W9128F22Q0101-0001 Amendment.pdf

PDF 605 KB Posted

Attached to
Phase 3 Lake Zorinsky Tree Removal Federal contract opportunity
Solicitation number
W9128F22Q0101
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document is a performance work statement for a tree and vegetation removal contract to create firebreaks at Papio Creek Dam Site 18 - Lake Zorinsky. The contractor shall provide all personnel, equipment, supplies and services to remove trees and vegetation from eight designated areas totaling approximately 9 acres to establish 30-foot-wide firebreaks around the perimeter of the property. Work must be completed within 365 calendar days of award and all tree removal must occur between September 1st and April 1st. The contractor shall follow all applicable wildlife laws and protect existing erosion control structures. The contractor will also conduct cleanup, disposal, seeding, mulching and erosion control work. The contract will be awarded based on best value considering past performance, equipment, and price.

View the file

Other files for this federal contract opportunity

Other files attached to Phase 3 Lake Zorinsky Tree Removal, newest first.
File Type Posted
Questions and Answers 8-19-22.docx DOCX document
W9128F22Q01010002.pdf PDF
Attachment 3 City of Omaha Storm and Sanitary Manhole Maps.pdf PDF
Attachment 1REVISED A4.pdf PDF
Redacted Site Visit Sign in Sheet 17AUG2022.pdf PDF
Attachment 1 - Project Maps.pdf PDF
Attachment 2 - PesticideAppRecord FORM .pdf PDF
Attachment 1 - Project Maps.pdf PDF
W9128F22Q0101.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Update clauses: added 52.212-1 and included site map for site inspection- Update PWS. Update attachment 1 - Project Map: All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F22Q0101

X 9B. DATED (SEE ITEM 11)

10-Aug-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Aug-2022

CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9128F22Q0101

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

52.212-1 ADDENDUM

52.212-1 Addendum; Instructions to Quoters—Commercial Items

(a) Site Visit – When: August 17, 2022 at 9:00 a.m.

Where: 168th Street, Zorinsky Lake Recreation Area Parking Lot, Omaha, NE Contact Tommy Aldmeyer to RSVP at Thomas.e.aldmeyer@usace.army.mil

(b)Submission of quotations. Submit quotations by email to: Robert J. Turner, robert.j.turner@usace.army.mil.

Quotations may be submitted on a word, pdf, or other electronic document.

As a minimum, quoters must include:

(1) The solicitation number; W9128F22R0064

(2) The company name, address, and telephone number of the quoter as it appears in System for Award Management (SAM);

(3) CAGE Code and DUNS Number;

(4) A completed copy of FAR 52.212-3(b) if applicable;

(5) Acknowledgment of Solicitation Amendments; and

(6) Information required per FAR 52.212-2;

(c) Period for acceptance of quotes. Not applicable.

(d) Product samples. Not Applicable.

(e) Multiple quotations. Quoters are encouraged to submit multiple quotations presenting alternative terms and conditions or commercial items for satisfying the requirements of this solicitation. Each quotation submitted will be evaluated separately.

(f) Late submissions, modifications, and revisions of quotes. (1) Quoters are responsible for submitting quotations so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that quotations are due.

(2) Any quotation received at the Government office designated in the solicitation after the exact time specified for receipt of quotations is late and will not be considered unless it is received before the government issues the purchase order and the Contracting Officer determines that accepting the late quotation would not delay the acquisition.

(g) Issuance of purchase order. Quotations should contain the quoter’s best technical and price terms. The Contracting Officer may reject any or all quotations. The Contracting Officer may issue a purchase order to other than the quoter with the lowest priced quotation. After the evaluation of quotations, the Contracting Officer may negotiate final terms with one or more quoters of the Government’s choice before issuing any purchase order. The Contracting Officer will not negotiate with any quoters other than those of the Government’s choice and will not use the formal source selection procedures described in FAR part 15.

(h) Multiple purchase orders. The Government may issue a purchase order for any item or group of items of a quotation, unless the quoter qualifies the quotation by specific limitations. Unless otherwise provided in the Schedule, quotations may not be submitted for quantities less than those specified. The Government reserves the right to issue a purchase order for a quantity less than the quantity quoted, at the unit prices quoted, unless the quoter specifies otherwise in the quotation.

(i) Availability of requirements documents cited in the solicitation.

(1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to- GSA Federal Supply Service Specifications Section Suite 8100 470 East L’Enfant Plaza, SW Washington, DC 20407 Telephone (202) 619-8925 Facsimile (202) 619-8978.

(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision.

Additional copies will be issued for a fee.

(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:

(i) ASSIST (https://assist.dla.mil/online/start/).

(ii) Quick Search (http://quicksearch.dla.mil/).

(iii) ASSISTdocs.com (http://assistdocs.com).

(3) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by-

(i) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);

(ii) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or

(iii) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone

(215) 697-2667/2179, Facsimile (215) 697-1462.

(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.

(j) Unique entity identifier.(Applies to all quotes that exceed the micro-purchase threshold, and quotes at or below the micro-purchase threshold if the solicitation requires the Contractor to be registered in the System for Award Management (SAM).) The Quoter shall include, along with its name and address of its quote, the annotation "Unique Entity Identifier" followed by the unique entity identifier that identifies the Quoter’s name and address. The Quoter also shall enter its Electronic Funds Transfer (EFT) indicator, if applicable. The EFT indicator is a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the Quoter to establish additional SAM records for identifying alternative EFT accounts (see FAR subpart 32.11) for the same entity. If the Quoter does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for unique entity identifier establishment directly to obtain one. The Quoter should indicate that it is providing a quote for a Government solicitation when contacting the entity designated at www.sam.gov for establishing the unique entity identifier.

(l) Requests for information. The contracting officer will not notify unsuccessful quoters that responded to this solicitation. Quoters may request information on purchase order(s) resulting from this solicitation from the contracting officer.

PWS

PERFORMANCE WORK STATEMENT

PHASE III - TREE REMOVAL FOR FIREBREAK ZONES AT

PAPIO CREEK SITE 18 – LAKE ZORINSKY

OMAHA, NEBRASKA

General: This is a non-personnel services contract to provide tree and vegetation removal to create a 30-foot-wide firebreak at Papio Creek Dam Site 18 – Lake Zorinsky. All work shall be completed 365 calendar days after contract award. All trees identified in this Performance Work Statement (PWS) shall be felled between September 1 and April 1. Contractor shall follow all Local, State, and Federal wildlife laws and regulations regarding the Bald and Golden Eagle Protection Act, Migratory Bird Treaty Act, and the Endangered Species Act. The Government shall not exercise any supervision or control over the contract service providers performing the services herein.

Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

Description of Services: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform tree and vegetation removal at Papio Creek Dam Site 18 – Lake Zorinsky as defined in this PWS. For the project maps see Attachment

1. The amount of effort varies for each area defined in this PWS, the density of trees and level of work shall be determined by the contractor during the arranged site visit. The contractor shall perform to the standards in this

PWS.

1. BASE BID – AREA 00 - 30 FOOT FIREBREAK ZONE:

The work includes creating a 30-foot-wide firebreak zone identified as Area 00 around the perimeter of the Papio Creek Dam Site 18 – Lake Zorinsky government fee property line. Area 00 is approximately 4.28 acres and is shown in the drawings on Sheets A-1 and A-2 and will be marked in the field. All trees 6 inches in diameter and larger are required to be removed to a minimum of 6 inches below existing ground surface by saw cutting, stump grinder, root ball removal, or other approved methods. All trees and vegetation 6 inches in diameter and smaller shall be cut flush with the ground surface and treated. All tree stumps and cut vegetation shall be treated with an herbicide to kill all vegetation in accordance with Federal, State and Local laws. The contractor shall submit for approval the quantity and type of proposed herbicide. The Contractor shall submit within 24 hours after application a completed pesticide application report (Attachment 2).

2. OPTION 1 – AREA 01 – 30 FOOT FIREBREAK ZONE:

The work includes creating a 30-foot-wide firebreak zone identified as Area 01 around the perimeter of the Papio Creek Dam Site 18 – Lake Zorinsky government fee property line. Area 01 is approximately 1.031 acre and is shown in the drawings on Sheet A-3 and will be clearly marked in the field. All trees 6 inches in diameter and larger are required to be removed to a minimum of 6 inches below existing ground surface by saw cutting, stump grinder, root ball removal, or other approved methods. All trees and vegetation 6 inches in diameter and smaller shall be cut flush with the ground surface and treated. All tree stumps and cut vegetation shall be treated with an herbicide to kill all vegetation in accordance with Federal, State and Local laws. The contractor shall submit for approval the quantity and type of proposed herbicide. The Contractor shall submit within 24 hours after application a completed pesticide application report (Attachment 2).

3. OPTION 2 – AREA 02 – 30 FOOT FIREBREAK ZONE:

The work includes creating a 30-foot-wide firebreak zone identified as Area 02 around the perimeter of the Papio Creek Dam Site 18 – Lake Zorinsky government fee property line. Area 02 is approximately 1.051 acre and is shown in the drawings on Sheet A-3 and will be clearly marked in the field. All trees 6 inches in diameter and larger are required to be removed to a minimum of 6 inches below existing ground surface by saw cutting, stump grinder, root ball removal, or other approved methods. All trees and vegetation 6 inches in diameter and smaller shall be cut flush with the ground surface and treated. All tree stumps and cut vegetation shall be treated with an herbicide to kill all vegetation in accordance with Federal, State and Local laws. The contractor shall submit for approval the quantity and type of proposed herbicide. The Contractor shall submit within 24 hours after application a completed pesticide application report (Attachment 2).

4. OPTION 3 – AREA 03 – 30 FOOT FIREBREAK ZONE:

The work includes creating a 30-foot-wide firebreak zone identified as Area 03 around the perimeter of the Papio Creek Dam Site 18 – Lake Zorinsky government fee property line. Area 03 is approximately 1.008 acre and is shown in the drawings on Sheet A-3 and will be clearly marked in the field. All trees 6 inches in diameter and larger are required to be removed to a minimum of 6 inches below existing ground surface by saw cutting, stump grinder, root ball removal, or other approved methods. All trees and vegetation 6 inches in diameter and smaller shall be cut flush with the ground surface and treated. All tree stumps and cut vegetation shall be treated with an herbicide to kill all vegetation in accordance with Federal, State and Local laws. The contractor shall submit for approval the quantity and type of proposed herbicide. The Contractor shall submit within 24 hours after application a completed pesticide application report (Attachment 2).

5. OPTION 4 – AREA 04 – 30 FOOT FIREBREAK ZONE:

The work includes creating a 30-foot-wide firebreak zone identified as Area 04 around the perimeter of the Papio Creek Dam Site 18 – Lake Zorinsky government fee property line. Area 04 is approximately 1.11 acre and is shown in the drawings on Sheet A-3 and will be clearly marked in the field. All trees 6 inches in diameter and larger are required to be removed to a minimum of 6 inches below existing ground surface by saw cutting, stump grinder, root ball removal, or other approved methods. All trees and vegetation 6 inches in diameter and smaller shall be cut flush with the ground surface and treated. All tree stumps and cut vegetation shall be treated with an herbicide to kill all vegetation in accordance with Federal, State and Local laws. The contractor shall submit for approval the quantity and type of proposed herbicide. The Contractor shall submit within 24 hours after application a completed pesticide application report (Attachment 2).

6. OPTION 5 – AREA 05 – 30 FOOT FIREBREAK ZONE:

The work includes creating a 30-foot-wide firebreak zone identified as Area 05 around the perimeter of the Papio Creek Dam Site 18 – Lake Zorinsky government fee property line. Area 05 is approximately 0.954 acres and is shown in the drawings on Sheet A-4 and will be clearly marked in the field. All trees 6 inches in diameter and larger are required to be removed to a minimum of 6 inches below existing ground surface by saw cutting, stump grinder, root ball removal, or other approved methods. All trees and vegetation 6 inches in diameter and smaller shall be cut flush with the ground surface and treated. All tree stumps and cut vegetation shall be treated with an herbicide to kill all vegetation in accordance with Federal, State and Local laws. The contractor shall submit for approval the quantity and type of proposed herbicide. The Contractor shall submit within 24 hours after application a completed pesticide application report (Attachment 2).

7. OPTION 6 – AREA 06 – 30 FOOT FIREBREAK ZONE:

The work includes creating a 30-foot-wide firebreak zone identified as Area 06 around the perimeter of the Papio Creek Dam Site 18 – Lake Zorinsky government fee property line. Area 06 is approximately 1.042 acres and is shown in the drawings on Sheet A-4 and will be clearly marked in the field. All trees 6 inches in diameter and larger are required to be removed to a minimum of 6 inches below existing ground surface by saw cutting, stump grinder, root ball removal, or other approved methods. All trees and vegetation 6 inches in diameter and smaller shall be cut flush with the ground surface and treated. All tree stumps and cut vegetation shall be treated with an herbicide to kill all vegetation in accordance with Federal, State and Local laws. The contractor shall submit for approval the quantity and type of proposed herbicide. The Contractor shall submit within 24 hours after application a completed pesticide application report (Attachment 2).

8. OPTION 7 – AREA 07 – 30 FOOT FIREBREAK ZONE:

The work includes creating a 30-foot-wide firebreak zone identified as Area 07 around the perimeter of the Papio Creek Dam Site 18 – Lake Zorinsky government fee property line. Area 07 is approximately 1.229 acre and is shown in the drawings on Sheets A-4 and A-5 and will be clearly marked in the field. All trees 6 inches in diameter and larger are required to be removed to a minimum of 6 inches below existing ground surface by saw cutting, stump grinder, root ball removal, or other approved methods. All trees and vegetation 6 inches in diameter and smaller shall be cut flush with the ground surface and treated. All tree stumps and cut vegetation shall be treated with an herbicide to kill all vegetation in accordance with Federal, State and Local laws. The contractor shall submit for approval the quantity and type of proposed herbicide. The Contractor shall submit within 24 hours after application a completed pesticide application report (Attachment 2).

9. OPTION 8 – AREA 08 – 30 FOOT FIREBREAK ZONE:

The work includes creating a 30-foot-wide firebreak zone identified as Area 08 around the perimeter of the Papio Creek Dam Site 18 – Lake Zorinsky government fee property line. Area 08 is approximately 0.80 acre and is shown in the drawings on Sheet A-5 and will be clearly marked in the field. All trees 6 inches in diameter and larger are required to be removed to a minimum of 6 inches below existing ground surface by saw cutting, stump grinder, root ball removal, or other approved methods. All trees and vegetation 6 inches in diameter and smaller shall be cut flush with the ground surface and treated. All tree stumps and cut vegetation shall be treated with an herbicide to kill all vegetation in accordance with Federal, State and Local laws. The contractor shall submit for approval the quantity and type of proposed herbicide. The Contractor shall submit within 24 hours after application a completed pesticide application report (Attachment 2).

10. PERIOD OF PERFORMANCE: All work shall be completed 365 calendar days after contract award.

All trees identified in this PWS to be removed must be felled between September 1 and April 1 in accordance with Section 15 of this PWS. The Contractor shall be required to complete services during normal duty hours of work, 7:00 a.m. to 5:30 p.m., Monday through Fridays, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the Contractor shall not be reimbursed when the government facility is closed for the above reasons. Requests for additional work hours shall require written approval from the contracting officer’s representative (COR), 7 days in advance of the proposed work period.

The Contractor must at all times maintain an adequate workforce to provide uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

11. RECOGNIZED HOLIDAYS: Contractors shall not work on the Federal Holidays. These holidays include:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day

President’s Day Veteran’s Day Memorial Day Juneteenth National Independence Day Thanksgiving Day Independence Day Christmas Day

12. FIREBREAK ZONE: The firebreak zone consists of an area clear of all trees, woody vegetation, vegetation, grasses, underbrush, debris, trash, and potential fuel for forest fires a minimum of 30 foot wide along the Government fee property line and a minimum 30 foot high canopy. The firebreak zone includes the perceived Government boundary fence and the contractor shall clear the Government boundary fence of all trees, woody vegetation, vegetation, grasses, underbrush, debris, trash, and potential fuel for forest fires along the Government boundary in accordance with this PWS. The firebreak zone shall be cleared of all remnant debris, trash, prepared and seeded as stated in this PWS.

13. EXISTING EROSION CONTROL STRUCTURES: The existing erosion control structures may be reinforced concrete structures, concrete block, riprap, or wire tied gabion baskets designed and placed to mitigate backward erosion at natural drainage swales along the property line. The Contractor shall coordinate with the Government POC for work near the erosion control structures. The contractor shall protect all erosion control structures from damage related to the work in this PWS for the duration of the contract. If any erosion control structure is damaged, the structure shall be repaired to preconstruction condition at no additional costs to the Government.

14. CLEAN-UP & DISPOSAL: At the end of each workday all dirt, mud, leaves, limbs, branches, brush, trash, and other debris shall be removed from walkways, paths, roads, and recreational areas. All trees, woody vegetation, vegetation, grasses, underbrush, debris, trash, and potential fuel for forest fires shall be disposed of by the contractor at an approved landfill, recycling center, or mulched on-site. All trees, woody vegetation, vegetation, grasses, underbrush that is mulched onsite shall be spread outside the 30-foot firebreak zone evenly throughout the adjacent timber to leave a natural appearance with no visible disposal piles. All vegetation mulched and spread evenly onsite into the adjacent timber shall not exceed 8 inches in depth in any area.

15. FINISHING DISTURBED AREAS: All disturbed areas from this PWS shall be filled with cohesive lean clay and compacted prior to seeding. Disturbed areas shall be topped with topsoil and graded to blend with the surrounding area and approved by the government POC prior to seeding.

16. SEEDING: Contractor shall prepare ground surfaces, fertilize, seed, provide erosion control and mulch all disturbed ground surfaces as shown on the drawings or in all areas disturbed as a part of the work in this PWS.

Contractor shall ensure all weed plants are controlled and killed during all phases of the work. Prior to seeding operations, the soil must be tilled to a depth of no less than 6 inches to allow root penetration in all areas or no less than 4 inches in areas restricted by obstacles, fence posts or fence fabric. The prepared surface shall be blended to the existing surrounding areas. The prepared surface shall be finished with a light raking to remove remnant mulch and other debris outside the seeding area. Remnant mulch debris, stones, trash and other debris over a minimum 2 inch in any dimension shall be removed outside the seeding area. Areas with the prepared surface must be protected from compaction or damage by vehicular or pedestrian traffic and surface erosion.

Prepared surface shall be subject to approval by the COR and any deficiencies shall be corrected prior to seeding.

SEEDING TIME/SEASONS:

Seed Mix "A" must be installed from April 1 to May 30 for spring establishment, and from August 1 to September 15 for fall establishment. Seeding operations must be performed only during periods when beneficial results can be obtained. When drought, excessive moisture, or other unsatisfactory conditions prevail, the work must be stopped when directed at no additional cost to the government. The contractor shall guarantee the seed to be established for one full year after planting. The contractor shall reseed any areas greater than 50 square feet of failed seed establishment as determined by the COR.

SEED MIX: State-certified seed of the latest season's crop shall be submitted in original sealed packages bearing the producer's guaranteed analysis for percentages of mixture, purity, germination, hard seed, weed seed content, and inert material. Labels shall be in conformance with all applicable state seed laws. Seed mixtures shall be free from any State listed noxious weeds including but not limited to plumeless thistle, Canadian thistle, diffuse knapweed, purple loosestrife, and leafy spurge.

Prior to purchasing the seed, a complete list of seed varieties (common name and botanical name) shall be submitted for approval. Prior to the delivery of materials, certificates of compliance attesting that materials meet the specified “Seed Mix A” below shall be submitted for approval. Certified copies of the material certificates shall include the following: Classification, botanical name, common name, percent pure live seed, minimum percent germination and hard seed, maximum percent weed seed content, and date tested shall be submitted for approval. Signed statement certifying that seed mixtures have been tested within the last 6 months prior to the date of delivery for seed type and weed content shall be submitted for approval.

Seed species and mixtures shall be proportioned by weight: Computation of quantity of seed required is based on the percent of purity and percent of germination. Pounds of pure live seed (PLS) = pounds of seed x germination x purity.

Seed Mix "A" below shall be applied in all areas disturbed as a part of the work in this PWS.

Seed Mix "A"

Seed Variety Pounds PLS/ACRE

Grasses

Smooth Bromegrass 10.00

Timothy 6.00

Orchardgrass 4.00

Red Top 4.00

Common Oats (Certified) if Spring planting used

Annual Rye (Certified) if fall planting used 30.00

Warm Season Grasses

Switchgrass (Nebraska) 4.00

Western Wheat Grass 3.00

Total Seed Mixture lbs. PLS/ACRE 61.00

FERTILIZER: Fertilizer shall be incorporated into the soil to a maximum 4-inch depth or may be incorporated as part of the preparatory tilling operation. The nutrients ratio shall be 18 percent nitrogen, 24 percent phosphorus, and 6 percent potassium. The fertilizer shall supply no less than 80 lbs. per acre of Nitrogen, 120 pounds per acre of Phosphorous and 80 pounds per acre of Potassium.

EROSION CONTROL: Surface erosion control material shall be installed within 24 hours of seeding, in accordance with manufacturer's instructions. Soil erosion control material shall be placed on all seeded surfaces shown on the plans with slopes steeper than 1V:4H and all swales concentrating water leading to culverts, inlets and surfaces around culvert entrances and exits. Placement of the material shall be accomplished without damage to installed material or without deviation to finished grade.

MULCH: Mulch shall be utilized in all seeded areas. Prairie hay mulch shall be spread uniformly, in a continuous blanket, at the rate of 2 tons per acre. Mulch shall be spread by hand, blower-type mulch spreader or other approved method. All seeded areas shall be mulched on the same day as the seeding. Hay mulching is not required in areas to receive erosion control blankets. Mulch materials shall be native to the region. Prairie hay shall be native prairie hay from alfalfa or clover furnished in an air-dry condition suitable for placing with commercial mulch-blowing equipment. Hay shall be free of noxious weeds, mold or other objectionable material.

17. PROTECTION OF EXISTING FACILITIES AND WORKS: The contractor will be responsible for the protection of private property and structures from any damage during the construction operations. Private property, structures, roads and surfaces shall be protected from damage by the work, or if damaged, shall be repaired to preconstruction condition at no additional costs to the Government. At all times, the work areas shall be kept in a condition conducive to safety of workmen and the public and neat in appearance. The Contractor must place caution/men working signs when working within 250 feet of a public walkways, paths, roads, and recreation areas. Waste and surplus materials shall not be allowed to accumulate in the construction areas.

Private landowners have and will continue to encroach onto Government property in some identified work areas. The contractor shall notify the Government POC regarding private landowner’s dumping brush, debris, or other personal property located within the identified work areas. The contractor shall protect the private landowner’s personal property from any damage. The contractor shall not touch, disturb or move the private landowner’s personal property for the duration of the contract.

18. SECURITY REQUIREMENTS: The contractor shall be responsible for safeguarding the construction site, construction equipment, all government property, equipment, and information provided. At the close of each workday, construction equipment, materials, government property, and facilities shall be secured.

19. WILDLIFE LAWS AND REGUALTIONS: Contractor shall follow all Local, State, and Federal wildlife laws and regulations. Information regarding the Bald and Golden Eagle Protection Act, Migratory Bird Treaty Act, and the Endangered Species Act are provided by The US Fish and Wildlife Service at https://www.fws.gov. Please visit the following links for specific information regarding the:

Bald and Golden Eagle Protection Act:

https://www.fws.gov/midwest/eagle/Nhistory/NestChron.html Migratory Bird Treaty Act:

https://www.fws.gov/birds/policies-and-regulations.php Endangered Species Act:

https://www.fws.gov/birds/policies-and-regulations/laws-legislations/other-relevant-laws.php#endangered

All trees identified in this PWS to be removed must be felled between September 1 and April 1 in accordance with the above stated laws and regulations.

20. SITE VISIT: Contractors are encouraged to attend the arranged site visit. The site visit will be conducted where services are to be performed to satisfy the Contractor regarding the required performance work statement and all general and local conditions that may affect the cost of contract performance to the extent the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for claim after contract award. The prescribed site visit will be coordinated by Tommy Aldmeyer (See contact information below).

21. POST AWARD, PRECONSTRUCTION, & PERIODIC PROGRESS MEETINGS: The Contractor agrees to attend any conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor’s performance. At these meetings the contracting officer will apprise the contractor of how the Government views the contractor’s performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

22. ACCIDENT PREVENTION PLAN: In accordance with EM 385-1-1, the contractor shall prepare and submit an Accident Prevention Plan (APP) no more than 10 days after award and before any work begins. The APP shall be followed by all contractor personnel during performance of the work. The plan shall be developed only after a careful analysis of the work involved and shall be tailored specifically to the conditions of this contract and shall address the following items:

A. Responsible Individuals B. Indoctrination of New Employees C. “Tool Box" Safety Meetings D. Fire Prevention and Protection E. Housekeeping F. Mechanical Equipment Inspection G. First Aid and Medical Facilities H. Sanitation I. Personal Protective Equipment/Devices J. Accident Reporting

The contractor is responsible for complying with all applicable safety requirements and practices set forth in the USACE Manual EM 385-1-1 entitled “Safety and Health Requirements Manual”, dated 30 November 2014 and available on-line at:

https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf.

The contractor is responsible for the safety of his employee(s), and for any injury or damage done by said personnel and shall protect the government from any claims. All personnel are required to wear the manufacturer’s recommended personal protective equipment during all work activities conducted in completion of this PWS. The contractor's equipment shall meet or exceed all current federal, state, and local safety requirements. The contractor and his employee(s) shall be required to use the personal protective devices recommended by the manufacturer during all work activities conducted in completion of this PWS. The contractor shall provide the minimum on-site safety equipment/requirements as follows:

A. The contractor shall provide at least one nonfreezing-type A-B-C fire extinguisher in each vehicle, vessel, and piece of motorized equipment (ATV, UTV, etc). Place in a location readily accessible to personnel.

B. The contractor shall provide and maintain a first aid kit commensurate with the size of the project and with items necessary for first-aid treatment of all injuries.

C. The contractor shall advise personnel of the location of first-aid kits and fire extinguishers.

D. The contractor shall visually post the route and telephone number of nearest hospital or ambulance service and fire station in a conspicuous location and advise all personnel of locations and telephone numbers.

23. WORK PLAN: The contractor must prepare and submit a detailed work plan no more than 10 days after award and before any work begins. Approval of the detailed plan must be obtained from the Contracting Officer’s Representative prior to starting the work. If necessary, modify the plan as required to meet field conditions. Modifications to the work plan must be approved by the COR prior to use. As a minimum, the plan must contain the following:

a. The schedule of work.

b. The sequence of work.

c. Methods for completing the work.

d. Proposed seeding/fertilizing methods

e. Erosion control plan for controlling erosion from surface runoff at the work areas.

f. Proposed access locations, staging areas, creek crossing details, and hauls routes within the project limits and other information required to demonstrate compliance with the PWS.

g. Proposed tree/vegetation disposal plan.

24. QUALITY CONTROL PLAN: The Contractor shall submit a Quality Control Plan no more than 10 days after contract award and before any work begins. The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which they assure that their work complies with the requirement of the contract.

Quality Assurance. The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards of this PWS. The POC shall be allowed at any time or place the contractor is on government property, to observe and photograph all work activities conducted through the duration of the PWS. If the contractor is found to be operating in an unsafe and delinquent manner, the contract will be terminated, and the contractor shall be held liable for any damages and pay for the completion of the contract by a different source. The POC may inspect the work and equipment as contract progresses. The contractor shall not be paid for any work performed that is deemed defective to the POC. Any defective service(s) noted by the POC shall be corrected at no additional cost to the Government. The contractor shall be responsible to perform only the work specified within the PWS and shall receive no compensation for work performed that is not specified within the PWS.

No government personnel will be allowed to assist the contractor in actual work performed as a part of this PWS or supervision of the contractor’s personnel.

25. HERBICIDE/PESTICIDE and WEED CONTROL PLAN: The Contractor shall submit an Herbicide/Pesticide and Weed Control Plan no more than 10 days after contract award. The plan shall include but is not limited to:

Nebraska State Chemical Application License List of all herbicides and pesticides proposed as a part of this work.

Schedule of application Manufacturer product labels Safety Data Sheets.

The proposed process that ensures all vegetation and weed plants are killed and controlled during all phases of the work.

The proposed process that ensures all tree stumps and cut vegetation are killed in accordance with this PWS, Federal, State and Local laws.

26. STORM WATER POLLUTION PREVENTION PLAN: The contractor shall prepare and implement a Storm Water Pollution Prevention Plan in accordance with National Pollutant Discharge Prevention Plan- NPDES General Permit No.2. A copy of the Storm Water Pollutant Prevention Plan shall be submitted to the Contracting Officer’s Representative at least 2 days prior to the commencement of construction activities. The NPDES Construction Storm Water permit and related forms are available at www.deq.state.ne.us.

27. TEMPORARY CREEK CROSSINGS: The contractor shall submit a detail in his work plan on how they intend to cross each creek crossing shown on the drawings or any creek encountered in the work areas.

The detail shall be accepted and approved before work begins. USACE will review the submission to ensure that the work falls within the Nebraska Regulatory Office, Nationwide Permit #33 for temporary construction, access, and dewatering. Stream crossings must allow downstream flow to remain near normal, minimize flooding, and must be removed entirely at the completion of the project. The stream banks and other impacted areas must be returned to pre-construction condition including vegetation. The contractor shall follow all requirements outlined in nationwide permit #33 as well as the Nebraska Regulatory regional conditions and required best management practices. These documents may be found at the Nebraska Regulatory Office website, https://www.nwo.usace.army.mil/Missions/Regulatory-Program/Nebraska/

28. FINAL INSPECTION: Work will not be considered ready for final inspection until all work required has been completed (including cleanup of the premises and removal of all of the contractor’s equipment, materials, and supplies). The contractor shall notify the COR a minimum of 2 business days prior to the anticipated date of completion to schedule the final inspection. The contractor shall be required to attend the final inspection with the Government POC.

29. LIQUIDATED DAMAGES: If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $850 for each calendar day of delay until the work is completed or accepted. See FAR 52.211-12 LIQUIDATED DAMAGES-

CONSTRUCTION (SEPT 2000).

If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

30. PAYMENT: The contractor shall furnish all materials, equipment and labor as per the specifications and attached drawings for payment of accepted contract line items at Papio Creek Dam Site 18 – Lake Zorinsky.

Partial payments are allowed for one invoice per month for the percent of work completed for each CLIN item as determined by the COR. No more than 80% of any single CLIN value will be paid. 20% is retained until the final inspection and all work is completed and accepted for each CLIN item.

31. GOVERNMENT POINT OF CONTACT: For any technical questions or for information regarding the site visit, please contact Thomas E. Aldmeyer at: Thomas.E.Aldmeyer@usace.army.mil or 402-996-3757.

32. SUBMITTALS: The list of submittals can be found below:

Title Due Date Approval Date

Revision Date

Revision Approval

Accident Prevention Plan 10 Days after award

Work Plan Quality Control Plan Herbicide/Pesticide/Weed Control Plan

SWPPP

State Certified Seed Mix Prior to purchasing Proposed Fertilizer Prior to purchasing Pesticide Application Record (Attachment 2)

24 hours after application

33. BEST VALUE: Award to the successful contractor shall be based on “Best Value” rather than low bid.

Bids will be rated on the following factors and references from previous employers and must be provided on each of the following items with the exception of price:

a. Past Performance. Provide three references of tree removal/land clearing projects (similar magnitude) with the point contact information, to include name, telephone number, e-mail address, and physical address.

b. Equipment. Please provide a written narrative of your company’s abilities and current equipment. This shall include a list of equipment including loaders, bunchers, mulchers, ariel equipment, etc.

c. Price. The bid price shall be inclusive of all costs that might be incurred by the contractors during the contract such as, but not limited to, mobilization/demobilization, fuel, labor, mileage, equipment, equipment rental fees, licenses, insurance, required plans, training, etc.