W9128F20Q0074 Fencing at Garrison Dam ND.PDF

PDF 1 MB Posted

Attached to
GA - Boundary Fencing Federal contract opportunity
Solicitation number
W9128F20Q0074
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

View the file

Other files for this federal contract opportunity

Other files attached to GA - Boundary Fencing, newest first.
File Type Posted
W9128F20Q0074 - Maps.pdf PDF
Amd 01 W9128F20Q0074 Fencing at Garrison Dam ND.PDF PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COE GARRISON PRJT OFC NTR RSC SEC

ANDREW LILLEJORD

USAED, OMAHACENWO-OD-GA-N

PO BOX 527

RIVERDALE ND 58565

TEL: 701-654-7758 FAX:

W59XQG01671276

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W9128F20Q0074 02-Sep-2020 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

14-Sep-2020(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

701-654-7748RACHAEL M TAYLOR

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W9128F20Q0074

Section A - Solicitation/Contract Form

SUMISSION DATE AND TIME

End of Business Day is 4:00pm (CDT)

Section B - Supplies or Services and Prices

PRICING SCHEDULE

PRICE SCHEDULE

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

BASIC ITEMS

38,760 feet of three wire barbed wire fence

38,760 ft $_______ $_______

30 estimated corner braces each $_______ $_______

6 steel gates with H-braces each $_______ $_______

TOTAL AMOUNT (ITEMS 1 THRU 3) $_________________

NOTES:

1. Prices must be entered for all items of the schedule. All amounts shall be subject to verification by the Government. In the event of a discrepancy between the unit price and the CLIN amount, the unit prices will be considered the quoted price.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

FENCING - GARRISON PROJECT

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform fencing and boundary surveying as defined in the Statement of Work. The work shall be performed at the following Government owned facilities: Garrison project on Lake Sakakawea.

FOB: Destination

MILSTRIP: W59XQG01671276

PURCHASE REQUEST NUMBER: W59XQG01671276

PSC CD: 5660

NET AMT

Section C - Descriptions and Specifications

SOW

STATEMENT OF WORK

Garrison Project, Lake Sakakawea

Reunion Bay Fencing Project

1.0 GENERAL: This is a non-personal construction contract to provide fencing and boundary surveying practices.

The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. Reference maps that are furnished by the government to the contractor are not to be substituted for legal survey maps. The government is not responsible for any variances from the legal boundary in their reference maps and the contractor is responsible for any fencing mistakes when building fence that is not in accordance with the legal survey boundary.

1.1 DESCRIPTION OF SERVICES/INTRODUCTION: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform fencing and boundary surveying as defined in this Performance Work Statement. The work shall be performed at the following Government owned facilities: Garrison project on Lake Sakakawea.

1.2 BACKGROUND: The services to be provided for this contract are boundary fencing and boundary surveying work. The area that the fencing and surveying will occur in is the Reunion Bay area. Areas to be fenced and surveyed will be discussed below in this SOW.

1.3 OBJECTIVES: The objectives of this SOW are to properly install a three row barbed wire fence, (where applicable) on the legal USACE boundary line. Corner posts, H-braces and some gates will also be required where specified. Legal surveying will be necessary to decipher where Army Corps of Engineer boundary markers and boundary pins need to be replaced, (where boundary markers and pins are absent). Fencing will be placed on the official legal boundary.

1.4 COMPLETION DATE: The completion date is 12 months from issuance of Notice to Proceed.

1.5 QUALITY CONTROL: The contractor shall develop a Quality Control Plan (QCP), for approval of the CO/COR, designated to demonstrate how the contractor will meet the needs of the project. The Quality Control Plan shall contain a list of disinfectants and supplies to be used in performing the contract duties. The plan shall identify the Contractor-furnished equipment and state how the work will be accomplished. Changes in the approved plan shall be submitted for approval prior to implementing the change. The Plan shall document how the Contractor will identify and correct performance shortfalls. Complete records of all inspections performed by the Contractor must be maintained and made available to the Government throughout the term of the contract.

1.6 QUALITY ASSURANCE

The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.1 The Government has the right to inspect and test all services called for by the contract to the extent practicable for customary commercial services, at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that shall not unduly delay the work.

1.6.2 The COR shall inform the contractor when discrepancies occur and shall request corrective action. The COR shall make a notation of the discrepancy with the date, time and discrepancy that was noted, and request the authorized contractor representative to initial the entry and provide the appropriate corrective action.

1.6.3 Government Remedies: The Contracting Officer or the COR shall follow FAR 52.212-4, Contract Terms and Conditions – Commercial Items, for contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

1.7 HOURS OF OPERATION

There are no restrictions on the hours of operation to the contractor in this contract. Please note that the government contact for this contract (COR) will only be available to the contractor via phone during the hours of 6:30 AM – 4:00 PM, Monday-Friday during a typical work week. The government is not liable for any mistakes and/or injuries that the contractor’s employees may sustain from working in adverse weather or low light conditions. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.8 CONTRACTOR PERSONNEL

1.8.1 The contractor shall provide a person who shall be responsible for the performance of the work. The name of this person and alternates who shall act for the contractor shall be designated in writing to the Contracting Officer and the COR within ten (10) days after date of award. Telephone numbers shall be provided where the Project Manager and alternate may be contacted 24/7.

1.8.2 The contractor representative or alternate shall be available during normal duty hours to meet with Government personnel designated by the Contracting Officer or the COR to discuss problem areas.

1.9 CONTRACTOR EMPLOYEES

1.9.1 The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the Contracting Officer and the COR as a potential threat to health, safety, security, general well-being or operational mission of the facility and its population. List of personnel shall be made available in writing to the Government at the start of the contract.

1.9.2 All contractor personnel shall be fully clothed at all times, including enclosed shoes, while performing these services. Clothing shall be professional, clean and neat in appearance. In addition, all contractor personnel are responsible for wearing the appropriate personal protective equipment in accordance with the owner’s manuals of any and all equipment that they utilize during the performance of this contract.

1.9.3 Contractor personnel shall utilize tact, diplomacy and courtesy at all times during contact with the public.

1.9.4 The contractor shall make sure employees have valid driver license(s) before starting work under this contract and throughout the term of the contract. All state and federal laws must be obeyed during the performance of this contract.

1.10 COORDINATION WITH THE PROJECT OFFICE

1.10.1 Day to day contact with Government personnel, and telephone communication shall normally provide adequate information exchange. The Government reserves the right to schedule meetings at the Project Office as necessary to insure strict compliance with the terms and conditions of the contract. Such meetings shall be scheduled, to the extent possible, at mutually convenient times, at no additional cost. However, upon notice, the contractor shall attend meetings regarding matters affecting this contract.

1.11 SAFETY & SECURITY REQUIREMENTS

1.11.1 The contractor shall comply with all pertinent provisions of the Federal, State, and local regulations as stated in the applicable Safety & Health Requirements Manual per EM 385-1-1. EM 385-1-1 (available on-line at:

http://www.usace.army.mil/CESO/Pages/EM 385-1-1, aspx) and shall take or cause to be taken such additional measures as the CO may determine to be reasonable and necessary for the purpose.

1.11.2 The contractor shall take reasonable measures to safeguard any keys issued to them to perform the services required by the contract. All keys shall be returned to the Government upon request and/or completion of the contract.

Failure to return keys can result in withholding of payment.

1.12 ANTITERRORISM/OPERATION SECURITY REQUIREMENTS: The contractor will coordinate with the COR and /or the facility security office for access when required. (Use when security clearances are not required, i.e. facility repair or construction). Proposed language: “All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.”

1.13 DATA RIGHTS: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software and legal survey maps, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.14 GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR INFORMATION: The government will furnish legal survey boundary maps of where the contractor is to place fence and/or survey. All equipment, clothing, personal protective equipment, etc. will be provided by the contractor. Fencing supplies will be provided by the government.

2.0 DEFINITIONS AND ACRONYMS: The following definitions and descriptions apply wherever the word, phrase, or acronym is used in this performance work statement.

Contracting Officer’s Representative (COR): Means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions.

SOW: Statement of Work

Performance-Based Contract: (FAR 2.101) Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise.

Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable quality level (AQL) for each work requirement.

Quality Control (QC): A method used by the Contractor to control the quality of goods and services provided.

Quality Assurance (QA): A method used by the Government to provide some measure of control over the quality of purchased goods and services received.

Shall: Imperative

3.0 SPECIFIC TASKS.

3.1 BASIC SERVICES.

The contractor shall provide services for boundary fencing and boundary surveying of US Army Corps of Engineers property at the Garrison project in the Reunion Bay area. The fencing for this project will be placed on the legal description, USACE boundary. No new fence will need to be installed where there is existing boundary fence that is in good condition. Existing fence must be repaired or updated to new fence specifications.

3.2 TASK HEADING.

Installment of fence posts.

Installment of corner posts, corner braces and H-braces.

Installment of 3-row barbed wire fence.

Installment of gates where requested.

3.3 WORK SEQUENCE.

Schedule and execute work to prevent excessive traffic. Care should be exercised to provide protection from causing vehicle ruts.

3.4 USE OF THE PREMISES.

Before beginning work, the contractor must secure approval from the COR for the following:

Areas permitted for personnel parking.

Access to the site.

Areas permitted for storage of materials and debris.

Areas permitted for the loading and unloading materials.

3.5 MATERIALS.

Services: The government will perform QA through inspections.

Facilities: The government will not furnish any facilities to the contractor.

Utilities: The government will not furnish any utilities to the contractor.

Equipment: The government will not furnish any equipment to the contractor.

Materials: The government will furnish: 1) CFR, Title 36 Rules and Regulations Governing Public Use on Corps of Engineers Water Resource Development Projects pamphlet; 2) USACE Manual EM 385-1-1 entitled "Safety and Health Requirements Manual", dated July 2014 (electronic version); 3) ORV permit(s); 4) additional copies of the attachments (upon request); 5) area of avoidance lists (due to human activity or T&E species); 6) local emergency telephone numbers;

3.6 CONTRACTOR FURNISHED SERVICES, FACILITIES, UTILITIES, EQUIPMENT, AND

MATERIALS.

Services: The contractor shall furnish QC and all labor.

Facilities: The contractor shall furnish his own facilities.

Utilities: The contractor shall furnish his own utilities.

Equipment: The contractor shall furnish his own equipment.

Materials: The contractor shall furnish all other materials necessary to complete the installation of the fence. The contractor will provide necessary protection against weather to keep all materials free from damage during shipment, storage, or in place.

3.7 SAFETY

The contractor shall be responsible for all means and methods as they relate to safety and shall comply with all applicable local, state and federal requirements that are safety related. Safety shall be the responsibility of the contractor. All related personnel shall be instructed daily to be mindful of the full time requirement to maintain a safe environment for the facility's occupants including staff, visitors, customers and the occurrence of the general public on or near the site.

3.8 WORKMANSHIP

Superintendent shall be thoroughly trained and experienced in this type of work.

All work shall be of highest quality and in strict accordance with the manufacturer's published specifications, standard industry practices and to the COR satisfaction.

There shall be a supervisor on the job site at all times while work is in progress.

3.9 QUALITY ASSURANCE

Unless otherwise noted in this specification, the contractor must strictly comply with the manufacturer's current specifications and details.

A. Provide adequate number of experienced workmen regularly engaged in this type of work who are skilled in the application techniques of the materials specified. Provide at least one thoroughly trained and experienced superintendent on the job at all times work is in progress.

B. There shall be no deviations made from this specification or the approved shop drawings without the prior written approval of the COR. Any deviation from the manufacturer's installation procedures must be supported by a written ce1iification on the manufacturer's letterhead and presented to the COR for approval.

C. The contractor shall develop and implement an effective quality control program to ensure services are performed in accordance with this P\VS.

The contractor's quality control program is the means by which the contractor assures themselves that the work complies with the requirement of the contract. No formal QCP is required for government review for this contract. The government shall evaluate the contractor's performance based on adherence to the requirements provided herein.

3.10 JOB CONDITIONS, CAUTIONS AND WARNINGS

Safety Data Sheets (SDS) must be on location at all times during the transportation, storage and application of materials. Proceed with work only when weather conditions are in compliance with the manufacturer's recommended limitations, and when conditions will permit the work to proceed in accordance with the manufacturer's requirements and recommendations.

Security: Contractor shall coordinate with the COR for site access and other security measures.

3.11 EXECUTION

The contractor shall be responsible for complying with the following requirements:

A. Means and methods of construction shall be such as the contractor may choose unless stated otherwise. The KO (Contracting Officer) retains the right to reject means and methods proposed which:

B. Constitute a hazard to the work, persons, or property. Will not produce finished work in accordance with terms of the contract. Are contrary to specified means or methods included in the contract.

C. The right to reject the means and methods of the Contractor shall not be construed or interpreted as acceptance of control of means and methods by the KO. ·

D. The KO’s approval of means and methods or failure to exercise right to reject means and methods shall not relieve the contractor of the obligation to complete the work required by the contract. Total responsibility for control of all means and methods lies with the contractor for all work.

3.12 ENGINEERING SERVICES.

The government boundary is delineated with fiberglass markers, concrete boundary markers and brass pins at random intervals so that line fences are constructed in a straight line between corners. The contractor shall set any temporary intermediate staking between these points as needed and remove them after fence is installed.

All permanent property corner monuments, line monuments, and fiberglass markers shall be protected from damage.

4.1 DEVIATIONS.

A. Line posts may not deviate more than 6" on line spacing.

B. All posts may not deviate more than 1" from plumb or specified height above ground.

C. The center of no post shall be more than 6” out of alignment on a straight run of fence.

D. All other measurements mentioned in and not specifically addressed in A thru C will not be allowed to deviate from that specified without prior approval from the COR.

4.2 CLEARING.

The contractor is required to clear fence lines of trees, brush, shrubs, and other obstructions large enough to hinder proper fence installation operations to a minimum distance of 6' and maximum distance of 8'. The contractor is authorized to cut, shred, or shear the woody vegetation to the surrounding grade. Pushing over or pulling out the woody vegetation is not authorized. All woody vegetation shall be cleared to a maximum stump height of 2" above the natural ground surface and shall have no limbs or branches remaining. All woody vegetation shall be scattered within the immediate vicinity of the work area, but outside the cleared corridor and not within .any coulee, draw, drainage, gully, ravine or water body without prior authorization from the COR.

Scattered woody vegetation shall be: 1) such that the main trunk is horizontal to the ground and not left in any varying degree of upright or vertical position; 2) such that the trunk is perpendicular to the cleared corridor; 3) such that it is not left in a stack, pile, or linear windrow in any way, shape, or form; and 4) such that it cannot roll back into the cleared corridor or be blown back into the cleared corridor by the wind. For any non-woody obstruction(s), the contractor will consult with the COR prior to removal of the obstruction(s). On interior fence lines where the government owns the property on both sides, the contractor shall consult with the COR to determine if clearing is required to be completed on one side or both sides of the fence. On exterior boundary fence lines where the government owns land only on one side, clearing shall only be done on the government owned side. Without private landowner permission, all woody vegetation that has fallen from government land onto privately owned land shall be removed from the privately owned land and properly scattered on government land as outlined above. Overhanging branches from privately owned land shall be trimmed back to the government property line and properly scattered on government property as outlined above. Existing grass, sod, and other vegetation shall be disturbed as little as possible.

Construction of access roads, dozing, or grading along the boundary line, property line, or existing fence line will not be permitted unless authorized in writing by the KO. Any grading or sloping of drainages will not be permitted unless authorized in writing by the KO.

Cost of clearing operations and any other necessary work required to install new fence(s), shall be included in the bid price.

4.3 FENCE INSTALLATION.

A. The fence shall be installed 1' inside the government boundary and consist of 3 strands of barbed wire. The bottom wire shall be 14” off the ground; the top wire shall be 42-44” from the ground, the middle wire shall fall equidistant between the two wires. Depending on location, all steel posts shall be (16') spaced, except where wooden braces or corners are located. Wooden bracing, corner braces and gates shall be installed initially, with the fence installed in a straight line between them. At all low points, anchors shall be installed. At the discretion of the contractor, the spacing of posts may be closer than 16’ when running up or down a steep grade; spacing may be no closer than 10’. Additionally, the contractor may alternate wooden anchor posts and steel posts where deemed necessary to retain the integrity of the structure. Fence will be expected to be placed where walking up/down a grade is possible. Existing fence lines must be either repaired to new fence specifications, or removed to make way for new fence to be installed.

B. Excavation and Backfilling Wood Posts. Using 6" diameter posts (8" diameter when installing round tubular steel gate(s)), carry all excavations down to the required depth of 42" below ground level, regardless of the soil conditions encountered. Post holes, cylindrical in shape and plumb with the centers in true alignment with bottoms flat. Set posts in center of holes. Deposit backfill and carefully tamp in lifts a maximum of 6" in thickness. Restore surfaces to existing grade after mounding, tamping, and smoothing off. Dispose of excess waste excavation as directed by the

COR.

C. Power Drive Wood Posts. Upon approval, set wood posts by means of an approved power post driver in lieu of excavation and backfill method where terrain and soil conditions to be penetrated are suit-able. Large end of post shall have blunt point to facilitate driving. Damaged posts shall be replaced by the contractor at no cost to the government. No additional payment will be allowed if contractor elects to use this method.

D. Driven Steel Line Posts. Posts shall be installed to a depth of 18" below ground level regardless of the nature of soil conditions encountered. Protect posts from damage during driving. Replace damaged or bent posts.

E. Relocation of Posts. If impenetrable materials are encountered, the post shall be moved to the closest location allowing for proper installation. The hole(s) from the previous attempt(s) shall be backfilled.

4.4 WIRE.

Placement. Place wire for fence on side of posts away from government land (private property side) unless directed otherwise.

4.5 STRETCHING.

Stretch by hand or use suitable equipment to ensure wire will be tight. All existing fences on the USACE boundary must be re-stretched to ensure the proper tightness of wires is maintained. If it is decided that existing fence lines’ wire is too weathered to be stretched properly, new barbed wire will have to be run.

4.6 SPLICING.

Use wrap or telephone-type splice using a minimum of 6 complete turns in each direction. Do not stretch splices around steel or wooden posts.

4.7 STAPLES.

Place on opposite side of the barb as the direction of pull and drive slightly canted left/right to wood grain at slight downward angle on level ground or where pull of wire is downward or at slight upward angle in depressions or where pull of wire is upward. Drive deep enough to hold wire close to posts without deforming wood surface or kinking the wire. Wire shall be free to move through staples during stretching and seasonal contraction/expansion.

4.8 CLIPS.

Install between t-post studs. Clips shall be installed tight enough to prevent wire from sliding up/down on the post, yet loose enough to allow barbed wire to move during stretching and seasonal contraction/expansion.

4.9 ANCHORS.

Studded t-post anchors shall be installed as a component of a washout panel and at all low points where stresses tend to pull posts from the ground. Washout panel anchors shall be affixed to the top of the panels’ posts on each end and installed at an angle opposite the direction of pull. In all other applications, anchors shall be guyed to all 3 strands of barbed wire using 1 continuous length of barbless wire with tag end attached to the anchor. At low points with severe elevation changes, anchors shall be installed on both sides of the post(s). In areas where the soil is exceptionally rocky, an appropriately sized rock(s) properly fastened and hanging from the fence shall be substituted. Studded t-post anchors shall be installed, as determined by the COR, at corners where stresses tend to pull posts from the ground. Corner anchors shall be installed at an angle opposite the direction of pull.

4.10 ROUND TUBULAR STEEL GATES.

Gates shall be 16' wide x 48" high. Gate shall be installed in the mid-line of the left-hand (single gate) 8" appurtenance post when entering and with the bottom horizontal rail a minimum of 6" above ground level and a maximum of 12” above the ground. The gate should be constructed of a minimum of 3” solid steel piping/tubing. The bottom hinge shall be installed 9" above ground level and the top hinge installed 8" below the top of the post. Gate shall be installed with the hinges as close to the post(s) as possible without eliminating the ability to make adjustments to allow for proper alignment. Gate shall be hung with the bottom hinge mounting pin pointed upward and the top mounting hinge pin pointed downward. Gate shall be adjusted so they are level and do not drag on the ground when swung completely open or closed. Gate shall be adjusted with a 2" gap between them (double gates) or the closed position appurtenance post.

All gated locations are required to have wooden H-braces on either side of the gate or a minimum of 6” steel stationary upright pipe anchored with concrete footings into the ground on either side of the gate. Woven wire panel fencing

4.11 CORNER BRACE.

Braces shall consist of 3-post anchorage, unless directed otherwise, using 6"x 8' diameter wood posts, installed to a depth of 42". Set at corners regardless of varying degree of angle. The 6"x 8' horizontal braces shall be installed so the top of the post is even with the top strand of barbed wire (44"). Horizontal braces shall be connected to the posts via 5/8" x 6" rebar dowels installed into 3" deep pre-drilled holes in the center of both ends of the braces and in the corresponding locations on the posts. Three turns of barbless wire, inset 1" from the end and twisted together (3 twists), shall be installed at both ends of the horizontal brace. \Vires shall be stretched tight at corners, double wrapped around the corner post with tag end wrapped a minimum of 6 times around itself, and stapled once on the outside of all wood posts. Wire shall not be stretched around the corner brace. Diagonal brace wires shall be fabricated with 4 strands of barbless wire with enough extra length to allow for tightening. Brace wires shall be stapled 4" down from the top of the direction of pull post and 4" above ground level on the corner post. Brace shall be tightened utilizing a 5/8"x24" rebar handle placed in the center of the horizontal brace span and in between the 2 pair of opposing brace wires. Brace wires shall be twisted a maximum of 4 twists until entire brace is rigid with brace wires singing tight and the free end of the rebar flush with the top of the horizontal brace and secured to it with a single staple.

4.12 END BRACE.

Brace shall consist of 2-post anchorage, unless directed, using 6"x 8' diameter wood posts, installed to a depth of 42". Set at terminus of a fence. The 6"x 8' horizontal brace shall be installed so the top of the post is even with the top strand of barbed wire (44"). Horizontal brace shall be connected to the posts via 5/8" x 6" rebar dowels installed into 3" deep pre-drilled holes in the center of both ends of the brace and in the corresponding locations on the posts. Three turns of barbless wire, inset 1" from the end and twisted together (3 twists), shall be installed at both ends of the horizontal brace. Wires shall be stretched tight at ends, double wrapped around the end post with tag end wrapped a minimum of 6 times around itself, and stapled once on the outside of all wood posts. Wire shall not be stretched around the end brace. Diagonal brace wires shall be fabricated with 4 strands of barbless wire with enough extra length to allow for tightening. Brace wires shall be stapled 4" down from the top of direction of pull post and 4" above ground level on the end post. Brace shall be tightened utilizing a 5/8"x24" rebar handle placed in the center of the horizontal brace span and in between the 2 pair of opposing brace wires. Brace wires shall be twisted a maximum of 4 twists until entire brace is rigid with brace wires singing tight and the free end of the rebar flush with the top of the horizontal brace and secured to it.

4.13 STRESS BRACE.

Brace shall consist of 2-post (flat/even terrain) or 3-post anchorage (sharp vertical angles/major terrain changes), unless directed otherwise, using 6"x 8' diameter wood posts, installed to a depth of 42". Set at a maximum of 660'and at sharp vertical angles/major terrain changes. The 6"x8' horizontal brace shall be installed so the top of the post is even with the top strand of barbed wire (44"). Horizontal brace shall be connected to the posts via 5/8" x 6" rebar dowels installed into 3" deep pre-drilled holes in the center of both ends of the brace and in the corresponding locations on the posts. Three turns of barbless wire, inset l" from the end and twisted together (3 twists), shall be installed at both ends of the horizontal brace. For each opposing run, wires shall be stretched tight at ends, double wrapped around the end post with tag end wrapped a minimum of 6 times around itself, and stapled once on the outside of all wood posts. Wire shall not be stretched around the stress brace. Diagonal brace wires shall be fabricated with 4 strands of barbless wire with enough extra length to allow for tightening. Brace wires shall be stapled 4" down from the top of each post and 4" above ground level on the end posts. Brace shall be tightened utilizing a 5/8"x24" rebar handle placed in the center of the horizontal brace span and in between the 4 pair of opposing diagonal brace wires. Brace wires shall be twisted a maximum of 4 twists until entire brace is rigid with brace wires singing tight and the free end of the rebar flush with the top of horizontal brace and secured to it with a single staple.

4.14 DRAW/GULLY PANEL.

Panel shall be constructed in accordance with Line Fence and as an integrated component (continuation) of the line fence. Panel shall be installed across drainages where water run-off does not require the installation of a washout panel. Major drainage crossings which cannot be closed by the installation of a draw/gully panel as determined by the COR shall not be fenced.

4.15 WASHOUT PANEL.

Panel shall be constructed in accordance with Line Fence and as an independent component of the line fence.

Panel shall be installed across drainages where water run- off has the potential to destroy the fence. Major drainage crossings which cannot be closed by the installation of a washout panel as determined by the COR shall not be fenced.

4.16 TAG FENCE.

Tag fence shall be constructed in accordance with Line Fence. Fence shall be installed between the terminus of a fence and any existing body of water such as a river, lake, or reservoir. Upon approval by the COR, the contractor shall utilize geological or other physical land features or structures to construct the tag fence where site conditions prohibit the installation of posts. The tag fence shall extend far enough into the water body so as to restrict livestock movement around the end, yet not pose a navigational hazard to the recreating public.

4.17 CLEAN UP

Perform daily clean-up to collect all wrappings, empty containers, paper, and other debris from the project site.

Upon completion, all debris must be disposed of in a legally acceptable manner.

4.18 FINAL INSPECTION

Work will not be considered ready for final inspection until all work required for each work activity (removal, installation, repair) has been completed (including cleanup of the premises and removal of all of the contractor's equipment, materials, and supplies) and the contractor has certified that all items are properly operating and in strict compliance with all contract terms and conditions. The contractor shall notify the COR a minimum of 2 business days prior to the anticipated date of completion to schedule the final inspection. The contractor shall be required to attend the final inspection with the COR.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 12 mths. ANP 1 COE GARRISON PRJT OFC NTR RSC SEC

ANDREW LILLEJORD

USAED, OMAHACENWO-OD-GA-N

PO BOX 527

RIVERDALE ND 58565

701-654-7758 FOB: Destination

968708

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 12 months after issuance of Notice to Proceed. * The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section G - Contract Administration Data

Section H - Special Contract Requirements

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) ) Site visit is scheduled for 10:00am (CDT) on Thursday, 10 September 2020. Contractor must notify Andrew Lillejord by 2pm (CDT) on 09 September 2020 if attending the site visit.

POC: Andrew Lillejord Email: Andrew.J.Lillejord@usace.army.mil Location: Parking lot of United Quality Cooperative on Hwy 1804 just north of New Town.

99 Coop Street, New Town, ND 58763

(End of provision)

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUN 2020

52.204-13 System for Award Management Maintenance OCT 2018 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

AUG 2020

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

AUG 2020

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.211-18 Variation in Estimated Quantity APR 1984 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.219-6 Notice Of Total Small Business Set-Aside MAR 2020 52.219-28 Post-Award Small Business Program Rerepresentation MAY 2020 52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records AUG 2018 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.223-6 Drug-Free Workplace MAY 2001 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

AUG 2018

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

JUN 2020

52.225-10 Notice of Buy American Requirement--Construction Materials

MAY 2014

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.

JUN 2020

52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Alt I Accident Prevention (Nov 1991) - Alternate I NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.246-16 Responsibility For Supplies APR 1984 52.246-21 Warranty of Construction MAR 1994 52.249-10 Default (Fixed-Price Construction) APR 1984 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

DEC 2019

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991

52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL

ITEMS) (JUN 2020)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(iv) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

(v) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(vi) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).

(vii) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(viii) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(ix) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78 (19 U.S.C. 3805 note).

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments (APR 1984).

(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).

(iii) 52.232-11, Extras (APR 1984).

(iv) 52.232-25, Prompt Payment (JAN 2017).

(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).

(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013).

(vii) 52.233-1, Disputes (MAY 2014).

(viii) 52.244-6, Subcontracts for Commercial Items (JUN 2020).

(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (MAR 2016) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia)).

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).

(ii) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (JAN 2020) (E.O. 13126) (Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in FAR 2.101 on the date of award of this contract).

(iii) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment (JUN 2020) (41 U.S.C. chapter 65) (Applies to supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).

(iv) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).

(v) 52.222-36, Equal Employment for Workers with Disabilities (JUN 2020) (29 U.S.C. 793) (Applies to contracts over the threshold specified in FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, ``United States'' includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)

(vi) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).

(vii) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S.

Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).

(viii)(A) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627) (Applies to all solicitations and contracts).

(B) Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).

(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (Executive Order 13658) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia)).

(x) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))

(xi) 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2011) (E.O. 13423) (Applies to services performed on Federal facilities).

(xii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June, 2016) (E.O. 13693)(applies to contracts for products as prescribed at FAR 23.804(a)(1)).

(xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792) (Applies to contracts greater than the threshold specified in FAR 26.404 on the date of award of this contract, that provide for the provision, the service, or the sale of food in the United States).

(xiv) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR ® Program or Federal Energy Management Program (FEMP) will be--

(A) Delivered;

(B) Acquired by the Contractor for use in performing services at a Federally-controlled facility;

(C) Furnished by the Contractor for use by the Government; or

(D) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance).

(xv) 52.223-20, Aerosols (June, 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).

(xvi) 52.223-21, Foams (June, 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent;

or contracts for construction of buildings or facilities.

(xvii) 52.225-1, Buy American--Supplies (MAY 2014) (41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold, as defined in FAR 2.101 on the date of award of this contract, and the acquisition--

(A) Is set aside for small business…