W9128F23Q0028 - Solicitation.pdf

PDF 2 MB Posted

Attached to
Oahe Total Vegetation Spray Federal contract opportunity
Solicitation number
W9128F23Q0028
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

View the file

Other files for this federal contract opportunity

Other files attached to Oahe Total Vegetation Spray, newest first.
File Type Posted
W9128F23Q0028 - QA.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9128F23Q0028 05-Apr-2023

b. TELEPHONE NUMBER

605-945-3401

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 20 Apr 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9128F9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ERIN M PATTON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ARMY CORPS OF ENGINEERS

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 968818 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

COE OAHE PRJT OFC MNTN SEC

RUSSELL SOMSEN

USAED, OMAHACENWO-OD-OA-M

28563 POWERHOUSE RD

PIERRE SD 57501

TEL: (605) 945-3421 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$8,500,000

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF127

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W9128F23Q0028

Section SF 1449 - CONTINUATION SHEET

PERFORMANCE OF WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

TOTAL VEGETATION CONTROL

US ARMY CORPS OF ENGINEERS

(OAHE PROJECT/LAKE OAHE)

28563 Powerhouse Road

PIERRE, SD 57501

January 17, 2023

1.0 General Information.

1.1 Background: This is a service contract to provide all labor, supervision, equipment, chemical, supplies, and transportation to provide chemical application to control all vegetation in the designated areas during the 2023- 2027 growing season. Approximately 50 acres are to be kept free of vegetation on Oahe Project Corps of Engineers lands. Since these are residential areas special care must be taken around other people property (gardens, trees, flowers and shrubs). The contractor must be very aware of chemical drift. The contractor will be held liable for any damages that occur during the execution of this contract.

1.2 Scope of Work: : The contractor(s) or applicator(s) will provide all equipment, personnel, chemicals and chemical additives necessary to perform the spraying in accordance with All State and Federal laws. All areas that are to be sprayed adjacent to water must be sprayed with a federal and state approved chemical. The applicator(s) will have a current and valid applicators license for all chemicals and methods of applications and will provide the license number. The applicator(s) will provide pesticide application records (attachment 1) to this office within two weeks of completion of spraying. The applicator(s) will be required to spray the following acres in three separate areas on Oahe Project in the States of North and South Dakota (see enclosed maps).

1.2.1 Schedules: There will be two scheduled sprayings for this contract. The first will be done with the use of a total vegetation pre-emergent/post-emergent herbicide mix. All designated areas will need to be completely covered with the total vegetation pre-emergent chemical. This spraying will be done from May 1st to May 30th, annually. The second spraying will be a spot spraying of anything green and growing. All areas will be visited and any vegetation that is growing in the control area needs to be spot sprayed. This spraying will need to be done from July 15th to August 15th, annually, at the direction of the POC.

1.3 Period of Performance: The period of performance shall be for one (1) Base Offer and 4 options. The Period of Performance reads as follows:

Base Offer – 1 May 2023 – April 30 2024 Active Period of Performance:

1 May 2023 to 30 May 2023.

Inactive Period of performance:

1 June 2023 – 14 July 2023 Active Period of Performance:

15 July 2023 to 15 August 2023 Inactive Period of performance:

16 August 2023 to April 30 2024

Option 1 - 1 May 2024 – April 30 2025 Active Period of Performance:

1 May 2024 to 30 May 2024.

Inactive Period of performance:

1 June 2024 – 14 July 2024 Active Period of Performance:

15 July 2024 to 15 August 2024 Inactive Period of performance:

16 August 2024 to April 30 2025

Option 2 - 1 May 2025 – April 30, 2026 Active Period of Performance:

1 May 2025 to 30 May 2025.

Inactive Period of performance:

1 June 2025 – 14 July 2025 Active Period of Performance:

15 July 2025 to 15 August 2025 Inactive Period of performance:

16 August 2025 to April 30 2026

Option 3 - 1 May 2026 – April 30, 2027 Active Period of Performance:

1 May 2026 to 30 May 2025.

Inactive Period of performance:

1 June 2026 – 14 July 2026 Active Period of Performance:

15 July 2026 to 15 August 2026 Inactive Period of performance:

16 August 2026 to April 30 2027

Option 4 - 1 May 2027 – 15 August, 2027 Active Period of Performance:

1 May 2027 to 30 May 2027.

Inactive Period of performance:

1 June 2027 – 14 July 2027 Active Period of Performance:

15 July 2027 to 15 August 2027

1.4 Contractor Personnel. The contractor shall perform all work under this contract using his or her own forces except as provided in Paragraph 1.4.1 Subcontracting. Employees who perform this work shall be qualified persons on the contractor’s own payroll. All contractor vehicles shall be registered, licensed, and insured to meet all State and local laws. The contractor employees shall be skilled in and capable of performing the work under this contract. All employees of the contractor or subcontractor shall be at least 16 years of age or older.

1.4.1 Subcontracting. The contractor shall not subcontract any of the work without written approval of the Contracting Officer. Compliance with the provisions of this contract by subcontractors shall be the responsibility of the contractor.

1.5 Quality Control. The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.

1.6 Quality Assurance Surveillance Plan. The government will use a Quality Assurance Surveillance Plan (QASP) during the life of the contract to ensure that the contractor is performing the services required by this PWS in an acceptable manner. The Government develops the QASP and the Project Office administers the Plan through Quality Assurance Evaluators (QAE(s)).

1.6.1 The government will evaluate the contractor’s performance under this agreement in accordance with Part 7 of this PWS. The evaluation is primarily focused on what the government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). The POC will be allowed at any time or place the contractor is on government property, to obtain a sample of the chemical for testing. If the contractor is found to be using a chemical off-label or a chemical not approved for use by the KO, the agreement will be terminated and the contractor shall be held liable for any damages and pay for the completion of the agreement by a different source. The POC will be allowed to observe and photograph all work activities conducted in completion of this PWS. The POC may inspect the work as the agreement progresses. The contractor will not be paid for any work performed that is deemed defective to the POC. Any defective service(s) noted by the POC shall be corrected at no additional cost to the government. The contractor shall be responsible to perform only that work specified within the PWS, and shall receive no compensation for any work performed that is not specified within the PWS.

No government personnel will be allowed to assist the contractor in actual spraying operations or supervision of the contractor's personnel.

1.7 Hours of Operation: The contractor is responsible for conducting business, sunrise to sunset CST, Monday thru Sunday, except federal holidays or when the government facility is closed due to local or national emergencies, administrative closings, or similar government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.8 Pre-Work Meeting. Prior to commencing any activities, the contractor shall arrange a Pre-work Meeting with the COR. The Meeting shall discuss the work requirements, scheduling, submittal process, review of the Activity Hazard Analysis (AHA), and Abbreviated Accident Prevention Plan (AAP). At least one (1) week prior to commencing work, the contractor shall coordinate their proposed work schedule with the COR.

1.9. Submittals. Prior to commencement of services, the contractor shall submit the following documents to the COR for review and approval:

a. Activity Hazard Analysis (AHA);

b. Abbreviated Accident Prevention Plan (APP)

c. List of who will perform work on this contract;

d. Proof of Insurance for Contractors and Subcontractors;

e. Material Safety Data Sheets (MSDS): The Contractor shall supply MSDS’s for all Chemicals and materials used on the project.

1.10 Standards and Regulations. The contractor shall perform to the standards in the contract and comply with all Local, State, and Federal Regulations during the services performed. The contractor is responsible for ascertaining the extent to which these regulations affect the operations resulting from this contract. The contractor shall comply will all applicable regulations. Applicable regulations include, but are not limited to the following:

a. Code of Federal Regulations (CFR), Title 36, Chapter III, Part 327, Rules and Regulations Governing Public Use on Corps of Engineers Water Resource Development Projects EP 1165-2-316 (http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_1165-2- 316.pdf?ver=2013-08-22-104526-670)

b. Engineering Manual (EM) 385-1-1 (USACE – Safety and Health Requirements Manual), dated November 2014; http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

c. Occupational Safety and Health Standards (29 CFR 1910);

1.10.1 Activity Hazard Analysis (AHA). Contractor shall prepare AHAs IAW Paragraph 01.A.14 or 01.A.15 of the EM 385-1-1. If using Paragraph 01.A.15, prepare AHAs IAW Figure 1-2.

Note: Contractors and other individual employer’s typically use Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools. The government shall consider these documents equivalent to, and acceptable substitutes for, the USACE’s AHA provided the data collected is the same as that required by the AHA, commensurate with the type of services performed by the contractor.

1.10.2 Abbreviated Accident Prevention Plan (APP). EM 385-1-1 in its entirety may be too complex for the type of work performed under these contracts; Contractors may reference Appendix A, for abbreviated Accident Prevention Plan (APP). The contractor shall only need to submit items in Appendix A that are pertinent to the contract. The contractor shall use a qualified person to prepare the site-specific Abbreviated Accident Prevention Plan (AAPP). Prepare the AAPP in accordance with the format and requirements of the EM 385-1-1 and supplemented herein. The contractor shall sign and submit the APP for Government approval prior to the start of work onsite.

1.11 Physical Security

1.11.1 The contractor shall be responsible for safeguarding all government facilities, property, and materials provided for contractor use. The contractor shall secure at all times all government facilities, property, and materials.

Specific security conditions may change based on threats to national defense, and based on the risk of specific facilities to these threats. The contractor shall abide by these changing conditions at all times.

1.12 Payment

1.12.1 The government will make payment bi-annually, after the government has inspected and accepted the services provided by the contractor, and the government has reviewed, approved, and processed the contractor’s invoice. The contractor shall submit the invoice to the COR and/or any other person that has been designated in the contract to receive the invoice.

1.12.2 The contractor must provide the contractor’s name, address, contract number, period of services completed (i.e., for the month of January or for the period of performance of January 1 through February 23), CLIN number and specific quantities of work performed (i.e., 1 Month, 40 days, 100 acres, etc.), and total requested, for an invoice to be considered proper.

1.13 Place of Performance: The work to be performed under this agreement shall be performed on federal land administered by the USACE Oahe Project, Pierre, South Dakota.

1.14 Security Requirements:

1.14.1. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures—this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

1.14.2. Antiterrorism (AT) Level I training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).

1.14.3. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

1.14.4. Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

1.14.5. Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.

1.14.6. Pre-screen candidates using E-Verify Program (http://www.dhs.gov/E‐Verify): Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart

22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

2.0 Definitions and Acronyms:

2.1. Definitions.

2.1.1. Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the government.

The term used in this contract refers to the prime.

2.1.2. Contracting Officer. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. Contracting Officer's Representative (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. Physical Security. Actions that prevent the loss or damage of Government property.

2.1.8. Quality Assurance. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. Subcontractor. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12 Work Day. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12 Work Week. Monday through Friday, unless specified otherwise.

2.2. Acronyms:

AR Army Regulation CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative DA Department of the Army DOD Department of Defense FAR Federal Acquisition Regulation NLT No Later Than OCI Organizational Conflict of Interest POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control

3.0 Government Furnished Items and Services:

3.1. Services: N/A.

3.2 Facilities: The Government shall NOT make available to the Contractor any space or facilities for storage of equipment or supplies, unless negotiated by the POC.

3.3 Utilities: The Government may provide water at no extra cost to the contractor for the performance of objectives requested in the PWS, while the water system is working or may be obtained from other sources approved by the COR. If obtained from sources other than the Government water supply systems, all arrangements, and payments, if any, will be made by the Contractor. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning. The Contractor shall be responsible to furnish all equipment necessary to load, contain, and transport water for cleaning.

3.4 Materials: N/A

4. Contractor Furnished Items and Responsibilities:

4.1 General: The Contractor shall furnish all supplies, equipment, personnel, supervision, facilities and other items and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Materials: Any chemical, additives, or other substances used the Contractor must supply the COR with Material Data Safety Sheets for any product used on this contract.

4.3 Equipment: The Contractor shall furnish all equipment to meet the requirements under this PWS. All equipment used to perform work under this contract must be in good operating and mechanical condition. All equipment will be equipped with the manufacturers recommended safety protective devices to insure worker and public safety at all times. The Contractor will provide to his/her workers proper eye, ear, head, and foot protection equipment for the job. The equipment and operators must also comply with the U.S. Army Corps of Engineers Safety and Health Requirements Manual EM 385-1-1.4.6.1.

5. SPECIFIED TASKS:

5.1. Basic Services: The contractor shall provide services for chemical application. There will be two scheduled sprayings for this contract. The first will be done with the use of a total vegetation pre-emergent chemical. All designated areas will need to be completely covered with the total vegetation pre-emergent chemical. This spraying will be done from May 1st to May 30th, annually. The second spraying will be a spot spraying of anything green and growing. All areas will be visited and any vegetation that is growing in the control area needs to be spot sprayed. This spraying will need to be done from July 15th, to August 15th, annually, at the direction of the POC.

5.2. Task Heading:

5.2.1 Areas to be sprayed / controlled (see attachment 2, for specific map locations):

Pierre South Dakota 37.5 acres (Within 6 miles of Oahe Project Office)

Mobridge South Dakota 3.0 acres (Within 60 miles of Corps Office @ Indian Creek)

Bismarck - Fort Yates North Dakota 5.5 acres (From Fort Yates to Bismarck N.D. approx. 73 miles)

Total – 46.0 acres

5.2.2. Chemical Application Documentation: The contractor will be required to provide all MSDS sheet for each chemical/additive used. The contractor shall provide a Pesticide Application Record (attachment 1) for each day spraying is performed. If other forms of Pesticide Application Record are to be used it will need to be approved by the POC.

5.2.3. Invoices: The contractor shall be required to prepare itemized invoices to receive payment for services rendered.

6.0 Performance Requirements Summary. The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

Standard Performance Threshold Method of Surveillance

PRS # 1.

Pre-emergent spraying :

PWS paragraph 5.2

The Contractor shall spray all designated areas with approved pre-emergent chemical.

In accordance with Part 5.2 and attachment 2.

Zero Deviation From Standard.

100% inspection

PRS # 2

Spot spraying:

PWS paragraph 5.2

The Contractor shall spray anything green and growing in designate areas.

In accordance with Part 5.2 and attachment 2.

Zero Deviation From Standard.

100% inspection

PRS #3

Chemical Application Documentation:

PWS paragraph 5.2

The contractor will be responsible to provide all MSDS sheet and Pesticide Application Records (attachment 1) to the COR.

IAW Part 5.2 Section C

Zero Deviation From Standard.

100% inspection

PRS #4

Invoices:

PWS paragraph 5.2

The Contractor shall submit all invoices to the POC.

IAW Part 5.2 Section D

Zero Deviation From Standard.

100% inspection

7.0 Attachment/Technical Exhibit List:

7.1. Attachment 1 – Pesticide Application Record

7.2. Attachment 2 – Spray Map Locations

ATTACHMENT 1

PESTICIDE APPLICATION RECORD

U.S. ARMY CORPS OF ENGINEERS, OMAHA DISTRICT, OAHE PROJECT

Date: ______________ Area or Treatment Site: ___________________________ Total Acres Treated:_________

WEATHER CONDITIONS DURING TREATMENT:

Temperature: A.M._______ P.M._______ Wind Speed:A.M. _______ P.M. ______ Wind Direction: A.M. ______ P.M._____ TIME OF APPLICATION: Beg Time: ________ End Time: ________ Beg Time: ________ End Time: ________ Total Hours: _________

APPLICATION EQUIPMENT USED: PICKUP - BOOM HANDGUN

ATV - BOOM HANDWAND____

GRANULAR________ BACKPACK ____

TARGET WEEDS CONTROLLED:__________________________________________

GROWTH STAGE: DORMANT ( ) ACTIVE TO FLOWER ( ) MATURE TO SEED SET ( )

MIXTURE AND/OR FORM APPLIED: ___________________________________________

Chemical Used: _____________________ Common Name: ____________________________

Manufacturer: __________________________ EPA Registration # _____________

Total Quantity: _____________________ APPLICATION RATE: _________________________________________

Chemical Used: _____________________ Common Name: ____________________________

Chemical Used: _____________________ Common Name: ____________________________

SPECIAL PRECAUTIONS TAKEN: ________________________________________

PROBLEMS ENCOUNTERED AT TIME OF APPLICATION:

APPLICATOR’S NAME & LICENSE #:

ATTACHMENT 2

QUOTER INSTRUCTIONS

Quoter Instructions

This solicitation is being advertised as a Firm Fixed Price Best Value procurement. Award to the successful contractor shall be based on “Best Value” rather than low quote. See clause 52.212-2 Evaluation-Commercial Products and Commercial Services for specific information to be submitted with your quote.

The quoter must provide pricing for all items in the solicitation for its quote to be acceptable to the Government. All quoted items must meet the requirements of the Request for Quote (RFQ). Multiple quotes are not accepted for this RFQ. If multiple quotes are received only one quote (as determined by the Contracting Officer, will be evaluated by the Government. The quote shall be determined acceptable based on the date and time received. The contractor should list any special features or warranty information applicable to the quoted product(s).

1. REPRESENTATIONS AND CERTIFICATIONS CONTAINED HEREIN MUST BE COMPLETED BY

QUOTERS AND RETURNED WITH QUOTES:

IF YOUR REPRESENTATIONS AND CERTIFICATIONS ARE REGISTERED IN THE

“SYSTEM FOR AWARD MANAGEMENT” (SAM) CHECK HERE ______. IF NOT, YOU CAN REGISTER

ONLINE AT www.sam.gov

2. Request for Quote No.: W9128F23Q0028

3. North American Industry Classification System (NAICS) code, small business size standard and Product Service Code (PSC).

The NAICS code (561730) and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits a quotation in its own name, but which proposes to furnish an item which it did not itself manufacture, is $8,500,000.

The PSC is S208.

4. Email quotes shall be accepted before closing at e-mail address erin.m.patton@usace.army.mil. For questions call 605-945-3401. Make the Subject line: Quote for W9128F23Q0028

5. Availability of Funds Per IAW AFARS 5132.702 funds are subjected to availability. See clause 52.232-18 Availability of Funds.

6. Best Value Criteria Provide all information requested in 52.212-2

SUPPLEMENTAL PRICING SHEET

BASE YEAR

CLIN

Description/Area Unit Quantity Price Per Unit

Total

0001AA PRE-EMERGENT SPRAYING ON CORPS OF

ENGINEERS, OAHE PROJECT LANDS AS PER

SPECIFICATIONS - PIERRE AREA. Maps for all areas are attached. This spraying will be done in 2023 as per the specifications in the PWS.

Acre 37.5

0001AB PRE-EMERGENT SPRAYING - MOBRIDGE AREA Acre 3

0001AC PRE-EMERGENT SPRAYING – BISMARCK-FORT

YATES

Acre 5.5

0001AD SPOT SPRAY PIERRE AREA Acre 37.5

0001AE SPOT SPRAY MOBRIDGE AREA Acre 3

0001AF SPOT SPRAY BISMARCK-FORT YATES Acre 5.5

TOTAL PRICE FOR BASE YEAR 92

OPTION YEAR 1

CLIN

Description/Area Unit Quantity Price Per Unit

Total

0002AA PRE-EMERGENT SPRAYING ON CORPS OF

ENGINEERS, OAHE PROJECT LANDS AS PER

SPECIFICATIONS - PIERRE AREA. Maps for all areas are

Acre 37.5 attached. This spraying will be done in 2024 as per the specifications in the PWS.

0002AB PRE-EMERGENT SPRAYING - MOBRIDGE AREA Acre 3

0002AC PRE-EMERGENT SPRAYING – BISMARCK-FORT

YATES

Acre 5.5

0002AD SPOT SPRAY PIERRE AREA Acre 37.5

0002AE SPOT SPRAY MOBRIDGE AREA Acre 3

0002AF SPOT SPRAY BISMARCK-FORT YATES Acre 5.5

TOTAL PRICE FOR OPTION YEAR 1 92

OPTION YEAR 2

CLIN

Description/Area Unit Quantity Price Per Unit

Total

0003AA PRE-EMERGENT SPRAYING ON CORPS OF

ENGINEERS, OAHE PROJECT LANDS AS PER

SPECIFICATIONS - PIERRE AREA. Maps for all areas are attached. This spraying will be done in 2025 as per the specifications in the PWS.

Acre 37.5

0003AB PRE-EMERGENT SPRAYING - MOBRIDGE AREA Acre 3

0003AC PRE-EMERGENT SPRAYING – BISMARCK-FORT

YATES

Acre 5.5

0003AD SPOT SPRAY PIERRE AREA Acre 37.5

0003AE SPOT SPRAY MOBRIDGE AREA Acre 3

0003AF SPOT SPRAY BISMARCK-FORT YATES Acre 5.5

TOTAL PRICE FOR OPTION YEAR 2 92

OPTION YEAR 3

CLIN

Description/Area Unit Quantity Price Per Unit

Total

0004AA PRE-EMERGENT SPRAYING ON CORPS OF

ENGINEERS, OAHE PROJECT LANDS AS PER

SPECIFICATIONS - PIERRE AREA. Maps for all areas are attached. This spraying will be done in 2026 as per the specifications in the PWS.

Acre 37.5

0004AB PRE-EMERGENT SPRAYING - MOBRIDGE AREA Acre 3

0004AC PRE-EMERGENT SPRAYING – BISMARCK-FORT

YATES

Acre 5.5

0004AD SPOT SPRAY PIERRE AREA Acre 37.5

0004AE SPOT SPRAY MOBRIDGE AREA Acre 3

0004AF SPOT SPRAY BISMARCK-FORT YATES Acre 5.5

TOTAL PRICE FOR OPTION YEAR 3 92

OPTION YEAR 4

CLIN

Description/Area Unit Quantity Price Per Unit

Total

0005AA PRE-EMERGENT SPRAYING ON CORPS OF

ENGINEERS, OAHE PROJECT LANDS AS PER

SPECIFICATIONS - PIERRE AREA. Maps for all areas are attached. This spraying will be done in 2027 as per the specifications in the PWS.

Acre 37.5

0005AB PRE-EMERGENT SPRAYING - MOBRIDGE AREA Acre 3

0005AC PRE-EMERGENT SPRAYING – BISMARCK-FORT

YATES

Acre 5.5

0005AD SPOT SPRAY PIERRE AREA Acre 37.5

0005AE SPOT SPRAY MOBRIDGE AREA Acre 3

0005AF SPOT SPRAY BISMARCK-FORT YATES Acre 5.5

TOTAL PRICE FOR OPTION YEAR 4 92

TOTAL PRICE FOR CONTRACT (BASE PLUS 4 OPTION

YEARS)

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Base Year - FY23 - OA Vegetation Spray

FFP

The contractor(s) or applicator(s) will provide all equipment, personnel, chemicals and chemical additives necessary to perform the spraying in accordance with All State and Federal laws. All areas that are to be sprayed adjacent to water must be sprayed with a federal and state approved chemical. The applicator(s) will have a current and valid applicators license for all chemicals and methods of applications and will provide the license number. The applicator(s) will provide pesticide application records (attachment 1) to this office within two weeks of completion of spraying. The applicator(s) will be required to spray the following acres in three separate areas on Oahe Project in the States of North and South Dakota (see enclosed maps). Active Period of Performance 1: 1 May 2023 to 30 May 2023.

Inactive Period of Performance 1: 1 June 2023 – 14 July 2023. Active Period of Performance 2: 15 July 2023 to 15 August 2023. Inactive Period of Performance:

16 August 2023 to April 30 2024.

NET AMT

0001AA 1 Job Pre-Emergent Spray - Pierre Area

FFP

Pre-Emergent Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Pierre Area - 37.5 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2023 to 30 May 2023. Inactive Period of Performance 1: 1 June 2023 – 14 July 2023. Active Period of Performance 2: 15 July 2023 to 15 August 2023. Inactive Period of Performance: 16 August 2023 to April 30 2024.

FOB: Destination

PSC CD: S208

0001AB 1 Job Pre-Emergent Spray - Mobridge Area

FFP

Pre-Emergent Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Mobridge Area - 3 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2023 to 30 May 2023. Inactive Period of Performance 1: 1 June 2023 – 14 July 2023. Active Period of Performance 2: 15 July 2023 to 15 August 2023. Inactive Period of Performance: 16 August 2023 to April 30 2024.

0001AC 1 Job Pre-Emergent Spray - Bismarck Area

FFP

Pre-Emergent Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Bismarck-Ft. Yates Area - 5.5 Acres. Maps for all areas are attached. Active Period of Performance 1:

1 May 2023 to 30 May 2023. Inactive Period of Performance 1: 1 June 2023 – 14 July 2023. Active Period of Performance 2: 15 July 2023 to 15 August 2023.

Inactive Period of Performance: 16 August 2023 to April 30 2024.

0001AD 1 Job Spot Spray - Pierre Area

FFP

Spot Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Pierre Area - 37.5 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2023 to 30 May 2023. Inactive Period of Performance 1: 1 June 2023 – 14 July 2023. Active Period of Performance 2: 15 July 2023 to 15 August 2023. Inactive Period of Performance: 16 August 2023 to April 30 2024.

0001AE 1 Job Spot Spray - Mobridge Area

FFP

Spot Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Mobridge Area - 3 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2023 to 30 May 2023. Inactive Period of Performance 1: 1 June 2023 – 14 July 2023. Active Period of Performance 2: 15 July 2023 to 15 August 2023. Inactive Period of Performance: 16 August 2023 to April 30 2024.

0001AF 1 Job Spot Spray - Bismarck Area

FFP

Spot Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Bismarck-Ft. Yates Area - 5.5 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2023 to 30 May 2023. Inactive Period of Performance 1: 1 June 2023 – 14 July 2023. Active Period of Performance 2: 15 July 2023 to 15 August 2023. Inactive Period of Performance: 16 August 2023 to April 30 2024.

OPTION OP YR1 - FY24 - OA Vegetation Spray

FFP

The contractor(s) or applicator(s) will provide all equipment, personnel, chemicals and chemical additives necessary to perform the spraying in accordance with All State and Federal laws. All areas that are to be sprayed adjacent to water must be sprayed with a federal and state approved chemical. The applicator(s) will have a current and valid applicators license for all chemicals and methods of applications and will provide the license number. The applicator(s) will provide pesticide application records (attachment 1) to this office within two weeks of completion of spraying. The applicator(s) will be required to spray the following acres in three separate areas on Oahe Project in the States of North and South Dakota (see enclosed maps). Active Period of Performance 1: 1 May 2024 to 30 May 2024.

Inactive Period of Performance 1: 1 June 2024 – 14 July 2024. Active Period of Performance 2: 15 July 2024 to 15 August 2024. Inactive Period of Performance:

16 August 2024 to April 30 2025.

0002AA 1 Job OPTION Pre-Emergent Spray - Pierre Area

FFP

Pre-Emergent Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Pierre Area - 37.5 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2024 to 30 May 2024. Inactive Period of Performance 1: 1 June 2024 – 14 July 2024. Active Period of Performance 2: 15 July 2024 to 15 August 2024. Inactive Period of Performance: 16 August 2024 to April 30 2025.

0002AB 1 Job OPTION Pre-Emergent Spray - Mobridge Area

FFP

Pre-Emergent Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Mobridge Area - 3 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2024 to 30 May 2024. Inactive Period of Performance 1: 1 June 2024 – 14 July 2024. Active Period of Performance 2: 15 July 2024 to 15 August 2024. Inactive Period of Performance: 16 August 2024 to April 30 2025.

0002AC 1 Job OPTION Pre-Emergent Spray - Bismarck Area

FFP

Pre-Emergent Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Bismarck-Ft. Yates Area - 5.5 Acres. Maps for all areas are attached. Active Period of Performance 1:

1 May 2024 to 30 May 2024. Inactive Period of Performance 1: 1 June 2024 – 14 July 2024. Active Period of Performance 2: 15 July 2024 to 15 August 2024.

Inactive Period of Performance: 16 August 2024 to April 30 2025.

0002AD 1 Job OPTION Spot Spray - Pierre Area

FFP

Spot Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Pierre Area - 37.5 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2024 to 30 May 2024. Inactive Period of Performance 1: 1 June 2024 – 14 July 2024. Active Period of Performance 2: 15 July 2024 to 15 August 2024. Inactive Period of Performance: 16 August 2024 to April 30 2025.

0002AE 1 Job OPTION Spot Spray - Mobridge Area

FFP

Spot Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Mobride Area - 3 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2024 to 30 May 2024. Inactive Period of Performance 1: 1 June 2024 – 14 July 2024. Active Period of Performance 2: 15 July 2024 to 15 August 2024. Inactive Period of Performance: 16 August 2024 to April 30 2025.

0002AF 1 Job OPTION Spot Spray - Bismarck Area

FFP

Spot Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Bismarck-Ft. Yates Area - 5.5 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2024 to 30 May 2024. Inactive Period of Performance 1: 1 June 2024 – 14 July 2024. Active Period of Performance 2: 15 July 2024 to 15 August 2024. Inactive Period of Performance: 16 August 2024 to April 30 2025.

OPTION OP YR2 - FY25 - OA Vegetation Spray

FFP

The contractor(s) or applicator(s) will provide all equipment, personnel, chemicals and chemical additives necessary to perform the spraying in accordance with All State and Federal laws. All areas that are to be sprayed adjacent to water must be sprayed with a federal and state approved chemical. The applicator(s) will have a current and valid applicators license for all chemicals and methods of applications and will provide the license number. The applicator(s) will provide pesticide application records (attachment 1) to this office within two weeks of completion of spraying. The applicator(s) will be required to spray the following acres in three separate areas on Oahe Project in the States of North and South Dakota (see enclosed maps). Active Period of Performance 1: 1 May 2025 to 30 May 2025.

Inactive Period of Performance 1: 1 June 2025 – 14 July 2025. Active Period of Performance 2: 15 July 2025 to 15 August 2025. Inactive Period of Performance:

16 August 2025 to April 30 2026.

0003AA 1 Job OPTION Pre-Emergent Spray - Pierre Area

FFP

Pre-Emergent Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Pierre Area - 37.5 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2025 to 30 May 2025. Inactive Period of Performance 1: 1 June 2025 – 14 July 2025. Active Period of Performance 2: 15 July 2025 to 15 August 2025. Inactive Period of Performance: 16 August 2025 to April 30 2026.

0003AB 1 Job OPTION Pre-Emergent Spray - Mobridge Area

FFP

Pre-Emergent Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance o7f Work Statement - Mobridge Area - 3 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2025 to 30 May 2025. Inactive Period of Performance 1: 1 June 2025 – 14 July 2025. Active Period of Performance 2: 15 July 2025 to 15 August 2025. Inactive Period of Performance: 16 August 2025 to April 30 2026.

0003AC 1 Job OPTION Pre-Emergent Spray - Bismarck Area

FFP

Pre-Emergent Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Bismarck-Ft. Yates Area - 5.5 Acres. Maps for all areas are attached. Active Period of Performance 1:

1 May 2025 to 30 May 2025. Inactive Period of Performance 1: 1 June 2025 – 14 July 2025. Active Period of Performance 2: 15 July 2025 to 15 August 2025.

Inactive Period of Performance: 16 August 2025 to April 30 2026.

0003AD 1 Job OPTION Spot Spray - Pierre Area

FFP

Spot Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Pierre Area - 37.5 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2025 to 30 May 2025. Inactive Period of Performance 1: 1 June 2025 – 14 July 2025. Active Period of Performance 2: 15 July 2025 to 15 August 2025. Inactive Period of Performance: 16 August 2025 to April 30 2026.

0003AE 1 Job OPTION Spot Spray - Mobridge Area

FFP

Spot Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Mobridge Area - 3 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2025 to 30 May 2025. Inactive Period of Performance 1: 1 June 2025 – 14 July 2025. Active Period of Performance 2: 15 July 2025 to 15 August 2025. Inactive Period of Performance: 16 August 2025 to April 30 2026.

0003AF 1 Job OPTION Spot Spray - Bismarck Area

FFP

Spot Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Bismarck-Ft. Yates Area - 5.5 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2025 to 30 May 2025. Inactive Period of Performance 1: 1 June 2025 – 14 July 2025. Active Period of Performance 2: 15 July 2025 to 15 August 2025. Inactive Period of Performance: 16 August 2025 to April 30 2026.

OPTION OP YR3 - FY26 - OA Vegetation Spray

FFP

The contractor(s) or applicator(s) will provide all equipment, personnel, chemicals and chemical additives necessary to perform the spraying in accordance with All State and Federal laws. All areas that are to be sprayed adjacent to water must be sprayed with a federal and state approved chemical. The applicator(s) will have a current and valid applicators license for all chemicals and methods of applications and will provide the license number. The applicator(s) will provide pesticide application records (attachment 1) to this office within two weeks of completion of spraying. The applicator(s) will be required to spray the following acres in three separate areas on Oahe Project in the States of North and South Dakota (see enclosed maps). Active Period of Performance 1: 1 May 2026 to 30 May 2026.

Inactive Period of Performance 1: 1 June 2026 – 14 July 2026. Active Period of Performance 2: 15 July 2026 to 15 August 2026. Inactive Period of Performance:

16 August 2026 to April 30 2027.

0004AA 1 Job OPTION Pre-Emergent Spray - Pierre Area

FFP

Pre-Emergent Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Pierre Area - 37.5 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2026 to 30 May 2026. Inactive Period of Performance 1: 1 June 2026 – 14 July 2026. Active Period of Performance 2: 15 July 2026 to 15 August 2026. Inactive Period of Performance: 16 August 2026 to April 30 2027.

0004AB 1 Job OPTION Pre-Emergent Spray - Mobridge Area

FFP

Pre-Emergent Spraying on Corps of Engineers - Oahe Project Lands as per Specifications listed in the Performance of Work Statement - Mobridge Area - 3 Acres. Maps for all areas are attached. Active Period of Performance 1: 1 May 2026 to 30 May 2026. Inactive Period of Performance 1: 1 June 2026 – 14 July 2026. Active Period of Performance 2: 15 July 2026 to 15 August 2026. Inactive Period of Performance: 16 August 2026 to April 30 2027.

0004AC 1 Job OPTION Pre-Emergent…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .