 of the specification.

A furniture and furnishings drawing(s) shall be developed and submitted to the Government for review and approval during Phase I.

C460 NAMEPLATES, NOTICES AND MARKINGS

The contractor shall fabricate and install nameplates, notices and markings as required. Nameplates, notices and markings exposed to the weather shall be photo anodized aluminum and shall be attached with stainless steel screws.

Interior nameplates, notices and markings shall be engraved on photo anodized aluminum and shall be attached with stainless steel screws.

In addition to those required by contract Clause C003 of the specification, the following shall be provided:

Each doorway shall be labeled (above) with the compartment designation.

NO SMOKING notices shall be placed at fuel oil fill stations and on the doorways to all…