W9128F26QA055 Questions and Answers.pdf
PDF 186 KB Posted
- Attached to
- Garrison Dam Man Lift Rental
- Solicitation number
- W9128F26QA055
About this file
This is a Questions and Answers document for federal contract W9128F26QA055, issued on 01 June 2026 by the Omaha District Corps of Engineers.
The contract requirement is for man lift rental in support of Health and Safety Surveillance (HSS) inspections of Garrison Dam Spillway Tainter Gates. The document clarifies that the contractor is responsible only for providing the man lift rental and associated placement services on the spillway slab; government personnel will operate the equipment. The man lift must be capable of lifting three persons (two inspectors and one operator) and must reach horizontally approximately 65 feet to access the spillway gates. The contract includes multiple CLINs, with CLIN 0003 designated as "All remaining work," allowing offerors to allocate costs for supplies, equipment, and facilities required to perform the contract work that are not specified under CLINs 0001-0002.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W9128F26QA00550001 SF30.pdf | ||
| Solicitation - W9128F26QA055.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9128F26QA055
Man Lift Rental in Support of Required HSS Inspections of Garrison Dam Spillway Tainter Gates for the Omaha District Corps of Engineers
Questions and Answers
01 June 2026
Q: Do you need an operator for the man lift?
A: No, this contract is only to provide for rental of the man lift, as well as the associated services to place the man lift on the spillway slab. Government personnel will be operating the man lift to complete the required inspections.
Q: Can you specify what “all remaining work” refers to?
A: CLIN 0003, “All remaining work,” allows an offeror to allocate any costs for supplies, equipment, and facilities required to perform work under this contract that are not specified under CLINs 0001-0003.
Q: What is the weight we will be lifting and the radius?
A: The man lift must be capable of lifting three persons – two (2) inspectors and one (1) operator.
The man lift will be required to reach horizontally approximately 65 feet to the spillway gates.
File details come from the government source that posted it. Updated .