KO SIGNED_Abstract of Bid Phase 2 W9128F22B0002.pdf
PDF 235 KB Posted
- Attached to
- STEP-ONE IFB - Pipestem Dam Spillway Modification Project, Pipestem Creek, Jamestown, ND.
- Solicitation number
- W9128F22B0002
About this file
This abstract of bids document summarizes the responses to a two-step Invitation for Bid for the Pipestem Dam Spillway Modification Project in Jamestown, North Dakota. Two construction firms - Barnard Construction Company and Ames Construction Inc. - submitted technically acceptable proposals that will proceed to the second step. The project involves modifying the spillway of Pipestem Dam on Pipestem Creek. The Corps of Engineers district office in Omaha issued the IFB and will award the contract. Step two bids are due on July 30, 2022. The document lists the line item estimates for 34 work items from the government estimate and the lump sum bids from the two contractors. Their total basic amounts were $171 million, $166 million, and $131 million respectively.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE STEP 2 DUE
15-Jul-22 15-Aug-22
I CERTIFY THAT I HAVE OPENED, READ AND
AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED
Unique ID: M459W4SCYM19 Unique ID: LEGGW1TNMVC9
C. REASONABLE CONTRACT
7A 7B 7C D. E. F.
ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT 0001 Mobilization and Demobilization 1 JOB N/A $10,600,000.00 N/A $16,926,000.00 N/A $9,225,000.00 0002 Clearing and Grubbing 10 ACRES $20,235.61 $202,356.10 $10,000.00 $100,000.00 $10,000.00 $100,000.00 0003 Topsoil 212,300 CY $41.59 $8,829,557.00 $13.00 $2,759,900.00 $7.00 $1,486,100.00 0004 Excavation & Transportation of Soils 1,952,100 CY $11.22 $21,902,562.00 $14.00 $27,329,400.00 $8.20 $16,007,220.00 0005 Excavation & Transportation of Shale Bedrock 99,200 CY $15.30 $1,517,760.00 $17.50 $1,736,000.00 $11.50 $1,140,800.00 0006AA Standard Compacted Cohesive Fill 1,214,700 CY $17.65 $21,439,455.00 $3.00 $3,644,100.00 $5.75 $6,984,525.00 0006AB Method Compacted Cohesive Fill 130,700 CY $11.22 $1,466,454.00 $3.00 $392,100.00 $1.25 $163,375.00 0006AC Method Compacted Random Fill 194,100 CY $10.79 $2,094,339.00 $3.00 $582,300.00 $1.25 $242,625.00 0006AD Method Compacted Onsite Sand 76,900 CY $10.79 $829,751.00 $3.00 $230,700.00 $1.25 $96,125.00 0006AE Method Compacted Spoil Materian 435,900 CY $9.70 $4,228,230.00 $0.25 $108,975.00 $1.25 $544,875.00 0007AA Surface Sands - Excavation, Transportation and Spoil (1st 5,000 CY) 5,000 CY $11.22 $56,100.00 $8.00 $40,000.00 $7.50 $37,500.00 0007AB Surface Sands - Method Compacted Cohesive Fill (1st 5,000 CY) 5,000 CY $14.27 $71,350.00 $2.00 $10,000.00 $2.50 $12,500.00 0007AC Surface Sands - Excavation, Transportation and Spoil (over 5,000 CY) 55,000 CY $11.22 $617,100.00 $8.00 $440,000.00 $7.25 $398,750.00 0007AD Surface Sands - Method Compacted Cohesive Fill (over 5,000 CY) 55,000 CY $14.27 $784,850.00 $2.00 $110,000.00 $2.50 $137,500.00 0008 Riprap 20,470 TONS $150.51 $3,080,939.70 $175.00 $3,582,250.00 $75.00 $1,535,250.00 0009 Spalls 5,205 TONS $158.44 $824,680.20 $175.00 $910,875.00 $70.00 $364,350.00 0010 Bedding 5,190 TONS $92.73 $481,268.70 $150.00 $778,500.00 $55.00 $285,450.00 0011 Gravel Surfacing for Roads 10,350 TONS $91.67 $948,784.50 $80.00 $828,000.00 $28.00 $289,800.00 0012 Seeding 255 ACRES $10,351.61 $2,639,660.55 $5,600.00 $1,428,000.00 $5,700.00 $1,453,500.00 0013AA Roller Compacted Concrete (RCC) Test Section 1 JOB N/A $810,000.00 N/A $1,500,000.00 N/A $750,000.00 0013AB Labyrinth Weir Test Section 1 JOB N/A $1,467,000.00 N/A $1,000,000.00 N/A $900,000.00 0013AC Soil Cement Key Test Section 1 JOB N/A $815,000.00 N/A $500,000.00 N/A $350,000.00 0014AA Mix, Convey and Place Roller Compacted Concrete (RCC) 96,575 CY $54.44 $5,257,543.00 $170.00 $16,417,750.00 $44.00 $4,249,300.00 0014AB Coarse Aggregate for RCC 85,085 TONS $82.90 $7,053,546.50 $90.00 $7,657,650.00 $50.00 $4,254,250.00 0014AC Fine Aggregate for RCC 74,800 TONS $60.49 $4,524,652.00 $74.00 $5,535,200.00 $31.00 $2,318,800.00 0014AD Sump Fines (- #200 Material) 9,270 TONS $52.25 $484,357.50 $110.00 $1,019,700.00 $82.00 $760,140.00 0014AE Cement for RCC 12,025 TONS $424.19 $5,100,884.75 $311.00 $3,739,775.00 $300.00 $3,607,500.00 0014AF Pozzolan for RCC 5,970 TONS $249.54 $1,489,753.80 $237.00 $1,414,890.00 $150.00 $895,500.00 0014AG Air Entrainment Admixture for RCC 4,830 GALLONS $12.53 $60,519.90 $16.00 $77,280.00 $6.00 $28,980.00 0014AH Water Reducing and Retarding Admixture for RCC 6,040 GALLONS $11.57 $69,882.80 $21.00 $126,840.00 $6.50 $39,260.00 0015AA Mix, Convey and Place Soil Cement 26,760 CY $54.35 $1,454,406.00 $110.00 $2,943,600.00 $50.00 $1,338,000.00 0015AB On-Site Sand for Soil Cement 37,275 TONS $10.86 $404,806.50 $20.00 $745,500.00 $14.00 $521,850.00 0015AC Cement for Soil Cement 5,970 TONS $424.19 $2,532,414.30 $400.00 $2,388,000.00 $320.00 $1,910,400.00 0016 Reinforced Concrete 2,622 CY $1,173.29 $3,076,366.38 $1,500.00 $3,933,000.00 $1,450.00 $3,801,900.00 0017 Mass Concrete 15,333 CY $1,039.43 $15,937,580.19 $1,250.00 $19,166,250.00 $1,175.00 $18,016,275.00 0018 Reinforced Concrete Labyrinth Weir 2,770 CY $2,621.01 $7,260,197.70 $1,250.00 $3,462,500.00 $1,950.00 $5,401,500.00 0019 Terminal Structure Fine Aggregate (C-33 Fine Aggregate) 49,420 TONS $82.07 $4,055,899.40 $60.00 $2,965,200.00 $43.00 $2,125,060.00 0020 Terminal Structure Coarse Aggregate (C-33 No. 8) 42,580 TONS $149.54 $6,367,413.20 $75.00 $3,193,500.00 $75.00 $3,193,500.00 0021 18-Inch HDPE Perforated Pipe 7,105 LF $61.90 $439,799.50 $100.00 $710,500.00 $50.00 $355,250.00 0022 18-Inch HDPE Solid Pipe 141 LF $261.13 $36,819.33 $400.00 $56,400.00 $375.00 $52,875.00 0023 36-Inch HDPE Solid Pipe 1,050 LF $665.95 $699,247.50 $300.00 $315,000.00 $275.00 $288,750.00 0024 Precast Reinforced Concrete Manholes 22 EA $32,600.00 $717,200.00 $23,000.00 $506,000.00 $35,978.00 $791,516.00 0025 Geomembrane 8,580 SY $38.92 $333,933.60 $20.00 $171,600.00 $8.00 $68,640.00 0026 Dewatering 1 JOB N/A $5,272,550.00 N/A $5,400,000.00 N/A $7,993,000.00 0027 Environmental Mitigation (Tree Plantings Only) 160 EA $1,102.00 $176,320.00 $450.00 $72,000.00 $498.00 $79,680.00 0028 Resident Engineer Buildings/Trailers 1 JOB N/A $1,520,240.00 N/A $4,600,000.00 N/A $400,000.00 0029 Quality Control/Quality Assurance (QC/QA) Laboratories 1 JOB N/A $1,857,000.00 N/A $1,400,000.00 N/A $8,000,000.00 0030 Database Development 1 JOB N/A $375,000.00 N/A $1,500,000.00 N/A $350,000.00 0031 Database Maintenance & Turnover 42 MONTHS $73,090.00 $3,069,780.00 $4,000.00 $168,000.00 $4,500.00 $189,000.00 0032 Instrumentation Installation 1 JOB N/A $1,382,000.00 N/A $1,600,000.00 N/A $2,900,000.00 0033 Instrumentation Data Collection 1 JOB N/A $404,000.00 N/A $375,000.00 N/A $400,000.00 0034 All Remaining Work 1 JOB N/A $4,150,000.00 N/A $9,500,000.00 N/A $14,660,766.00
TOTAL BASIC AMOUNT $171,271,311.60 $166,098,235.00 $131,496,937.00
OMAHA, NE 68102-1618
1616 CAPITOL AVENUE
CONTRACTING DIVISION (CENWO-CT)
US ARMY CORPS OF ENGINEERS
l PAGES
9. OFFERS
TO THIS SOLICITATION
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type) Jessica R. Jackson
NO. 1 NO. 2
ABSTRACT OF TECHNICAL PROPOSALS - STEP 1 IFB
1. SOLICITATION NUMBER
W9128F22B0002
4. ISSUING OFFICE
8. GOVERNMENT ESTIMATE
(Check A, B or C AND COMPLETE D, E AND F)
5. PROJECT TITLE
A. OFFEROR A. OFFEROR
2500 County Rd 42
A. HIRED LABOR
IGE
Ames Construction
West Burnsville MN 55337-6911 CAGE Code: OK3W0 B. REASONABLE CONTRACT
SAM Exclusion: None
CAGE Code: 0BRU7
SAM Exclusion: None (Without Profit)
9 Amendments
POC: Don Rasmussen
C. AMENDMENTS ACKNOWLEDGED: 9
POC: Ely Johnson
C. AMENDMENTS ACKNOWLEDGED: 9
6. NUMBER OF AMENDMENTS ISSUED -9
(Including Profit)
PIPESTEM DAM SPILLWAY MODIFICATION
Barnard Construction 701 Gold Ave Bozeman MT 59715
18-Aug-22
PAGE1
| 2022-08-18T07:37:20-0500 | |
| JACKSON.JESSICA.R.1016540583 |