W9128F22Q0027_Solicitation.pdf

PDF 509 KB Posted

Attached to
Garrison Project Facility Cleaning Services for Recreation Areas Federal contract opportunity
Solicitation number
W9128F22Q0027
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9128F22Q0027 09-Feb-2022

b. TELEPHONE NUMBER

402-995-2589

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 02 Mar 2022

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9128F9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

TIMOTHY B BOYTE

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W59XQG20037377

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 968708 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

COE GARRISON PRJT OFC NTR RSC SEC

ERIC KELSEY

USAED, OMAHACENWO-OD-GA-N

PO BOX 527

RIVERDALE ND 58565

TEL: 701-654-7760 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$19,500,000

NAICS:

561720

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF70

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Summer Vault Cleanings - Base

FFP

Base Year

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

MILSTRIP: W59XQG20037377

PURCHASE REQUEST NUMBER: W59XQG20037377

PSC CD: S201

NET AMT

0002 1 Job Downstream Shower Bldgs - Base

FFP

Base Year

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

MILSTRIP: W59XQG20037377

0003 1 Job Downstream Comfort Station - Base

FFP

Base Year

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

0004 1 Job Spillway Pond Comfort Station - Base

FFP

Base Year

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

0005 1 Job Fish Cleaning Stations - Base

FFP

Base Year

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

0006 1 Job Placement of Refuse Cans - Base

FFP

Base Year

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

0007 1 Job Removal of Refuse Cans - Base

FFP

Base Year

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

0008 1 Job Service of Refuse Cans - Base

FFP

Base Year

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

0009 1 Job Winter Vault Cleaning - Base

FFP

Base Year

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

1001 1 Job OPTION Summer Vault Cleanings - OY1

FFP

Option Year 1

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

1002 1 Job OPTION Downstream Shower Bldgs - OY1

FFP

Option Year 1

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

1003 1 Job OPTION Downstream Comfort Station - OY1

FFP

Option Year 1

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

1004 1 Job OPTION Spillway Pond Comfort Station - OY1

FFP

Option Year 1

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

1005 1 Job OPTION Fish Cleaning Stations - OY1

FFP

Option Year 1

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

1006 1 Job OPTION Placement of Refuse Cans - OY1

FFP

Option Year 1

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

1007 1 Job OPTION Removal of Refuse Cans - OY1

FFP

Option Year 1

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

1008 1 Job OPTION Service of Refuse Cans - OY1

FFP

Option Year 1

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

1009 1 Job OPTION Winter Vault Cleanings - OY1

FFP

Option Year 1

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

2001 1 Job OPTION Summer Vault Cleanings - OY2

FFP

Option Year 2

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

2002 1 Job OPTION Downstream Shower Buildings - OY2

FFP

Option Year 2

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

2003 1 Job OPTION Downstream Shower Buildings - OY2

FFP

Option Year 2

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

2004 1 Job OPTION Spillway Pond Comfort Station - OY2

FFP

Option Year 2

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

2005 1 Job OPTION Fish Cleaning Stations - OY2

FFP

Option Year 2

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

2006 1 Job OPTION Placement of Refuse Cans - OY2

FFP

Option Year 2

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

2007 1 Job OPTION Replacement of Refuse Cans - OY2

FFP

Option Year 2

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

2008 1 Job OPTION Service of Refuse Cans - OY2

FFP

Option Year 2

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

2009 1 Job OPTION Winter Vault Cleanings - OY2

FFP

Option Year 2

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

3001 1 Job OPTION Summer Vault Cleanings - OY3

FFP

Option Year 3

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

3002 1 Job OPTION Downstream Shower Bldgs - OY3

FFP

Option Year 3

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

3003 1 Job OPTION Downstream Comfort Stations - OY3

FFP

Option Year 3

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

3004 1 Job OPTION Spillway Pond Comfort Stations - OY3

FFP

Option Year 3

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

3005 1 Job OPTION Fish Cleaning Stations - OY3

FFP

Option Year 3

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

3006 1 Job OPTION Placement of Refuse Cans - OY3

FFP

Option Year 3

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

3007 1 Job OPTION Removal of Refuse Cans - OY3

FFP

Option Year 3

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

3008 1 Job OPTION Service of Refuse Cans - OY3

FFP

Option Year 3

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

3009 1 Job OPTION Winter Vault Cleanings - OY3

FFP

Option Year 3

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

4001 1 Job OPTION Summer Vault Cleanings - OY4

FFP

Option Year 4

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

4002 1 Job OPTION Downstream Shower Building - OY4

FFP

Option Year 4

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

4003 1 Job OPTION Downstream Comfort Station - OY4

FFP

Option Year 4

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

4004 1 Job OPTION Spillway Pond Comfort Station - OY4

FFP

Option Year 4

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

4005 1 Job OPTION Fish Cleaning Stations - OY4

FFP

Option Year 4

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

4006 1 Job OPTION Placement of Refuse Cans - OY4

FFP

Option Year 4

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

4007 1 Job OPTION Removal of Refuse Cans - OY4

FFP

Option Year 4

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

4008 1 Job OPTION Service of Refuse Cans - OY4

FFP

Option Year 4

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

4009 1 Job OPTION Winter Vault Cleanings - OY4

FFP

Option Year 4

GARRISON DAM USACE OPERATED CAMPGROUNDS RECREATION

AREAS PER ATTACHED PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

OPTION 52.217-8, Option to Extend

FFP

the option can be exercised at any time, and can be exercised in increments Period of one to six months, but for no more than a total of six months during the life of the contract. Not Separately Priced. Evaluation will assume that the prices for option exercised under FAR 52.217-8 will be at the same rates as those in effect under the contract at the time the option is exercised.

FOB: Destination

PRICE SCHEDULE

QUOTE SHEET

FACITLITY CLEANING SERVICES FOR

RECREATION AREAS

US ARMY CORPS OF ENGINEERS

(GARRISON PROJECT/LAKE SAKAKAWEA)

BASE OFFER (15 May 2022 through 14 May 2023)

Item

Description

Number of Units

X

Service Days

Unit Price

Total

0001 Summer Vault Cleanings 13 X 35 X $ = $

0002 Downstream Shower Buildings 3 X 88 X $ = $

0003 Downstream Comfort Station 1 X 88 X $ = $

0004 Spillway Pond Comfort Station 1 X 35 X $ = $

0005 Fish Cleaning Stations 3 X 53 X $ = $

0006 Placement of Refuse Cans 10 X 1 X $ = $

0007 Removal of Refuse Cans 10 X 1 X $ = $

0008 Service of Refuse Cans 10 X 34 X $ = $

0009 Winter Vault Cleanings 6 X 16 X $ = $ Base Offer Total Quote = $

OPTION YEAR I (15 May 2023 through 14 May 2024)

1001 Summer Vault Cleanings 13 X 36 X $ = $

1002 Downstream Shower Buildings 3 X 88 X $ = $

1003 Downstream Comfort Station 1 X 88 X $ = $

1004 Spillway Pond Comfort Station 1 X 36 X $ = $

1005 Fish Cleaning Stations 3 X 54 X $ = $

1006 Placement of Refuse Cans 10 X 1 X $ = $

1007 Removal of Refuse Cans 10 X 1 X $ = $

1008 Service of Refuse Cans 10 X 35 X $ = $

1009 Winter Vault Cleanings 6 X 16 X $ = $ Option Year I Total Quote = $

OPTION YEAR II (15 May 2024 through 14 May 2025)

2001 Summer Vault Cleanings 13 X 35 X $ = $

2002 Downstream Shower Buildings 3 X 89 X $ = $

2003 Downstream Comfort Station 1 X 89 X $ = $

2004 Spillway Pond Comfort Station 1 X 35 X $ = $

2005 Fish Cleaning Stations 3 X 53 X $ = $

2006 Placement of Refuse Cans 10 X 1 X $ = $

2007 Removal of Refuse Cans 10 X 1 X $ = $

2008 Service of Refuse Cans 10 X 35 X $ = $

2009 Winter Vault Cleanings 6 X 16 X $ = $ Option Year II Total Quote = $

OPTION YEAR III (15 May 2025 through 14 May 2026)

3001 Summer Vault Cleanings 13 X 36 X $ = $

3002 Downstream Shower Buildings 3 X 89 X $ = $

3003 Downstream Comfort Station 1 X 89 X $ = $

3004 Spillway Pond Comfort Station 1 X 36 X $ = $

3005 Fish Cleaning Stations 3 X 53 X $ = $

3006 Placement of Refuse Cans 10 X 1 X $ = $

3007 Removal of Refuse Cans 10 X 1 X $ = $

3008 Service of Refuse Cans 10 X 36 X $ = $

3009 Winter Vault Cleanings 6 X 16 X $ = $ Option Year III Total Quote = $

W9128F22Q0027

OPTION YEAR IV (15 May 2026 through 14 May 2027)

4001 Summer Vault Cleanings 13 X 36 X $ = $

4002 Downstream Shower Buildings 3 X 89 X $ = $

4003 Downstream Comfort Station 1 X 89 X $ = $

4004 Spillway Pond Comfort Station 1 X 36 X $ = $

4005 Fish Cleaning Stations 3 X 53 X $ = $

4006 Placement of Refuse Cans 10 X 1 X $ = $

4007 Removal of Refuse Cans 10 X 1 X $ = $

4008 Service of Refuse Cans 10 X 35 X $ = $

4009 Winter Vault Cleanings 6 X 16 X $ = $ Option Year IV Total Quote = $

TOTAL QUOTE: BASE+OPTIONS = $

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

FACILITY CLEANING SERVICE CONTRACT

US ARMY CORPS OF ENGINEERS

(GARRISON PROJECT/LAKE SAKAKAWEA)

201 First Street

RIVERDALE, ND 58565

1.0 General Information.

1.1 Background. The Corps of Engineers manages/maintains five (5) day use areas and two (2) campgrounds within close proximity of the Garrison Dam. These areas are heavily used by the visiting public during the summer season (15 May through 15 September). Facilities within these areas consist of comfort stations, shower buildings, vault toilets, fish cleaning stations, picnic shelters and fire rings that need to be cleaned on a regular basis. This requires that we have someone clean these facilities on a regular basis to provide a quality recreational experience to the visiting public. The Corps of Engineers also maintains several facilities during the winter season (16 September through 14 May) for the use by winter sportsmen. Facilities maintained during these months are various vault toilets around Lake Sakakawea and Lake Audubon.

1.2 Scope of Work. This is a non-personal services contract to provide all labor, supervision, certain equipment/supplies, and transportation to provide facility cleaning services for the Corps of Engineers (Garrison Project/ Lake Sakakawea). Services include all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform facility cleaning services for the Corps of Engineers as defined in this Performance Work Statement except for those items specified as government furnished property and services. The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the government. This is a fixed priced, performance-based service contract where the government defines and measures desired outcomes, while contractor methods are generally not constrained or directed.

1.3 Period of Performance. The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years. The Period of Performance reads as follows:

Base Year: 15 May 2022 through 14 May 2023 Option Year 1: 15 May 2023 through 14 May 2024 Option Year 2: 15 May 2024 through 14 May 2025 Option Year 3: 15 May 2025 through 14 May 2026 Option Year 4: 15 May 2026 through 14 May 2027

1.4 Contractor Personnel

1.4.1 The contractor shall perform all work under this contract using his or her own forces except as provided in Paragraph 1.3.2 Subcontracting. Employees who perform this work shall be qualified persons on the contractor’s own payroll.

1.4.2 Subcontracting. The contractor shall not subcontract any work without written approval of the Contracting Officer. Compliance with the provisions of this contract by subcontractors shall be the responsibility of the contractor.

1.5 Quality Control

1.5.1 The contractor shall designate, in writing, an employee who shall serve as the contact for matters involving quality and performance or nonperformance of the required work stated in this PWS. The employee(s) shall be qualified and fully competent with full authority to act for, and on behalf of, the contractor as necessary to ensure that the required work is performed in accordance with the standards contained herein. The contractor shall furnish the above written designation to the COR no later than the first day of work. The contractor shall include the name(s), address(s), and telephone number(s) of the responsible individual(s).

1.5.2 The Contracting Officer reserves the right to disapprove any individual whom he considers incompetent to perform the work required. The Contracting Officer will provide a written notice of any disapproval to the contractor.

1.6 Quality Assurance. The government will use a Quality Assurance Surveillance Plan (QASP) to ensure that the Contractor is performing the services required by this PWS in an acceptable manner. The Government may use Quality Assurance Evaluators (QAE(s)) to provide assistance with the quality assurance methods.

1.6.1 The government has the right to inspect all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The government shall perform inspections in a manner that will not delay the work.

1.6.2 If any of the services do not conform to contract requirements, the government may require the contractor to perform the services in conformity with contract requirements and at no increase in cost. If the contract requirements are not met after a second attempt the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.

1.6.2.1 Upon verification of a validated customer complaint or corrective action report, the COR will notify the contractor that they are required to re-perform specific services. The contractor is required to re-perform services within 8 hours of notification from the COR.

1.6.3 The government may take action, if the contractor fails to perform the services again or to take the necessary action to ensure future performance is in conformity with the contract requirements. The government may (1) by contract, or otherwise, perform the services and charge to the contractor any cost incurred by the government that related to the performance of such service or (2) terminate the contract in whole or in part

1.6.4 The contractor is responsible to replace/repair any damage to government property due to negligence, at his or her own cost. The government may take action, if the contractor fails to replace/repair any damage to government property. The government may (1) by contract, or otherwise, replace/repair damaged government property and charge to the contractor any cost incurred by the government to replace/repair any damage.

1.7 Hours of Operation. The contractor is responsible for conducting business, between the hours of 6:00 am. and 12:00 pm. will all comfort stations and shower buildings being completed prior to 9:00 am. Sunday through Saturday, including Federal Holidays. The Contractor must maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.8 Pre-Work Meeting. Prior to commencing any activities, the contractor shall arrange a Pre-work Meeting with the COR. The Meeting shall discuss the work requirements, scheduling, submittal process, review of the Activity Hazard Analysis (AHA), and Abbreviated Accident Prevention Plan (AAP). At least one (1) week prior to commencing work, the Contractor shall coordinate their proposed work schedule with the COR.

1.9. Submittals. Prior to commencement of services, the Contractor shall submit the following documents to the COR for review and approval:

a. Activity Hazard Analysis (AHA);

b. Safety Data Sheets (SDS);

c. List of who will perform work on this contract;

d. Proof of Insurance for Contractors and Subcontractors;

1.10 Standards and Regulations. The Contractor shall perform to the standards in the contract and comply with all Local, State, and Federal Regulations during the services performed. The Contractor is responsible for ascertaining the extent to which these regulations affect the operations resulting from this contract. The Contractor shall comply will all applicable regulations. Applicable regulations include, but are not limited to the following:

a. Code of Federal Regulations (CFR), Title 36, Chapter III, Part 327, Rules and Regulations Governing Public Use on Corps of Engineers Water Resource Development Projects EP 1165-2-316 (http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_1165-2- 316.pdf?ver=2013-08-22-104526-670)

b. Engineering Manual (EM) 385-1-1 (USACE – Safety and Health Requirements Manual), dated November 2014; http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

c. Occupational Safety and Health Standards (29 CFR 1910);

1.10.1 Activity Hazard Analysis (AHA). The contractor shall prepare the AHA in accordance with Paragraph 01.A.14 or 01.A.15 of the EM 385-1-1. If using Paragraph 01.A.15, prepare the AHA IAW Figure 1-2.

Note: Contractors and other individual employer’s typically use Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools. The government considers equivalent to, and acceptable substitutes for, the USACE’s AHA provided the data collected is the same as that required by the AHA, commensurate with the type of services the contractor is performing.

1.10.2 Abbreviated Accident Prevention Plan (APP). EM 385-1-1 in its entirety may be too complex for the type of work performed under these contracts; contractors may reference Appendix A, for abbreviated Accident Prevention Plan (APP). The contractor shall only need to submit items in Appendix A that are pertinent to the contract. The contractor shall use a qualified person to prepare the site-specific abbreviated Accident Prevention Plan (APP). The contractor shall prepare the APP in accordance with the format and requirements of the EM 385-1-1 and supplemented herein. The contractor shall sign and submit the APP for approval prior to the start of work onsite.

1.11 Physical Security

1.11.1 The contractor shall be responsible for safeguarding all government facilities, property, and materials provided for contractor use. The contractor shall secure at all times all government facilities, property, and materials. Specific security conditions may change based on threats to national defense and based on the risk of specific facilities to these threats. The contractor shall abide by these changing conditions at all times, as applicable.

1.11.2 Key Control. The contractor shall ensure all keys issued by the government are not lost, stolen, duplicated, or used by unauthorized persons.

1.11.2.1 The Contractor shall immediately report to the COR any occurrences of lost or stolen keys.

1.11.2.2 In the event keys, other than master keys are lost or stolen, the contractor may be required, upon written direction of the COR, to re-key or replace the affected lock or locks without cost to the government. The government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the contractor. If a master key is lost or stolen, the government may need to replace all locks and keys for that system. The government will deduct the total cost to replace the locks and keys from the contractor’s invoice.

1.11.2.3 The contractor shall prohibit the use of keys issued by the government by any persons other than the contractor’s employees. The contractor shall not facilitate access of secured areas to persons other than contractor personnel or subcontractors engaged in performance of contract work requirements.

1.12 Antiterrorism/Operation Security Requirements

1.12.1 Pre-screen candidates using E-Verify Program. The Contractor must pre‐screen candidates using the E‐ verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements.

The vendor must ensure that the candidate has two valid forms of government issued identification to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible candidates must be provided to the COR no later than three (3) business days after the initial contract award.

1.13 Payment

1.13.1 The government will make payment bi-monthly, after the government has inspected and accepted the services, and the government has reviewed, approved, and processed the contractor’s invoice. The contractor shall submit the invoice to the COR and/or any other person that has been designated in the contract to receive the invoice.

1.13.2 The contractor must provide the contractor’s name, address, contract number, period of services completed (i.e., for the month of January or for the period of performance of January 1 through February 23), CLIN number and specific quantities of work performed (i.e., 1 Month, 40 days, 100 acres, etc.), and total requested, for an invoice to be considered proper. The contractor shall submit the invoice by the fifth (5th) of the month for services completed the previous month or submit the invoice upon completion of all services, in accordance with the period of performance stated in the CLIN.

2.0 Definitions. The following definitions and descriptions apply wherever the word(s) or phrase(s) is/are stated in this PWS:

Acceptable Level of Performance (ALP): The maximum percent defective, the maximum number of defects per hundred units, or the number of defects in a lot considered satisfactory on the average. The allowable leeway or variance from a standard before the government will reject the specific service.

Contracting Officer’s Representative (COR): means an individual designated an authorized in writing by the Contracting Officer to perform specific technical or administrative functions.

Performance-Based Contract (FAR 2.101): Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise.

Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable level of performance (ALP) for each work requirement.

Quality Assurance Surveillance Plan (QASP): An organized written document used by the Government for quality assurance surveillance. Document contains sampling/evaluation guides, checklists, and the performance requirements summary (PRS).

3.0 Government Furnished Items and Services

3.1 Services. The Government will provide major repair maintenance required on vault toilets, comfort stations, fish cleaning stations, and picnic shelters.

3.2 Facilities. N/A

3.3 Utilities. The Government will provide water for cleaning from 15 May through 15 September: The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.4 Equipment. The Government shall provide dumpsters for disposal of refuse.

3.5 Materials. The Government shall provide all refuse cans, lids, locks, toilet paper, soap dispensers, and light bulbs used on project lands.

4.0 Contractor Furnished Items and Responsibilities

4.1 General. The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Materials. The Contractor shall provide chemicals, deodorizers, germicides, floor dry, disinfectants, cleaners, solvents, insecticides, plastic liners/bags of at least 2 millimeters in thickness, etc. as well as sufficient mops, brooms, scrub brushes, water buckets, yard brooms, rakes, etc.

4.3 Equipment. The Contractor shall provide sufficient mops, brooms, scrub brushes, water buckets, yard brooms, rakes, ladder, etc., as well as small tools, i.e., pliers, screwdriver, hammer to perform minor maintenance.

4.4 Material Safety Data Sheets (MSDS): The Contractor shall supply SDS’s for all cleaning solutions, detergents and materials used on the project.

4.5 Insurance: The contractor shall hold general liability insurance in the amounts specified in the official solicitation and/or in the clauses section of this PWS, and show proof of such, before commencement of services.

5.0 Specific Tasks

5.1 Basic Services. The contractor shall clean facilities and collect/remove garbage at the Downstream Boat Ramp, West Tailrace, Government Bay, Spillway Overlook, Spillway Pond Recreation Area, Downstream Campground (Loops 1, 2, 3, and 4), and Wolf Creek Recreation Area (Campground and Day Use Areas). Winter services for East Totten Trail Boat Ramp, Wolf Creek Boat Ramp, Missouri River Boat Ramp, West Tailrace, and Downstream Campground Loop 4 shall be performed in accordance with this statement of work and attached work schedules.

A. In the event a facility is occupied during the designated cleaning time, the Contractor shall contact the camper/guest and inform that individual of the Contractor's activity.

B. The Contractor shall re-supply all facilities so that supplies do not run out at any time. This shall include but not limited to toilet paper, paper towels and hand soap and sanitizer.

C. The Contractor shall perform minor maintenance, i.e., tighten loose doorknobs, dispensers, toilet seats, replace light bulbs, soap dispensers, etc. Any maintenance problem which cannot be corrected shall be reported to the POC within 24 hours.

D. All refuse from cleaning of facilities shall be disposed of in designated dumpsters.

5.2 Task Heading.

5.2.1 WINTER CLEANING SCHEDULE: Cleaning will take place on the 2nd and 4th Tuesday of each month from 16 September through 14 May. Downstream Campground, Missouri River Boat Ramp, East Totten Trail Boat Ramp, Wolf Creek Boat Ramp, Spillway Overlook and West Tailrace.

5.2.1.1 Vault Toilet Cleaning:

A. The Contractor shall clean the following facilities at the specified locations: six (6) vaults, one (1) at each of the following locations: Downstream Campground Loop 4, Missouri River Boat Ramp, East Totten Trail Boat Ramp, Wolf Creek Boat Ramp, Spillway Overlook and West Tailrace.

B. Specification of tasks:

1. Contractor shall thoroughly wash down the interior surfaces of all facilities. Stools and urinals shall be thoroughly washed, inside and out. All surfaces shall be wiped down, polished dry, dusted, swept and mopped. This shall be done to remove all residues and debris including but not limited to soap scum, mildew, water marks, etc. No standing water should remain on any fixtures or floors. Germicide and disinfectant should be applied on appropriate surfaces and fixtures.

2. Markings, stains, and all undesirable substances shall be removed from walls, doors, floors, etc., with either chemical solvents or cleaning agents. If a stain, mark, or substance cannot be removed by reasonable cleaning efforts, the POC shall be notified.

3. Debris or residue of any kind shall be removed from the interior and exterior of the facilities. The Contractor shall sweep down the exterior of all facilities and sidewalks leading to each building.

4. All litter within twenty-five (25) feet of facilities shall be picked up and properly disposed.

5. Ice melt/salt shall be applied to inside and outside of facilities where water from cleaning has frozen.

5.2.2 SUMMER CLEANING SCHEDULE: 15 May through 15 September. Downstream Campground, Wolf Creek Recreation Area, Spillway Overlook, Spillway Pond Recreation Area, Missouri River Boat Ramp, Government Bay and West Tailrace.

5.2.2.1. Vault Toilet, Comfort Stations and Shower Building Cleaning:

A. The Contractor shall clean the following facilities at the specified locations:

1. Thirteen (13) vault toilets will be cleaned: Three (3) at Downstream Campground, four (4) at the Wolf

Creek Campground and one (1) each at Missouri River Boat Ramp, Wolf Creek Boat Ramp, Government Bay Boat Ramp, Spillway Overlook, Spillway Pond and West Tailrace. Vault toilets shall be cleaned every Monday and Friday between 15 May through 15 September each year.

2. Three (3) shower buildings located in Downstream Campground. Shower building cleaning will be performed between the hours of 6:00 a.m. and 9:00 a.m. to reduce conflicts with customer usage every Sunday, Monday, Wednesday, Friday, and Saturday between 15 May through 15 September each year.

3. Two (2) comfort station buildings, one (1) each at Downstream Campground Loop 3 and Spillway Pond

Recreation Area. Cleaning at Downstream Campground will be performed between the hours of 6:00 a.m. and 9:00 a.m. to reduce conflicts with customer usage every Sunday, Monday, Wednesday, Friday, and Saturday between 15 May through 15 September each year. Cleaning at Spillway Pond will be performed every Monday and Friday between 15 May through 15 September each year.

1. Contractor shall thoroughly wash down the interior surfaces (walls, floors, and ceiling, fixtures, dividers, etc.) of all facilities. Stools and urinals shall be thoroughly washed, inside and out. All surfaces shall be wiped down, polished dry, dusted, swept and mopped. This shall be done to remove all residues and debris including but not limited to soap scum, mildew, water marks, etc. No standing water should remain on any fixtures or floors. Germicide and disinfectant should be applied on appropriate surfaces and fixtures. Cleaning of shower buildings shall include exterior sink facilities.

2. Markings, stains, and all undesirable substances shall be removed from walls, doors, floors, etc., with either chemical solvents or cleaning agents. If a stain, mark, or substance cannot be removed by reasonable cleaning efforts, the POC shall be notified.

3. Debris or residue of any kind shall be removed from the exterior of the facilities. The Contractor shall sweep down the exterior of all facilities and sidewalks leading to each building.

4. Empty all refuse receptacles, empty, and disinfect all napkin dispensers, and install new plastic bags.

5. All litter within twenty-five (25) feet of facilities shall be picked up and properly disposed.

6. Hand soap and sanitizer dispensers shall be kept filled with proper agents.

7. An insecticide shall be sprayed, as necessary, inside vault toilets after cleaning and direct contact should be avoided with the toilet seat. Hanging pest strips shall be unacceptable to meet the needs of insecticide application.

8. Contractor shall have access to the pipe space (center room of buildings) for storage of supplies. The pipe space is included in the cleaning requirements and shall be cleaned regularly as to avoid stains, debris, and infestation of pests.

9. Exhaust fans shall be cleaned thoroughly at least once a month.

10. All facilities not being cleaned during the winter cleaning schedule will be locked and secured following the final cleaning on 15 September each year.

5.2.2.2. Fish Cleaning Station Cleaning:

A. The Contractor shall clean three (3) fish cleaning stations, one (1) each at Government Bay, Wolf Creek and Missouri River Boat Ramp. Cleanings will be performed every Monday, Wednesday, and Friday between 15 May through 15 September each year.

1. Contractor shall check the operation of the fish cleaning station by running the grinder/water system a minimum of 15 seconds. Any unusual sound or if the grinder is not running the Contractor shall report this immediately to the POC.

2. All fixtures, including buttons and handles, working surfaces, skirting and base slab shall be cleaned.

Cleaning shall include sweeping and washing the base slab, removing all stains and remains from the working surface with a non-abrasive cleaning compound. The cleaning of the tabletop shall be completed using bleach (Clorox).

3. All insect nests, cobwebs, foreign material, etc. shall be removed from the underside of the roof, the outside of the fish cleaning station, the columns and all fixtures located on the fish cleaning station.

4. All litter, to include fish remains within twenty-five (25) feet of facilities, shall be picked up and deposited into a closed, leak proof container and disposed of in a dumpster. At no time shall the litter material be placed down the fish cleaning station disposal.

5.2.2.3. Refuse Can Placement/Removal/Collection:

A. Contractor shall place/remove seven (10) refuse cans and collect/dispose of all refuse in the West Tailrace

Recreation Area, three (3) Fish Cleaning Stations (Wolf Creek, Government Bay, and Missouri River Boat Ramp), Spillway Overlook, and Spillway Pond Recreation Area. Refuse cans shall be placed on 15 May and removed on 15 September each year. Collection shall be performed every Monday and Friday between placement and removal dates.

1. Refuse cans shall be removed from the designated storage area within the Corps of Engineers

Maintenance facility and be placed in designated locations. A plastic liner/bag will be placed and secured within each can and the cans and attached lids shall be secured to an immovable object with a lock and chain to avoid theft.

2. All refuse at each collection point including material inside the can and material placed near cans obviously intended for disposal shall be removed and disposed of in a designated dumpster. All litter within twenty-five (25) feet of each refuse can location shall be picked up and disposed of in a dumpster.

3. Refuse cans, when emptied, shall be washed every other week to remove any kind of debris on the interior or exterior, sprayed with an insecticide, absorbent material placed at the bottom to maintain freshness, a plastic liner/bag inserted, and the lid placed securely on top.

4. Contractor shall immediately clean up any refuse lost or spilled during handling or transport.

5. Contractor shall, on the removal dates, remove all refuse cans, clean with a detergent soap and water, and store at the designated locations. The washing of cans shall not be performed on government property and the Contractor shall provide all supplies for cleaning of cans.

6.0 Performance Requirements Summary. The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

Standard Performance Threshold Method of Surveillance

PRS # 1.

Clean Vault Toilets, Comfort Stations and Shower Buildings

The contractor shall be required to clean the vault toilets, comfort stations and shower buildings during the required hours.

PWS Part 5.2.1.1 & 5.2.2.1

Three or more legitimate complaints from the public within a 30-day period concerning the Contractor’s performance can be cause for contract termination.

Re-performance shall be accomplished within 8 hours of notification.

Periodic surveillance by the Government and Validated Customer Complaint received by

COR.

PRS # 2

Clean Fish Cleaning Stations

PWS Part 5.2.2.2

Three or more legitimate complaints from the public within a 30-day period concerning the Contractor’s performance can be cause for contract termination.

Re-performance shall be accomplished within 8 hours of notification.

Periodic surveillance by the Government and Validated Customer Complaint received by

COR.

PRS # 3

Collect/Dispose of Refuse

PWS Part 5.2.2.3

Three or more legitimate complaints from the public within a 30-day period concerning the Contractor’s performance can be cause for contract termination.

Re-performance shall be accomplished within 8 hours of notification.

Periodic surveillance by the Government and Validated Customer Complaint received by

COR.

7.0 Attachments – Service Area Maps (External Attachment)

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government 2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 3001 Destination Government Destination Government

3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government 3006 Destination Government Destination Government 3007 Destination Government Destination Government 3008 Destination Government Destination Government 3009 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government 4005 Destination Government Destination Government 4006 Destination Government Destination Government 4007 Destination Government Destination Government 4008 Destination Government Destination Government 4009 Destination Government Destination Government 5001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 15-MAY-2022 TO

14-MAY-2023

N/A COE GARRISON PRJT OFC NTR RSC SEC

ERIC KELSEY

USAED, OMAHACENWO-OD-GA-N

PO BOX 527

RIVERDALE ND 58565

701-654-7760

968708

0002 POP 15-MAY-2022 TO

14-MAY-2023

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 15-MAY-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 15-MAY-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 15-MAY-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 15-MAY-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 15-MAY-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 15-MAY-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 15-MAY-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 15-MAY-2023 TO

14-MAY-2024

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 15-MAY-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 15-MAY-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

1004 POP 15-MAY-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

1005 POP 15-MAY-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

1006 POP 15-MAY-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

1007 POP 15-MAY-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

1008 POP 15-MAY-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

1009 POP 15-MAY-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 15-MAY-2024 TO

14-MAY-2025

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 15-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 15-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

2004 POP 15-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

2005 POP 15-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

2006 POP 15-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

2007 POP 15-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

2008 POP 15-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

2009 POP 15-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 15-MAY-2025 TO

14-MAY-2026

N/A (SAME AS PREVIOUS LOCATION)

3002 POP 15-MAY-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

3003 POP 15-MAY-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

3004 POP 15-MAY-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

3005 POP 15-MAY-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

3006 POP 15-MAY-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

3007 POP 15-MAY-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

3008 POP 15-MAY-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

3009 POP 15-MAY-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 15-MAY-2026 TO

14-MAY-2027

N/A (SAME AS PREVIOUS LOCATION)

4002 POP 15-MAY-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

4003 POP 15-MAY-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

4004 POP 15-MAY-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

4005 POP 15-MAY-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

4006 POP 15-MAY-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

4007 POP 15-MAY-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

4008 POP 15-MAY-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

4009 POP 15-MAY-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

5001 POP 15-MAY-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

DEC 2021

52.219-8 Utilization of Small Business Concerns OCT 2018 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

AUG 2018

52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-18 Availability Of Funds APR 1984 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2021

52.237-2 Protection Of Government Buildings, Equipment, And Vegetation

APR 1984

52.237-3 Continuity Of Services JAN 1991 52.242-15 Stop-Work Order AUG 1989 52.245-1 Government Property SEP 2021 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7000 Requirements Relating to Compensation of Former DoD Officials

SEP 2011

252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

DEC 2019

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.243-7001 Pricing Of Contract Modifications DEC 1991 252.245-7001 Tagging, Labeling, and Marking of Government-Furnished

Property

APR 2012

252.245-7002 Reporting Loss of Government Property JAN 2021 252.245-7003 Contractor Property Management System Administration APR 2012

252.2…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .