W9128F20Q0022 Refuse Collection at Ft. Peck Dam, MT.PDF

PDF 1 MB Posted

Attached to
Fort Peck Refuse Removal Federal contract opportunity
Solicitation number
W9128F20Q0022
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

View the file

Other files for this federal contract opportunity

Other files attached to Fort Peck Refuse Removal, newest first.
File Type Posted
W9128F20Q0022 Amd 01 Refuse Collection at Ft. Peck Dam, MT.PDF PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9128F20Q0022 05-Mar-2020

b. TELEPHONE NUMBER

402-995-2086

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 17 Mar 2020

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9128F9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

CLINTON E RUSSELL

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 968609 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

COE FT PECK PROJECT OFFICE

STACY BRAATEN

USAED OMAHACENWO-OD-FP

301 EAST KANSAS STREET

FORT PECK MT 59223-0208

TEL: (406) 526-3411 EXT 4270 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$41,500,000

NAICS:

562111

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF51

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W9128F20Q0022

Section SF 1449 - CONTINUATION SHEET

BID SHEETS

PRICE SHEET FOR REFUSE CONTRACT, BASE PERIOD 1 APR 2020 - 31 MAR 2021

Example Line: # of Cans x # of Pickups x Price per pickup = Total (3 lg x 75 pickups x $5 = $1125)

LINE

ITEM

# CANS AREA NAME MONTHS # OF PRICE

PER

TOTAL

COLLECTED PICKUPS PICKUP

1 2 Large Ad Building 12 78

1 2 Large Powerhouse 12 78

1 1 Large Interpretive Center 12 78

2 1 Large Flat Lake Boat Ramp 5 43

2 1 Large Flat Lake Fishing Pond 5 43

2 1 Small Lewis & Clark Overlook 6 43

* 3 2 Large 1st Dredge Beach 5 39

* 3 2 Large 2nd Dredge Beach 5 39

* 3 1 Large 3rd Dredge Beach 5 39

4 10 Large Downstream Campground 6 48

# 4 2 Large Downstream Group Site 5 35

5 4 Large Kiwanis Park 5 43

5 2 Small Kiwanis Park Picnic Area 5 43

5 2 Large Kiwanis Dump Station 5 43

6 2 Large Roundhouse Point 5 43

6 1 Small Park Grove Pier 5 43

7 1 Small Winter Harbor 5 43

7 1 Large Flood Plain Camping Area 5 43

7 1 Small Flood Plain Boat Ramp 5 43

8 2 Large West End Shelter #1 5 43

8 1 Small West End Shelter #2 5 43

8 1 Large West End Shelter #3 5 43

8 1 Large West End Shelter #4 5 43

8 1 Large West End Shelter #4 5 43

8 1 Large Fish Cleaning 5 43

** 9 2 Large West End Campground 5 31

10 36 Large Holidays & Governor's Cup 4

10 7 Small Holidays & Governor's Cup 4

TOTAL BASE PERIOD ________________________________

*Scheduled pickups are Monday May 18 through Thursday September 24 for line items marked with *.

**Scheduled pickups are Monday May 25 through Tuesday, September 8 for line items marked with **.

# Scheduled pickups are Monday May 18 through Monday September 14 for line items marked #.

PRICE SHEET FOR REFUSE CONTRACT, OPTION PERIOD 1, 1 APR 2021 - 31 MAR 2022

CANS

AREA NAME MONTHS # OF PRICE

PER

TOTAL

COLLECTED PICKUPS PICKUP

1 2 Large Ad Building 12 77

1 2 Large Powerhouse 12 77

1 1 Large Maintenance 12 77

2 1 Large Interpretive Center 12 77

2 1 Large Flat Lake Boat Ramp 5 43

2 1 Large Flat Lake Fishing Pond 5 43

* 3 1 Small Lewis & Clark Overlook 5 43

* 3 2 Large 1st Dredge Beach 5 36

* 3 2 Large 2nd Dredge Beach 5 36

4 1 Large 3rd Dredge Beach 5 36

# 4 10 Large Downstream Campground 6 47

5 2 Large Downstream Group Site 5 31

5 4 Large Kiwanis Park 5 43

5 2 Small Kiwanis Park Picnic Area 5 43

6 2 Large Kiwanis Dump Station 5 43

7 2 Large Roundhouse Point 5 43

7 1 Small Winter Harbor 5 43

7 1 Large Flood Plain Camping Area 5 43

8 1 Small Flood Plain Boat Ramp 5 43

8 2 Large West End Shelter #1 6 43

8 1 Small West End Shelter #2 5 43

8 1 Large West End Shelter #3 5 43

8 1 Large West End Shelter #4 5 43

8 1 Large West End Shelter #4 5 43

** 9 1 Large Fish Cleaning 5 43

2 Large West End Campground 5 27

36 Large Holidays & Governor's Cup 4

7 Small Holidays & Governor's Cup 4

TOTAL PRICE OPTION 1 _______________________________

*Scheduled pickups are Monday May 24 through Thursday September 30 for line items marked with *.

**Scheduled pickups are Tuesday June 1 Tuesday, September 7 for line items marked with **.

# Scheduled pickups are Monday May 24 through Monday September 13 for line items marked #.

PRICE SHEET FOR REFUSE CONTRACT, OPTION PERIOD 2, 1 APR 2022 - 31 MAR 2023

# CANS AREA NAME MONTHS # OF PRICE

PER

TOTAL

COLLECTED PICKUPS PICKUP

1 2 Large Ad Building 12 79

1 2 Large Powerhouse 12 79

1 1 Large Interpretive Center 12 79

2 1 Large Flat Lake Boat Ramp 5 44

2 1 Large Flat Lake Fishing Pond 5 44

2 1 Small Lewis & Clark Overlook 6 44

* 3 2 Large 1st Dredge Beach 5 38

* 3 2 Large 2nd Dredge Beach 5 38

* 3 1 Large 3rd Dredge Beach 5 38

4 10 Large Downstream Campground 6 48

# 4 2 Large Downstream Group Site 5 33

5 4 Large Kiwanis Park 5 44

5 2 Small Kiwanis Park Picnic Area 5 44

5 2 Large Kiwanis Dump Station 5 44

6 2 Large Roundhouse Point 5 44

6 1 small Park Grove Pier 5 44

7 1 Small Winter Harbor 5 44

7 1 Large Flood Plain Camping Area 5 44

7 1 Small Flood Plain Boat Ramp 5 44

8 2 Large West End Shelter #1 5 44

8 1 Small West End Shelter #2 5 44

8 1 Large West End Shelter #3 5 44

8 1 Large West End Shelter #4 5 44

8 1 Large West End Shelter #4 5 44

8 1 Large Fish Cleaning 5 44

** 9 2 Large West End Campground 5 29

TOTAL PRICE OPTION 2 ______________________________

*Scheduled pickups are Monday May 23 through Thursday September 29 for line items marked with *.

**Scheduled pickups are Monday May 30 through Tuesday, September 6 for line items marked with **.

# Scheduled pickups are Monday May 23 through Monday September 12 for line items marked #.

PRICE SHEET FOR REFUSE CONTRACT, OPTION PERIOD 3, 1 APR 2023 - 31 MAR 2024

# CANS AREA NAME MONTHS # OF PRICE

PER

TOTAL

COLLECTED PICKUPS PICKUP

1 2 Large Ad Building 12 80

1 2 Large Powerhouse 12 80

1 1 Large Interpretive Center 12 80

2 1 Large Flat Lake Boat Ramp 5 44

2 1 Large Flat Lake Fishing Pond 5 44

2 1 Small Lewis & Clark Overlook 6 44

* 3 2 Large 1st Dredge Beach 5 38

* 3 2 Large 2nd Dredge Beach 5 38

* 3 1 Large 3rd Dredge Beach 5 38

4 10 Large Downstream Campground 6 48

# 4 2 Large Downstream Group Site 5 33

5 4 Large Kiwanis Park 5 44

5 2 Small Kiwanis Park Picnic Area 5 44

5 2 Large Kiwanis Dump Station 5 44

6 2 Large Roundhouse Point 5 44

6 1 Small Park Grove Pier 5 44

7 1 Small Winter Harbor 5 44

7 1 Large Flood Plain Camping Area 5 44

7 1 Small Flood Plain Boat Ramp 5 44

8 2 Large West End Shelter #1 5 44

8 1 Small West End Shelter #2 5 44

8 1 Large West End Shelter #3 5 44

8 1 Large West End Shelter #4 5 44

8 1 Large West End Shelter #4 5 44

8 1 Large Fish Cleaning 5 44

** 9 2 Large West End Campground 5 29

TOTAL PRICE OPTION 3 ______________________________

*Scheduled pickups are Monday May 22 through Thursday September 28 for line items marked with *.

**Scheduled pickups are Monday May 29 through Tuesday, September 5 for line items marked with **.

# Scheduled pickups are Monday May 22 through Monday September 11 for line items marked #.

PRICE SHEET FOR REFUSE CONTRACT, OPTION PERIOD 4, 1 APR 2024 - 31 MAR 2025

LINE ITEM # CANS AREA NAME MONTHS # OF PRICE

PER

TOTAL

COLLECTED PICKUPS PICKUP

1 2 Large Ad Building 12 78

1 2 Large Powerhouse 12 78

1 1 Large Interpretive Center 12 78

2 1 Large Flat Lake Boat Ramp 5 44

2 1 Large Flat Lake Fishing Pond 5 44

2 1 Small Lewis & Clark Overlook 5 44

* 3 2 Large 1st Dredge Beach 5 39

* 3 2 Large 2nd Dredge Beach 5 39

* 3 1 Large 3rd Dredge Beach 5 39

4 10 Large Downstream Campground 6 49

# 4 2 Large Downstream Group Site 5 33

5 4 Large Kiwanis Park 5 44

5 2 Small Kiwanis Park Picnic Area 5 44

5 2 Large Kiwanis Dump Station 5 44

6 2 Large Roundhouse Point 5 44

6 1 small Park Grove Pier 5 44

7 1 Small Winter Harbor 5 44

7 1 Large Flood Plain Camping Area 5 44

7 1 Small Flood Plain Boat Ramp 5 44

8 2 Large West End Shelter #1 5 44

8 1 Small West End Shelter #2 5 44

8 1 Large West End Shelter #3 5 44

8 1 Large West End Shelter #4 5 44

8 1 Large West End Shelter #4 5 44

8 1 Large Fish Cleaning 5 44

** 9 2 Large West End Campground 5 29

TOTAL PRICE OPTION 3 ______________________________

*Scheduled pickups are Monday May 23 through Thursday September 29 for line items marked with *.

**Scheduled pickups are Monday May 30 through Tuesday, September 6 for line items marked with **.

# Scheduled pickups are Monday May 23 through Monday September 12 for line items marked #.

Base Period Price _______________

Option 1 Price _______________

Option 2 Price _______________

Option 3 Price _______________

Option 4 Price _______________

Grand Total Price: _______________

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

Refuse Pickup and Removal Contract

US Army Corps of Engineers Fort Peck Project

PO Box 208 Fort Peck, MT 59223

1.0 General Information. This is a service contract to provide all labor, service, and equipment to pick up and remove all refuse from designated garbage dumpster locations within the Operations area and Flat Lake, Downstream, and West End Recreation Areas of Fort Peck Project.

1.1 Background. Fort Peck Project Operations and public recreation activities generates a significant amount of trash. Therefore, it is advantageous for the government to contract the pickup, removal, and disposal of this refuse.

1.2 Scope of Work. This is a non-personal services contract to provide all labor, equipment and supervision including garbage cans with lids and garbage can holders for all sizes of cans, necessary for the performance of all operations incidental to the collection, removal, and disposal of garbage from the designated locations of Fort Peck Project listed in Technical Exhibit 2.

All contracted tasks must be completed during the scheduled day and time unless otherwise specified herein or authorized by the Contracting Officer, or authorized representative. Services include: Contractor will provide and place the appropriate number and size of Garbage cans with adequate containment bases to prevent tipping over;

empty garbage cans, pickup spilled garbage, and properly dispose of garbage off Government lands. The contractor shall provide safe, careful, and efficient operations of all equipment and protection of Government property. The contractor shall perform work under this PWS to ensure grounds and facilities are safe, clean, and well maintained for the creating public. The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the government. This is a fixed priced, performance based service contract where the government defines and measures desired outcomes, while contractor methods are generally not constrained or directed.

1.3 Period of Performance. The period of performance shall be for one (1) base period of 12 months and four (4) 12 month option periods. The Period of Performance reads as follows:

Base Year: 01 April 2020 through 31 March 2021

Option Year 1: 01 April 2021 through 31 March 2022

Option Year 2: 01 April 2022 through 31 March 2023

Option Year 3: 01 April 2023 through 31 March 2024

Option Year 4: 01 April 2024 through 31 March 2025

1.4 Contractor Personnel

1.4.1 The contractor shall perform all work under this contract using the contractor’s own forces except as provided in Paragraph 1.4.2 Subcontracting. Employees who perform this work shall be qualified persons on the contractor’s own payroll.

1.4.2 Subcontracting. The contractor shall not subcontract any work without written approval of the Contracting Officer. Compliance with the provisions of this contract by subcontractors shall be the responsibility of the contractor.

1.5 Quality Control

1.5.1 The contractor shall designate, in writing, an employee who shall serve as the contact for matters involving quality and performance or nonperformance of the required work stated in this PWS. The employee(s) shall be qualified and fully competent with full authority to act for, and on behalf of, the contractor as necessary to insure that the required work is performed in accordance with the standards contained herein. The contractor shall furnish the above written designation to the Technical Point of Contact no later than the first day of work. The contractor shall include the name(s), address(s), and telephone number(s) of the responsible individual(s).

1.5.2 The Contracting Officer reserves the right to disapprove any individual whom he considers incompetent to perform the work required. The Contracting Officer will provide a written notice of any disapproval to the contractor.

1.6 Quality Assurance. The government will the methods stated in this PWS to ensure that the Contractor is performing the services required by this PWS in an acceptable manner. The Government may use Quality Assurance Evaluators (QAE(s)) to provide assistance with the quality assurance methods.

1.6.1 The government has the right to inspect all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The government shall perform inspections in a manner that will not delay the work.

1.6.2 If any of the services do not conform to contract requirements, the government may require the contractor to perform the services in conformity with contract requirements and at no increase in cost. If the contract requirements are not met after a second attempt the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed as determined by the Contracting Officer.

1.6.2.1 Upon verification of a validated customer complaint or corrective action report, the Technical Point of Contact will notify the contractor that they are required to re-perform specific services. If re-performance cannot be completed prior to the next required pick up the amount will be deducted from the contractor’s invoice.

1.6.3 The government may take action, if the contractor fails to perform the services again or to take the necessary action to ensure future performance is in conformity with the contract requirements. The government may (1) by contract, or otherwise, perform the services and charge to the contractor any cost incurred by the government that related to the performance of such service or (2) terminate the contract in whole or in part as determined by the Contracting Officer.

1.6.4 The contractor is responsible to replace/repair any damage to government property due to negligence, at his or her own cost. The government may take action, if the contractor fails to replace/repair any damage to government property. The government may (1) by contract, or otherwise, replace/repair damaged government property and charge to the contractor any cost incurred by the government to replace/repair any damage.

1.7 Hours of Operation. The contractor is responsible for conducting business, between the hours of 6:00 AM and 4:00 PM on scheduled pick up days except when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.7.1 Recognized Holidays. The contractor will not be required to work on the following recognized Federal Holidays.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.7.2 Scheduled Pickups Falling on Recognized Holidays. Scheduled pickups falling on a recognized federal holiday must be completed the following work day. Any deviation from this schedule must be approved by TPOC in advance.

1.7.3 Campground garbage collection. Garbage collection from the West End Campground (Line #9 Technical Exhibit 2) and the Downstream Campground (Line item # 4, Technical Exhibit 2) may not begin before 9:00 AM. While traveling within the Fort Peck Recreation Areas all posted restrictions must be followed.

1.7.4 Downstream Group Area Season: The Group loop of the Downstream Campground is open on a shorter season than the rest of the Downstream Campground. The garbage cans in this area will be emptied starting the third Monday in May in 2020, 2024 and 2025, and the fourth Monday in May in 2021, 2022, and 2023. Garbage collection in this area will end the second Monday of September in 2020, 2021, 2022, 2023, and 2024.

1.7.5. West End Campground Season: The West End Campground is open on a shorter season than the rest of the recreation areas. The garbage cans in this area will be emptied starting the fourth Monday in May in 2020 and 2024, and the fifth Monday in May in 2021, 2022 and 2023. Garbage collection in this recreation area will end second Tuesday in September in 2020, 2021, 2022, 2023 and 2024.

1.7.6. Swim Beach Area Season: the 1st, 2nd and 3rd Dredge cuts Beaches are open seasonally. The garbage cans in these areas will be emptied starting the third Monday in May in 2020, 2024 and 2025, and the fourth Monday in May in 2021, 2022, and 2023. Garbage collection in these recreation areas will end the last Monday in September in 2020 and 2024, and the last Thursday in September in 2021, 2022 and 2023.

1.7.7. October pickups at Downstream Campground: All garbage cans in the main loop of the Downstream Campground will be emptied on each of the Thursdays only for the month of October.

1.7.8. Holiday and Extra Pickups. On Saturday mornings between 9:00 AM and 12:00 noon during the Governor’s Cup Walleye Tournament and the Memorial Day, July 4th and Labor Day weekends all garbage cans in Line Items Number 2-9 of Technical Exhibit 2 will be emptied. Any deviation from this schedule must be approved by TPOC in advance.

1.8 Pre-Work Meeting. Prior to commencing any activities, the contractor shall arrange a Pre-work Meeting with the COR/TPOC. The Meeting shall discuss the work requirements, scheduling, submittal process, review of the Activity Hazard Analysis (AHA), and Abbreviated Accident Prevention Plan (AAP). At least one (1) week prior to commencing work, the Contractor shall coordinate their proposed work schedule with the TPOC.

1.9. Submittals. Prior to commencement of services, the Contractor shall submit the following documents to the COR/TPOC for review and approval.

a. Activity Hazard Analysis (AHA);

b. Abbreviated Accident Prevention Plan (APP)

c. List of who will perform work on this contract; including copies of driver’ licenses for operators

d. Work schedule to include final list of equipment, personnel requirements, area collection sequence, and approximate time schedules.

e. Proof of Insurance for Contractors and Subcontractors;

1.10 Standards and Regulations. The Contractor shall perform to the standards in the contract and comply with all Local, State, and Federal Regulations during the services performed. The Contractor is responsible for ascertaining the extent to which these regulations affect the operations resulting from this contract. The Contractor shall comply will all applicable regulations. Applicable regulations include, but are not limited to the following:

a. Code of Federal Regulations (CFR), Title 36, Chapter III, Part 327, Rules and Regulations Governing Public Use on Corps of Engineers Water Resource Development Projects EP 1165-2-316 (http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_1165-2- 316.pdf?ver=2013-08-22-104526-670)

b. Engineering Manual (EM) 385-1-1 (USACE – Safety and Health Requirements Manual), dated November 2014; http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

c. Occupational Safety and Health Standards (29 CFR 1910);

1.10.1 Activity Hazard Analysis (AHA). The contractor shall prepare the AHA in accordance with Paragraph 01.A.14 or 01.A.15 of the EM 385-1-1. If using Paragraph 01.A.15, prepare the AHA IAW Figure 1-2.

Note: Contractors and other individual employer’s typically use Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools. The government considers equivalent to, and acceptable substitutes for, the USACE’s AHA provided the data collected is the same as that required by the AHA, commensurate with the type of services the contractor is performing.

1.10.2 Abbreviated Accident Prevention Plan (APP). EM 385-1-1 in its entirety may be too complex for the type of work performed under these contracts; contractors may reference Appendix A, for abbreviated Accident Prevention Plan (APP). The contractor shall only need to submit items in Appendix A that are pertinent to the contract. The contractor shall use a qualified person to prepare the site-specific abbreviated Accident Prevention Plan (APP). The contractor shall prepare the APP in accordance with the format and requirements of the EM 385-1-1 and supplemented herein. The contractor shall sign and submit the APP for approval prior to the start of work onsite.

1.11 Physical Security

1.11.1 The contractor shall be responsible for safeguarding all government facilities, property, and materials provided for contractor use. The contractor shall secure at all times all government facilities, property, and materials. Specific security conditions may change based on threats to national defense, and based on the risk of specific facilities to these threats. The contractor shall abide by these changing conditions at all times, as applicable.

1.11.2 Key Control. NA

1.12 Antiterrorism/Operation Security Requirements

1.12.1 Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office.

Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

1.12.2 Pre-screen candidates using E-Verify Program. The Contractor must pre‐screen candidates using the E‐ verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements.

The vendor must ensure that the candidate has two valid forms of government issued identification to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible candidates must be provided to the COR/TPOC no later than three (3) business days after the initial contract award.

1.13 Payment

1.13.1 The government will make payment monthly, after the government has inspected and accepted the services, and the government has reviewed, approved, and processed the contractor’s invoice. The contractor shall submit the invoice to the TPOC/COR and/or any other person that has been designated in the contract to receive the invoice.

1.13.2 The contractor must provide the contractor’s name, address, contract number, period of services completed (i.e., for the month of January or for the period of performance of January 1 through February 23), CLIN number and specific quantities of work performed (i.e., 1 Month, 40 days, 100 acres, etc.), and total requested, for an invoice to be considered proper. The contractor shall submit the invoice by the fifth (5th) of the month for services completed the previous month or submit the invoice upon completion of all services, in accordance with the period of performance stated in the CLIN.

2.0 Definitions. The following definitions and descriptions apply wherever the word(s) or phrase(s) is/are stated in this PWS:

Acceptable Level of Performance (ALP): The maximum percent defective, the maximum number of defects per hundred units, or the number of defects in a lot considered satisfactory on the average. The allowable leeway or variance from a standard before the government will reject the specific service.

Contracting Officer’s Representative (COR): means an individual designated an authorized in writing by the Contracting Officer to perform specific technical or administrative functions.

Performance-Based Contract (FAR 2.101): Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise.

Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable level of performance (ALP) for each work requirement.

Quality Assurance Surveillance Plan (QASP): An organized written document used by the Government for quality assurance surveillance. Document contains sampling/evaluation guides, checklists, and the performance requirements summary (PRS).

Technical Point of Contact (TPOC). A government representative designated the point of contact for the contract.

3.0 Government Furnished Items and Services

3.1 Services. The Government will provide access within the restricted fenced area of the Fort Peck Powerhouses.

Contractor will be required to contact Shift Operator via telephone at the controlled access gate and request entry/exit when emptying garbage cans within fenced compound.

3.2 Facilities. The Government will provide a designated location hear the Project Maintenance facility for storing garbage cans and bases following recreation area closure or end of scheduled pick up dates. At the end of the scheduled pickups for the year, all garbage cans in recreation areas will be removed from pickup areas and hauled to the designated storage area near the maintenance facility with the exception of the garbage cans at the West End Campground.

3.3 Utilities. NA

3.4 Equipment. NA

3.5 Materials. NA

4.0 Contractor Furnished Items and Responsibilities

4.1 General. The Contractor shall furnish all supplies, materials, equipment, tools, labor, supervision, facilities and services required to perform work under this contract that are not listed under Section 5 of this PWS.

4.2 Materials.NA

4.3 Equipment. The Contractor shall furnish all equipment, including garbage cans with lids and garbage can holders for each size of can, necessary for the performance of all operations incidental to the collection, removal, and disposal of garbage from the locations of Fort Peck Project listed in Technical Exhibit 2.

4.3.1 The TPOC reserves the right to inspect any and all equipment at any time it is operated on Government Property. Any equipment found to be unsafe will be removed from operation until it is repaired and re-inspected by the TPOC.

4.3.2 All equipment used to perform work under this PWS must be in good operating and mechanical condition. All equipment will be equipped with the manufacture’s recommended safety protective devices to ensure worker and public safety at all times. The contractor will provide his/her employees proper Personal Protective Equipment (PPE) and operators must comply with the US Army Corps of Engineer Safety and Health Requirements Manual, EM 385-1-1.

4.3.3 Equipment List. A list of all equipment proposed for use in refuse collection and disposal shall be submitted at the Post Award Conference

5.0 Specific Tasks

5.1 Basic Services. The contractor shall supply and service the correct number and appropriately sized garbage receptacles at the locations identified in Technical Exhibit 3. The Contractor-furnished receptacles shall be maintained in an operationally safe, serviceable condition at all times. The contractor shall dump garbage receptacles, remove garbage from Government land, and properly dispose of collected garbage at an approved landfill site per the required schedule identified in Technical Exhibit 3.

5.2 Refuse Removal: The removal of refuse shall be thorough and completed to extend that none is lost or spilled during the course of handling or by the vehicle while travelling the route. Any spillage from the transport vehicle or garbage cans toppled by wind shall be cleaned up immediately by the Contractor. If using a “compression” style truck, any glass, liquids, or debris that leaks out of the truck during the compression maneuver will be cleaned up immediately. If residue is found on the pavement after the garbage truck has dumped all the garbage cans, the contractor will be called back to address clean up at no additional cost to the government.

5.3 Policing Garbage Can Locations: The Contractor shall police an area within the 20 foot radius of all designated garbage can locations to pick up all garbage, litter or debris.

5.4 Relocating Garbage cans: If the garbage can has been moved away from the designated pickup point, the contractor is responsible for moving the ca back to the original location.

5.5 Securing Garbage cans: Contractor is responsible to provide all means and methods to secure garbage cans at designated locations per Exhibit 1.

5.6 Garbage disposal off government Land: The Contractor shall dispose all refuse off Government land at an approved State of Montana landfill pursuant to Section 75-10-221, Montana Code annotated (MCA). The Contractor will be responsible for payment of any/all fees associated with refuse hauling and disposal assessed by State, County, or city governments.

5.7 Garbage can Storage: As soon as scheduled pickup end within a designated area for the season, all garbage can (except those in the West End Campground) will be removed from pickup locations and hauled to the designated garbage can storage area near the Fort Peck Project maintenance shop. All cans must be placed in storage no later Veterans Day and returned to their pickup locations by May 1. Garbage cans not moved into storage will require the Contractor to empty these cans at no cost to the government.

5.8 Monthly submittals: Contractor shall submit timely invoices for previous months work at the beginning of each month. Invoices shall be for actual costs accrued and must include contractor’s name and complete address, contract number, and an original signature and date.

6.0 Performance Requirements Summary. The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

Standard Performance Threshold Method of Surveillance

PRS # 1.

The contractor shall remove all contents of the garbage receptacles and all trash, paper, bottles, cans and other debris on the ground within a twenty-foot radius of each receptacle picked up. As described in 5.2 and 5.3 and technical exhibit 2.

The contractor shall empty all contents of each receptacle at designated dates/times and remove all debris within 20 feet of each receptacle.

Zero or no more than once per contract year

Periodic surveillance or validated customer complaint.

PRS # 2

Garbage disposal off of Government lands as described in 5.6

Contractor shall dispose of refuse in an approved State of Montana landfill.

zero Periodic surveillance or validated customer complaint.

PRS # 3

The Contractor shall relocate receptacles that have been moved and secure receptacles as described in 5.4 and 5.5

The contractor will move any receptacles that have been moved away from their designated locations and ensure the receptacle is secured to ensure the correct number and appropriately sized cans are located at each designated location.

Zero or no more than once per contract year

Periodic surveillance or validated customer complaint.

7.0 Attachments

7.1 Technical Exhibit 1 – Deliverables Schedule

Deliverable Frequency Number of Copies

Medium/Format Submit to:

Proposed list of equipment

Post award conference

One copy Paper or electronic

TBD

Work schedule to include final list of equipment, personnel requirements , area collection sequence and approximate time schedule

Initial at post award conference and as needed thereafter

One copy Paper or electronic

TBD

Proof of insurance and drivers licenses for operators

Post award conference

One copy Paper or electronic

TBD

Monthly Invoice

Monthly upon completion of required/sched uled pickups

One copy Paper or electronic

TBD

7.2 Technical Exhibit 2 – Monthly Schedule

NUMBER OF SCHEDULED PICKUPS BASE PERIOD APRIL 1, 2020 – MARCH 31, 2021

CANS

AREA NAME MAR APRIL MAY JUNE JULY AUG

SEPT

OCT

NOV DEC JAN FEB

1 2 large Ad Building 4 5 8 9 9 9 8 9 4 5 4 4 1 2 large Powerhouse 4 5 8 9 9 9 8 9 4 5 4 4 1 1 large Interpretive

Center 4 5 8 9 9 9 8 9 4 5 4 4

Large

Flat Lake Boat Ramp

8 9 9 9 8

*2 1 large flat lake fishing pond

8 9 9 9 8

*2 1 small Lewis & Clark Overlook

8 9 9 9 8

*3 2 large 1st Dredge Beach

4 9 9 9 8

*3 2 large 2nd Dredge Beach

4 9 9 9 8

*3 1 large 3rd Dredge Beach

4 9 9 9 8

*4 10 large

Downstream Campground

8 9 9 9 8 5

*4 2 Large

Downstream Group Site

4 9 9 9 4

4 large Kiwanis Park 8 9 9 9 8 2 small Kiwanis Park picnic area 8 9 9 9 8

*5 2 large Kiwanis Dump Station

8 9 9 9 8

*6 2 large Roundhouse Point

8 9 9 9 8

*6 1 small Park Grove Fishing Pier

8 9 9 9 8

*7 1 small Winter Harbor 8 9 9 9 8 1 large Flood Plain

Area 8 9 9 9 8

*7 1 small Flood Plain Area

8 9 9 9 8

*8 2 large West End Shelter #1

8 9 9 9 8

*8 1 small West End Shelter #2

8 9 9 9 8

*8 1 large West End Shelter #3

8 9 9 9 8

*8 1 large West End Shelter #4

8 9 9 9 8

*8 1 large West End Shelter #4

8 9 9 9 8

*8 1 large fish cleaning station

8 9 9 9 8

*9 2 large West End Campground

2 9 9 9 2 large

Holiday & Governor's Cup

1 2 1

10 7 small Holiday & Governor's Cup

1 2 1

*HOLIDAY AND GOVERNOR'S CUP PICKUPS FOR ITEM NUMBERS 2-9 ONLY

LINE ITEM 1 THURSDAY ONLY PICKUPS 1 NOVEMBER - 30 APRIL

PICKUPS SCHEDULED FOR MONDAYS AND THURSDAYS 1 MAY - 31 OCT UNLESS OTHERWISE

NOTED IN SCOPE OF WORK

NUMBER OF SCHEDULED PICKUPS OPTION PERIOD 1, APRIL 1, 2021 – MARCH 31, 2022

CANS

AREA NAME MAR APRIL MAY JUNE JULY

AUG

SEPT OCT NOV DEC JAN FEB

1 2 large Ad Building 4 5 9 8 8 9 9 8 4 5 4 4

1 2 large Powerhouse 4 5 9 8 8 9 9 8 4 5 4 4

1 1 large Interpretive Center 4 5 9 8 8 9 9 8 4 5 4 4

Large

Flat Lake Boat Ramp

9 8 8 9 9

*2 1 large flat lake fishing pond

9 8 8 9 9

*2 1 small Lewis & Clark Overlook

9 8 8 9 9

*3 2 large 1st Dredge Beach 2 8 8 9 9

*3 2 large 2nd Dredge Beach 2 8 8 9 9

*3 1 large 3rd Dredge Beach 2 8 8 9 9

*4 10 large

Downstream Campground

9 8 8 9 9 4

*4 2 Large

Downstream Group Site

2 8 8 9 4

4 large Kiwanis Park 9 8 8 9 9

2 small Kiwanis Park picnic area

9 8 8 9 9

*5 2 large Kiwanis Dump Station

9 8 8 9 9

*6 2 large Roundhouse Point 9 8 8 9 9

1 small Park Grove fishing pier

9 8 8 9 9

*7 1 small Winter Harbor 9 8 8 9 9

1 large Flood Plain Area 9 8 8 9 9

*7 1 small Flood Plain Area 9 8 8 9 9

*8 2 large West End Shelter #1

9 8 8 9 9

*8 1 small West End Shelter #2

9 8 8 9 9

*8 1 large West End Shelter #3

9 8 8 9 9

*8 1 large West End Shelter #4

9 8 8 9 9

*8 1 large West End Shelter #4

9 8 8 9 9

*8 1 large fish cleaning station

9 8 8 9 9

*9 2 large West End Campground

0 8 8 9 2 large

Holiday & Governor's Cup

1 2 1

10 7 small Holiday & Governor's Cup

1 2 1

*HOLIDAY AND GOVERNOR'S CUP PICKUPS FOR ITEM NUMBERS 2-9 ONLY

LINE ITEM 1 THURSDAY ONLY PICKUPS 1 NOVEMBER - 30 APRIL

PICKUPS SCHEDULED FOR MONDAYS AND THURSDAYS 1 MAY - 31 OCT UNLESS OTHERWISE

NUMBER OF SCHEDULED PICKUPS OPTION PERIOD 2, APRIL 1, 2022 – MARCH 31, 2023

ITEM

CANS

AREA NAME MAR APRIL MAY JUNE JULY

AUG

SEPT OCT NOV DE

C

JAN FEB

1 2 large Ad Building 5 4 9 9 8 9 9 9 4 5 4 4 1 2 large Powerhouse 5 4 9 9 8 9 9 9 4 5 4 4 1 1 large Interpretive

Center 5 4 9 9 8 9 9 9 4 5 4 4

Large

Flat Lake Boat Ramp

9 9 8 9 9

*2 1 large flat lake fishing pond

9 9 8 9 9

*2 1 small Lewis & Clark Overlook

9 9 8 9 9

*3 2 large 1st Dredge Beach

3 9 8 9 9

*3 2 large 2nd Dredge Beach

3 9 8 9 9

*3 1 large 3rd Dredge Beach

3 9 8 9 9

*4 10 large

Downstream Campground

9 9 8 9 9 4

*4 2 Large

Downstream Group Site

3 9 8 9 4

4 large Kiwanis Park 9 9 8 9 9 2 small Kiwanis Park picnic area 9 9 8 9 9

*5 2 large Kiwanis Dump Station

9 9 8 9 9

*6 2 large Roundhouse Point

9 9 8 9 9

*6 1 small Park Grove Fishing Pier

9 9 8 9 9

*7 1 small Winter Harbor 9 9 8 9 9 1 large Flood Plain

Area 9 9 8 9 9

*7 1 small Flood Plain Area

9 9 8 9 9

*8 2 large West End Shelter #1

9 9 8 9 9

*8 1 small West End Shelter #2

9 9 8 9 9

*8 1 large West End Shelter #3

9 9 8 9 9

*8 1 large West End Shelter #4

9 9 8 9 9

*8 1 large West End Shelter #4

9 9 8 9 9

*8 1 large fish cleaning station

9 9 8 9 9

*9 2 large West End Campground

1 9 8 9 2 large

Holiday & Governor's Cup

1 2 1

10 7 small Holiday & Governor's Cup

1 2 1

*HOLIDAY AND GOVERNOR'S CUP PICKUPS FOR ITEM NUMBERS 2-9 ONLY

LINE ITEM 1 THURSDAY ONLY PICKUPS 1 NOVEMBER - 30 APRIL

PICKUPS SCHEDULED FOR MONDAYS AND THURSDAYS 1 MAY - 31 OCT UNLESS OTHERWISE

NOTED IN SCOPE OF WORK

NUMBER OF SCHEDULED PICKUPS OPTION PERIOD 3, APRIL 1, 2023 – MARCH 31, 2024

LINE

ITE

M

CANS

AREA

NAME

MAR APRIL MAY JUNE JUL

Y

AUG

SEPT OCT NOV DEC JAN FEB

1 2 large Ad Building 5 4 9 9 9 9 8 9 5 4 4 5 1 2 large Powerhouse 5 4 9 9 9 9 8 9 5 4 4 5 1 1 large Interpretive

Center 5 4 9 9 9 9 8 9 5 4 4 5

Large

Flat Lake Boat Ramp

9 9 9 9 8

*2 1 large flat lake fishing pond

9 9 9 9 8

*2 1 small Lewis & Clark Overlook

9 9 9 9 8

*3 2 large 1st Dredge Beach

3 9 9 9 8

*3 2 large 2nd Dredge Beach

3 9 9 9 8

*3 1 large 3rd Dredge Beach

3 9 9 9 8

*4 10 large

Downstream Campgroun d

9 9 9 9 8 4

*4 2 Large

Downstream Group Site

3 9 9 9 3

4 large Kiwanis Park

9 9 9 9 8

2 small Kiwanis Park picnic area

9 9 9 9 8

*5 2 large Kiwanis Dump Station

9 9 9 9 8

*6 2 large Roundhouse Point

9 9 9 9 8

*6 1 small Park Grove Fishing Pier

9 9 9 9 8

*7 1 small Winter Harbor

9 9 9 9 8

1 large Flood Plain Area

9 9 9 9 8

*7 1 small Flood Plain Area

9 9 9 9 8

*8 2 large West End Shelter #1

9 9 9 9 8

*8 1 small West End Shelter #2

9 9 9 9 8

*8 1 large West End Shelter #3

9 9 9 9 8

*8 1 large West End Shelter #4

9 9 9 9 8

*8 1 large West End Shelter #4

9 9 9 9 8

*8 1 large fish cleaning station

9 9 9 9 8

*9 2 large West End Campgroun d

1 9 9 9 1 large

Holiday & Governor's Cup

1 2 1

10 7 small Holiday & Governor's Cup

1 2 1

*HOLIDAY AND GOVERNOR'S CUP PICKUPS FOR ITEM NUMBERS 2-9 ONLY

LINE ITEM 1 THURSDAY ONLY PICKUPS 1 NOVEMBER - 30 APRIL

PICKUPS SCHEDULED FOR MONDAYS AND THURSDAYS 1 MAY - 31 OCT

UNLESS OTHERWISE NOTED IN SCOPE OF WORK

NUMBER OF SCHEDULED PICKUPS OPTION PERIOD 4, APRIL 1, 2024 – MARCH 31, 2025

# CANS AREA

NAME

MAR APRIL MAY JUNE JULY AUG

SEPT

OCT NOV DEC JAN FEB

1 2 large Ad Building 4 4 9 8 9 9 9 9 4 4 5 4 1 2 large Powerhouse 4 4 9 8 9 9 9 9 4 4 5 4 1 1 large Interpretive

Center 4 4 9 8 9 9 9 9 4 4 5 4

1 Large Flat Lake Boat Ramp

9 8 9 9 9

*2 1 large flat lake fishing pond

9 8 9 9 9

*2 1 small Lewis & Clark Overlook

9 8 9 9 9

*3 2 large 1st Dredge Beach

4 8 9 9 9

*3 2 large 2nd Dredge Beach

4 8 9 9 9

*3 1 large 3rd Dredge Beach

4 8 9 9 9

*4 10 large Downstream Campground

9 8 9 9 9 5

*4 2 Large Downstream Group Site

4 8 9 9 3

4 large Kiwanis Park

9 8 9 9 9

2 small Kiwanis Park picnic area

9 8 9 9 9

*5 2 large Kiwanis Dump Station

9 8 9 9 9

*6 2 large Roundhouse Point

9 8 9 9 9

*6 1 small Park Grove Fishing Pier

9 8 9 9 9

*7 1 small Winter Harbor

9 8 9 9 9

1 large Flood Plain Area

9 8 9 9 9

*7 1 small Flood Plain Area

9 8 9 9 9

*8 2 large West End Shelter #1

9 8 9 9 9

*8 1 small West End Shelter #2

9 8 9 9 9

*8 1 large West End Shelter #3

9 8 9 9 9

*8 1 large West End Shelter #4

9 8 9 9 9

*8 1 large West End Shelter #4

9 8 9 9 9

*8 1 large fish cleaning station

9 8 9 9 9

*9 2 large West End Campground

2 8 9 9 1

36 large Holiday & Governor's Cup

1 2 1

10 7 small Holiday & Governor's Cup

1 2 1

*HOLIDAY AND GOVERNOR'S CUP PICKUPS FOR ITEM NUMBERS 2-9 ONLY

LINE ITEM 1 THURSDAY ONLY PICKUPS 1 NOVEMBER - 30 APRIL

PICKUPS SCHEDULED FOR MONDAYS AND THURSDAYS 1 MAY - 31 OCT UNLESS OTHERWISE

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Refuse Removal - Ops Area

FFP

This is a service contract to provide all labor, service, and equipment to pickup and remove all refuse from designated garbage dumpster locations within the Operations area which consist of the Admin Building, Powerhouses, and Interpretive Center IAW Technical Exhibit 2.

FOB: Destination

NET AMT

0002 1 Job Refuse Removal - Rec area

FFP

This is a service contract to provide all labor, service, and equipment to pickup and remove all refuse from designated garbage dumpster locations within Recreation Areas of Fort Peck Project IAW Technical Exhibit 2.

1001 1 Job OPTION Refuse Removal - Ops Area

FFP

This is a service contract to provide all labor, service, and equipment to pickup and remove all refuse from designated garbage dumpster locations within the Operations area which consist of the Admin Building, Powerhouses, and

1002 1 Job OPTION Refuse Removal - Rec area

FFP

This is a service contract to provide all labor, service, and equipment to pickup and remove all refuse from designated garbage dumpster locations within Recreation

2001 1 Job OPTION Refuse Removal - Ops Area

FFP

This is a service contract to provide all labor, service, and equipment to pickup and remove all refuse from designated garbage dumpster locations within the Operations area which consist of the Admin Building, Powerhouses, and

2002 1 Job OPTION Refuse Removal - Rec area

FFP

This is a service contract to provide all labor, service, and equipment to pickup and remove all refuse from designated garbage dumpster locations within Recreation

3001 1 Job OPTION Refuse Removal - Ops Area

FFP

This is a service contract to provide all labor, service, and equipment to pickup and remove all refuse from designated garbage dumpster locations within the Operations area which consist of the Admin Building, Powerhouses, and

3002 1 Job OPTION Refuse Removal - Rec area

FFP

This is a service contract to provide all labor, service, and equipment to pickup and remove all refuse from designated garbage dumpster locations within Recreation

4001 1 Job OPTION Refuse Removal - Ops Area

FFP

This is a service contract to provide all labor, service, and equipment to pickup and remove all refuse from designated garbage dumpster locations within the Operations area which consist of the Admin Building, Powerhouses, and

4002 1 Job OPTION Refuse Removal - Rec area

FFP

This is a service contract to provide all labor, service, and equipment to pickup and remove all refuse from designated garbage dumpster locations within Recreation

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 01-APR-2020 TO

31-MAR-2021

N/A COE FT PECK PROJECT OFFICE

STACY BRAATEN

USAED OMAHACENWO-OD-FP

301 EAST KANSAS STREET

FORT PECK MT 59223-0208

(406) 526-3411 EXT 4270

968609

0002 POP 01-APR-2020 TO

31-MAR-2021

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 01-APR-2021 TO

31-MAR-2022

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 01-APR-2021 TO

31-MAR-2022

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 01-APR-2022 TO

31-MAR-2023

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 01-APR-2022 TO

31-MAR-2023

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 01-APR-2023 TO

31-MAR-2024

N/A (SAME AS PREVIOUS LOCATION)

3002 POP 01-APR-2023 TO

31-MAR-2024

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 01-APR-2024 TO

31-MAR-2025

N/A (SAME AS PREVIOUS LOCATION)

4002 POP 01-APR-2024 TO

31-MAR-2025

N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-18 Availability Of Funds APR 1984 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.237-2 Protection Of Government Buildings, Equipment, And Vegetation

APR 1984

252.203-7000 Requirements Relating to Compensation of Former DoD Officials

SEP 2011

252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.243-7001 Pricing Of Contract Modifications DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.212-1 Addendum; Instructions to Quoters—Commercial Items

This solicitation is being advertised as a best value procurement. See FAR 52.212-2 Addendum; Evaluation— Commercial Items for specific information to be submitted with your quote.

Please provide the following information with your quote:

Company’s Name as it appears on SAM:

Company’s Address as it appears on SAM:

CAGE CODE:

DUNS:

TIN:

(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits a quotation in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.

(b) Submission of quotations. Submit quotations to the office specified in this solicitation at or before the exact time specified in this solicitation. Electronic quotations are preferred over paper responses, unless other arrangements have been made. Send completed quotation to clinton.e.russell@usace.army.mil

Quotations may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show --

(1) The solicitation number;

(2) The time specified in the solicitation for receipt of quotations;

(3) The name, address, and telephone number of the quoter;

(4) A technical description of the items being quoted in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;

(5) Terms of any express warranty;

(6) Price and any discount terms;

(7) “Remit to” address, if different than mailing address;

(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3( b ) for those representations and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .