W9128F24Q0028_AMD0001.pdf
PDF 499 KB Posted
- Solicitation number
- W9128F24Q0028
About this file
This amendment modifies a federal contract to revise the performance work statement for industrial laundry services at the Gavins Point Powerhouse. The contractor shall provide laundry services and maintain an inventory of 24 pairs of 100% cotton coveralls in various sizes for the Gavins Point Project. Services include bi-monthly pickup of soiled coveralls and delivery of clean replacements, along with adjustments to inventory levels as needed. Invoices shall be submitted monthly. The period of performance is one base year plus four option years, from May 2024 through April 2029, with an optional six-month extension. The purpose of this amendment is to clarify that coverall pickup and delivery will occur twice per month rather than the previously stated frequency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9128F24Q0028 SAM.gov Questions and Answers.pdf | ||
| W9128F24Q0028.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this Amendment is to incorporate the revised Performance Work Statement to clarify the frequency of requested services.
All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Feb-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F24Q0028
X 9B. DATED (SEE ITEM 11)
16-Feb-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Feb-2024
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F24Q0028
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
PWS REVISED 21-FEB-2024
PERFORMANCE WORK STATEMENT (PWS)
Powerhouse Coverall Supply and Industrial Laundry Services, Gavins
Point Project 2024-2029
Revised 21 February 2024
PART 1
GENERAL INFORMATION
1.0 General Information:
1.1 Background: The Gavins Point Project requires laundry services to fulfill their operations and maintenance activities.
1.2 Scope of Work: This is a non-personal services contract to provide Laundry
Services, 24 pairs various sizes (to be provided upon contract award) of 100 percent cotton coveralls for the Gavins Point Project. Services include providing all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform laundry services as defined in this Performance Work Statement. The Contractor shall perform to the standards in this contract. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. This is a firm fixed priced, performance-based service contract where the Government defines and measures desired outcomes, while Contractor methods are generally not constrained or directed.
1.3 Period of Performance: The period of performance shall be for one (1) Base
Year of 12 months and four (4) 12-month option years. The Period of Performance reads as follows:
Base Year: 01 May 2024 through 30 April 2025 Option Year 1: 01 May 2025 through 30 April 2026 Option Year 2: 01 May 2026 through 30 April 2027 Option Year 3: 01 May 2027 through 30 April 2028 Option Year 4: 01 May 2028 through 30 April 2029
Optional 6-Month Extension: 01 May 2029 through 31 October 2029
1.4 Contractor Personnel:
1.4.1 The contractor shall perform all work under this contract using his or her own forces except as provided in Paragraph 1.3.2 Subcontracting. Employees who perform this work shall be qualified persons on the contractor’s own payroll.
The Contractor shall identify those employees who will be delivering at the projects.
1.4.2 Subcontracting: The contractor shall not subcontract any work without written approval of the Contracting Officer. Compliance with the provisions of this contract by subcontractors shall be the responsibility of the contractor.
1.5 Quality Control:
1.5.1 The contractor shall designate, in writing, an employee who shall serve as the contact for matters involving quality and performance or nonperformance of the required work stated in this PWS. The employee(s) shall be qualified and fully competent with full authority to act for, and on behalf of, the contractor as necessary to ensure that the required work is performed in accordance with the standards contained herein. The contractor shall furnish the above written designation to the Contracting Officer’s Representative (COR) no later than the first day of work. The contractor shall include the name(s), address(s), and telephone number(s) of the responsible individual(s).
1.5.2 The Contracting Officer reserves the right to disapprove any individual whom he considers incompetent to perform the work required. The Contracting Officer will provide a written notice of any disapproval to the contractor.
1.6 Quality Assurance: The government will use the methods stated in this PWS to ensure that the Contractor is performing the services required by this PWS in an acceptable manner. The Government may use Quality Assurance Evaluators (QAE(s)) to provide assistance with the quality assurance methods.
1.6.1 The government has the right to inspect all services called for by the contract, to the extent practicable at all times and places during the term of the contract.
The government shall perform inspections in a manner that will not delay the work.
1.6.2 If any of the services do not conform to contract requirements, the government may require the contractor to perform the services in conformity with contract requirements and at no increase in cost. If the contract requirements are not met after a second attempt the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
1.6.3 The government may take action, if the contractor fails to perform the services again or to take the necessary action to ensure future performance is in conformity with the contract requirements. The government may (1) by contract, or otherwise, perform the services and charge to the contractor any cost incurred by the government that related to the performance of such service or
(2) terminate the contract in whole or in part.
1.6.4 The contractor is responsible to replace/repair any damage to government property due to negligence, at his or her own cost. The government may take action, if the contractor fails to replace/repair any damage to government property. The government may (1) by contract, or otherwise, replace/repair damaged government property and charge to the contractor any cost incurred by the government to replace/repair any damage.
1.7 Hours of Operation: The contractor is responsible for conducting business, between the hours of 7:00 am and 3:30 pm C.S.T Monday thru Thursday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.8 Pre-Work Meeting: Prior to commencing any activities, the contractor shall arrange a Pre-work Meeting via conference call with the COR. The Meeting shall discuss the work requirements, scheduling, and submittal process. At least one (1) week prior to commencing work, the Contractor shall coordinate their proposed work schedule with the COR.
1.9 Submittals: Prior to commencement of services, the Contractor shall submit the following documents to the Contracting Representative for review and approval:
a. List of who will perform work on this contract
1.10 Standards and Regulations: The Contractor shall perform to the standards in the contract and comply with all Local, State, and Federal Regulations during the services performed. The Contractor is responsible for ascertaining the extent to which these regulations affect the operations resulting from this contract. The Contractor shall comply will all applicable regulations. Applicable regulations include, but are not limited to the following:
a. Code of Federal Regulations (CFR), Title 36, Chapter III, Part 327, Rules and Regulations Governing Public Use on Corps of Engineers Water Resource Development Projects EP 1165-2-316
(http://www.publications.usace.army.mil/Portals/76/Publications/EngineerP amphlets/EP_1165-2-316.pdf?ver=2013-08-22-104526-670)
b. Engineering Manual (EM) 385-1-1 (USACE – Safety and Health Requirements Manual), dated November 2014;
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerM anuals/EM_385-1-1.pdf
c. Occupational Safety and Health Standards (29 CFR 1910)
1.11 Physical Security
1.11.1 The contractor shall be responsible for safeguarding all government facilities, property, and materials provided for contractor use. The contractor shall secure at all times all government facilities, property, and materials. Specific security conditions may change based on threats to national defense, and based on the risk of specific facilities to these threats. The contractor shall abide by these changing conditions at all times, as applicable.
1.12 Payment:
1.12.1 The government will make payment once a month after the government has inspected and accepted the services, and the government has reviewed, approved, and processed the contractor’s invoice. The contractor shall submit the invoice to the Contracting Officer and/or any other person that has been designated in the contract to receive the invoice at Gavins Point. The contractor shall combine the twice-monthly delivery tickets into a monthly invoice to be paid.
1.12.2 The contractor must provide the contractor’s name, address, contract number, period of services completed (i.e., for the month of January or for the period of performance of January 1 through February 23), CLIN number and specific quantities of work performed (i.e., 1 Month, 40 days, 100 acres, etc.), and total requested, for an invoice to be considered proper. The contractor shall submit the invoice by the fifth (5th) of the month for services completed the previous month or submit the invoice upon completion of all services, in accordance with the period of performance stated in the CLIN.
PART 2
DEFINITIONS & ACRONYMS
2.0 Definitions: The following definitions and descriptions apply wherever the word(s) or phrase(s) is/are stated in this PWS:
Acceptable Level of Performance (ALP): The maximum percent defective, the maximum number of defects per hundred units, or the number of defects in a lot considered satisfactory on the average. The allowable leeway or variance from a standard before the government will reject the specific service.
Contracting Officer’s Representative (COR): means an individual designated an authorized in writing by the Contracting Officer to perform specific technical or administrative functions.
Performance-Based Contract (FAR 2.101): Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise.
Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable level of performance (ALP) for each work requirement.
Quality Assurance Surveillance Plan (QASP): An organized written document used by the Government for quality assurance surveillance.
Document contains sampling/evaluation guides, checklists, and the performance requirements summary (PRS).
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3.0 Government Furnished Items and Services:
None.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.0 Contractor Furnished Items and Responsibilities:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Materials: The Contractor shall provide laundry services, 100% cotton coveralls, as described in this purchase agreement if and when requested by the Contracting Officer or the authorized representative of the Contracting Officer during the specified period and within the stipulated aggregate amount.
PART 5
SPECIFIC TASKS
5.0 Specific Tasks
5.1 Basic Services: The Contractor shall provide laundry services for Gavins Point
Project. The Contractor will maintain acceptable (24 pairs) inventory of coveralls, and pickup soiled coveralls and replace with clean on a twice a month basis. Adjustments to inventory levels and items utilized will be requested by key personnel and charged at the current rate.
5.2. Scope: Provide textile rental and laundry services for the Gavins Point Project.
Inventories need to be maintained in quantities large enough to meet mission requirements. Variations in inventories will be billed at the current contract rates.
Soiled coveralls will be picked up twice a month and replacement items will be dropped off at that time. During times of high usage such as unit maintenance the adjustments to inventory may be requested by the purchasing agent. The purchasing agent or alternate will also convey any changes necessary in coverall requirements.
5.3 Delivery Tickets: All supplies/services under this agreement shall be accompanied by service/delivery tickets or sales slips which shall contain the following minimum information:
a. Name of Contractor
b. Contract Number
c. Date of Delivery
d. Itemized list of supplies/services furnished
e. Quantity, unit price, and extension of each item, less applicable discounts
f. Date of delivery or ship
PART 6
ATTACHMENT/TECHNICAL EXHIBIT LISTING
6.0 ATTACHMENT/TECHNICAL EXHIBIT LIST:
6.1 Technical Exhibit 1 – Performance Requirements Summary
6.2 Technical Exhibit 2 – Deliverables Schedule
6.3 Technical Exhibit 3 – Estimated Items and Inventories
EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
Standard Performance Threshold
Method of Surveillance
PRS # 1.
The contractor shall pick up soiled coveralls and replace with clean coveralls at the Gavins Point Project per PWS, Para 5
Items must be clean and have no indication of contaminants that can transfer to clean equipment and personnel, i.e. no wet oil stains or grease, without impacting maintenance activities
No more than 1 rework of cleaning per month AND no negative effect on the completion of maintenance duties at the Gavins Point Project
Periodic Surveillance
EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Form at
Submit To
Items needed at Gavins Point Powerhouse, 200 Powerhouse RD, Crofton, NE 68730: as relayed by the Purchasing Agent or their alternate.
The route driver is to stop twice a month to pick up the soiled coveralls and drop off fresh coveralls at the Gavins Point Powerhouse.
NA
Route Driver To drop off at Gavins Point Project
Invoices for Gavins Point sent to:
Gavins Point Project, ATTN:
Martin A Goding, PO Box 710, Yankton, SD 57078
EXHIBIT 3
ESTIMATED ITEMS AND INVENTORIES
POWERHOUSE – TWICE A MONTH SERVICE
Items – Gavins Point Powerhouse
Size Inventory Maintained on Site
Average Quantity Requiring Cleaning Each Month
Coveralls Contractor Supplied
Various Sizes
The following have been deleted:
PERFORMANCE WORK STATEMENT
(End of Summary of Changes)
File details come from the government source that posted it. Updated .