This document contains a set of Questions and Answers related to Solicitation W9128F24Q0087 for the Missouri River Project Office (MRPO) Asphalt Roof Replacement. The key details are:
The solicitation is for the replacement of the existing asphalt roof system and associated features at the Corps of Engineers Missouri River Project Administration Building. Contractors are advised that drawings are provided, and a site visit is listed in the solicitation, to allow them to determine the material, labor, and other costs to complete this firm-fixed price construction project. All employees must be e-verified, and the prime contractor can subcontract, but must meet the requirements of this 100% small business set-aside. A bid bond is not required, but FAR 52.246-21 Warranty of Construction is included. There are no liquidated damages for this solicitation and resulting award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
Missouri River Project Office (MRPO) Asphalt Roof Replacement
Solicitation W9128F24Q0087
21 August 2024
Updated: 30 August 2024
1. Question: What is the approximate square footage of the building?
Answer: The drawing is provided as well as a site visit is listed within the solicitation, so contractors can determine the material, labor and all other costs to complete this project as a firm-fixed price construction award.
2. Question: I’m looking at the plans and drawings and having a problem coming up with a complete square footage or square count. Would you be able to help with this?
Answer: The drawing is provided as well as a site visit is listed within the solicitation, so contractors can determine the material, labor and all other costs to complete this project as a firm-fixed price construction award.
3. Question: Do all employees need to be e-verified?
Answer: All employees must be e-verified in accordance with the Statement of Work.
4. Question: Can employees be 1099?
Answer: The prime contractor can subcontract on this project. The prime contractor shall meet all the requirements of this 100% small business set-aside solicitation, which includes the wage determination applicable to this project.
5. Question: I’m looking to verify if this project requires a bid bond in addition to the payment and performance bond.
Answer: A bid bond is not required with the quote submitted for this solicitation.
6. Question: Please clarify the bid security, workmanship warranty, and liquidated damages if any?
Answer: A bid bond is not required to be submitted with the quote. FAR 52.246-21, Warranty of
Construction is included in the solicitation and resulting award. There are not any liquidated damages included in this solicitation and resulting award.