Bid Abstract_W9128F20B0030.pdf

PDF 258 KB Posted

Attached to
Road Rehab IDIQ SATOC at Big Bend Dam, SD
Solicitation number
W9128F20B0030
Issued by

View the file

Other files

File Type Posted
IDIQ Roads Big Bend Specs.pdf PDF
Attachment A_Pricing Schedule Big Bend Dam SD.XLSX XLSX spreadsheet
Solicitation (Division 00) W9128F20B0030.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED

I CERTIFY THAT I HAVE OPENED, READ AND

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

C. REASONABLE CONTRACT

7A 7B 7C D.

ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT

EARTHWORK (SPECIFICATION SECTION 31 00 00)

A001 Topsoil Borrow 100 CY $29.77 $30.37 $30.98 $31.60 $32.23 $15,495.00 A002 Unclassified Excavation 500 CY $18.40 $18.77 $19.15 $19.53 $19.92 $47,885.00 A003 Rock Excavation 10 CY $93.54 $95.41 $97.32 $99.27 $101.26 $4,868.00 A004 Embankment Borrow Material 500 CY $21.47 $21.90 $22.34 $22.79 $23.25 $55,875.00 A005 Select Granular Material 10 TON $31.29 $31.92 $32.56 $33.21 $33.87 $1,628.50 A006 Overhaul 1 CY/MI $1.91 $1.95 $1.99 $2.03 $2.07 $9.95

GEOTEXTILE FABRIC (SPECIFICATION SECTION 31 05 19)

A007 Supplied in Place 300 SY $5.95 $6.07 $6.19 $6.31 $6.44 $9,288.00

COLD MILLING OF BITUMINOUS PAVEMENT (SPECIFICATION SECTION 32 01 16.17)

A008 2" Mill Salvage & Stockpile 2500 SY $3.78 $3.86 $3.94 $4.02 $4.10 $49,250.00 A009 4" Mill Salvage & Stockpile 2500 SY $4.82 $4.92 $5.02 $5.12 $5.22 $62,750.00

CRACK SEALING (SPECIFICATION SECTION 32 01 17.16

A010 Asphalt 2000 FT $2.10 $2.14 $2.18 $2.22 $2.26 $21,800.00

AGGREGATE BASE COURSE (SPECIFICATION SECTION 32 11 23)

A011 First 1,000 Tons (Stockpiled) 1000 TON $23.54 $24.01 $24.49 $24.98 $25.48 $122,500.00 A012 Over 1,000 Tons (Stockpiled) 1000 TON $22.46 $22.91 $23.37 $23.84 $24.32 $116,900.00 A013 Aggregate (Supplied-In-Place) 1000 TON $29.77 $30.37 $30.98 $31.60 $32.23 $154,950.00

BITUMINOUS SURFACE TREATMENT (SPECIFICATION SECTION 32 12 11)

A014 Single 10000 SY $5.71 $5.82 $5.94 $6.06 $6.18 $297,100.00

HOT MIX ASPHALT (SPECIFICATION SECTION 32 12 16)

A015 Pave Gravel Surface 400 TON $182.66 $186.31 $190.04 $193.84 $197.72 $380,228.00 A016 Overlay Paved Surface 400 TON $182.66 $186.31 $190.04 $193.84 $197.72 $380,228.00 A017 Patch (4" Deep) 400 SF $8.59 $8.76 $8.94 $9.12 $9.30 $17,884.00

ASPHALTIC SEAL & FOG COATS (SPECIFICATION SECTION 32 12 36.13)

A018 Fog Seal 5 TON $3,135.00 $3,197.70 $3,261.65 $3,326.88 $3,393.42 $81,573.25

CONCRETE WORK (SPECIFICATION SECTION 32 16 13)

A019 Pavement 4" Thick 200 SF $8.66 $8.83 $9.01 $9.19 $9.37 $9,012.00 A020 Pavement 6" Thick 200 SF $10.42 $10.63 $10.84 $11.06 $11.28 $10,846.00 A021 Curb & Cutter (Cast) 100 FT $44.38 $45.27 $46.18 $47.10 $48.04 $23,097.00 A022 Rebar (#4) 100 FT $2.10 $2.14 $2.18 $2.22 $2.26 $1,090.00

PAVEMENT MARKINGS (SPECIFICATION SECTION 32 17 24.00 10)

A023 Shoulder Striping 4" 10000 FT $0.80 $0.82 $0.84 $0.86 $0.88 $42,000.00 A024 Centerline Striping 4" 5000 FT $0.80 $0.82 $0.84 $0.86 $0.88 $21,000.00 A025 Parking Area Striping 300 FT $2.77 $2.83 $2.89 $2.95 $3.01 $4,335.00 A026 Stop Line Striping (12") 20 FT $49.25 $50.24 $51.24 $52.26 $53.31 $5,126.00 A027 Handicap & Misc. Symbols 2 EA $267.09 $272.43 $277.88 $283.44 $289.11 $2,779.90

SEEDING (SPECIFICATION SECTION 32 92 19)

A028 Seeding 300 SY $2.16 $2.20 $2.24 $2.28 $2.33 $3,363.00 A029 Erosing Blanket 300 SY $4.09 $4.17 $4.25 $4.34 $4.43 $6,384.00

STORM DRAINAGE PIPING - INSTALLED (SPECIFICATION SECTION 33 40 00)

A030 18" CMP 0'-10' Deep 20 FT $54.39 $55.48 $56.59 $57.72 $58.87 $5,661.00 A031 18" CMP 10'-20' Deep 20 FT $68.46 $69.83 $71.23 $72.65 $74.10 $7,125.40 A032 18" Flared End 1 EA $511.45 $521.68 $532.11 $542.75 $553.61 $2,661.60 A033 18" Elbow (22.5 or 45 Degree) 1 EA $510.37 $520.58 $530.99 $541.61 $552.44 $2,655.99 A034 24" CMP 0'-10' Deep 20 FT $65.49 $66.80 $68.14 $69.50 $70.89 $6,816.40 A035 24" CMP 10'-20' Deep 20 FT $80.91 $82.53 $84.18 $85.86 $87.58 $8,421.20 A036 24" Flared End 1 EA $608.87 $621.05 $633.47 $646.14 $659.06 $3,168.59 A037 24" Elbow (22.5 or 45 Degree) 1 EA $634.58 $647.27 $660.22 $673.42 $686.89 $3,302.38 A038 Erosion Riprap 10 TON $65.49 $66.80 $68.14 $69.50 $70.89 $3,408.20 A039 Drainage Structure 4' Depth 1 EA $5,950.00 $6,069.00 $6,190.38 $6,314.19 $6,440.47 $30,964.04

$2,023,430.40

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

l PAGES

TO THIS SOLICITATION

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type) David W. Neal, Contracting Officer

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

W9128F20B0030

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE

(Check A, B or C AND COMPLETE D, E AND F)

5. PROJECT TITLE

(Without Profit)

(Including Profit)

A. HIRED LABOR

IGE

B. REASONABLE CONTRACT

6. NUMBER OF AMENDMENTS ISSUED

Road REHAB IDIQ for Big Bend

TOTALUNIT PRICE (YEAR

1) UNIT PRICE (YEAR 2) UNIT PRICE (YEAR 3) UNIT PRICE (YEAR 4) UNIT PRICE (YEAR 5)

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

7A 7B 7C D.

ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT

EARTHWORK (SPECIFICATION SECTION 31 00 00)

A001 Topsoil Borrow 100 CY $10.00 $10.00 $10.00 $10.00 $10.00 $5,000.00 A002 Unclassified Excavation 500 CY $10.00 $10.00 $10.00 $10.00 $10.00 $25,000.00 A003 Rock Excavation 10 CY $100.00 $100.00 $100.00 $100.00 $100.00 $5,000.00 A004 Embankment Borrow Material 500 CY $10.00 $10.00 $10.00 $10.00 $10.00 $25,000.00 A005 Select Granular Material 10 TON $40.00 $40.00 $40.00 $40.00 $40.00 $2,000.00 A006 Overhaul 1 CY/MI $1.00 $1.00 $1.00 $1.00 $1.00 $5.00

GEOTEXTILE FABRIC (SPECIFICATION SECTION 31 05 19)

A007 Supplied in Place 300 SY $5.00 $5.00 $5.00 $5.00 $5.00 $7,500.00

COLD MILLING OF BITUMINOUS PAVEMENT (SPECIFICATION SECTION 32 01 16.17)

A008 2" Mill Salvage & Stockpile 2500 SY $3.00 $3.00 $3.00 $3.00 $3.00 $37,500.00 A009 4" Mill Salvage & Stockpile 2500 SY $3.00 $3.00 $3.00 $3.00 $3.00 $37,500.00

CRACK SEALING (SPECIFICATION SECTION 32 01 17.16

A010 Asphalt 2000 FT $2.00 $2.00 $2.00 $2.00 $2.00 $20,000.00

AGGREGATE BASE COURSE (SPECIFICATION SECTION 32 11 23)

A011 First 1,000 Tons (Stockpiled) 1000 TON $20.00 $20.00 $20.00 $20.00 $20.00 $100,000.00 A012 Over 1,000 Tons (Stockpiled) 1000 TON $20.00 $20.00 $20.00 $20.00 $20.00 $100,000.00 A013 Aggregate (Supplied-In-Place) 1000 TON $30.00 $30.00 $30.00 $30.00 $30.00 $150,000.00

BITUMINOUS SURFACE TREATMENT (SPECIFICATION SECTION 32 12 11)

A014 Single 10000 SY $5.00 $5.00 $5.00 $5.00 $5.00 $250,000.00

HOT MIX ASPHALT (SPECIFICATION SECTION 32 12 16)

A015 Pave Gravel Surface 400 TON $165.00 $165.00 $165.00 $165.00 $165.00 $330,000.00 A016 Overlay Paved Surface 400 TON $165.00 $165.00 $165.00 $165.00 $165.00 $330,000.00 A017 Patch (4" Deep) 400 SF $8.50 $8.50 $8.50 $8.50 $8.50 $17,000.00

ASPHALTIC SEAL & FOG COATS (SPECIFICATION SECTION 32 12 36.13)

A018 Fog Seal 5 TON $600.00 $600.00 $600.00 $600.00 $600.00 $15,000.00

CONCRETE WORK (SPECIFICATION SECTION 32 16 13)

A019 Pavement 4" Thick 200 SF $15.00 $15.00 $15.00 $15.00 $15.00 $15,000.00 A020 Pavement 6" Thick 200 SF $20.00 $20.00 $20.00 $20.00 $20.00 $20,000.00 A021 Curb & Cutter (Cast) 100 FT $50.00 $50.00 $50.00 $50.00 $50.00 $25,000.00 A022 Rebar (#4) 100 FT $1.00 $1.00 $1.00 $1.00 $1.00 $500.00

PAVEMENT MARKINGS (SPECIFICATION SECTION 32 17 24.00 10)

A023 Shoulder Striping 4" 10000 FT $0.75 $0.75 $0.75 $0.75 $0.75 $37,500.00 A024 Centerline Striping 4" 5000 FT $0.75 $0.75 $0.75 $0.75 $0.75 $18,750.00 A025 Parking Area Striping 300 FT $2.00 $2.00 $2.00 $2.00 $2.00 $3,000.00 A026 Stop Line Striping (12") 20 FT $50.00 $50.00 $50.00 $50.00 $50.00 $5,000.00 A027 Handicap & Misc. Symbols 2 EA $250.00 $250.00 $250.00 $250.00 $250.00 $2,500.00

SEEDING (SPECIFICATION SECTION 32 92 19)

A028 Seeding 300 SY $3.00 $3.00 $3.00 $3.00 $3.00 $4,500.00 A029 Erosing Blanket 300 SY $3.00 $3.00 $3.00 $3.00 $3.00 $4,500.00

STORM DRAINAGE PIPING - INSTALLED (SPECIFICATION SECTION 33 40 00)

A030 18" CMP 0'-10' Deep 20 FT $50.00 $50.00 $50.00 $50.00 $50.00 $5,000.00 A031 18" CMP 10'-20' Deep 20 FT $75.00 $75.00 $75.00 $75.00 $75.00 $7,500.00 A032 18" Flared End 1 EA $500.00 $500.00 $500.00 $500.00 $500.00 $2,500.00 A033 18" Elbow (22.5 or 45 Degree) 1 EA $500.00 $500.00 $500.00 $500.00 $500.00 $2,500.00 A034 24" CMP 0'-10' Deep 20 FT $60.00 $60.00 $60.00 $60.00 $60.00 $6,000.00 A035 24" CMP 10'-20' Deep 20 FT $85.00 $85.00 $85.00 $85.00 $85.00 $8,500.00 A036 24" Flared End 1 EA $500.00 $500.00 $500.00 $500.00 $500.00 $2,500.00 A037 24" Elbow (22.5 or 45 Degree) 1 EA $500.00 $500.00 $500.00 $500.00 $500.00 $2,500.00 A038 Erosion Riprap 10 TON $60.00 $60.00 $60.00 $60.00 $60.00 $3,000.00 A039 Drainage Structure 4' Depth 1 EA $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $7,500.00

$1,640,255.00

TOTALUNIT PRICE (YEAR

1) UNIT PRICE (YEAR 2) UNIT PRICE (YEAR 3) UNIT PRICE (YEAR 4) UNIT PRICE (YEAR 5)

6. NUMBER OF AMENDMENTS ISSUED

20%

C. AMENDMENTS ACKNOWLEDGED

N/A

MORRIS (CAGE 0ELU6)

B. BID SECRUITY (Type & Amount)

A. OFFEROR

NO.1

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

W9128F20B0030

4. ISSUING OFFICE

5. PROJECT TITLE 9. OFFERS

TO THIS SOLICITATION

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type) David W. Neal, Contracting Officer

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

l PAGES

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

7A 7B 7C D.

ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT

EARTHWORK (SPECIFICATION SECTION 31 00 00)

A001 Topsoil Borrow 100 CY $23.00 $23.46 $23.93 $24.41 $24.90 $11,969.29 A002 Unclassified Excavation 500 CY $16.00 $16.32 $16.65 $16.98 $17.32 $41,632.32 A003 Rock Excavation 10 CY $60.00 $61.20 $62.42 $63.67 $64.95 $3,122.42 A004 Embankment Borrow Material 500 CY $21.00 $21.42 $21.85 $22.29 $22.73 $54,642.42 A005 Select Granular Material 10 TON $30.00 $30.60 $31.21 $31.84 $32.47 $1,561.21 A006 Overhaul 1 CY/MI $1.00 $1.02 $1.04 $1.06 $1.08 $5.20

A007 Supplied in Place 300 SY $4.00 $4.08 $4.16 $4.24 $4.33 $6,244.85

A008 2" Mill Salvage & Stockpile 2500 SY $7.00 $7.14 $7.28 $7.43 $7.58 $91,070.70 A009 4" Mill Salvage & Stockpile 2500 SY $9.00 $9.18 $9.36 $9.55 $9.74 $117,090.90

A010 Asphalt 2000 FT $3.00 $3.06 $3.12 $3.18 $3.25 $31,224.24

A011 First 1,000 Tons (Stockpiled) 1000 TON $23.00 $23.46 $23.93 $24.41 $24.90 $119,692.92 A012 Over 1,000 Tons (Stockpiled) 1000 TON $22.00 $22.44 $22.89 $23.35 $23.81 $114,488.88 A013 Aggregate (Supplied-In-Place) 1000 TON $25.00 $25.50 $26.01 $26.53 $27.06 $130,101.00

A014 Single 10000 SY $5.75 $5.87 $5.98 $6.10 $6.22 $299,232.31

A015 Pave Gravel Surface 400 TON $198.00 $201.96 $206.00 $210.12 $214.32 $412,159.98 A016 Overlay Paved Surface 400 TON 198 $201.96 $206.00 $210.12 $214.32 $412,159.98 A017 Patch (4" Deep) 400 SF 10 $10.20 $10.40 $10.61 $10.82 $20,816.16

A018 Fog Seal 5 TON 6 $6.12 $6.24 $6.37 $6.49 $156.12

A019 Pavement 4" Thick 200 SF 9 $9.18 $9.36 $9.55 $9.74 $9,367.27 A020 Pavement 6" Thick 200 SF 11 $11.22 $11.44 $11.67 $11.91 $11,448.89 A021 Curb & Cutter (Cast) 100 FT 55 $56.10 $57.22 $58.37 $59.53 $28,622.22 A022 Rebar (#4) 100 FT 2 $2.04 $2.08 $2.12 $2.16 $1,040.81

A023 Shoulder Striping 4" 10000 FT 1 $1.02 $1.04 $1.06 $1.08 $52,040.40 A024 Centerline Striping 4" 5000 FT 1 $1.02 $1.04 $1.06 $1.08 $26,020.20 A025 Parking Area Striping 300 FT 4 $4.08 $4.16 $4.24 $4.33 $6,244.85 A026 Stop Line Striping (12") 20 FT 114 $116.28 $118.61 $120.98 $123.40 $11,865.21 A027 Handicap & Misc. Symbols 2 EA 348 $354.96 $362.06 $369.30 $376.69 $3,622.01

A028 Seeding 300 SY 2 $2.04 $2.08 $2.12 $2.16 $3,122.42 A029 Erosing Blanket 300 SY 5 $5.10 $5.20 $5.31 $5.41 $7,806.06

A030 18" CMP 0'-10' Deep 20 FT 55 $56.10 $57.22 $58.37 $59.53 $5,724.44 A031 18" CMP 10'-20' Deep 20 FT 65 $66.30 $67.63 $68.98 $70.36 $6,765.25 A032 18" Flared End 1 EA 400 $408.00 $416.16 $424.48 $432.97 $2,081.62 A033 18" Elbow (22.5 or 45 Degree) 1 EA 400 $408.00 $416.16 $424.48 $432.97 $2,081.62 A034 24" CMP 0'-10' Deep 20 FT 63 $64.26 $65.55 $66.86 $68.19 $6,557.09 A035 24" CMP 10'-20' Deep 20 FT 68 $69.36 $70.75 $72.16 $73.61 $7,077.49 A036 24" Flared End 1 EA 500 $510.00 $520.20 $530.60 $541.22 $2,602.02 A037 24" Elbow (22.5 or 45 Degree) 1 EA 500 $510.00 $520.20 $530.60 $541.22 $2,602.02 A038 Erosion Riprap 10 TON 65 $66.30 $67.63 $68.98 $70.36 $3,382.63 A039 Drainage Structure 4' Depth 1 EA 4500 $4,590.00 $4,681.80 $4,775.44 $4,870.94 $23,418.18

$2,090,863.64

TOTALUNIT PRICE (YEAR

1) UNIT PRICE (YEAR 2) UNIT PRICE (YEAR 3) UNIT PRICE (YEAR 4) UNIT PRICE (YEAR 5)

C. AMENDMENTS ACKNOWLEDGED

N/A

6. NUMBER OF AMENDMENTS ISSUED

B. BID SECRUITY (Type & Amount) 20%

A. OFFEROR

RP&H (CAGE 07KCY)

5. PROJECT TITLE

9. OFFERS

TO THIS SOLICITATION

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type) David W. Neal, Contracting Officer

1. SOLICITATION NUMBER

W9128F20B0030

HOT MIX ASPHALT (SPECIFICATION SECTION 32 12 16)

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

l PAGES

NO.2

ABSTRACT OF OFFERS - CONSTRUCTION

4. ISSUING OFFICE

ASPHALTIC SEAL & FOG COATS (SPECIFICATION SECTION 32 12 36.13)

CONCRETE WORK (SPECIFICATION SECTION 32 16 13)

PAVEMENT MARKINGS (SPECIFICATION SECTION 32 17 24.00 10)

SEEDING (SPECIFICATION SECTION 32 92 19)

STORM DRAINAGE PIPING - INSTALLED (SPECIFICATION SECTION 33 40 00)

COLD MILLING OF BITUMINOUS PAVEMENT (SPECIFICATION SECTION 32 01 16.17)

CRACK SEALING (SPECIFICATION SECTION 32 01 17.16

AGGREGATE BASE COURSE (SPECIFICATION SECTION 32 11 23)

BITUMINOUS SURFACE TREATMENT (SPECIFICATION SECTION 32 12 11)

Bid Abstract_W9128F20B0030_IGE
PAGE1
Bid Abstract_W9128F20B0030_Offer 1_MORRIS
PAGE1
Bid Abstract_W9128F20B0030_Offer 2_RPH
PAGE1
2020-07-22T08:11:38-0500
NEAL.DAVID.W.1115489000

File details come from the government source that posted it. Updated .