Am_0002_DWGs.pdf
PDF 2 MB Posted
- Attached to
- Repair Golf Taxiway, FY22, Construction
- Solicitation number
- W9128F22R0029
About this file
This package includes design drawings and specifications for a federal construction project to repair a taxiway at Ellsworth Air Force Base in South Dakota. The project involves removing and replacing sections of the concrete taxiway pavement along with associated subbase, base course, and drainage work. Additional work includes relocating airfield lighting, installing a temporary displaced threshold, and establishing safety zones and haul routes. Construction will be phased to maintain aircraft operations, with the contractor allowed access to limited work zones at a time. The design drawings provide dimensions, material requirements, construction details, and a phasing plan to guide the repair work for the Golf Taxiway at the South Dakota base.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am_0004.pdf | ||
| Am_0003.pdf | ||
| Am_0003-DWGs.pdf | ||
| Am_0002.pdf | ||
| Am_0001.pdf | ||
| W9128-F-22-R-0029.pdf | ||
| W9128F22R0029 - dwgs - REPAIR TAXIWAY GOLF.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
...\EL\EL89\40000 Design Products\CAD_BIM\_Sheets\EL89_G-002
4:09:29 PM 3/1/2022 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
M
A H
A D
IS
T R
IC
T
C
A P
IT
O L A
V E
N U
E
O M
A H
A
N E
W F -1
-C -0
X
X
F E
B R
U A
R Y
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
A N
S I
D
W F
R
E L L S
W O
R T
H A
F B S
O U
T H D
A K
O T
A
R E
P A
IR
T
A X
IW
A Y G
O L F
T R
IR
E G
A
ADVERTISEMENT SET
H U
C K
L E
B
G O
L
IB
E R
B
G O
L
IB
E R
A F
-1
-0
E L
G -0
.d w g
/0
/2
G
E N
E R
A L R
E V
IS
IO
N
G-002
IN
D
E X O
F D
R A
W
IN
G
B
F
L E
R E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DESIGN FILE FILE NUMBER SHEET NO. DESCRIPTION
GENERAL
EL89_CB502.DWG
EL89_CB501.DWG
EL89_CB201.DWG
EL89_CB102.DWG
EL89_CB101.DWG
EL89_G-003.DWG
EL89_G-002.DWG
EL89_G-001.DWG
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
CB502
CB501
CB201
CB102
CB101
G-003
G-002
G-001
LOW PROFILED BARRICADE, CLOSED TAXIWAY CROSS AND ROPE & BARREL DETAILS
TEMPORARY DISPLACED THRESHOLD DETAILS
EQUIPMENT HEIGHT SAFETY PLAN
PHASING NOTES
PHASING PLAN
PROJECT LOCATION PLAN
INDEX OF DRAWINGS
COVER SHEET
INDEX
AF 111-10-01
GEOTECHNICAL
EL89_BB01.DWG BB01 SOIL BORING LOGS
AF 111-10-01
AF 111-10-01
AF 111-10-01
EXISTING CONDITIONS
EL89_VF102.DWG
EL89_VF101.DWG
EL89_VF100.DWG
VF102
VF101
VF100
EXISTING CONDITIONS PLAN - AREA B
EXISTING CONDITIONS PLAN - AREA A
OVERALL EXISTING CONDITIONS PLAN - AREA 1
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
CIVIL
EL89_CG502.DWG
EL89_CG501.DWG
EL89_CG402.DWG
EL89_CG401.DWG
EL89_CG203.DWG
EL89_CG202.DWG
EL89_CG201.DWG
EL89_CG101.DWG
EL89_CP801.DWG
EL89_CP701.DWG
EL89_CP504.DWG
EL89_CP503.DWG
EL89_CP502.DWG
EL89_CP501.DWG
EL89_CP402.DWG
EL89_CP401.DWG
EL89_CP201.DWG
EL89_CP101.DWG
EL89_CP100.DWG
EL89_CD201.DWG
EL89_CD104.DWG
EL89_CD103.DWG
EL89_CD102.DWG
EL89_CD101.DWG
CG502
CG501
CG402
CP401
CG203
CG202
CG201
CG101
CP801
CP701
CP504
CP503
CP502
CP501
CP402
CP401
CP201
CP101
CP100
CD201
CD104
CD103
CD102
CD101
SUBDRAIN DETAILS
HEAVY DUTY SUBDRAIN MANHOLE DETAILS
SPOT ELEVATION PLAN - AREA B
SPOT ELEVATION PLAN - AREA A
SUBDRAIN LINES D & E PROFILES
SUBDRAIN LINES B (CONT) & C PROFILES
SUBDRAIN LINES A & B PROFILES
GRADING PLAN - AREA 1
PAVEMENT MARKING DETAILS
PAVEMENT MARKING PLAN - AREA 1
STATIC GROUNDING POINT DETAILS
REINFORCEMENT DETAILS
JOINT SEALANT DETAILS
JOINT DETAILS
JOINT LAYOUT PLAN - AREA B
JOINT LAYOUT PLAN - AREA A
PAVEMENT REPLACEMENT SECTIONS
PAVING PLAN - AREA 1
GEOMETRIC CONTROL PLAN
PAVEMENT REMOVAL SECTIONS
PAVEMENT AND PAVEMENT MARKING REMOVAL PLAN - AREA 4
PAVEMENT AND PAVEMENT MARKING REMOVAL PLAN - AREA 3
PAVEMENT AND PAVEMENT MARKING REMOVAL PLAN - AREA 2
PAVEMENT AND PAVEMENT MARKING REMOVAL PLAN - AREA 1
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
AF 111-10-01
ELECTRICAL
EL89_ES509.DWG
EL89_ES508.DWG
EL89_ES507.DWG
EL89_ES506.DWG
EL89_ES505.DWG
EL89_ES504.DWG
EL89_ES503.DWG
EL89_ES502.DWG
EL89_ES501.DWG
EL89_ES101.DWG
EL89_ED105.DWG
EL89_ED104.DWG
EL89_ED103.DWG
EL89_ED102.DWG
EL89_ED101.DWG
ES509
ES508
ES507
ES506
ES505
ES504
ES503
ES502
ES501
ES101
ED105
ED104
ED103
ED102
ED101
AIRFIELD LIGHTING ELEVATED RUNWAY GUARD LIGHT (RGL) DETAILS
AIRFIELD LIGHTING JUNCTION CAN PLAZAS (JCP) AND DUCTBANK DETAILS
AIRFIELD LIGHTING TEMPORARY PAPI DETAILS
AIRFIELD LIGHTING TEMPORARY PAPI DETAILS
AIRFIELD LIGHTING SIGNAGE DETAILS
AIRFIELD LIGHTING CONDUIT DETAILS
AIRFIELD LIGHTING EDGE LIGHTING DETAILS
AIRFIELD LIGHTING EDGE LIGHTING DETAILS
AIRFIELD LIGHTING EDGE LIGHTING DETAILS
AIRFIELD LIGHTING ELECTRICAL SITE PLAN - AREA 1
AIRFIELD LIGHTING ELECTRICAL DEMOLITION PLAN - AREA 5
AIRFIELD LIGHTING ELECTRICAL DEMOLITION PLAN - AREA 4
AIRFIELD LIGHTING ELECTRICAL DEMOLITION PLAN - AREA 3
AIRFIELD LIGHTING ELECTRICAL DEMOLITION PLAN - AREA 2
AIRFIELD LIGHTING ELECTRICAL DEMOLITION PLAN - AREA 1
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
X X
XX XX XX XX XX
STAGING AREA (APPROX. 6.5 ACRES)
CONTRACTOR BATCH PLANT /
(CONTRACTOR FREE ZONE LIMITS)
ROPE AND BARREL FENCE
SEE BATCH PLANT NOTE 1
EXISTING POLE MOUNTED TRANSFORMER
(CONTRACTOR FREE ZONE LIMITS)
ROPE AND BARREL FENCE
(CONTRACTOR FREE ZONE LIMITS)
ROPE AND BARREL FENCE
(CONTRACTOR FREE ZONE LIMITS)
ROPE AND BARREL FENCE
ZONE LIMITS)
(CONTRACTOR FREE
LOW PROFILE BARRICADES
BARRICADES
LOW PROFILE
THRU CD104 FOR TEMPORARY RUNWAY MARKING LOCATIONS
OF TAXIWAY GOLF CONSTRUCTION (TYP.) - SEE SHEETS CD101
MARKINGS TO BE REMOVED AND REPLACED AFTER COMPLETION
EXISTING 3' X 100' REFLECTIVE WHITE RUNWAY CENTERLINE
THRESHOLD
TEMPORARY DISPLACED
PREVENT TRACKING MUD ONTO MENOHER ROAD
INSTALL CONSTRUCTION ENTRANCE TO
SEE NOTES 8 & 9
ENTRY CONTROL POINT (ECP)
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
5+
0+
5+
0+
5+
0+
5+
0+
100 ROW RAMP
TA
X
IW
A Y G
O
LF
LOLA RAMP
SEE BATCH PLANT NOTE 2
EXISTING FIRE HYDRANT
T A
X
IW
A Y A
L P
H A
MENOHER ROAD
TA
X
IW
A Y F
O X
TR
O T
R U
N W
A Y
- 3
R N
W Y S
TA
. 1
+2
5.
...\EL\EL89\40000 Design Products\CAD_BIM\_Sheets\EL89_CB101
9:03:52 AM 3/1/2022 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
A H
A D
IS
T R
IC
T
C
A P
IT
O L A
V E
N U
E
O M
A H
A
N E
W F -1
-C -0
X
X
F E
B R
U A
R Y
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
A N
S I
D
W F
R
E L L S
W O
R T
H A
F B S
O U
T H D
A K
O T
A
R E
P A
IR
T
A X
IW
A Y G
O L F
T R
IR
E G
A
H U
C K
L E
B
G O
L
IB
E R
B
G O
L
IB
E R
A F
-1
-0
E L
C B .d w g
CB101
P H
A S
IN
G P
L A
F
L E
R E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
SCALE: 1" = 200' - 0"
NN
ROPE AND BARREL FENCING - SEE NOTE 5
CONTRACTOR HAUL ROUTE
NOTES:
LEGEND:
LOW PROFILE BARRICADES - SEE NOTE 5
OFFICER, 14 DAYS IN ADVANCE OF CONNECTING TO THE WATER SUPPLY.
TO THE BATCH PLANT. NOTIFY ELLSWORTH AFB CES, THROUGH THE CONTRACTING
CONTRACTOR TO PROVIDE OWN CONNECTION AND MEANS OF CONVEYING WATER
INSTALL A BACKFLOW PREVENTER DOWNSTREAM OF THE WATER SUPPLY.
SHOWN AT NO EXPENSE TO THE CONTRACTOR. CONTRACTOR TO PROVIDE AND
2. WATER AVAILABLE FOR CONTRACTOR USE WITHIN THE BATCH PLANT LOCATION
ADVANCE OF CONNECTING TO THE POWER SOURCE.
NOTIFY ELLSWORTH AFB CES, THROUGH THE CONTRACTING OFFICER, 14 DAYS IN
THE TRANSFORMER BENEATH MENOHER ROAD TO THE BATCH PLANT LOCATION.
THE BATCH PLANT AND OTHER FACILITIES. JACK-AND-BORE THE POWER LINE FROM
CONNECT HIS OWN STEP-DOWN TRANSFORMER TO PROVIDE USABLE POWER FOR
SHOWN AT NO EXPENSE TO THE CONTRACTOR. CONTRACTOR TO PROVIDE AND
1. POWER AVAILABLE FOR CONTRACTOR USE WITHIN THE BATCH PLANT LOCATION
BATCH PLANT NOTES:
ADVERTISEMENT SET
/0
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
REMOVING THE SWING GATE AND REINSTALLING THE SECURITY FENCING.
COMPLETION OF THE PROJECT RETURN THE FENCE TO IT'S EXISTING CONDTION BY
CHAIN LINK SWING GATE WITH LOCK TO ACCESS THE WORK LOCATION. AT THE
9. NO GATE CURRENTLY EXISTS THAT THE EXP LOCATION SHOWN. INSTALL A NEW
WEEKS FOR THE REQUEST TO BE CONSIDERED.
REQUEST ADDITIONAL HOURS, THROUGH THE CONTRACTING OFFICER. ALLOW 2
WILL BE MANNED THE SAME HOURS AS THE BISMARK GATE. CONTRACTOR MAY
8. ENTRY CONTROL POINT TO BE MANNED BY GOVERNMENT PERSONNEL. THE ECP
AT ALL LOCATIONS WHERE FREE ZONE LIMITS CROSS NON-PAVED (TURFED) AREAS.
PAVEMENTS INCLUDING SHOULDER PAVEMENT. INSTALL ROPE AND BARREL FENCE
BARRICADES AT ALL LOCATIONS WHERE FREE ZONE LIMITS CROSS PAVED AIRFIELD
PROFILE BARRICADES AND ROPE AND BARREL FENCING. INSTALL LOW PROFILE
7. CONTRACTOR FREE ZONE TO BE DELINEATED BY A COMBINATION OF LOW
TEMPORARY DISPLACED THRESHOLD REQUIREMENTS.
6. SEE SHEETS CD101 THRU CD104 AND ED101 THRU ED104 FOR ADDITIONAL
DETAILS.
5. SEE SHEET CB502 FOR LOW PROFILE BARRICADE AND ROPE AND BARREL FENCE
4. SEE SHEET CB501 FOR TEMPORARY DISPLACED THRESHOLD DETAILS.
3. SEE SHEET CB201 FOR EQUIPMENT HEIGHT SAFETY PLAN.
2. SEE SHEET CB102 FOR PHASING NOTES.
TRAILER AREA AND HAUL ROUTE REQUIREMENTS.
1. SEE SHEET G-003 FOR CONTRACTOR STAGING / STORAGE / BATCH PLANT /
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
...\EL\EL89\40000 Design Products\CAD_BIM\_Sheets\EL89_CB102
3:58:10 PM 3/1/2022 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
A H
A D
IS
T R
IC
T
C
A P
IT
O L A
V E
N U
E
O M
A H
A
N E
W F -1
-C -0
X
X
F E
B R
U A
R Y
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
A N
S I
D
W F
R
E L L S
W O
R T
H A
F B S
O U
T H D
A K
O T
A
R E
P A
IR
T
A X
IW
A Y G
O L F
T R
IR
E G
A
H U
C K
L E
B
G O
L
IB
E R
B
G O
L
IB
E R
A F
-1
-0
E L
C B .d w g
/0
/2
G
E N
E R
A L R
E V
IS
IO
CB102
H
A S
IN
G N
O T
E
F
L E
R E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
THROUGH THE CONTRACTING OFFICER, 60 DAYS PRIOR TO BEGINNING ANY WORK ON ELLSWORTH AFB.
P. PROVIDE ALL REQUIRED INFORMATION FOR THE AIRFIELD MANAGER TO SUBMIT FAA FORM 7460-1 TO THE AIRFIELD MANAGER, OFFICER'S SATISFACTION.
AIRFIELD LIGHTS AND/OR NAVAIDS AT NO ADDITIONAL COST TO THE GOVERNMENT. REPAIR ALL DAMAGES TO THE CONTRACTING
NAVAIDS IS DAMAGED BY THE CONTRACTOR, IMMEDIATELY NOTIFY THE CONTRACTING OFFICER. REPAIR OR REPLACE THE DAMAGED
O. PROTECT ALL EXISTING AIRFIELD LIGHTS AND/OR NAVAIDS DURING CONSTRUCTION. IF AN EXISTING AIRFIELD LIGHTS AND/OR
DURING CONSTRUCTION AND FAA AC 150 5370-2f OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION.
N. COMPLY WITH ALL ASPECTS OF UFC 3-260-01, SECTION 14 CONSTRUCTION PHASING PLAN AND OPERATIONAL SAFETY ON AIRFIELDS
M. MAXIMUM EQUIPMENT HEIGHT ALLOWABLE ON TAXIWAY G SHALL NOT EXCEED 20'.
3. GENERAL REQUIREMENTS (CON'T)
CONTROLLED LANDS.
L. ALL SUBGRADE, BASE COUSE, CONCRETE AND ASPHALT REMOVED AS PART OF THIS PROJECT SHALL BE DISPOSED OF OFF GOVERNMENT
OVERRUN PAVEMENT, DURING CONSTRUCTION.
K. STOCKPILING OF BASE COURSE AND SUBGRADE MATERIALS WILL NOT BE ALLOWED ON ANY AIRFIELD PAVEMENTS, INCLUDING SHOULDER AND
ANY TIME. STEEL BUCKET OR BLADE EQUIPMENT MAY BE USED TO REMOVE/REPLACE EXISTING BASE AND SUBGRADE MATERIALS.
J. DO NOT OPERATE STEEL BUCKET OR BLADE EQUIPMENT WITH THE BUCKET OR BLADE IN DIRECT CONTACT WITH ANY PAVEMENT TO REMAIN AT
CHANGE.
CONTRACTOR MAY REQUEST EXTENDED HOURS OF GATE ACCESS THROUGH THE CONTRACTING OFFICER. GATE HOURS ARE SUBJECT TO
THE SAME HOURS AS THE BISMARK GATE. SEE HAUL ROUTE NOTE 7 ON SHEET G-003 FOR GATE HOURS. FOURTEEN DAYS IN ADVANCE, THE
CONTRACTOR'S ACCESS POINT TO THE CONSTRUCTION SITE, WILL BE MANNED BY GOVERNMENT SECURITY FORCES. THE ECP WILL BE MANNED
SCHEDULE PERSONNEL ACCESS AND MATERIAL DELIVERIES TO AVOID DELAYS. THE ENTRY CONTROL POINT (ECP), WHICH SHALL BE USED AS THE
ONLY ONE SET OF GOVERNMENT SECURITY FORCES WILL BE INSPECTING VEHICLES ONE VEHICLE AT A TIME. THEREFORE, STRATEGICALLY
I. ALL CONTRACTOR VEHICLES AND EQUIPMENT WILL BE INSPECTED BY GOVERNMENT SECURITY FORCES PRIOR TO ACCESS TO ELLSWORTH AFB.
H. COORDINATE ALL WORK NEAR THE AIRFIELD WITH THE AIRFIELD MANAGER AND BASE OPERATIONS.
WITHIN ONE HOUR OF BEING NOTIFIED BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
AND BARREL FENCING. INITIATE AND COMPLETE REPAIRS OF LOW PROFILE BARRICADES AND HAZARD LIGHTS AND ROPE AND BARREL FENCING
G. HAVE A PERSON AVAILABLE 24 HOURS A DAY FOR EMERGENCY MAINTENANCE OF LOW PROFILE BARRICADES AND HAZARD LIGHTS AND ROPE
F. MAINTAIN ALL HAUL ROUTES SO THEY REMAIN PASSABLE AT ALL TIMES.
E. THE HAUL ROUTES WILL BE USED BY THE SECURITY POLICE AND BASE OPS DURING CONSTRUCTION.
D. RESTORE ALL HAUL ROUTES BACK TO ORIGINAL CONDITION BY REPAIRING POTHOLES, RUTS AND SOFT YIELDING SPOTS.
C. CONTINUOUSLY VACUUM SWEEP ALL HAUL ROUTES AND CONSTRUCTION AREA FREE ZONES.
AND POV PASSES FOR ALL VEHICLES AND MOBILE EQUIPMENT ACCESSING ELLSWORTH AFB.
TO THE CONSTRUCTION AREA ZONES. THE CONTRACTOR WILL REQUIRE EAL FOR ALL PERSONELL, INCLUDING SUBCONTRACTOR PERSONELL, ON SHEETS CB101. AFTER THE CONSTRUCTION FREE ZONE HAS BEEN ESTABLISHED THE CONTRACTOR WILL NOT BE REQUIRED TO BE ESCORTED
THRESHOLD. AN ESCORT WILL BE REQUIRED FOR ALL PERSONNEL IN CHARGE OF ESTABLISHING THE CONSTRUCTION FREE ZONES AS SHOWN
B. THE CONTRACTOR WILL REQUIRE CMA QUALIFIED ESCORTS FOR THIS FOR ALL PERSONNEL INSTALLING THE TEMPORARY DISPLACED
CONTINUOUSLY DURING CONTRACTOR HAULING OPERATIONS.
PAVEMENT VACUUMING TRUCK WHICH IS SPECIFICALLY MANUFACTURED TO CLEAN AIRFIELD PAVEMENTS. OPERATE THE VACUUM TRUCK
DEBRIS (FOD) IS PRESENT. REMOVE ALL FOD FOUND ON AIRFIELD PAVEMENTS WITHIN 1-HOUR OF DISCOVERY. PROVIDE A SELF-CONTAINED
PAVEMENTS TRAFFICKED BY THE CONTRACTOR'S CONSTRUCTION EQUIPMENT HOURLY BY THE CONTRACTOR TO DETERMINE IF FOREIGN OBJECT
A. ALL VEHICLES REQUIRE COMPANY MARKINGS, FLASHING BEACONS, AND FLIGHT LINE PASSES DISPLAYED. INSPECT ALL ACTIVE AIRFIELD
3. GENERAL REQUIREMENTS
TO MATCH EXISTING CONDITION PRIOR TO CONSTRUCTION.
B. RE-ESTABLISH EXISTING PAVEMENT MARKINGS AND ALL EXISTING UTILITIES WITHIN EACH CAZ REMOVED OR DAMAGED BY THE CONTRACTOR
FORMULA CONFORMING TO 32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING.
SPECIFICATION 32 13 14.13 CONCRETE PAVEMENTS FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS AND AN APPROVED HMA JOB MIX
A. NO DEMOLITION OF EXISTING AIRFIELD PAVEMENT UNTIL THE CONTRACTOR HAS AN APPROVED CONCRETE MIX DESIGN CONFORMING TO
2. CONSTRUCTION PHASING
RDR'S OVER ONE (1) WEEKEND. THE CONTRACTOR WILL REQUIRE CMA QUALIFIED ESCORTS FOR THIS WORK.
TEMPORARY PAPI FOUNDATIONS, REMOVE ALL DISPLACED THRESHOLD MARKINGS, INSTALL ALL NEW RUNWAY MARKINGS AND REINSTALL THE
3. AT THE COMPLETION OF ALL WORKTH WITHIN 250' OF THE RUNWAY EDGE, REMOVE THE TEMPORARY (RELOCATED) PAPI, REMOVE
ESCORTS FOR THIS WORK.
THRESHOLD MARKINGS, CONCURRENTLY. COMPLETE ALL WORK OVER ONE (1) WEEKEND. THE CONTRACTOR WILL REQUIRE CMA QUALIFIED
2. RELOCATE THE RUNWAY 13 END EXISTING PAPI, ADJUST THE RUNWAY DISTANCE REMAINING (RDR'S) SIGNS AND INSTALL ALL OF DISPLACED
CONTRACTOR WILL REQUIRE CMA QUALIFIED ESCORTS FOR THIS WORK.
RUNWAY 13 EXISTING PAPI INSTALLATION. SEE THE ELECTRICAL SITE SHEETS FOR THE TEMPORARY PAPI INSTALLATION LOCATIONS. THE
THRESHOLD MARKINGS AND LIGHTING, INSTALL THE TEMPORARY PAPI CONCRETE FOUNDATIONS THAT ARE REQUIRED FOR THE RELOCATED
1. FOURTEEN (14) DAYS IN ADVANCE OF RELOCATING THE EXISTING RUNWAY 13 END PAPI AND INSTALLATION OF THE TEMPORARY DISPLACED
REQUIRE CMA QUALIFIED ESCORTS FOR THIS WORK.
TEMPORARY DISPLACED THRESHOLD WILL OCCUR OUTSIDE OF THE CONSTRUCTION AREA FREE ZONE SHOWN ON CB101. THE CONTRACTOR WILL
C. INSTALL THE TEMPORARY DISPLACED THRESHOLD PRIOR TO BEGINNING ANY WORK ON TAXIWAY G. ALL WORK REQUIRED TO INSTALL THE
DISPLACED THRESHOLD.
B. NOTIFY THE AIRFIELD MANAGER, THROUGH THE CONTRACTING OFFICER'S REPRESENTATIVE, 30 DAYS IN ADVANCE OF INSTALLING THE
REQUIRED.
SECURITY FENCE AND ALL HAUL ROUTES SHOWN ON SHEET G-003 ARE CONSIDERED A FREE ZONE, I.E. A GOVERNMENT ESCORT IS NOT
ADDITIONAL HOURS ARE REQUESTED BY THE CONTRACTOR AND APPROVED BY THE CONTRACTING OFFICER. ALL AREAS WITHIN THE AIRFIELD
AIRFIELD MANAGER, THROUGH THE CONTRACTING OFFICER. ACCESS TO AND FROM WORK AT THE SITE IS LIMITED TO DAYLIGHT HOURS UNLESS
A. ESTABLISH ACCESS TO THE SITE PRIOR TO INITIATING ANY WORK. COORDINATE ACCESS WITH AND OBTAIN APPROVAL BY THE ELLSWORTH AFB
1. WORK AREA & ACCESS LIMITATIONS
ADVANCE, THROUGH THE CONTRACTING OFFICER, COORDINATING WORK WITHIN EACH CONSTRUCTION AREA ZONE.
WITHIN THE TIME FRAME REQUIRED AND IS APPROVED BY THE CONTRACTING OFFICER. PROVIDE A TWENTY-ONE DAY WRITTEN NOTICE IN
(CAZ) AT ANY ONE TIME. DO NOT INITIATE WORK UNTIL THE CONTRACTOR'S SCHEDULE DEMONSTRATES THE ABILITY TO COMPLETE THIS WORK
FACILITIES DURING CONSTRUCTION. THE CONTRACTOR SHALL BE ALLOWED ACCESS TO A LIMITED NUMBER OF CONSTRUCTION AREA ZONES
PHASING, PROVIDED HEREIN, IS ESTABLISHED TO MAINTAIN AIRCRAFT OPERATIONAL CAPABILITY AND CONTINUAL ACCESS TO AIR FORCE
CONSTRUCTION PHASING NOTES
OFFICER.
OPERATIONS. THE CONTRACTOR WILL BE NOTIFIED 7 DAYS IN ADVANCE OF THE PLANNED SHUTDOWN BY THE CONTRACTING
A. THE CONTRACTOR SHALL EXPECT TO BE SHUT DOWN ONE WEEK EACH AUGUST AND NOT BE ALLOWED TO WORK DUE TO BASE
4. SPECIAL REQUIREMENTS
E
C B
E E E E E E
E
E
E
E
E
E
E
E
E
E
EE
E
E
E
E
E
E
EEEEEEE
E
E
E E E
IN
V E R T = 3268.656
D
IA
M E
TE
R = 24"
M A
TE
R
IA
L = R C P
R
IM
E
LE
V A
TIO
N = 3272.656
IN
V E R T = 3267.770
D
IA
M E
TE
R = 24"
M A
TE
R
IA
L = R C P
R
IM
E
LE
V A
TIO
N = 3272.760
IN
V E R T = 3268.809
D
IA
M E
TE
R = 6"
M A
TE
R
IA
L = IR
O
N
R
IM
E
LE
V A
TIO
N = 3272.760
IN
V E R T = 3268.222
D
IA
M E
TE
R = 36"
M A
TE
R
IA
L = R C P
R
IM
E
LE
V A
TIO
N = 3272.760
IN
V E R T = 3270.685
D
IA
M E
TE
R = 6"
M A
TE
R
IA
L = IR
O
N
R
IM
E
LE
V A
TIO
N = 3275.685
IN
V E R T = 3271.180
D
IA
M E
TE
R = 6"
M A
TE
R
IA
L = IR
O
N
R
IM
E
LE
V A
TIO
N = 3275.685
IN
V E R T = 3270.698
D
IA
M E
TE
R = 6"
M A
TE
R
IA
L = IR
O
N
R
IM
E
LE
V A
TIO
N = 3275.685
C O
U
LD
N
O T B
E
LO
C A
TE
D
O
TH
E R E
N D O
F P
IP
E
D C 18-13
C O
R E 18-15
C O
R E 18-16
D C 18-14
D C 18-11
C O
R E 18-17
D C 18-12
D C 18-10
IN
V E R T = 3266.575
D
IA
M E
TE
R = 6"
M A
TE
R
IA
L = IR
O
N
R
IM
E
LE
V A
TIO
N = 3272.325
IN
V E R T = ~3277.78
D
IA
M E
TE
R = 6"
M A
TE
R
IA
L = D U C
TILE
IR
O
N
R
IM
E
LE
V A
TIO
N = ~3281.94
IN
V E R T = 3270.98
D
IA
M E
TE
R = 6"
M A
TE
R
IA
L = IR
O
N
R
IM
E
LE
V A
TIO
N = 3276.89
IN
V E R T = 3274.32
D
IA
M E
TE
R = 6"
M A
TE
R
IA
L = D U C
TILE
IR
O
N
R
IM
E
LE
V A
TIO
N = 3279.49
N E -S
W D
E P
TH
O
F C O
N D
U
IT = 4.58'
N W -S
E D
E P
TH
O
F C O
N D
U
IT = 5.50'
R
IM
E
LE
V . = 3274.00
E
LE
C
TR
IC
A L M
A N
H O
LE
N E -S
W D
E P
TH
O
F C O
N D
U
IT = 4.6'
N W -S
E D
E P
TH
O
F C O
N D
U
IT = 5.25'
R
IM
E
LE
V . = 3276.00
E
LE
C
TR
IC
A L M
A N
H O
LE
IN
V E R T = 3275.01
D
IA
M E
TE
R = 6"
M A
TE
R
IA
L = D U C
TILE
IR
O
N
R
IM
E
LE
V A
TIO
N = 3279.34
C B
C
E
E
E
E
E
D
D
D
TO BE REMOVED (TYP.)
TAXIWAY CENTERLINE
TO BE REMOVED (TYP.)
TAXIWAY CENTERLINE
TO BE REMOVED (TYP.)
TAXIWAY CENTERLINE
SEE NOTE 1 (TYP.)
SEE NOTE 1 (TYP.)
SEE NOTE 1 (TYP.)
SEE NOTE 2 (TYP.)
SEE NOTE 2 (TYP.)
SEE NOTE 1 (TYP.)
SEE NOTES 8 THRU 12 (TYP.)
INSTALL NEW CHEVRON
SEE NOTE 2 (TYP.)
DESIGNATION MARKING
EXISTING RUNWAY 13
TO BE REMOVED (TYP.)
IRON SUBDRAIN LINE
EXISITNG 6" DUCTILE
TO BE REMOVED (TYP.)
IRON SUBDRAIN LINE
EXISITNG 6" DUCTILE
TO BE REMOVED (TYP.)
IRON SUBDRAIN LINE
EXISITNG 6" DUCTILE
TO BE REMOVED (TYP.)
IRON SUBDRAIN LINE
EXISITNG 6" DUCTILE
TO BE REMOVED (TYP.)
IRON SUBDRAIN LINE
EXISITNG 6" DUCTILE
TO BE REMOVED (TYP.)
IRON SUBDRAIN LINE
EXISITNG 6" DUCTILE
TO BE REMOVED (TYP.)
IRON SUBDRAIN LINE
EXISITNG 6" DUCTILE
TO REMAIN (TYP.)
IRON SUBDRAIN LINE
EXISITNG 6" DUCTILE
TO REMAIN (TYP.)
IRON SUBDRAIN LINE
EXISITNG 6" DUCTILE
TO REMAIN (TYP.)
IRON SUBDRAIN LINE
EXISITNG 6" DUCTILE
TO BE REMOVED (TYP.)
IRON SUBDRAIN LINE
EXISITNG 6" DUCTILE
TO BE REMOVED (TYP.)
EXISITNG SUBDRAIN MANHOLE
TO BE REMOVED (TYP.)
EXISITNG SUBDRAIN MANHOLE
MANHOLE TO REMAIN (TYP.)
EXISITNG SUBDRAIN
MANHOLE TO REMAIN (TYP.)
EXISITNG SUBDRAIN
TO BE REMOVED (TYP.)
EXISITNG SUBDRAIN MANHOLE
BAR TO REMAIN
EXISTING THRESHOLD
PRIOR TO PAVEMENT REMOVAL
SURVEY EXISTING MARKING
CABLING PRIOR TO ANY PAVEMENT DEMOLITION
THE JUNCTION BOX AND REMOVE THE ICE DETECTION
DISCONNECT EXISTING ICE DETECTION SENSOR AT
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
KEY PLAN
SCALE: 1" = 500' - 0"
2 3 4 5
N
A
C D
C D
A
C D
C D
(T Y
P
(TYP.)
20'
(TYP.)
20'
(T Y
P
(TYP.)
20'
(T Y
P
(TYP.)
20'
(T Y
P
C
CD201
CD101
C
CD201
CD101
B
C D
C D
BC
D
C D
.5
20'
20'2
.5
37.5'
W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W
W
W W W W
143+00
144+00
145+00
146+00
147+00
148+00
149+00
150+00
151+00
152+00
+0
.2
P
C
+3
0.2
0PT
.7
4P I
+0
+0
12+
13+00
14+00
.0
P
C
13+58.51
PT
.0 0P I
D D
D
TO BE REMOVED
BREAKER / 21.5" PCC
12" PCC / 2 ACC BOND
REMOVED - SEE NOTE 13
4" TO 16" ACC TO BE
TO BE REMOVED
BREAKER / 17.5" PCC
12" PCC / 2 ACC BOND
NOTES:
LEGEND:
TO BE REMOVED
PAVEMENT MARKINGS
TO BE REMOVED
12" PCC (REINFORCED)
TO 4" AT EDGE OF SHOULDER.
TRANSITIONS FROM 16" ADJACENT TO CONCRETE
13" THICK. ASSUME THE EXISTNG ASPHALT
THICKNESS OF ASPHALT TO BE APPROXIMATELY
13. CORE 18-16 INDICATES THE EXISTING
DISPLACED THRESHOLD.
AIRFIELD MANAGER PRIOR TO INSTALLING THE
12. CONTRACTOR SHALL COORDINATE WITH THE
4" ACC TO BE REMOVED
W SEE NOTE 5
PAINT.
BE PAINTED DIRECTLY ON THE PAVEMENT WITH A HALF APPLICATION OF REFLECTIVE
11. ALL TEMPORARY MARKINGS REQUIRED FOR THE DISPLACED THRESHOLD SHALL
BLACK BORDER.
10. ALL TEMPORARY MARKINGS SHALL BE OUTLINED WITH A 6" NON-REFLECTIVE
THE EXACT LOCATION AS THE REMOVED CENTERLINE MARKINGS.
CB501 FOR MARKING REMOVAL DETAILS. INSTALL NEW CENTERLINE MARKINGS AT
THRESHOLD, THE CHEVRONS AND THE EXISTING CENTELRINE MARKINGS. SEE SHEET
9. AT THE COMPLETION OF THE PROJECT, REMOVE THE TEMPORARY DISPLACED
MARKING AND THE TEMPORARY DISPLACED THRESHOLD.
ALL EXISTING CENTERLINE MARKINGS BETWEEN THE RUNWAY 13 DESIGNATION
8. INTALL TEMPORARY CHEVRONS FOR THE TEMPORARY DISPLACED THRESHOLD ON
- THE JOINT BETWEEN THE RUNWAY AND TAXIWAY GOLF.
- THE JOINT BETWEEN SLABS OF DIFFERENT SIZES.
- THE JOINT ADJACENT TO STRUCTURES.
THICKENED EDGE EXPANSION JOINT EXISTS AT THE FOLLOWING LOCATIONS:
THE SURROUNDING PAVEMENT. THE CONTRACTOR SHALL ASSUME THAT A
ASSUME THAT THE PAVEMENT AT THAT LOCATION IS 1.3 TIMES THE THICKNESS OF
7. AT LOCATIONS OF THICKENED EDGE EXPANSION JOINTS, THE CONTRACTOR SHALL
HIS OWN EXPENSE.
OPERATIONS SHALL BE ENTIRELY REMOVED AND REPLACED BY THE CONTRACTOR AT
INDICATED TO BE REMOVED, THAT ARE MARRED OR REMOVED BY THE CONTRACTOR'S
6. EXISTING PAVEMENT MARKINGS NOT WITHIN THE PAVEMENT REMOVAL AREA, OR
A SQUARE OR RECTANGULAR SLAB.
DIMENSION EXCEEDS THE SHORTER ONE BY MORE THAN 25% OR IF THE SLAB IS NOT
IN BOTH DIRECTIONS. A SLAB IS CONSIDERED ODD-SHAPED IF THE LONGER
STRUCTURAL PENETRATIONS ARE REINFORCED WITH 0.05% STEEL DEFORMED BARS
5. ALL ODD-SHAPED SLABS, SLABS IDENTIFIED WITH A "W" AND SLABS WITH
COMPACT SUBBASE COURSE MATERIAL AS NECESSARY.
SECTION IS LESS THAN THE EXISTING PAVEMENT SECTION REMOVED, PLACE AND
CONSTRUCT THE NEW PAVEMENT SECTION. IN AREAS WHERE THE NEW PAVEMENT
PAVEMENT REMOVED, REMOVE EXISTING SUBGRADE MATERIAL AS NECESSARY TO
4. IN AREAS WHERE THE NEW PAVEMENT THICKNESS IS GREATER THAN THE EXISTING
REPLACEMENT SECTIONS, RESPECTIVELY.
3. SEE SHEETS CD201 AND SHEET CP201 FOR PAVEMENT REMOVAL AND PAVEMENT
CONTROLLED LANDS.
VERTICAL SAWCUT. ALL ACC SHALL BE DISPOSED OF OFF GOVERNMENT
2. ALL ACC PAVEMENT REMOVALS SHALL BE INITIATED WITH A SINGLE FULL DEPTH,
FULL DEPTH, VERTICAL SAWCUT. SEE SHEET CD201 FOR SAWCUT DETAILS.
1. ALL PCC PAVEMENT REMOVALS SHALL BE INITIATED WITH A DOUBLE OR TRIPLE
...\EL\EL89\40000 Design Products\CAD_BIM\_Sheets\EL89_CD101
9:27:53 AM 3/1/2022 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
A H
A D
IS
T R
IC
T
C
A P
IT
O L A
V E
N U
E
O M
A H
A
N E
W F -1
-C -0
X
X
F E
B R
U A
R Y
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
A N
S I
D
W F
R
E L L S
W O
R T
H A
F B S
O U
T H D
A K
O T
A
R E
P A
IR
T
A X
IW
A Y G
O L F
T R
IR
E G
A
H U
C K
L E
B
G O
L
IB
E R
B
G O
L
IB
E R
A F
-1
-0
E L
C D
.d
CD101
A
V E
M E
N T A
N D P
A V
E M
E N
T M
A R
K
IN
G R
E M
O V
A L P
L A
N
A R
E
F
L E
R E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
SCALE: 1" = 50' - 0"
NN
/0
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
C
C O
M W
M W
M W
M W
M W
M
WM
W
M W
M W
M
WM
W
M W
LI
G
H
TI
N G V
A U
LT
T L
T L
T L
T L
T L
T L
T L
T L
T L
T L
T L
T L
T L
T L
T L
T L
T L
T L
UGE
UGE
W
E
E
E
E
E
EE
E
E
E
T O
R
E
C
E
E
E
E
E
D
D
D
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
KEY PLAN
SCALE: 1" = 500' - 0"
2 3 4 5
N
A
C P
C P
A
C P
C P
C
CP201
CP101
C
CP201
CP101
BC
P
C P
B
C P
C P
340' 503'
843'
.5
.5
37.5'
'5
143+00
144+00
145+00
146+00
147+00
148+00
149+00
150+00
151+00
152+00
+0
+0
+0
12+
13+00
14+00
LEGEND:
COURSE / 8" LIME MODIFIED SUBGRADE
4" STABILIZED DRAINAGE LAYER / 6" SUBBASE
NEW 3" ACC / 18" AGGREGATE BASE COURSE /
NOTES:
12" SUBBASE COURSE / 8" LIME MODIFIED SUBGRADE
NEW 21" PCC / 4" STABILIZIED DRAINAGE LAYER /
1. SEE SHEET CP100 GEOMETRIC CONTROL PLAN FOR DIMENSIONS.
NEW 3" ACC / 6" (MIN) AGGREGATE BASE COURSE
NEW 3" ACC / 6" (min) AGGREGATE BASE COURSE
...\EL\EL89\40000 Design Products\CAD_BIM\_Sheets\EL89_CP101
4:16:34 PM 3/1/2022 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
A H
A D
IS
T R
IC
T
O M
A H
A
N E
W F -1
-C -0
X
X
F E
B R
U A
R Y
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
A N
S I
D
E L L S
W O
R T
H A
F B S
O U
T H D
A K
O T
A
R E
P A
IR
T
A X
IW
A Y G
O L F
T R
IR
E G
A
H U
C K
L E
B
G O
L
IB
E R
B
G O
L
IB
E R
A F
-1
-0
E L
C P .d
CP101
A
V
IN
G P
L A
N
A R
E
F
L E
R E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
NN
SCALE: 1" = 50' - 0"
C
A P
IT
O L A
V E
N U
E W
F
R
ADVERTISEMENT SET
/0
/2
A M G
E N
E R
A L R
E V
IS
IO
N S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A d 1.
3.
NOTES:
TABLE 1
2.
A h DENOTES REINFORCED CONCRETE PAVEMENT DESIGN THICKNESS.
REINFORCING STEEL IS NOT CARRIED THROUGH JOINT.
SLABS TO BE REINFORCED ARE MARKED WITH R ON THE JOINT LAYOUT
SHEETS.
d h
TRANSVERSE CONTRACTION JOINT
3"
D-DENOTES DOWEL DIAMETER
3"
LAP
LONGITUDINAL CONSTRUCTION JOINT
DOWEL
D-DENOTES DOWEL DIAMETER
STEEL
REINFORCING
STEEL
REINFORCING
REINFORCING STEEL
SPACING IN REINFORCING MAT
MAXIMUM SPACING = ONE-HALF BAR
DOWELED JOINT
h d
1" d h d h
+1" d h
D
SECTION
BSECTION
d h
NOT TO SCALE
DETAIL FOR TERMINATION OF STEEL JOINT
THICKNESS
PAVEMENT
h d
1"
21"
REBAR SIZE
#4 @ 12" C.C. EACH WAY
A
B
BAR MAT - 24 BAR DIAMETERS
LAP SPACING :
NOTE:
LENGTH OF SLAB
LONGITUDINAL CONSTRUCTION JOINT3"
W
ID
T H O
F S
L A
B
LAP
TRANSVERSE CONTRACTION JOINT
BAR MAT
LENGTH OF MAT
L O
N G
IT
U D
IN
A L B
A R
S C T
O C O
F O
U T S
ID
E W
ID
T H O
F M
A T
L O
N G
IT
U D
IN
A L
B A
R S
P A
C
IN
G
TRANSVERSE BAR SPACING
TRANSVERSE BAR DIAMETER
LONGITUDINAL BAR DIAMTER
3"
NOT TO SCALE
DETAIL OF SLAB REINFORCEMENT
NOTE:
NOT TO SCALE
DETAIL OF BAR MAT
LENGTH OF LAP
BAR MAT - 24 BAR DIAMETERS
LAP SPACING :
...\EL\EL89\40000 Design Products\CAD_BIM\_Sheets\EL89_CP503
9:19:16 AM 3/1/2022 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
A H
A D
IS
T R
IC
T
C
A P
IT
O L A
V E
N U
E
O M
A H
A
N E
W F -1
-C -0
X
X
F E
B R
U A
R Y
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
A N
S I
D
W F
R
E L L S
W O
R T
H A
F B S
O U
T H D
A K
O T
A
R E
P A
IR
T
A X
IW
A Y G
O L F
T R
IR
E G
A
H U
C K
L E
B
G O
L
IB
E R
B
G O
L
IB
E R
A F
-1
-0
E L
C P .d w g
/0
/2
G
E N
E R
A L R
E V
IS
IO
CP503
E
IN
F O
R C
E M
E N
T D
E T
A
IL
F
L E
R E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
| EL89_G-002 |
| EL89_CB101 |
| EL89_CB102 |
| EL89_CD101 |
| EL89_CP101 |
| EL89_CP503 |
File details come from the government source that posted it. Updated .