Sources Sought - Excitation System Upgrade.docx
DOCX document 35 KB Posted
- Attached to
- Fort Peck Excitation System Upgrade
- Solicitation number
- W9128F27RA001
About this file
This is a Sources Sought notice for market research purposes regarding potential modernization of excitation systems at Fort Peck Dam, a remote hydroelectric facility operated by the U.S. Army Corps of Engineers on the Missouri River near Glasgow, Montana. The facility comprises two powerhouses with five total generating units. Powerhouse 1 (Units 1-3) requires targeted modernization of front-end excitation controls, field breakers, and operator interface components while potentially reusing existing digital excitation regulator hardware and cubicles. Powerhouse 2 (Units 4-5) may require full excitation system replacement, including removal of legacy equipment and installation of new digital static excitation systems. The anticipated scope includes modern digital excitation systems, integration with existing generator and plant systems, excitation modeling and validation testing, and factory and site acceptance testing. Work will be performed at a remote location with limited local labor availability and requires coordination across multiple generating units and outage windows.
The Sources Sought document requests information from qualified contractors regarding their experience and capability to execute this work. Respondents must address seven primary questions covering: excitation system modernization or replacement experience at operating hydroelectric or comparable industrial facilities within the past five years; experience performing electrical work at operating facilities with restricted access and outage coordination requirements in remote locations; experience coordinating work across multiple generating units and phased outages; whether the firm self-performs or subcontracts major excitation system elements; capability to accomplish the work and meet personnel requirements; staffing and mobilization approach for remote hydroelectric facilities with limited local labor; and any feedback regarding the acquisition strategy. The NAICS code is 335311 (Power, Distribution, and Specialty Transformer Manufacturing). The proposal due date was extended to April 7, 2026. This notice does not constitute a formal solicitation but is issued for market research to assess industry capability and interest.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought - Excitation System Upgrade.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Company Name | Click or tap here to enter text. | |
| Street Address | Click or tap here to enter text. | |
| City | Click or tap here to enter text. | |
| State | Click or tap here to enter text. | |
| Zip | Click or tap here to enter text. |
| Point of Contact | Click or tap here to enter text. | |
| Click or tap here to enter text. | ||
| Phone | Click or tap here to enter text. |
| Cage Code | Click or tap here to enter text. | |
| UEI # | Click or tap here to enter text. |
Background USACE is seeking information from interested and qualified contractors regarding potential modernization of excitation systems at Fort Peck Dam, a remote hydroelectric facility located on the Missouri River near Glasgow, Montana. The facility consists of two powerhouses with a total of five generating units. Existing excitation systems present reliability and supportability concerns due to aging equipment, partial legacy upgrades, and obsolescence of key control components.
Powerhouse 1 – Units 1–3
· Existing digital excitation regulator hardware remains serviceable.
· Front-end excitation controls, field breakers, and operator interface components are obsolete and/or experiencing reliability issues.
· The Government is evaluating a targeted excitation system modernization approach, which may include replacement of failing or obsolete front-end components while reusing existing regulator hardware and cubicles, with modifications as required.
Powerhouse 2 – Units 4–5
· Existing excitation systems include legacy components operating beyond their recommended design life.
· The Government is evaluating a full excitation system replacement for these units, which may include removal of existing equipment and installation of new digital static excitation systems.
The anticipated scope may include modern digital excitation systems, integration with existing generator and plant systems, excitation modeling and validation testing, and factory and site acceptance testing. Work would be performed at a remote location with limited local labor availability and would require coordination across multiple generating units and outage windows.
This Sources Sought notice is issued solely for market research purposes to assess industry capability, interest, and potential acquisition strategies. It does not constitute a solicitation.
General Information
Has your company performed work for the Federal Government under a different name or UEI or as a member of a Joint Venture (JV)?
☐Yes ☐No If yes, you may provide an explanation below:
Click or tap here to enter text.
Is your company currently register in System of Award Management (SAM) ☐Yes ☐No
Is your company registered under NAICS code 335311 (Power, Distribution, and Specialty Transformer Manufacturing)? If not, is there a similar NAICS code that the company is registered under?
Click or tap here to enter text.
Select whether your firm is classified by the Small Business Administration as any of the following:
☐Small Business ☐Service-Disabled Veteran-Owned Small Business (SDVOSB) ☐Section 8(a) ☐Women Owned Small Business (WOSB) ☐Economically Disadvantaged Women Owned Small Business (EDWOSB) ☐HUB Zone ☐None of the above
Questions
1. Does your firm have experience performing excitation system modernization, replacement or integration work at operating hydroelectric generating facilities or comparable industrial power generation facilities within the last five (5) years?
☐Yes ☐No If yes, please provide a brief description and at least two (2) example projects, including:
· Facility type
· Scope of excitation system work (modernization, partial replacement, full replacement, integration, etc.)
· Approximate project magnitude
· Whether the facility remained operational during construction
2. Does your firm have experience performing electrical construction or renovation work at operating facilities with restricted access, outage coordination requirements, or remote/logistically challenging locations within the last five (5) years?
☐Yes ☐No If yes, please provide examples and describe how your firm addressed staffing and mobilization challenges.
3. Does your firm have experience executing work across multiple generating units or coordinating phased outages under a single contract?
If yes, briefly describe the project(s) and the coordination approach utilized.
4. Does your firm typically self-perform major aspects of excitation system installation and integration, or rely on subcontractors for key elements (engineering, equipment supply, installation, testing, commissioning)?
☐ Primarily self-perform ☐ Primarily subcontract ☐ Combination Please briefly describe your typical approach.
5. After reviewing Sources Sought, does your organization believe that it can accomplish this work and meet the experiential and personnel requirements.
☐No
6. Describe your company’s approach to staffing and mobilizing work at remote hydroelectric facilities with limited local labor availability.
☐Yes
7. Do you have any feedback you would like to provide for this acquisition?