This file contains construction drawings for the Riverdale Feeder Relocation project at Garrison Dam, North Dakota, issued by the US Army Corps of Engineers Omaha District under solicitation W9128F25R0003 with an issue date of January 7, 2025.
The drawings detail electrical and site work plans for relocating power feeder lines, including installation of underground ductbanks, handholes, pad-mounted disconnects, pole-mounted reclosers, and power poles. Key components include three-phase 13.8kV underground ductbanks with 4/0 AWG copper XLPE cables, communications ductbanks, 40-foot overhead power poles with guy wires, a 200A 15kV pole-mounted recloser, and a 600A 15kV pad-mounted disconnect switch. The drawings provide detailed specifications for pole installations, ductbank configurations, electrical equipment mounting, and switchyard bus connections. Two soil boring locations (GA24-01 and GA24-02) are identified on the site plan to characterize subsurface conditions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001 - W9128F25R0003 GA Riverdale Feeder.pdf | ||
| Site Visit Sign In Sheet - W9128F25R0003 GA Riverdale Feeder Relocation 1-23-25.pdf | ||
| W9128F25R0003 Garrison Riverdale Feeder Relocation Solicitation 1of3.pdf | ||
| W9128F25R0003 Garrison Riverdale Feeder Relocation Specs 2of3.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A N
S I
D
R
IV
E R
D A
L E
F E
E D
E R
R E
L O
C A
T
IO
N
G A
R R
IS
O
N D
A M
N
O R
T H
D A
K O
T A
W F
R
/0
/2
O M
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
IC
T
F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J
S W
E R
C Z
E K
C
V E
R
I N
D E
X
G-001
M H
O F
F M
A N
J
S W
E R
C Z
G
G
-0
.d g n
H
O F
F M
S
P
D
:3
:2
A
M
/2
/2
G R
G
-0 .d
RIVERDALE FEEDER RELOCATION
GARRISON DAM, NORTH DAKOTA
W9128F25R0003
01/07/2025
OMAHA DISTRICT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A D
V E
R T
IS
E
M E
N T of Engineers
US Army Corps
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
Omaha District of Engineers
US Army Corps
SUBMITTED BY:
CHIEF:
SUBMITTED BY:
CHIEF:
SUBMITTED BY:
CHIEF:
SUBMITTED BY:
CHIEF:
SUBMITTED BY:
CHIEF:
SUBMITTED BY:
CHIEF:
SUBMITTED BY:
CHIEF:
SUBMITTED BY:
SECTION
PE
SECTION
PE
SECTION
PE
SECTION
PE
SECTION
PE
SECTION
SECTION
RA
CADD
PROJECT COORD.
DATE
DATE
DATE
DATE
CHIEF, DESIGN BRANCH
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL OF DRAWINGS IN THIS SET.
ENGINEERING DIVISION, P.E.
CHIEF,
EMPLOYMENT AS REQUIRED BY ER 1110-1-8152
AND REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR
THIS PROJECT WAS DESIGNED BY THE OMAHA DISTRICT OF THE US ARMY CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES
ENGINEERING & SCIENCES BRANCH
CHIEF, GEOTECHNICAL
ENGINEERING BRANCH
CHIEF, HYDROLOGIC
FUELS
ARCH. / INTER.
ELEC.
MECH.
PE
CIVIL / ENVIR.
STRUCT.
DATECHIEF, DAM SAFETY PROD.
CENTER
GEOT./ DAM SAFETY
S
E R
D A
L E
F E
E D
E R
R E
L O
C A
T
IO
N
G A
R R
IS
O
N D
A M
N
O R
T H
D A
K O
T A
W F
R
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
J
S W
E R
C Z
B
B R
E V
IA
T
IO
N
S
G-002
M H
O F
F M
A N
J
S W
E R
C Z
G
-0
.d
H
O F
F M
P
D
:3
:3
A
M
/2
/2
G R
G
-0 .d g n
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A D
V E
R T
IS
E
M E
N T
CONTRACTORCONTR
CONTINUE CONT
CONSTRUCTIONCONSTR
CONNECTCONN
CONCRETECONC
COMPARTMENTCOMPT
COMBUSTIONCOMB
COMMONCOM
COLUMNCOL
CARBON DIOXIDECO2
CLEANOUTCO
COUNTERCNTR
CORNERCNR
CONDUCTIVE NEOPRENE LATEXCNL
CONDUITCND
CONCRETE MASONRY UNITCMU
COMPOSITECMPST
CORRUGATED METAL PIPECMP
CENTIMETER(S)cm
CLEAR WIRED GLASSCLWG
CLEAR(ANCE)CLR
CLOSURECLOS
CLOSETCLO
CONTRACT LIMIT LINECLL
CLEAR GLASSCLGL
CEILING HEIGHTCLG HT
CEILINGCLG
CENTER LINECL
CIRCUIT BREAKERCKT BRKR
CIRCUITCKT
CONSTRUCTION JOINTCJ
CONTROL JOINTCJ
CIRCULARCIRC
CAST-IN-PLACECIP
CURB INLETCI
CAST IRONCI
CHROME PLATEDCHR PL
CHECKCHK
CHIMNEYCHIM
CHAMFERCHFR
CHALKBOARDCH BD
CORNER GUARDCG
CUBIC FEET PER MINUTECFM
COUNTERFLASHINGCFLG
CONDUCTIVE FLOORINGCFI
CERAMICCER
CEMENT PLASTERCEM PLAS
CEMENTCEM
COVER ELEVATIONCE
CLOSED CIRCUIT TELEVISIONCCTV
CUBICLE CURTAIN TRACKCCT
CATCH BASINCB
CAPACITYCAP
CABINETCAB
BOTH WAYSBW
BUILT-UP ROOFINGBUR
BETWEENBTWN
BTU PER HOURBtuH
BRITISH THERMAL UNITBtu
BASEMENTBSMT
BOTH SIDESBS
BRONZEBRZ
BRACKETBRKT
BRICKBRK
BEARING PLATEBRG PL
BEARINGBRG
BRIDGINGBRDG
BRACINGBRCG
BACK PLASTER(ED)BP
BOTTOMBOT
BOTTOM OFBO
BENCHMARKBM
BELOWBLW
BUILDINGBLDG
BUILDING LINEBL
BED JOINTBJT
BITUMINOUSBITUM
BEVELBEV
BRICK EXPANSION JOINTBEJ
BOUNDARYBDRY
BOARDBD
BOOKCASEBC
BULLETIN BOARDBB
ACOUSTICAL WALL TREATMENTAWT
AMERICAN WIRE GAUGEAWG
AVERAGEAVG
AUTOMATICAUTO
ACOUSTICAL TILE CEILINGATC
ASPHALTASPH
ABOVE SUSPENDED CEILINGASC
ASBESTOSASB
AMERICAN REFRIGERATION INSTITUTEARI
ARCHITECTARCH
APPROXIMATEAPPROX
APPROVEDAPPD
AMERICAN NATIONAL STANDARDS INSTITUTEANSI
ANODIZEANOD
AMPEREAMP
AMBIENTAMB
ALUMINUMALUM
ALTERNATEALT
ACTIVE LEAFA.L.
AMERICAN INSTITUTE OF STEEL CONSTRUCTIONAISC
AMPERE INTERRUPTING CAPACITYAIC
AREA INLETAI
AIR HANDLING UNITAHU
ANCHOR AHR
AGGREGATEAGGR
ABOVE FINISHED FLOORAFF
AUTOMATIC DOOR OPERATORADO
ADJACENT, ADJOINING, ADJUSTABLEADJ
ADHESIVEADH
ADDENDUMADDM
ACOUSTICAL CEILING TILEACT
ACOUSTICACST
ALUMINUM CABLE STEEL REINFORCEDACSR
ACCESS PANELACS PNL
ACCESS DOORACS DR
ACRYLIC PLASTICACR
AMERICAN CONCRETE INSTITUTEACI
ACCESSIBLEACC
ALTERNATING CURRENTAC
ABOVEABV
ANCHOR BOLTAB
AIR CONDITIONING UNITA/C UNIT
AIR CONDITIONINGA/C
ANGLEL
FLOORFLR
FLASHINGFLASH
FLUSH JOINTFJT
FIXTUREFIXT
FINISH FLOORFIN FLR
FINISHFIN
FIGUREFIG
FLAT HEAD WOOD SCREWFHWS
FIRE HOSE STATIONFHS
FIRE HOSE RACKFHR
FLAT HEAD MACHINE SCREWFHMS
FIRE HOSE CABINETFHC
FLAT HEADFH
FIRE HYDRANTFH
FIBERGLASSFGL
FACTORY FINISHFF
FIRE EXTINGUISHER CABINETFEC
FIRE EXTINGUISHER BRACKETFEB
FIRE EXTINGUISHERFE
FOUNDATIONFDTN
FIRE DAMPERFDMPR
FLOOR DRAINFD
FAN COIL UNITFCU
FLOOR CLEANOUTFCO
FLOOR CONSTRUCTION JOINTFCJ
FACINGFCG
FACE BRICKFC BRK
FOOT CANDLEFC
FIRE BRICKF BRK
FRESH AIR INTAKEFAI
FIRE APPARATUS CLOSETFAC
FRESH AIRFA
FIRE ALARMFA
FAHRENHEITF
EXTERIOREXT
EXPANSION BOLTEXP BT
EXPOSEDEXP
EXPANSIONEXP
EXISTINGEXST
EXHAUST AIREXH A
EXHAUSTEXH
EXCAVATEEXC
ENTERING WATER TEMPERATUREEWT
ELECTRIC WATER COOLEREWC
ESTIMATE(D)EST
ESCALATORESCAL
EQUIPMENTEQUIP
EQUALEQ
EPOXY COATINGEPY
EXPLOSION PROOFEPRF
ELECTRICAL PANELBOARDEP
ENTRANCE, ENTERINGENTR
ENCLOSE(URE)ENCL
EMERGENCYEMER
ESTIMATED MAXIMUM DEMANDEMD
EXPANDED METAL EM
ELECTRICELEC
ELEVATION - GRADE OR BUILDINGEL
EXPANSION JOINTEJ
EACH FACEEF
ENTERING AIR TEMPERATUREEAT
EACHEA
EASTE
DIRECT EXPANSIONDX
DUMBWAITERDWTR
DRAWERDWR
DOWELSDWLS
DRAWINGDWG
DOVETAIL DVTL
DRAIN TILEDT
DOWNSPOUTDS
DOUBLE STRENGTH (GLASS)DS
DOOR CLOSERDR CL
DRAINBOARDDRB
DRAINDR
DOORDR
DOWNDN
DEMOUNTABLEDMT
DAMPERDMPR
DAMPPROOFINGDMPF
DEAD LOADDL
DIVISIONDIV
DISTRIBUTION PANELDISTR PNL
DISPENSERDISP
DISCONNECTDISC
DIMENSIONDIM
DIAGONALDIAG
DIAMETERDIA
DUCT HEATERDH
DOUBLE HUNGDH
DRINKING FOUNTAINDF
DETAILDET
DEPARTMENTDEPT
DEPRESSIONDEPR
DEMOLITIONDEMO
DEGREEDEG
DUMMY CONTROL JOINTDCJT
DOWELED CONTROL JOINTDCJ
DOUBLE ACTING DOORDBL ACT DR
DOUBLEDBL
DRY BULBDB
DATUMDAT
PENNY (AS IN NAIL - 10D)d
CYLINDERCYL
COLD WATERCW
CONDUCTIVE VINYL HOMOGENEOUS (SHEET TYPE)CVH
CEILING VENTCV
CUBIC YARDSCU YD
CABINET UNIT HEATERCUH
CUBIC FEETCU FT
COPPERCu
CONDENSING UNITCU
CENTERCTR
CENTER TO CENTERC TO C
CURRENT TRANSFORMERCT
CERAMIC TILECT
CASEMENTCSMT
COUNTERSUNKCSK
CAST STONECS
COURSE(S)CRS
CROSS GRAINCRG
CORROSIVE RESISTANT STEELCRES
CIRCUMFERENCECRCMF
CARPETCPT
COMPRESSIBLECPRS
COVERCOV
CORRIDORCORR
LAG BOLTLB
LAVATORYLAV
LAUNDRYLAU
LEAVING AIR TEMPERATURELAT
LAMINATELAM
LADDERLAD
LABORATORYLAB
KEYWAYKWY
KILOWATTkW
KILOVOLT AMPERES REACTIVEkVAR
KILOVOLT AMPERESkVA
KILOVOLTSkV
KILOMETERkm
KICKPLATEKPL
KNOCKOUT PANELKOP
KITCHENKIT
KILOPOUND (1000 POUNDS)KIP
JOINTJT
JOISTJST
JUNCTIONJCT
JUNCTION BOXJ-BOX
JANITOR’S CLOSETJAN CLO
INSIDE PIPE SIZEI.P.S.
IRON PIPE SIZEIPS
IRON PIPEIP
INVERTINV
INTERMEDIATEINTM
INTERIORINT
INSULATIONINSUL
INSULATING FILLINSF
INCLUDEDINCL
INCINERATORINCIN
INCHIN
INTERLOCKILK
ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICAIESNA
INSIDE DIAMETERID
INTERCOMIC
HERTZHz
HYDRAULICHYDR
HEATING, VENTILATING AND AIR CONDITIONINGHVAC
HEATERHTR
HEATINGHTG
HEIGHTHT
HOUSEKEEPINGHSKPG
HIGH-STRENGTH GYPSUM PLASTERHSGYP
HIGH STRENGTHHS
HOURHR
HIGH POINTHPT
HORSEPOWERHP
HIGH PRESSUREHP
HORIZONTALHORIZ
HANDRAILHNDRL
HOLLOW METALHM
HOOK(S)HK
HANDHOLEHH
HEXAGONHEX
HIGH EARLY-STRENGTH CEMENTHES
HARDWOODHDWD
HARDWAREHDW
HEADERHDR
HEAD JOINTHD JT
HARDBOARDHDBD
HEAVY DUTYHD
HEADHD
HANDICAPPEDHCP
HALON CONTAINMENT DAMPERHCD
HOLLOW COREHC
HOSE BIBBHB
GYPSUM PLASTERGYP PLAS
GYPSUM BOARDGYP BD
GYPSUMGYP
GLAZED WALL TILEGWT
GROUTGT
GLAZED STRUCTURAL UNITSGSU
GLAZED STRUCTURAL TILEGST
GRATINGGRTG
GRADE LINEGR LN
GRANITEGRAN
GYPSUM TILEGPT
GALLONS PER MINUTEGPM
GOVERNMENTGOVT
GROUNDG
GLAZED CONCRETE MASONRY UNITSGLZ CMU
GLAZINGGLZ
GLASS FIBERGLF
GLASS BLOCKGL BLK
GLASSGL
GASKET(ED)GKT
GALVANIZED IRON PIPEGIP
GALVANIZED IRONGI
GOVERNMENT-FURNISHED EQUIPMENT CONTRACTOR INSTALLEDGFE/CI
GOVERNMENT-FURNISHED EQUIPMENTGFE
GROUND FAULT CIRCUIT INTERRUPTERGFCI
GROUND FACEGF
GENERALGEN
GENERAL CONTRACTORGC
GRAB BARGB
GALVANIZED STEELGALV STL
GALVANIZEDGALV
GALLON(S)GAL
GAGEGA
NATURAL GASG
FABRIC WALL COVERINGFWC
FIRE WATERFW
FUTUREFUT
FURRINGFURG
FOOTINGFTG
FEETFT
FASTEN(ER)FSTNR
FULL SIZEFS
FIRE-RETARDANTFRT
FRAMINGFRMG
FORGEDFRG
FRAMEFR
FIRE RESISTANT FR
FEET PER MINUTEFPM
FIREPROOFFP
FIRE PARTITIONFP
FACE OF STUDFOS
FACE OF MASONRYFOM
FACE OF FINISHFOF
FACE OF CONCRETEFOC
FENCEFN
FLUORESCENTFLUOR
FLOOR PLATEFLR PL
FLOORINGFLG
FLEXIBLEFLEX
PERFORATE(D)PERF
PEDESTALPED
PAVEMENT DRAINPD
CEMENT PLASTER (PORTLAND)PCP
POUNDS PER CUBIC FOOTPCF
PRECAST CONCRETEPCC
PIECEPC
PUSH BUTTON STATIONPBS
PARTICLE BOARDPBD
PANIC BARPB
PARALLELPAR
PUBLIC ADDRESSPA
POLEP
OBSCURE WIRED GLASSOWGL
OUTSIDE SCREW AND YOKEOS & Y
OPERATIONSOPS
OPAQUEOPQ
OPPOSITEOPP
OPENINGOPNG
OPPOSITE HANDOPH
OVALHEAD WOOD SCREWOHWS
OVALHEAD MACHINE SCREWOHMS
OVERHEADOH
OBSCURE GLASSOGL
OFFICEOFC
OUTSIDE DIAMETEROD
ON CENTER EACH WAYOCEW
ON CENTEROC
OBSERVATION WINDOWOBW
OBSCUREOBSC
OUTSIDE AIROA
NOT TO SCALENTS
NOT REQUIREDN’’REQD
NOISE REDUCTION COEFFICIENTNRC
NOISE REDUCTIONNR
NOMINALNOM
NUMBERNO
NORMALLY OPENNO
NONMETALLICNM
NEOPRENE LATEXN.L.
NAILABLENL
NOT IN CONTRACTNIC
NICKELNi
NATIONAL FIRE PROTECTION ASSOCIATIONNFPA
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATIONNEMA
NATIONAL ELECTRICAL CODENEC
NORMALLY CLOSEDNC
NATURALNAT
NORTHN
MULLIONMULL
MOVABLEMVBL
METALMTL
METAL FURRINGMTFR
MOUNTEDMTD
MOUNTMT
METAL THRESHOLDMT
MACHINE SCREWSMS
METAL ROOF DECKINGMRD
MARBLE BASEMRB
MOP RECEPTORMR
MOVABLE PARTITIONMP
MOTORMOT
MODIFIEDMOD.
MODULARMOD
MASONRY OPENINGMO
MATERIAL NOT IN CONTRACT (INSTALLATION BY CONTRACTOR)MNIC
MILLIMETER(S)mm
MILLWORKMLWK
MOULDINGMLDG
MONOLITHICML
METAL LATHML
MISCELLANEOUSMISC
MIRRORMIRR
MINIMUMMIN
MALLEABLE IRONMI
MANHOLEMH
MATTE-GLAZED TILEMGT
MOTOR GENERATORMG
MANUFACTURERMFR
MANUFACTURINGMFG
METAL FLOOR DECKINGMFD
METAL EDGE STRIPMES
MEMBRANEMEMB
MEDIUMMED
MECHANICAL ROOMMECH RM
MECHANICALMECH
METAL DIVIDER STRIPMDS
METAL-CASED OPENINGMCO
MASONRY CONTROL JOINTMCJ
MEDICINE CABINETMC
MEMBERMBR
MACHINE BOLTSMB
MAXIMUMMAX
MATERIAL(S)MATL
MASONRYMAS
MACHINEMACH
MATCHED AND BEADEDM&B
METER(S)m
LEAVING WATER TEMPERATURELWT
LIGHTWEIGHT CONCRETELWC
LOUVERLVR
LIGHTNINGLTNG
LIGHTINGLTG
LIGHTWEIGHTLT WT
LIGHTLT
LAWN SPRINKLERLS
LIVING ROOMLR
LOW POINTLPT
LIGHTPROOF LOUVERLPL
LIGHTPROOF DOORLPD
LIGHTPROOFLP
LONGITUDINALLONG
LINTELLNTL
LIMESTONELMST
LUMENLM
LEAD-LINED DOORLLD
LIVE LOADLL
LOCKERLKR
LINEARLIN
LEFT HAND(ED)LH
LENGTHLG
LOADINGLDG
LOADLD
LIGHT CONTROLLC
LUMBERLBR
LABELLBL
POUNDLB
SOUNDPROOF DOORSPD
SPECIALSPCL
SPACERSPC
SHUT OFF VALVESOV
SHEET METAL SCREWSSMS
SHEET METALSM
SLEEVESLV
SEALANTSLNT
SKYLIGHTSKLT
STEEL JOIST INSTITUTESJI
SIMILARSIM
SHELVINGSHV
SHEATHINGSHTHG
SHEETSHT
SHOULDERSHLDR
SHEET GLASSSG
STRUCTURAL FACING UNITSFU
STRUCTURAL FACING TILE UNITSFTU
SAFETY GLASSSFGL
SEQUENCESEQ
SECTIONSECT
STEEL DOOR INSTITUTESDI
STORM DRAINSD
STRUCTURAL CLAY TILESCT
SCREENSCRN
SCHEDULESCHED
SOLID CORESC
SECURITY BARSS.B.
SPLASH BLOCKSB
SUPPLY AIRSA
SOUTHS
RAINWATER CONDUCTORRWC
RIVETRVT
REVERSERVS
RUBBER TILE FLOORRTF
RAISED PATTERN RUBBER TILERPRT
REVOLUTIONS PER MINUTERPM
RETRACTABLE PARTITIONRP
RIGHT OF WAYROW
ROUGH OPENINGRO
ROUNDRND
ROOMRM
RAILINGRLG
RACKRK
ROOF HATCHRH
RIGHT HANDRH
RELATIVE HUMIDITYRH
ROOFINGRFG
REVISIONREV
RETURNRET
RESILIENTRESIL
REQUIREDREQD
REMOVE(ABLE)REM
REINFORCEREINF
REGLETREG
REGISTERREG
REFRIGERATIONREFR
REFLECTREFL
REFERENCEREF
RECTIFIERRECT
RECREATION ROOMREC ROOM
RECEPTACLERECPT
RIGID INSULATIONRDG INS
ROOF DRAINRD
RECEIVERRCVR
REINFORCED CONCRETE PIPERCP
REMOTE CONTROLRC
RUBBERRBR
RUBBLE STONERBL
RUBBER BASE, RESILIENT BASERB
RETURN AIR REGISTERRAR
RETURN AIR GRILLERA GR
RABBETEDRAB
RETURN AIRRA
RISERR
RANGER
RADIUSR
QUANTITYQTY
QUARTER ROUND1/4 RND
QUARTERQTR
QUARTQT.
QUARRY TILEQT
PASS WINDOWPW
PAVINGPVG
POLYVINYL CHLORIDEPVC
PAVEDPV
PAPER TOWEL RECEPTACLEPTR
PARTITIONPTN
PAPER TOWEL DISPENSERPTD
POST-TENSIONED CONCRETEPT CONC
POINTPT.
PNEUMATIC TUBEPT
POUNDS PER SQUARE INCHPSI
POUNDS PER SQUARE FOOTPSF
PRESTRESSED CONCRETEPS CONC
PRESSED STEELP.S.
PIPE SPACEPS
PRESSURE-REGULATING VALVEPRV
PROJECTPROJ
PARKINGPRKG
PREFORMEDPREFMD
PREFINISHEDPREFIN
PREFABRICATE(D)PREFAB
PAIRPR
PARTS PER MILLIONPPM
POLISHED PLATE GLASSPPGL
PORTABLEPORT
PORCELAINPORC
POLISHEDPOL
PAINT(ED)PT
PANELPNL
PLYWOODPLYWD
PLATE GLASSPL GL
PILINGPLG
POUNDS PER LINEAR FOOTPLF
PLUMBINGPLBG
PLATFORMPLAT
PLASTERPLAS
PLASTIC LAMINATEPLAM
PROPERTY LINEPL
PLATEPL
POST INDICATING VALVEPIV
PREFAB ISOLATION POWER UNITPIPU
POINT OF INTERSECTIONPI
PHARMACYPHAR
PHASEPH
PERIMETERPERIM
YARD DRAINYD
YARDYD
TRANSFORMERXFMR
WELDED WIRE REINFORCEMENTWWR
WELDED WIRE MESHWWM
WELDED WIRE FABRICWWF
WALL TO WALLW/W
WIDTHWTH
WEIGHTWT
WAINSCOTWSCT
WASTE STACKW.S.
WATERSTOPWS
WARDROBEWRB
WASTE RECEPTACLEWR
WORKING POINTWP
WEATHERPROOFWP
WATERPROOF(ING)WP
WITHOUTW/O
WIRE MESHWM
WORK SHOPWKSH
WROUGHT IRONWI
WATT-HOUR METERWHM
WHEEL BUMPERWHB
WATER HEATERWH
WALL HUNGWH
WIRED GLASSWGL
WIDE FLANGEWF
WINDOWWDW
WASTE DISPOSERWDSP
WOOD DOORWD
WOODWD
WOOD-CASED OPENINGWCO
WHEELCHAIRW/C
WATER CLOSETWC
WOOD BLOCKINGWBL
WET BULBWB
WITHW/
WESTW
VINYL WALL COVERINGVWC
VENT THRU ROOFVTR
VOLTAGE TRANSFORMERV.T.
VENT STACKVS
VERMICULITEVRM
VAPOR RETARDERVR
VOLUMEVOL
VENEERVNR
V-JOINT(ED)VJ
VINYL HOMOGENEOUSVH
VERTICAL GRAINVG
VINYL FABRICVF
VESTIBULEVEST
VERTICALVERT
VENTILATOR(TION)VENT
VAULT DOORVD
VITRIFIED CLAY TILEVCT
VINYL COMPOSITION TILEVCT
VINYL BASEVB
VARNISHVAR
VOLTV
UNIT VENTILATORUV
UTILITYUTIL
URINALUR
UNINTERRUPTABLE POWER SUPPLYUPS
UNFINISHEDUNFIN
UNEXCAVATEDUNEX
UNDERWRITERS LABORATORIESUL
UNIT HEATERUH
UNDERGROUNDUGND
UNIT COOLERUC
TYPICALTYP
TELEVISIONTV
THERMOSTATTSTAT
TRANSVERSETRANS
TRANSOMTRANS
TOILET PARTITIONTPTN
TOILET PAPER DISPENSERTPD
TOP OF WALLTOW
TOP OF STEELTOS
TOP OF SLABTOS
TOPOGRAPHYTOPO
TOLERANCETOL
TOP OFTO
TACKSTRIPTKS
TACKBOARDTK BD
THRESHOLDTHRES
THICK(NESS)THK
TRUSS HEADTH
TOGGLETGL
TONGUE AND GROOVET&G
TERMINALTERM
TERRAZZOTER
TEMPORARYTEMP
TEMPERATURETEMP
TELEPHONETEL
TERRA COTTATC
TOWEL BARTB
TANGENTTAN
TREADT
SYSTEMSYS
SYNTHETICSYNTH
SYMMETRICALSYMM
SWITCHBOARDSWBD
SWITCHSW
SHEET VINYL SV
SUSPENDEDSUSP
SUBFLOORSUB FL
STAIRWAYSTWY
STRUCTURALSTRUCT
STRINGERSTR
STATIC PRESSUREST PR
STORAGESTOR
STEELSTL
SEATINGSTG
STANDARDSTD
STATIONSTA
STAINLESS STEELSST
STANDING SEAM (ROOF)SS
SERVICE SINKSS
SHELF AND RODS&R
SQUARE HEADSQHD
SQUARESQ
SPEAKERSPKR
SPACE HEATERSPH
SPECIAL FINISHSP FIN
SOUNDPROOFSPF
SPECIFICATIONSPEC
ABBREVIATIONS
BORING LEGEND
GA24-01
June 26, 2024
N 183740.265 E 1738973.938
ELEV. 727 FT
MC
LL
PI
N
% fines
Opt. MC
Max. DD pH
SO4
ppm
Resistivity
EOB
BORING NUMBER
DATE BORING COMPLETED
UNITED STATES STATE PLANE COORDINATES, US SURVEY
FEET, ZONE 3301, North Dakota SOUTH
TOP OF BORING ELEVATION ROUNDED TO NEAREST
HALF-FOOT (NAVD88)
NATURAL MOISTURE CONTENT IN PERCENT (ASTM D2216)
LIQUID LIMIT
PLASTICITY INDEX
STANDARD PENETRATION BLOW COUNT. NUMBER OF BLOWS
FOR A 140-POUND WEIGHT DROPPING 30 INCHES TO DRIVE A
2-INCH OUTSIDE DIAMETER SAMPLER 1 FOOT.
PERCENT OF SOIL BY DRY WEIGHT PASSING THE NO. 200
SIEVE (ASTM D422 / C136)
OPTIMUM MOISTURE CONTENT FROM MODIFIED PROCTOR
COMPACTION TEST (ASTM D1557)
MAXIMUM DRY DENSITY FROM MODIFIED PROCTOR
COMPACTION TEST (ASTM D1557)
pH VALUE FROM LAB ANALYSIS (ASTM G51)
WATER SOLUBLE SULFATE FROM LAB ANALYSIS (ASTM C1580)
PARTS PER MILLION
RESISTIVITY AS RECIPROCAL OF ELECTRICAL RESISTIVITY
FROM LAB ANALYSIS (AWWA 2520)
GROUNDWATER TABLE WHILE DRILLING
GROUNDWATER TABLE 24 HOURS AFTER DRILLING
BORING CAVE-IN DEPTH AND DATE MEASURED
END OF BORING
6/26
6/26
C.I. 6/26
GA24-01
JUNE 26, 2024
N 183691.26 E 1739003.561
ELEV. 1727.0 FT
LL PIMC N
0.0
5.0
10.0
DEPTH (FT)UCS DD
CL
EOB - 15.0 FT BELOW GROUND SURFACE
20.6
50 32
1.5tsf 114.4 LEAN CLAY, gray-brown, sand, trace roots and brick debris, moist
FAT CLAY, very dark gray-brown, moist, 1% medium fines, 5% coarse fines, 94% fines
FILL
3.4tsf 101.5
CH
.5tsf 103.419.9
SANDY CLAY, brown-gray, moist
SC
1tsf 97.624.5
15.0
GA24-02
JUNE 26, 2024
N 183740.265 E 1738973.938
ELEV. 1726.0 FT
LL PIMC N
0.0
5.0
10.0
DEPTH (FT)UCS DD
CL
EOB - 15.0 FT BELOW GROUND SURFACE
26.9
26.7
30 9
1tsf 110.2 LEAN CLAY, gray-brown, sand, trace roots and brick debris, moist
LEAN CLAY, brown-gray, moist
FILL
.5tsf 100.7
CL
.4tsf 100.123 Brown-gray, sandy, moist, 17% fine sand, 83% fines
CL
1tsf 101.619.8
15.0
1.3tsf 106.417.1
.7tsf 99.120.8 LEAN CLAY, brown-gray, trace sand, moist
Sandy, brown-gray, moist
BORING NOTES
1. THE DESCRIPTIONS AT THE RIGHT OF THE LOGS ARE THE RESULTS OF
FIELD AND LABORATORY DATA. THE TERMS "DRY", "MOIST", "WET", ETC.
ARE FIELD DESCRIPTIONS MADE BY THE GEOLOGIST IN THE FIELD AT THE
TIME OF DRILLING. SEE "MC" ON THE CONDENSED LOG OF BORINGS FOR
LABORATORY DETERMINATION OF MOISTURE CONTENTS FOR THE SOIL.
LABORATORY CLASSIFICATIONS ARE IN ACCORDANCE WITH ASTM D 2487.
2. THE LOGS FURNISHED REPRESENT THE TYPES OF SOIL ENCOUNTERED AT
THEIR RESPECTIVE LOCATIONS AND THE WATER LEVEL ENCOUNTERED AT
THAT TIME. THE BORING LOGS ARE CONSIDERED REPRESENTATIVE OF
THE SOILS WHICH WERE ENCOUNTERED AT THAT LOCATION; HOWEVER,
WATER LEVELS CAN FLUCTUATE APPRECIABLY AT DIFFERENT SEASONS
OF THE YEAR OR FROM YEAR TO YEAR DEPENDING LARGELY ON CLIMATIC
CONDITIONS. THE CONTRACTOR SHOULD IDENTIFY GROUNDWATER
CONDITIONS PRIOR TO THE TIME OF CONSTRUCTION.
3. FOR SOIL BORING LOCATIONS, SEE SHEET E-102.
4. COORDINATE SYSTEM: NORTH DAKOTA NORTH STATE PLANE (3301)
DATUM: NAVD88, NAD83
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
C :\U
SE
R
S\ G
6E D
XJ
D
S\ O
N
ED
R
IV
E
- U
S
AR
M Y
C O
R
PS
O F
EN
G
IN
EE
R S\
D O
C U
M
EN
TS
\G
A R
IV
ER
D
AL
E\ G
A R
IV
ER
D
AL
E
BO
R
IN
G S.
D W
G
:1 5:
A
M
/8 /2
M O
N O
C H
R O
M E.
C
TB
G 6E
D
XJ
D S
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
/0
7/
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
AN
SI
D
G
AR
R
IS
O N
D
AM
, N O
R
TH
D
AK
O
TA
R
IV
ER
D
AL
E
FE
ED
ER
R
EL
O
C
AT
IO
N
J.
R
U
FF
C O
R N
K.
H
AL
L
J.
R
U
FF
C O
R N
K.
H
AL
L
BO
R
IN
G
L O
G
B-301
G R
9B -3
.d w g
AD
VE
R
TI
SE
M
EN
T
W
F2
5R
S
E R
D A
L E
F E
E D
E R
R E
L O
C A
T
IO
N
G A
R R
IS
O
N D
A M
N
O R
T H
D A
K O
T A
W F
R
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
S L
IN
D
G R
L
C A
T
IO
N M
A P
E-100
D O
T T
E R
B Y
S L
IN
D
G R
E
-1 .d
O
T T
E R
Y
P
D
:1
:4
A
M
/7 /2
G R
E
-1 .d g n
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A D
V E
R T
IS
E
M E
N T
N
POWERHOUSE
PROJECT LOCATION
AREA
SOIL BORROW
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 TomTom
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
N
S
E R
D A
L E
F E
E D
E R
R E
L O
C A
T
IO
N
G A
R R
IS
O
N D
A M
N
O R
T H
D A
K O
T A
W F
R
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
S L
IN
D
G R
E A
E L
E C
T R
IC
A
L S
IT
E
P L
A N
E-101
D O
T T
E R
B Y
S L
IN
D
G R
E
-1 .d
O
T T
E R
P
D
:1
:1
A
M
/7 /2
G R
E
-1 .d g n
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A D
V E
R T
IS
E
M E
N T
E
CROSS EXISTING ROAD.
14. INSTALL DUCTBANK USING HORIZONTAL DIRECTIONAL BORING TO
CONNECTION TO EXISTING SWITCHYARD BUS.
CABLES. SEE DETAILS ON SHEET E-504 FOR ADDITIONAL INFORMATION ON
INSTALL 4" RIGID CONDUIT WITH THREE 4/0 AWG 15 kV COPPER XLPE 13.
DAMAGED DURING INSTALLATION OF NEW DUCTBANK.
EXISTING WATER LINE CROSSING. ENSURE THAT WATER LINE IS NOT 12.
NOT DAMAGED DURING INSTALLATION OF NEW DUCTBANK.
PRIOR TO START OF CONSTRUCTION. ENSURE THAT FIBER OPTIC LINE IS
EXISTING FIBER OPTIC LINE CROSSING. LOCATE FIBER OPTIC LINE 11.
INSTALL NEW OVERHEAD 1/0 ACSR T2 RAVEN CONDUCTOR.10.
INFORMATION.
REMOVAL. SEE DETAIL H13 ON SHEET ON E-502 FOR ADDITIONAL
SERVICE SWITCHGEAR, APPROXIMATELY 225'. CAP CONDUIT AFTER CABLE
CONDUIT. REMOVE EXISTING RISER CONDUCTORS TO OUTSIDE STATION
EXISTING RISER CONNECTION. REMOVE TOP 10' EXISTING PVC RISER
NEW OVERHEAD CONDUCTORS TO EXISTING OVERHEAD LINE. REMOVE
INSTALL NEW DEAD END GUY ON EXISTING POWER POLE. CONNECT 9.
DETAILS A13 ON SHEET E-502 FOR ADDITIONAL INFORMATION.
INSTALL NEW 40' OVERHEAD DOUBLE DEAD END POWER POLE. SEE 8.
SHEET E-502 FOR ADDITIONAL INFORMATION.
UNDERGROUND TO OVERHEAD RISER. SEE DETAILS F3, B3, AND H13 ON
INSTALL NEW 40' OVERHEAD DEAD END POWER POLE. INSTALL 7.
DUCTBANK HAS BEEN INSTALLED.
REPAIR GROUND GRID AND SEPARATION GEOTEXTILE AFTER 6.
ADDITIONAL INFORMATION.
CONDUIT AT BREAKER 1722. SEE DETAIL K8 ON SHEET E-501 FOR
DIG TRENCH FOR DUCTBANK. CONNECT DUCTBANK TO EXISTING SPARE
INSTALL NEW UNDERGROUND COMMUNICATIONS DUCTBANK. HAND 5.
ADDITIONAL INFORMATION.
AWG 15 kV COPPER XLPE CABLES. SEE DETAIL K1 ON SHEET E-501 FOR
INSTALL NEW UNDERGROUND 13.8kV DUCTBANK WITH THREE 4/0 4.
ADDITIONAL INFORMATION.
INSTALL NEW 4x4 HANDHOLE. SEE DETAIL A3 ON SHEET E-501 FOR 3.
DISCONNECT SHALL BE RATED FOR 600A AT 15kV.
INSTALL NEW PAD MOUNTED THREE PHASE DISCONNECT. 2.
ADDITIONAL INFORMATION.
SHALL BE RATED FOR 200A AT 15kV. SEE DETAILS ON SHEET E-503 FOR
INSTALL NEW POLE MOUNTED THREE PHASE RECLOSER. RECLOSER 1.
KEYED NOTES1
4 6
N
15' 30'0
5 6
S
E R
D A
L E
F E
E D
E R
R E
L O
C A
T
IO
N
G A
R R
IS
O
N D
A M
N
O R
T H
D A
K O
T A
W F
R
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
S L
IN
D
G R
E A
E L
E C
T R
IC
A
L S
IT
E
P L
A N
E-102
D O
T T
E R
B Y
S L
IN
D
G R
E
-1 .d
O
T T
E R
P
D
:3
:4
A
M
/1 /2
G R
E
-1 .d g n
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A D
V E
R T
IS
E
M E
N T
E 1739018.57
N 670198.24
E 1739092.96
N 670058.47
E 1738992.86
N 669960.16
E 1738970.10
N 669950.10
GA24-02
E 1739003.21
N 669901.35
GA24-01
E
CROSS EXISTING ROAD.
14. INSTALL DUCTBANK USING HORIZONTAL DIRECTIONAL BORING TO
CONNECTION TO EXISTING SWITCHYARD BUS.
CABLES. SEE DETAILS ON SHEET E-504 FOR ADDITIONAL INFORMATION ON
INSTALL 4" RIGID CONDUIT WITH THREE 4/0 AWG 15 kV COPPER XLPE 13.
DAMAGED DURING INSTALLATION OF NEW DUCTBANK.
EXISTING WATER LINE CROSSING. ENSURE THAT WATER LINE IS NOT 12.
NOT DAMAGED DURING INSTALLATION OF NEW DUCTBANK.
PRIOR TO START OF CONSTRUCTION. ENSURE THAT FIBER OPTIC LINE IS
EXISTING FIBER OPTIC LINE CROSSING. LOCATE FIBER OPTIC LINE 11.
INSTALL NEW OVERHEAD 1/0 ACSR T2 RAVEN CONDUCTOR.10.
INFORMATION.
REMOVAL. SEE DETAIL H13 ON SHEET ON E-502 FOR ADDITIONAL
SERVICE SWITCHGEAR, APPROXIMATELY 225'. CAP CONDUIT AFTER CABLE
CONDUIT. REMOVE EXISTING RISER CONDUCTORS TO OUTSIDE STATION
EXISTING RISER CONNECTION. REMOVE TOP 10' EXISTING PVC RISER
NEW OVERHEAD CONDUCTORS TO EXISTING OVERHEAD LINE. REMOVE
INSTALL NEW DEAD END GUY ON EXISTING POWER POLE. CONNECT 9.
DETAILS A13 ON SHEET E-502 FOR ADDITIONAL INFORMATION.
INSTALL NEW 40' OVERHEAD DOUBLE DEAD END POWER POLE. SEE 8.
SHEET E-502 FOR ADDITIONAL INFORMATION.
UNDERGROUND TO OVERHEAD RISER. SEE DETAILS F3, B3, AND H13 ON
INSTALL NEW 40' OVERHEAD DEAD END POWER POLE. INSTALL 7.
DUCTBANK HAS BEEN INSTALLED.
REPAIR GROUND GRID AND SEPARATION GEOTEXTILE AFTER 6.
ADDITIONAL INFORMATION.
CONDUIT AT BREAKER 1722. SEE DETAIL K8 ON SHEET E-501 FOR
DIG TRENCH FOR DUCTBANK. CONNECT DUCTBANK TO EXISTING SPARE
INSTALL NEW UNDERGROUND COMMUNICATIONS DUCTBANK. HAND 5.
ADDITIONAL INFORMATION.
AWG 15 kV COPPER XLPE CABLES. SEE DETAIL K1 ON SHEET E-501 FOR
INSTALL NEW UNDERGROUND 13.8kV DUCTBANK WITH THREE 4/0 4.
ADDITIONAL INFORMATION.
INSTALL NEW 4x4 HANDHOLE. SEE DETAIL A3 ON SHEET E-501 FOR 3.
DISCONNECT SHALL BE RATED FOR 600A AT 15kV.
INSTALL NEW PAD MOUNTED THREE PHASE DISCONNECT. 2.
ADDITIONAL INFORMATION.
SHALL BE RATED FOR 200A AT 15kV. SEE DETAILS ON SHEET E-503 FOR
INSTALL NEW POLE MOUNTED THREE PHASE RECLOSER. RECLOSER 1.
KEYED NOTES1
N
15' 30'0
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
N
S
E R
D A
L E
F E
E D
E R
R E
L O
C A
T
IO
N
G A
R R
IS
O
N D
A M
N
O R
T H
D A
K O
T A
W F
R
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
S L
IN
D
G R
E A
E L
E C
T R
IC
A
L S
IT
E
P L
A N
E-103
D O
T T
E R
B Y
S L
IN
D
G R
E
-1 .d
O
T T
E R
P
D
:1
:4
A
M
/7 /2
G R
E
-1 .d g n
CROSS EXISTING ROAD.
14. INSTALL DUCTBANK USING HORIZONTAL DIRECTIONAL BORING TO
CONNECTION TO EXISTING SWITCHYARD BUS.
CABLES. SEE DETAILS ON SHEET E-504 FOR ADDITIONAL INFORMATION ON
INSTALL 4" RIGID CONDUIT WITH THREE 4/0 AWG 15 kV COPPER XLPE 13.
DAMAGED DURING INSTALLATION OF NEW DUCTBANK.
EXISTING WATER LINE CROSSING. ENSURE THAT WATER LINE IS NOT 12.
NOT DAMAGED DURING INSTALLATION OF NEW DUCTBANK.
PRIOR TO START OF CONSTRUCTION. ENSURE THAT FIBER OPTIC LINE IS
EXISTING FIBER OPTIC LINE CROSSING. LOCATE FIBER OPTIC LINE 11.
INSTALL NEW OVERHEAD 1/0 ACSR T2 RAVEN CONDUCTOR.10.
INFORMATION.
REMOVAL. SEE DETAIL H13 ON SHEET ON E-502 FOR ADDITIONAL
SERVICE SWITCHGEAR, APPROXIMATELY 225'. CAP CONDUIT AFTER CABLE
CONDUIT. REMOVE EXISTING RISER CONDUCTORS TO OUTSIDE STATION
EXISTING RISER CONNECTION. REMOVE TOP 10' EXISTING PVC RISER
NEW OVERHEAD CONDUCTORS TO EXISTING OVERHEAD LINE. REMOVE
INSTALL NEW DEAD END GUY ON EXISTING POWER POLE. CONNECT 9.
DETAILS A13 ON SHEET E-502 FOR ADDITIONAL INFORMATION.
INSTALL NEW 40' OVERHEAD DOUBLE DEAD END POWER POLE. SEE 8.
SHEET E-502 FOR ADDITIONAL INFORMATION.
UNDERGROUND TO OVERHEAD RISER. SEE DETAILS F3, B3, AND H13 ON
INSTALL NEW 40' OVERHEAD DEAD END POWER POLE. INSTALL 7.
DUCTBANK HAS BEEN INSTALLED.
REPAIR GROUND GRID AND SEPARATION GEOTEXTILE AFTER 6.
ADDITIONAL INFORMATION.
CONDUIT AT BREAKER 1722. SEE DETAIL K8 ON SHEET E-501 FOR
DIG TRENCH FOR DUCTBANK. CONNECT DUCTBANK TO EXISTING SPARE
INSTALL NEW UNDERGROUND COMMUNICATIONS DUCTBANK. HAND 5.
ADDITIONAL INFORMATION.
AWG 15 kV COPPER XLPE CABLES. SEE DETAIL K1 ON SHEET E-501 FOR
INSTALL NEW UNDERGROUND 13.8kV DUCTBANK WITH THREE 4/0 4.
ADDITIONAL INFORMATION.
INSTALL NEW 4x4 HANDHOLE. SEE DETAIL A3 ON SHEET E-501 FOR 3.
DISCONNECT SHALL BE RATED FOR 600A AT 15kV.
INSTALL NEW PAD MOUNTED THREE PHASE DISCONNECT. 2.
ADDITIONAL INFORMATION.
SHALL BE RATED FOR 200A AT 15kV. SEE DETAILS ON SHEET E-503 FOR
INSTALL NEW POLE MOUNTED THREE PHASE RECLOSER. RECLOSER 1.
KEYED NOTES1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A D
V E
R T
IS
E
M E
N T
E 1738974.88
N 670294.52
15' 30'0
3" 3" 3"
3" 3"
3"
N
S
E R
D A
L E
F E
E D
E R
R E
L O
C A
T
IO
N
G A
R R
IS
O
N D
A M
N
O R
T H
D A
K O
T A
W F
R
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
S L
IN
D
G R
U
C T
B A
N K
D E
T A
IL
S
E-501
D O
T T
E R
B Y
S L
IN
D
G R
E
-5 .d
O
T T
E R
P
D
:2
:2
A
M
/7 /2
G R
E
-5 .d g n
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A D
V E
R T
IS
E
M E
N T
4. ALL REINFORCEMENT SHALL HAVE A CLEAR COVER OF AT LEAST 2".
MANHOLE OR VAULT.
TRENCH SHALL BE GRADED TO PROVIDE GRADUAL DEPTH CHANGE WITHIN 30' OF
3. TO ENSURE DUCT IS AT PROPER DEPTH FOR ENTRY INTO HANDHOLES, BOTTOM OF
PLACED NOT MORE THAN 4' APART ON CENTER.
2. DUCT SPACING SHALL BE MAINTAINED BY USE OF SEPARATORS OR SPACING BLOCKS
UNDERGROUND DUCT BANK AND HANDHOLES.
1. SEE ELECTRICAL SITE DRAWINGS FOR LOCATION OF POWER CABLES IN
NOTES:
"4"
6"
6"
4"
ELEVATION
4'-0"
3'-0"
4'-0"
1'-0"
C-I-P)
(PRE-CAST OR
CONCRETE
6" REINFORCED
REQUIRED
DUCTS AS
GROUND ROD
(BELOW)
FRAME
COVER AND
SUMP
A-A
SECTION
#5
12"
#5 @ 7"
12"
A A
NOTES:
7. HANDHOLES WILL NOT BE INSTALLED IN HARDSTAND OR SHOULDERS.
6. PROVIDE KNOCKOUTS FOR DUCTS ON ALL SIDE OF HANDHOLE.
5. WALLS AND FLOORS SHALL HAVE BARS AT 7" SPACING.
4. PULLBOX DESIGNED FOR H-20 LOADING (32,000 LBS. SINGLE AXLE LOAD OVER A 10" x 20" AREA).
3. A MINIMUM OF 12" HOOK AT CORNERS AND INTERSECTIONS IS REQUIRED.
2. BARS SHALL BE ON CENTER IN WALLS AND FLOOR.
1. ALL BARS SHALL BE A NO. 5 ROUND DEFORMED.
GROUND ROD
3/4" x 10'
RACEWAYS USED. TYPICAL.
DUCT SPACER. SIZE FOR
FLOW FILL CONCRETE
(3) 4" CONDUITS.
E
SELECT SOIL BACKFILL
RACEWAYS USED. TYPICAL.
DUCT SPACER. SIZE FOR
FLOW FILL CONCRETE
M
IN
IM
U M
SELECT SOIL BACKFILL
COMM
FINISHED GRADE
FINISHED GRADE
SPAREINDICATED.
CABLES SIZE AND NUMBER AS
SPARE
LABELED "ELECTRIC"
WARNING TAPE LABELED "ELECTRIC"
WARNING TAPE
2" CONDUITS.
CRUSHED GRAVEL
FILLED WITH
PROVIDE DRAIN
A3 4' x 4' HANDHOLE
NOT TO SCALE
CONDUITS
INCOMING
GRADEGRADE
SUBGRADE
COMPACTED
6" WELL
SEAL ALL CONDUITS AFTER CABLES ARE INSTALLED
SILICONE SEALANT
SEAL AROUND BASE WITH
PAD INFORMATION
3.3 FOR ADDITIONAL
26 13 01 PARAGRAPH
SEE SPEICIFICATION
PAD 4" ABOVE GRADE
ON ALL SIDES
BEYOND UNIT
MINIMUM OF 6"
EXTEND PAD A
CONDUITS
INCOMING
DISCONNECT SWITCH
PAD-MOUNTED
CONCRETE PAD
CONDUITS
OUTGOING
DISCONNECT SWITCH
PAD-MOUNTED
UNDER FOUNDATION
CONDUITS ROUTED
OUTGOING
GROUND ROD
3/4" x 10'
K1
13.8 KV CONCRETE ENCASED DUCT BANK
NOT TO SCALE
K8
DIRECT BURIED DUCT BANK
NOT TO SCALE
E14
DISCONNECT PAD DETAIL
NOT TO SCALE
S
E R
D A
L E
F E
E D
E R
R E
L O
C A
T
IO
N
G A
R R
IS
O
N D
A M
N
O R
T H
D A
K O
T A
W F
R
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
S L
IN
D
G R
P
W E
R P
O L
E D
E T
A
IL
S
E-502
D O
T T
E R
B Y
S L
IN
D
G R
E
-5 .d
O
T T
E R
P
D
:2
:5
A
M
/7 /2
G R
E
-5 .d g n
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A D
V E
R T
IS
E
M E
N T
2'
PRIMARY CONDUCTORS
3' MIN WITH APPROVAL
EPR TAPE TYPICAL
CABLE STRAIN RELIEF
#6 BARE COPPER SOLID
8' ABOVE GRADE
WARING SIGN IF REVERSE FEED
PHYSICAL DAMAGE
PROTECT GROUND FROM PER SIZE AND TYPE
POLE SETTING DEPTH VARIES
GRADE
TYPICAL ALL CONDUCTORS
COMPRESSION CRIMPED
SQUARE NUT.
W/ SPRING LOCK, FLAT
5 / 8 " THROUGH BOLT
PVC ADAPTER
3 / 4 " 10' GROUND ROD
42"
600 AMP FUSED CUTOUTS
4" GRC
PROVIDE RAPTOR PROTECTION
A
B
"L"
"H"
NOTE:
INSTALL FIBERGLASS GUY STRAIN INSULATOR SO THE LOWER
END OF THE INSULATOR WILL BE AT LEAST 3' BELOW
ANY ENERGIZED CONDUCTOR, EQUIPMENT BUSHING OR
SIMILAR LIVE PART. & A MINIMUM OF 8'-0" ABOVE THE
GROUND, BOTH UNDER NORMAL CONDITIONS & IF GUY WERE
TO BE BROKEN OR COME LOOSE AT THE ANCHOR END
OF THE GUY.
TO MEET THE ABOVE CLEARANCE REQUIREMENTS,
ADDITIONAL FIBERGLASS STRAIN INSULATORS MAY
BE REQUIRED.
ATTACHMENT, GUY
INSULATOR, FIBERGLASS GUY STRAIN
GUARD, GUY - 8' PVC
BOLT, MACHINE 3/4" X REQUIRED LENGTH
WASHER, CURVED 4" x 4" x 13/16" HOLE
WASHER, DOUBLE COIL 3/4"
ROLLER, GUY
BOLT, MACHINE 7/8" x 3"
LINK, CONNECTING
DEADEND, 3/16" AUTOMATIC GUY
GUY WIRE - 3/16" SIEMENS - MARTIN GRADE
GRIP, 3/16" GUY
DESCRIPTION
MATERIAL LIST
GENERAL NOTES
HEIGHT "H" VARIES WITH POLE HEIGHT & CONDUCTOR
POSITION ON POLE.
ATTACH END OF FIBERGLASS GUY STRAIN INSULATOR
DIRECTORY TO GUY ATTACHMENT PLATE.
A
B
CONDUCTOR
SIZED EQUAL TO UG PHASE
15 kV INSULATED UV RATED
GRC
4' RADIUS 90 PVC-COATED
OF CONDUIT
WEATHERHEAD TO TOP
PROVIDE
A
B
"L"
"H"
NOTE:
INSTALL FIBERGLASS GUY STRAIN INSULATOR SO THE LOWER
END OF THE INSULATOR WILL BE AT LEAST 3' BELOW
ANY ENERGIZED CONDUCTOR, EQUIPMENT BUSHING OR
SIMILAR LIVE PART. & A MINIMUM OF 8'-0" ABOVE THE
GROUND, BOTH UNDER NORMAL CONDITIONS & IF GUY WERE
TO BE BROKEN OR COME LOOSE AT THE ANCHOR END
OF THE GUY.
TO MEET THE ABOVE CLEARANCE REQUIREMENTS,
ADDITIONAL FIBERGLASS STRAIN INSULATORS MAY
BE REQUIRED.
ATTACHMENT, GUY
INSULATOR, FIBERGLASS GUY STRAIN
GUARD, GUY - 8' PVC
BOLT, MACHINE 3/4" X REQUIRED LENGTH
WASHER, CURVED 4" x 4" x 13/16" HOLE
WASHER, DOUBLE COIL 3/4"
ROLLER, GUY
BOLT, MACHINE 7/8" x 3"
LINK, CONNECTING
DEADEND, 3/16" AUTOMATIC GUY
GUY WIRE - 3/16" SIEMENS - MARTIN GRADE
GRIP, 3/16" GUY
DESCRIPTION
MATERIAL LIST
GENERAL NOTES
HEIGHT "H" VARIES WITH POLE HEIGHT & CONDUCTOR
POSITION ON POLE.
ATTACH END OF FIBERGLASS GUY STRAIN INSULATOR
DIRECTORY TO GUY ATTACHMENT PLATE.
A
B
B
"L"
E4
THREE PHASE RISER POLE
NOT TO SCALE
A13
DOUBLE DOWN GUY (WRAPPED TYPE)
NOT TO SCALE
H13
SINGLE DOWN GUY (WRAPPED TYPE)
NOT TO SCALE
POLE MOUNTED RECLOSER
FORM 6 RECLOSER CONTROL
LOCKABLE ENCLOSURE
COMPLETE
CABLE INSTALLATION IS
SEAL CONDUIT WHEN
MANUAL OPEN HANDLE
N
S
E R
D A
L E
F E
E D
E R
R E
L O
C A
T
IO
N
G A
R R
IS
O
N D
A M
N
O R
T H
D A
K O
T A
W F
R
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
S L
IN
D
G R
C L
O S
E R
D E
T A
IL
S
E-503
D O
T T
E R
B Y
S L
IN
D
G R
E
-5 .d
O
T T
E R
P
D
:2
:1
A
M
/7 /2
G R
E
-5 .d g n
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A D
V E
R T
IS
E
M E
N T
NOT TO SCALE
POLE-MOUNTED RECLOSER
G5
3 3/4 "
3' 3'
/2
2"
A N
S
E R
D A
L E
F E
E D
E R
R E
L O
C A
T
IO
N
G A
R R
IS
O
N D
A M
N
O R
T H
D A
K O
T A
W F
R
/0
/2
A H
A
N E
C A
P
IT
O L
A V
E
O M
A H
A D
IS
T
R
E
N U
M B
E R
F
IL
E N
A M
E
S L
IN
D
G R
W
IT
C
H Y
A R
D C
O N
N E
C T
IO
N
D E
T A
IL
S
E-504
D O
T T
E R
B Y
S L
IN
D
G R
E
-5 .d
O
T T
E R
P
D
:2
:4
A
M
/7 /2
G R
E
-5 .d g n
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A D
V E
R T
IS
E
M E
FRONT VIEW
B.O.S.
T.O.S.
C BUS
L
SIDE VIEW
4" BUSHING
4" RIGID CONDUIT
4" PERMA-COTTE RIGID FEMALE ADAPTER
ALUMINIUM TEE 3"-6" IPS, WELD TO BUS
COPPER TERMINATION TERMINAL
4/0 AWG COPPER XLPE CABLE
NOT TO SCALE
SWITCHYARD BUS CONNECTION
E5
SEAL CONDUIT AFTER CABLE INSTALLATION
| GENERAL | |
| G-001 | COVER & INDEX (1) |
| G-002 | ABBREVIATIONS (1) |
| GEOTECHNICAL | |
| B-301 | BORING LOG (1) |
| ELECTRICAL | |
| E-100 | LOCATION MAP (1) |
| E-101 | ELECTRICAL SITE PLAN - AREA 101 (1) |
| E-102 | ELECTRICAL SITE PLAN - AREA 102 (1) |
| E-103 | ELECTRICAL SITE PLAN - AREA 103 (1) |
| E-501 | DUCT BANK DETAILS (1) |
| E-502 | POWER POLE DETAILS (1) |
| E-503 | RECLOSER DETAILS (1) |
| E-504 | SWITCHYARD CONNECTION DETAILS (1) |
File details come from the government source that posted it. Updated .