W9128F24Q0030 Questions and Answers 6March2024.pdf
PDF 65 KB Posted
- Solicitation number
- W9128F24Q0030
About this file
This document contains questions and answers regarding solicitation number W9128F-24Q0030 from the Department of the Army Corps of Engineers Engineering District Omaha. The solicitation is for the supply and delivery of 30,000 tons of quarried stone meeting specifications for maximum size of less than 750 pounds or 25 inches in diameter. The stone will be delivered to the location specified in Section 5.1 of the solicitation. Questions were asked to clarify gradation requirements, confirm maximum material size, and identify the supply location and quarry sources. The solicitation is set aside 100% for small businesses, and a subcontractor may be used provided the prime contractor meets the set-aside requirements. No incumbent contractor was previously awarded this supply contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9128F24Q0030_MRPO Rock.pdf | ||
| Attachment 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9128F24Q0030
Questions and Answers
6 March 2024
1. Q. I would like to ask you for clarification on the maximum material size for the material specified in the project documentation. I noticed that the material cannot exceed 5% through the ½” sieve, but I would appreciate further clarification on the maximum allowable size.
Please confirm if you have an available gradation for this material.
A. The gradation is shown in Table 1 – COE Special Gradation Requirements in Section
2.3 of the Specifications within the solicitation on page 6.
2. Q. Also, any additional details or specifications you could provide about the maximum material size would be greatly appreciated.
A. As noted in Table 1 – COE Special Gradation Requirements in Section 2.3 of the
Specifications within the solicitation on page 6, 100% of the stone must be less than
750 lbs. or 25 inches in diameter.
3. Q. I did not see a supply location or name for the specific rock you guys are requesting. Are you able to provide me with that information?
A. The rock shall be delivered to the delivery location listed in Section 5.1 of the specification within the solicitation on page 9. The contractors shall provide the quarry(ies) supplying the stone.
4. Q. Can you tell me if there is an incumbent and, if so, what the past award amount was and the solicitation number?
A. There is not an incumbent contractor for this supply purchase for rock.
5. Q. Can a subcontractor be used to complete this project?
A. Use of a subcontractor is the contractor’s decision. This solicitation is 100% small business set-aside, and the prime contractor shall ensure the quote submitted is consistent with the set-aside requirements for this supply purchase.
File details come from the government source that posted it. Updated .