W9128F20Q0062_Specs and Technical Data (1 of 2).pdf

PDF 561 KB Posted

Attached to
Pipestem Bituminous Paving Federal contract opportunity
Solicitation number
W9128F20Q0062
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

View the file

Other files for this federal contract opportunity

Other files attached to Pipestem Bituminous Paving, newest first.
File Type Posted
W9128F20Q0062_AMD 002.pdf PDF
Questions and Answers for Solicitation W9128F20Q0062.pdf PDF
W9128F20Q0062_AMD 001.pdf PDF
W9128F20Q0062_Solicitation.pdf PDF
W9128F20Q0062_Specs and Technical Data (2 of 2).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

SECTION 32 12 36.13

ASPHALTIC SEAL AND FOG COATS

05/17

PART 1 GENERAL

1.1 UNIT PRICES

1.1.1 Measurement

Measure the quantities of bituminous material and aggregate used in the accepted work and to be paid for, provided that the measured quantities are not more than 10 percent over the specified application rate. Any amount of bituminous material and aggregate more than 10 percent over the specified application rate for each application will be deducted from the measured quantities except for irregular areas where hand spraying of the bituminous material and hand spreading of the aggregate is necessary.

1.1.1.1 Bituminous Material

The amount of bituminous material to be paid for will be measured in gallons at 60 degrees F of residual asphalt cement.

1.1.1.2 Aggregate

The amount of aggregate to be paid for will be measured in tons of dry aggregate. Measure materials [using approved weigh scales].

1.1.2 Payment

The quantities of aggregate and bituminous material, determined as specified above, will be paid for at the respective contract unit prices.

Payment will constitute full compensation for all operations necessary to complete the work as specified herein.

1.1.3 Waybills and Delivery Tickets

Do not remove bituminous material from the tank car or storage tank until measurements of the remaining quantity have been taken. Submit waybills and delivery tickets during the progress of the work. Before the final statement is allowed, file certified waybills and delivery tickets for all materials used in the work covered by this section.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

Ref Id Ref Title

AASHTO M 140 Standard Specification for Emulsified Asphalt AASHTO M 208 Standard Specification for Cationic Emulsified Asphalt

AASHTO M 82(2018) Standard Specification for Cationic Emulsified Asphalt

NDDOT North Dakota Department of Transportation 2014 Standard Specifications for Road and Bridge Construction

NDDOT Section 401 Prime or Tack Coat and FOG Seal

Section 420 Bituminous seal coat

Section 816 Aggregates

Section 818.02E Bituminous Materials Cationic Emulsified Asphalt

U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)

MUTCD (2009) Manual on Uniform Traffic Control Devices

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal. Submit the following submittals to the Garrison Project Office:

SD-03 Product Data

Waybills and Delivery Tickets; G,GPO Equipment List; G,GPO Inspection Reports; G, GPO

SD-04 Samples

Bituminous Materials; G, GPO Aggregates; G, GPO Fog Seal; G, GPO

SD-06 Test Reports

Tests; G, GPO

1.4 EQUIPMENT, TOOLS, AND MACHINES

Equipment, plant and tools used in the work are subject to approval.

Maintain in a satisfactory working condition at all times. Provide equipment which is adequate and has the capability of producing the results specified. Provide calibrated equipment, such as asphalt distributors, scales, batching equipment, spreaders and similar equipment, that has been calibrated by an approved calibration laboratory within [12] months prior to commencing work, by such laboratory from the date of recalibration, during the term of the contract. Submit an equipment list with calibration reports.

1.4.1 Bituminous Distributors

Provide distributors that have pneumatic tires of sufficient size and number to prevent rutting, shoving, or otherwise damaging any part of the pavement structure. Use distributors that distribute the bituminous material in a uniform double or triple lap at the specified temperature, at readily determined and controlled rates from 0.05 to 2.0 gallons/square yard, with a pressure range of 25 to 75 psi with an allowable variation from the specified rate of not more than plus or minus 5 percent, and at variable widths. Include in the distributor equipment a separate power unit for the bitumen pump, full-circulation spray bars, tachometer, pressure gauges, volume-measuring devices, adequate heaters for heating of materials to the proper application temperature, a thermometer for reading the temperature of tank contents, and a hand-held hose attachment suitable for applying bituminous material manually to areas inaccessible to the distributor.

Equip the distributor to circulate and agitate the bituminous material during the heating process. Provide distributor with a horizontally and vertically adjustable spray nozzle bar. Make normal width of bar application at least 12 feet, with provisions for lesser or larger width when necessary. Equip distributor with a meter having a dial registering feet of travel/min and a meter that registers the application rate in gallons/square yard. Make both dials visible to the distributor driver.

Provide a thermometer and well, not in contact with any heating tubes, for accurately indicating temperature of asphalt emulsion.

1.4.2 Aggregate Spreader

Use aggregate-spreading equipment that is adjustable and capable of uniformly spreading aggregate at the specified rate in a single-pass operation over the surface to be sealed.

1.4.3 Pneumatic-Tired Roller

Provide a pneumatic-tired roller of sufficient size to seat the cover aggregate into the bituminous material without fracturing the aggregate particles. Use rollers that have a total compacting width of not less than 5 feet and a tire pressure of at least 50 psi. Use rollers that weigh at least 18,000 pounds.

1.4.4 Power Brooms and Power Blowers

Provide power brooms and power blowers suitable for cleaning surfaces to which the seal coat is to be applied].

1.4.5 Scales

Use scales of sufficient size and capacity to accommodate all trucks hauling aggregates in the job. Weigh materials on a certified scale.

Provide a scale operator to operate the scale, issue weigh tickets, perform scale verifications, and prepare tare weight reports and daily haul summaries. Provide scales that are:

a. Certified by a scale service company registered with the North Dakota Public Service Commission. If the certification is more than 9 months old when the scale begins project use, have the scale recertified. Submit a copy of the certification before starting weighing operations.

b. Accurate to within 1.0 percent of the true weight of the applied load throughout the range of use.

1.4.6 Weighhouse

Provide a weatherproof weighhouse, constructed in a manner that will afford adequate protection for the recording devices on the scales, of a suitable size with one sliding window facing the scales platform, one end window, and a desk-type area at least 2 feet wide by 6 feet long.

1.4.7 Storage Tanks

Provide tanks capable of heating the bituminous material, under effective and positive control at all times, to the required temperature. Accomplish heating by steam coils, hot oil, or electricity. Affix to the tank an armored thermometer with a range from 100 to 300 degrees F so that the temperature of the bituminous material may be read at all times.

1.4.8 Single-Pass, Surface-Treatment Machines

Provide machines capable of spraying bituminous material and spreading aggregate in one pass; of distributing the bituminous material uniformly, at even heat, and in controlled amounts; and immediately spreading aggregates uniformly, in controlled amounts, over the surface to be sealed.

1.4.9 Vacuum Sweepers

Provide self-propelled, vacuum pickup sweeper capable of removing loose sand, water, and debris from pavement surface.

1.5 QUALITY ASSURANCE

Perform sampling and testing using an approved commercial testing laboratory or facilities furnished by the Contractor. No work requiring testing will be permitted until the facilities have been inspected and approved. The first inspection will be at the expense of the Government.

Costs incurred for any subsequent inspection will be charged to the Contractor. Perform tests in sufficient numbers, and at the location and times directed, to ensure that the materials meet specified requirements.

1.5.1 Samples

Take aggregate samples for laboratory tests in accordance with ASTM D75/D75M.

Take samples of bituminous material in accordance with ASTM D140/D140M.

1.5.2 Aggregates Source

Select sources from which aggregates are to be obtained and notify the Contracting Officer within 15 days after the award of the Contract. Submit a 50 pound sample of each aggregate to be used. Perform tests for the evaluation of aggregates by using an approved commercial laboratory at no expense to the Government. Tests for determining the suitability of aggregate include, but are not limited to: gradation in accordance with ASTM C136/C136M, abrasion resistance in accordance with ASTM C131/C131M, clay lumps and friable particles in accordance with ASTM C142/C142M, unit weight and voids in accordance with ASTM C29/C29M, and flat and elongated particles in accordance with ASTM D4791.

1.5.3 Bituminous Material Source

Select sources from which bituminous materials are to be obtained and notify the Contracting Officer within 15 days after the award of the contract. From each source of supply, submit a one gallon sample of bituminous material.

1.5.4 Equipment Calibration

Furnish all equipment, materials and labor necessary to calibrate the bituminous distributor and the aggregate spreader. Perform all calibrations with the approved job materials and prior to applying the specified coatings to the prepared surface. Perform calibration of the bituminous distributor in accordance with ASTM D2995. Inspect all equipment prior to start of work and at regular intervals as needed during work.

1.6 DELIVERY, STORAGE, AND HANDLING

Deliver asphalt materials to the site in a homogenous and undamaged condition. Inspect the materials for contamination and damage. Unload and store the materials with a minimum of handling. Protect stored aggregate from contamination and segregation. Replace defective or damaged materials.

1.7 ENVIRONMENTAL REQUIREMENTS

Apply the coating when the existing surface is dry, and when the weather is not foggy, rainy, or when the wind velocity will prevent the uniform application of the bitumen or aggregates. [Apply the bituminous seal coat only when the atmospheric temperature is above 60 degrees F in the shade and when the pavement surface temperature is above 60 degrees F, unless otherwise directed.] [Apply fog seal when atmospheric temperature is above 50 degrees F and rising or when pavement temperature is above 60 degrees F, unless otherwise directed.]

PART 2 PRODUCTS

2.1 BITUMINOUS MATERIAL FOR SEAL COAT

Use bituminous material conforming to AASHTO M 208.

2.2 AGGREGATE FOR SEAL COAT

ND DOT section 816.03 AGGREGATES FOR BLOTTER AND SEAL COATS Supply aggregate that meets the requirements of Table 816-02. Provide aggregate consisting of crushed stone, crushed gravel, sand, mineral filler or screenings. The moisture content of the aggregate shall be between 1% and

3%.

ND DOT Specifications Table 816-02 Aggregates for Blotter and Seal coats

AGGREGATE Class (Percent by Weight Passing Square-Mesh Sieves)

Sieve Size Class 41 Class 41M

3/8 in 100 100

No. 4 20-70 20-70

No. 8 0-17 0-17

No. 200 0-1.5 0-1.5

ND T 113,

Shale (max%)

8% 8%

AASHTO T 96,

L.A.

40% 40%

ND DOT 4

Fractured faces 1

50%

1. Minimum weight percentage allowable for the portion of the aggregate retained on a No. 4 sieve having at least 1 fractured face for Class 41M.

2.2.1 Coarse Aggregate

Use coarse aggregate consisting of clean, sound, durable particles meeting the following requirements.

2.2.1.1 Film Retention

Use aggregate that exhibits not less than 95 percent retention of bituminous film(ASTM D3625/D3625M.

2.2.2 Fine Aggregate

Use fine aggregate consisting of clean, sound, durable particles of crushed stone, slag, or crushed gravel.

2.3 EMULSIFIED ASPHALT FOR FOG SEAL

Use emulsified asphalt for Fog Seal conforming to ASTM D977,for anionic and ASTM D2397/D2397M CSS-1h for cationic materials.

2.4 WATER

Provide fresh, clean, and potable water.

PART 3 EXECUTION

3.1 PREPARATION OF SURFACE

Repair damaged surface and fill cracks before starting work. Immediately before starting work, remove all loose material, dirt, clay, or other objectionable material from the surface to be treated with power brooms or power blowers, if needed. Paint firmly bonded to the surface may remain.

Do not mix material removed from the surface with the cover aggregate.

When necessary to achieve a clean surface for fog application, flushing with water will be permitted.

3.2 SEAL COAT APPLICATION

3.2.1 Rate

Spread the bituminous material in the quantities shown in TABLE III. The exact quantities within the range specified, which may be varied to suit field conditions, will be determined by the Contractor and approved by the Contracting Officer prior to use. The bituminous quantities may have to be increased when the pavement has rough surface texture and may have to be decreased when the pavement surface is very tight.

TABLE III. APPLICATION OF MATERIAL

(Quantities Per Square YardMeter)

Gradation No.Class Bitumen, gallons Aggregate, pounds

41 0.15-0.240 15-250

3.2.2 Temperature

Apply asphalt at a temperature that will provide an application viscosity between 10 and 60 seconds, Saybolt Furol, or between 20 and 120 centistokes, kinematic. Furnish the temperature/viscosity relationship to the Contracting Officer.

3.2.3 Application of Bituminous Material

Following the preparation and inspection of the pavement surface, apply the seal coat material at the specified application rates. Uniformly apply the bituminous material in a single pass of the distributor and with either a double or triple lap spray over the surface to be sealed. Apply bitumen to a dry surface with a minimum pavement temperature of 70 degrees Fahrenheit. Spread building paper on the surface for a sufficient distance back from the ends of each application so that flow through the spray bar may be started and stopped on the paper and so that all sprays will be operating at the proper pressure on the surface to be sealed. Immediately after the bituminous material application, remove the building paper.

Apply bituminous material to all areas missed with the distributor. No smoking, fires, or flames, other than the heaters that are a part of the equipment, will be permitted within 25 feet of heating, distributing, and transferring operations of bituminous material other than bituminous emulsions.

3.2.4 Aggregate Application Rate

Spread the aggregate in the quantities shown in TABLE III. The exact quantities within the range specified, which may be varied to suit field conditions, will be determined by the Contractor, and approved by the Contracting Officer prior to use. The aggregate weights shown in this table are those of aggregate having a specific gravity of 2.65. If the specific gravity of the aggregate to be used is less than 2.55 or greater than 2.75, make adjustments in the number of pounds of aggregate required per square yard to insure a constant volume of aggregate per square yard of treatment.

3.2.5 Application of Aggregate

Spread the specified quantity of cover aggregate uniformly over the bituminous material. Provide sufficient aggregate on trucks at the work site to cover the distributor load of bituminous material before the bituminous material is applied. No bituminous material may be down more than 3 to 4 minutes before it is covered with aggregate. Uniformly spread aggregate with aggregate-spreading equipment. Lightly recover areas having insufficient cover with additional aggregate by hand during the operations whenever necessary.

3.2.6 Rolling and Brooming

Begin rolling operations immediately following the application of cover aggregate. Perform rolling using pneumatic-tired rollers. Operate the rollers at a speed that will not displace the aggregate. Continue rolling until the aggregate is uniformly distributed and keyed into the bituminous material. Sweep off the surface and remove all surplus aggregate not less than 24 hours nor more than 4 days after rolling is completed. Immediately prior to opening to traffic, roll the entire treated area with a self-propelled pneumatic-tired roller.

3.3 FIELD QUALITY CONTROL - SEAL COAT

3.3.1 Tests

Perform field tests in sufficient numbers to assure that the specifications are being met. Submit copies of the test results, within 24 hours of the completion of the test. Submit certified copies of the aggregate test results, not less than 15 days before the material is required in the work and certified copies of the bituminous materials test reports indicating compliance with applicable specified requirements, not less than 15 days before the material is required in the work. Provide a copy of the calibration test results before the bituminous distributor and aggregate spreader are used on the job. Testing is the responsibility of the Contractor. Perform test using an approved commercial laboratory. The following number of tests, if performed at the appropriate time, will be the minimum acceptable for each type of operation.

3.3.1.1 Gradation

Perform gradation tests in accordance with ASTM C136/C136M. Perform a minimum of three gradations for each day's run. Repeat the gradation test when the source of materials is changed. When deficiencies are found, retest the material already placed to determine the extent of the unacceptable material. Replace all in-place unacceptable material at no additional expense to the Government.

3.3.1.2 Abrasion Resistance

Perform abrasion resistance tests in accordance with ND T 96. Perform one test prior to start of work. If sources of aggregate are changed, conduct an abrasion resistance test prior to using another source.

3.3.1.3 Stripping

Perform stripping test on aggregate from each source, in accordance with ASTM D3625/D3625M, prior to incorporation into the work and when the source is changed.

3.3.2 Bituminous Material Sample

Obtain a sample of the bituminous material used under the supervision of the Contracting Officer. The sample will be retained by the Government.

3.4 TRIAL APPLICATION - SEAL COAT

Prior to applying the seal coat, place a test section at least 100 feet long by 20 feet wide using the approved job materials and roll them in accordance with the specified requirements. Perform tests to determine the application rates of the bitumen and aggregate. If the tests indicate that the seal coat test section does not conform to the specification requirements, make necessary adjustments to the application equipment and to the spreading and rolling procedures, and construct additional test sections for conformance to the specifications. Where test sections do not conform to specification requirements, remove seal coat at no expense to the Government; no separate payment will be made for seal coat materials and labor, either in placement or removal of any test section. Perform quality control sampling and testing during construction as required in paragraph FIELD QUALITY CONTROL above.

3.5 FOG SEAL APPLICATION

3.5.1 Sample Application

Determine the required application rate from a sample installation. Select an area of the prepared pavement at least 300 feet long and as wide as the distributor spray bar. Dilute emulsified asphalt with an equal part of water or as agreed to by the Contracting Officer. Apply the water diluted asphalt emulsion in at least three test sections; each a minimum of 100 feet long. Make trial applications at residual rates of 0.058, 0.14, and

0.20 gallons/square yard. The trial application rates may be modified if approved by the Contracting Officer. Additional trial applications may be made if warranted by pavement surface conditions. Use the rate which has been satisfactorily applied without leaving an excess of asphalt residue on the surface and has been approved, for the fog seal.

3.5.2 Application Inspection

Inspect application of fog seal for uniformity. During application, take one sample for each 500 square yards of surface area to receive emulsified asphalt. Weigh samples to determine conformance with application rate.

3.5.3 Inspection Reports

Furnish a written report citing climatic temperature during application of fog seal, emulsion temperature during application, rate of emulsion application, and any significant observations.

3.5.4 Application

Following preparation of the surface, apply the water diluted asphalt emulsion at the rate determined from the trial application. Maintain application temperature of emulsified asphalt between 75 and 160 degrees F.

To obtain uniform application of the fog seal at the junction of previous and subsequent applications, spread building paper on the surface of the applied material for a sufficient distance back from the ends of each application so that flow from the spray bar may be started and stopped on the paper, and so that all sprayers will operate at full force.

Immediately after application, remove and properly dispose of the building paper. Treat spots unavoidably missed with the hand spray equipment. Base bids on application of diluted emulsion at 0.0514 gsy. If the actual amount required is more or less than 0.14 gsy, an adjustment in the contract price will be made as provided by the contract.

3.6 SITE PROTECTION

During applications, protect adjacent buildings, structures, vehicles, manhole covers, inlet grates, and trees to prevent being spattered or marred.

3.7 TRAFFIC CONTROL

Protect freshly placed coatings from damage by traffic. Provide sufficient warning signs and barricades to prevent traffic over freshly treated surfaces. Protect treated areas from traffic for at least 24 hours after final application of coatings, or for such time as necessary to prevent picking up. Provide warning signs and barricades for proper traffic control, in accordance with MUTCD.

-- End of Section --

SECTION 32 17 23

PAVEMENT MARKINGS

08/16

1.1 UNIT PRICES

1.1.1 Measurement

1.1.1.1 Pavement Striping and Markings

The unit of measurement for pavement markings is the number of lineal feet of reflective striping or markings actually completed and accepted by the Contracting Officer.

1.1.2 Payment

The quantities of surface preparation, pavement striping or markings, raised pavement markers, and removal of pavement markings determined as specified in paragraph Measurement, will be paid for at the contract unit price. The payment constitutes full compensation for furnishing all labor, materials, tools, equipment, appliances, and doing all work involved in preparing and marking the pavements as shown on the drawings. Remove and replace any striping or markings which required reflective media, but are placed without it, do not meet the stated minimum retro-reflective requirements, or with other defects, at no cost to the Government. Remove and replace striping or markings which do not conform to the required physical characteristics, alignment or location required at no cost to the Government.

1.2 REFERENCES

extent referenced. The publications are referred to in the text by the

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION (NDDOT)

2014 NDDOT (2014) Standard Specification for Road and Bridge Construction

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FS TT-P-1952 (2015; Rev F) Paint, Traffic and Airfield Markings, Waterborne

1.3 SUBMITTALS

submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following submittals to the Garrison Project Office:

Equipment List; G, GPO

Qualifications; G, GPO

1.4 QUALITY ASSURANCE

1.4.1 Qualifications

Submit documentation certifying that pertinent personnel are qualified for equipment operation and handling of applicable chemicals.

1.5 DELIVERY AND STORAGE

Deliver paint materials, and reflective media in original sealed containers that plainly show the designated name, specification number, batch number, color, date of manufacture, manufacturer's directions, and name of manufacturer.

1.6 Environmental Requirements

1.6.1 Pavement surface must be free of snow, ice, or slush; with a surface temperature of at least 40 degrees F and rising at the beginning of operations, except those involving shot or sand blasting or grinding.

Cease operation during thunderstorms, or during rainfall, except for waterblasting and removal of previously applied chemicals. Cease waterblasting where surface water accumulation alters the effectiveness of material removal.

1.6.2 Traffic Controls

Place warning signs conforming to MUTCD near the beginning of the worksite and well ahead of the worksite for alerting approaching traffic from both directions. Place small markers along newly painted lines to control traffic and prevent damage to newly painted surfaces. Mark painting equipment with large warning signs indicating slow-moving painting equipment in operation.

When traffic must be rerouted or controlled to accomplish the work, provide necessary warning signs, flag persons, and related equipment for the safe passage of vehicles.

PART 2 PRODUCTs

2.1 Paint

The paint shall be homogeneous, easily stirred to smooth consistency, and shall show no hard settlement or other objectionable characteristics during a storage period of 6 months. Paints for roads, parking areas, and streets shall conform to FS TT-P-1952, color as indicated. Pavement marking paints shall comply with applicable state andlocal laws enacted to ensure compliance with Federal Clean Air Standards. Paint materials shall conform to the restrictions of the local Air Pollution Control District. The paint shall be in conformance with 2014 NDDOT Sections 880.

2.2 Reflective Media

Reflective media for roads and streets shall conform to 2014 NDDOT Section 880.01P

Use glass beads for pavement marking that meet AASHTO M 247, Type I except use beads that have a minimum of 80 percent true spheres.

3.1 SURFACE PREPERATION

Thoroughly clean surfaces to be marked before application of the pavement marking material. Dust, dirt, and other granular surface deposits shall be removed by sweeping, blowing with compressed air, rinsing with water or a combination of these methods as required.

3.2 APPLICATION

Apply pavement markings to dry pavements only. All pavement markings shall be placed as shown on the plans.

3.2.1 Paint

Paint application shall follow 2014 NDDOT Section 880.

3.2.1.1 RATE OF APPLICATION

Apply paint at a rate so that 1 gallon of paint will cover a 4 inch wide stripe for a length of 260 to 300 feet.

Uniformly distribute glass beads over the wet paint stripe at a rate of at least 6 pounds per gallon of paint. Apply beads using an automatic pressure dispenser. Application of reflective media shall immediately follow application of pigmented binder.

Should there be malfunction of either paint applicator or reflective media dispenser, operations shall be discontinued immediately until deficiency is corrected.

3.2.1.2 DRYING

The maximum drying time requirements of the paint specifications will be strictly enforced to prevent undue softening of bitumen, and pickup, displacement, or discoloration by tires of traffic. If there is a delay in drying of the markings, painting operations shall be discontinued until cause of the slow drying is determined and corrected.

3.3

3.3.1 Cleanup and Waste Disposal

Keep the worksite clean and free of debris and waste from the application operations. Dispose of debris at approved sites.

3.4 FIELD QUALITY CONTROL

3.4.1 Sampling and Testing

3.4.2 Material Inspection

Examine material at the job site to determine that it is the material referenced in the report of test results or certificate of compliance. A certificate of compliance shall be accompanied by test results substantiating conformance to the specified requirements.

3.4.3 Dimensional Tolerances

Apply all markings in the standard dimensions provided in the drawings.

New markings may deviate a maximum of 10 percent larger than the standard dimension. The maximum deviation allowed when painting over an old marking is up to 20 percent larger than the standard dimensions.

SECTION 34 71 13.16

VEHICLE CRASH BARRIERS

02/15

1.1 REFERENCES

extent referenced. The publications are referred to within the text by the

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO M 30 (2002; R 2010) Standard Specification for Zinc-Coated Steel Wire Rope and Fittings for Highway Guardrail

AASHTO MASH (2016) Manual for Assessing Safety Hardware - Second Edition

ASTM INTERNATIONAL (ASTM)

ASTM A123/A123M (2015) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A153/A153M (2016) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A307 (2014; E 2017) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength

ASTM A449 (2014) Standard Specification for Hex Cap Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use

ASTM A563 (2015) Standard Specification for Carbon and Alloy Steel Nuts

ASTM C94/C94M (2017a) Standard Specification for Ready-Mixed Concrete

ASTM F3125/F3125M (2015a) Standard Specification for High Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi (830 MPa) and 150 ksi (1040 MPa) Minimum Tensile Strength, Inch and Metric Dimensions

NDDOT North Dakota Department of Transportation 2014 Standard Specifications (NDDOT)

NDDOT SECTION 764 GUARDRAIL AND ATTENUATION

DEVICES

NDDOT SECTION 862 GUARDRAILS AND POSTS

NDDOT SECTION 862.04 TREATED WOOD GUARDRAIL

POSTS

1.2 SUBMITTALS

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following submittals to the Garrison Project Office:

FHWA Acceptance Letter

SD-08 Manufacturer's Instructions

PART 2 PRODUCTS

2.1 GUARDRAIL POSTS

Guardrail posts must be wood of the dimensions indicated.

2.1.1 Sawn Wood Posts and Offset Blocks

Except as otherwise specified herein, provide wood posts and offset blocks as specified in NDDOT Section 862.04. Posts and offset blocks must be of stress grade and capable of resisting a working stress of 1600 psi on the extreme fibers when subjected to bending. Posts and blocks must be double end trimmed with the mounting bolt hole in each being drilled 1/16 inch oversize and within 1/2 inch of the specified location on either side of the post or block. All wood posts and offset blocks must be rough, free of wane, squarecut, and fully sawn to the dimensions indicated. Drill post bolt holes before preservative treatment is applied. Unless otherwise approved, use only one preservative on the project.

2.2 CABLE BARRIER

2.2.1 Cable

Provide 3/4 inch, Type I, Class A coating in accordance with AASHTO M 30.

2.2.2 Cable Splices, Ends, Fittings

Design cable splices and ends capable of developing the full breaking strength of the cable (25,000 lbs). Cable ends must be cast steel or malleable iron. Cable wedges must be malleable iron and not be galvanized. Conform cast steel fittings to ASTM A27/A27M, grade 70-36.

Conform maleable iron fittings to ASTM A47/A47M. Galvanize cable splices, ends, and fittings in accordance with ASTM A123/A123M.

2.2.3 Compensating Device

Provide compensating devices with a spring rate of 450 lbs plus or minus 50 lbs per inch and a minimum total available travel of 6 inches. Galvanize all parts in accordance with ASTM A153/A153M.

2.2.4 Hook Bolts

Provide hook bolts conforming to ASTM A307 Grade A with a tensile strength of 60 ksi and a yield strength of 36 ksi. Provide corrosion-resistant bolts manufactured from ASTM F3125/F3125M Type 3 material, with a tensile strength of 120 ksi and a yield strength of 92 ksi. Hook bolts must develop an ultimate pull open strength, applied in a direction normal to the longitudinal axis of the post, from 500 to 1000 pounds. Use galvanized nuts conforming to ASTM A563 Grade A. Use corrosion-resistant nuts conforming to ASTM A563 Grade C3. Finish galvanized bolts and nuts according to ASTM A153/A153M for Class C or ASTM B695 for Class 50. If galvanized, overlap the threads as specified in ASTM A563.

2.2.5 Anchor Assembly

Provide steel cable anchor brackets conforming to ASTM A709/A709M Grade 36 or ASTM A36/A36M. Provide anchor posts and anchor post plates conforming to ASTM A36/A36M. Galvanize cable anchor brackets, anchor posts, and anchor post plates after fabrication in accordance with ASTM A123/A123M.

Provide steel [rods] [hook or J bolts] conforming to ASTM A449 or ASTM A568/A568M and galvanize the top 6 inches in accordance with ASTM A123/A123M. Provide hex nuts conforming to ASTM A563.

2.2.6 Concrete

ASTM C94/C94M, using 3/4 inch maximum aggregate, and having minimum compressive strength of 4000 psi at 28 days. Reinforcing steel must be deformed bars conforming to ASTM A615/A615M, ASTM A706/A706M, or ASTM A1035/A1035M grade 40.

3.1 POSTS

Posts may be placed by driving or by setting in excavated holes. Post holes for guardrail posts must be round and at least 4 inches larger, in diameter, than the greater dimensions (not the diagonal) of the posts, and must be backfilled around the posts with material removed or other suitable soil, placed in lifts not exceeding 4 inches, each lift thoroughly tamped.

When placed by driving, drive the posts plumb, to the depth and in the position indicated. Remove posts which are broomed, split or damaged in any other way and replace with a sound post. Carry on driving operations in such manner that nearby structures, shoulders, or pavements are not damaged. Cuts and abrasions in preservative-treated posts and blocks must have the newly exposed surfaces treated with at least three applications of the same type of preservative with which the material was originally treated. Each application must be reasonably dry before the succeeding coat is applied. At the time a timber post is installed, any seasoning check which extends the full length of the piece cannot exceed 1/4 inch in width. Adjust posts used for vertical transition in length so that a minimum of 60 inches will be buried. Where guardrail cross buried structures and 60 inches of bury is not obtainable, install the guardrail post as deep as possible and with a 24 inch diameter concrete encasement for the full depth of bury.

3.2 THREE CABLE GUARDRAIL

3.2.1 Posts

Set all posts plumb and firm and spaced as indicated.

3.2.2 Cable Splices, Compensating Devices and Turnbuckle Cable End Assemblies

Stagger cable splices. Provide a minimum of 20 feet between any pair.

Provide a minimum of 100 feet between cable splices on the same cable. For length of cable runs up to 1000 feet, use a compensating device on one end and a turnbuckle on the other end of each individual cable. For length of cable runs from 1000 feet to 2000 feet, use a compensating device on the ends of each individual cable. For length of cable runs over 2000 feet, start a new stretch by interlacing at the last parallel post.

3.2.3 Pretension of Cable

Install and tension the cable barrier as follows:

a. Properly seat the spring in the compensator device and permanently mark the unloaded spring position on the compensator rod.

b. Install spring end assemblies at one end of the barrier and secure to the anchor.

c. With cable strung through the hook bolts, introduce tension into the cable at the opposite end of the barrier to compress the installed springs approximately 3.5 inches.

d. Clamp this tension in the cable while the end assemblies are installed at the second anchor.

e. Remove the slack between the clamp point and the second anchor by taking up the turnbuckle. If springs are also used at this end, compress them approximately 3.5 inches.

f. After two weeks at this setting, reset the spring compression as indicated based on the temperature at the time of adjustment.

ENG FORM 4025, MAY 2017 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2

U.S. Army Corps of Engineers (USACE)

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.

DATE TRANSMITTAL NO.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

TO:

PROJECT TITLE AND LOCATIONSPECIFICATION SEC. NO. (Cover only one section with each transmittal)

FROM: CONTRACT NO. CHECK ONE:

THIS TRANSMITTAL IS FOR: (Check one)

THIS IS A NEW TRANSMITTAL

THIS IS A RESUBMITTAL OF

TRANSMITTAL

FIO GA DA CR DA/CR DA/GA

ITEM

NO.

(See

Note 3)

USACE

ACTION

CODE

(Note 9)

SUBMITTAL

TYPE CODE

(See Note 8)

OF

COPIES

SPEC.

PARA. NO.

DRAWING

SHEET NO.

CONTRACTOR

REVIEW

VARIATION

Enter "Y" if requesting a variation

(See Note 6)

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.)

a. i.c. d. e. f. g. h.b.

CONTRACT DOCUMENT

REFERENCE

REMARKS

SECTION II - APPROVAL ACTION

I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.

NAME OF CONTRACTOR SIGNATURE OF CONTRACTOR

NAME AND TITLE OF APPROVING AUTHORITY SIGNATURE OF APPROVING AUTHORITY DATEENCLOSURES RETURNED (List by item No.)

ENG FORM 4025, MAY 2017 Page 2 of 2

INSTRUCTIONS

1. Section I will be initiated by the Contractor in the required number of copies.

2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.

3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.

4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.

5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.

6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.

7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.

8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.

Submittal types are the following:

SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports

SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout

9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal

Action Codes in column i of Section I. The Submittal Action Codes are:

A -- Approved as submitted.

B -- Approved, except as noted on drawings. Resubmission not required.

C -- Approved, except as noted on drawings. Refer to attached comments.

Resubmission required.

D -- Will be returned by separate correspondence.

E -- Disapproved. Refer to attached comments.

10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.

F -- Receipt acknowledged.

X -- Receipt acknowledged, does not comply with contract requirements, as noted.

G -- Other action required (Specify)

K -- Government concurs with intermediate design. (For D-B contracts)

R -- Design submittal is acceptable for release for construction. (For D-B contracts)

ENG FORM 4025, MAY 2017

PREVIOUS EDITIONS ARE OBSOLETE.

Page of

ENG FORM 4025, MAY 2017

Page of

U.S. Army Corps of Engineers (USACE)

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

CHECK ONE:

THIS TRANSMITTAL IS FOR: (Check one)

ITEM

NO.

(See

Note 3)

USACE

ACTION

(Note 9)

SUBMITTAL

TYPE CODE

(See Note 8)

NO.

OF

COPIES

SPEC.

PARA. NO.

DRAWING

SHEET NO.

CONTRACTOR

REVIEW

VARIATION

Enter "Y" if requesting a variation

(See Note 6)

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.)

a.

i.

c.

d.

e.

f.

g.

h.

b.

CONTRACT DOCUMENT

REFERENCE

SECTION II - APPROVAL ACTION

I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.

INSTRUCTIONS

1. Section I will be initiated by the Contractor in the required number of copies.

2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.

3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.

4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.

5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.

6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.

7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.

8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.

Submittal types are the following:

SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports

SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout

9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal

Action Codes in column i of Section I. The Submittal Action Codes are:

A -- Approved as submitted. B -- Approved, except as noted on drawings. Resubmission not required. C -- Approved, except as noted on drawings. Refer to attached comments. Resubmission required. D -- Will be returned by separate correspondence. E -- Disapproved. Refer to attached comments.

10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.

F -- Receipt acknowledged.

X -- Receipt acknowledged, does not comply with contract requirements, as noted.

G -- Other action required (Specify)

K -- Government concurs with intermediate design. (For D-B contracts)

R -- Design submittal is acceptable for release for construction. (For D-B contracts)

1.0 darwin.chen@usace.army.mil

2017-05-24

Forms Design Team

Darwin Chen

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

2017-05-24

PrintButton1:

saveas:

EmailSubmitButton1:

CurrentPage:

PageCount:

No1_DateTime:

No2_Transmittal:

No3_To:

No8_Pro_Title:

No7_Specification:

No4_From:

No5_Cont_No:

No6a_CheckBox: 0

No6b_CheckBox: 0

No6_Transmittal:

No9a_CheckBox: 0

No9b_CheckBox: 0

No9c_CheckBox: 0

No9d_CheckBox: 0

No9e_CheckBox: 0

No9f_CheckBox: 0

ITEM NO. (See Note 3):

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.):

SUBMITTAL TYPE CODE (See Note 8):

NO. OF COPIES:

SPEC. PARA. NO.:

DRAWING SHEET NO. :

CONTRACTOR REVIEW CODE

VARIATION Enter "Y" if requesting a variation (See Note 6):

USACE ACTION CODE (Note 9) :

Remarks:

Contractor_Name:

Contractor_Signature:

Authority_Name:

Authority_Signature:

Authority_DateTime:

Enclosures:

ENG FORM 4288-R, JAN 1997 EDITION OF MAR 95 IS OBSOLETE. PAGE OF PAGES (Proponent: CEMP-CE) PE v1.00

SUBMITTAL REGISTER

(ER 415 1-10 )

CONTRACT NO.

SPECIFICATION SECTIONTITLE AND LOCATION CONTRACTOR

A C T I V I T Y

N O a.

TRANS-

MITTAL

b.

D

T f.

M

N U A L S o.

R E C O R n.

M P L m.

R T I F I C A T E l.

P O R k.

A T E M E N T j.

H E D U L E i.

I

S T R U C T I O h.

A W I N G g.

V A E P R P N R M O E V N E T D q

F O M A T O I N O L N Y p.

DESCRIPTION OF

ITEM SUBMITTED

c.

SPECIFICATION

PARAGRAPH

NUMBER

d.

TYPE OF SUBMITTAL CLASSI-

FICATION

V I E W r.

SCHEDULE DATES

SUBMIT

s.

MATER-

IAL

NEEDED

BY

u.

DATE

w.

TO

GOVERN-

MENT

x.

v.

APPROVAL

t.

GOVERNMENT

aa.

y.

z.

ENG FORM 4288-R, JAN 1997

EDITION OF MAR 95 IS OBSOLETE. PAGE OF PAGES

(Proponent: CEMP-CE)

PE v1.00

SUBMITTAL REGISTER

(ER 415 1-10 )

A

C

T

I

V

I

Y a.

TRANS-

MITTAL

b.

A f.

N

U

A

L o.

E

C

O

R n.

A

M

P

L m.

E

R

T

I

F

I

C

A

T l.

E

P

O

R k.

T

A

T

E

M

E

N j.

C

H

E

D

U

L i.

N

S

T

R

U

C

T

I

O h.

R

A

W

I

N g.

O

V A

E P

R P

N R

M O

E V

N E

T D q

N

F

O

M

A

T O

I N

O L

N Y p.

DESCRIPTION OF

ITEM SUBMITTED

SPECIFICATION

PARAGRAPH

NUMBER

d.

T

TYPE OF SUBMITTAL

CLASSI-

FICATION

R

E

V

I

E

W r.

SCHEDULE DATES

CONTRACTOR

s.

MATER-

IAL

u.

w.

TO

GOVERN-

MENT

x.

O v.

APPROVAL

t.

GOVERNMENT

aa.

O y.

z.

1.0

09-27-2010

Forms Design

SUBMITTAL REGISTER

Darwin Chen

ENG FORM 4288-R

415-503-6946

10-06-2010

TextField1:

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

CheckBox1: 0

TextField2:

TextField82:

TextField62:

TextField102:

TextField3:

TextField4:

DateTimeField1:

TextField35:

TextField93:

TextField73:

TextField113:

TextField36:

TextField37:

TextField38:

TextField94:

TextField74:

TextField114:

TextField39:

TextField40:

TextField41:

TextField95:

TextField75:

TextField115:

TextField42:

TextField43:

TextField44:

TextField96:

TextField76:

TextField116:

TextField45:

TextField46:

TextField47:

TextField97:

TextField77:

TextField117:

TextField48:

TextField49:

TextField50:

TextField98:

TextField78:

TextField118:

TextField51:

TextField52:

TextField53:

TextField99:

TextField79:

TextField119:

TextField54:

TextField55:

TextField56:

TextField100:

TextField80:

TextField120:

TextField57:

TextField58:

TextField59:

TextField101:

TextField81:

TextField121:

TextField60:

TextField61:

TextField5:

TextField83:

TextField63:

TextField103:

TextField6:

TextField7:

TextField8:

TextField84:

TextField64:

TextField104:

TextField9:

TextField10:

TextField11:

TextField85:

TextField65:

TextField105:

TextField12:

TextField13:

TextField14:

TextField86:

TextField66:

TextField106:

TextField15:

TextField16:

TextField17:

TextField87:

TextFiel…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .