About this file

This abstract of offers is for a construction contract to perform Missouri River Recovery Operation and Maintenance projects on structures located on the Missouri River in Iowa, Missouri, and Nebraska. The projects include rehabilitating damaged structures at Upper and Lower Hamburg, Kansas Bend Chute, and Nishnabotna Bend Chute by adding stone to replace deteriorated areas, grading, and restoring sites. The contract has a total estimated value between $5-10 million and is restricted to small businesses under the NAICS code 237990. Bids were due by September 2, 2020 and the work must be completed within 730 days of notice to proceed. The document provides the agency estimate and multiple bidders' pricing for the base work and various options to rehabilitate additional structures. The Army Corps of Engineers Omaha District is the issuing agency.

View the file

Other files

File Type Posted
MRROM South Hamburg Nish Kansas.pdf PDF
Mo River MRROM SOUTH MRR0 Drawings_RTA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED

I CERTIFY THAT I HAVE OPENED, READ AND

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

X C. REASONABLE CONTRACT

7A. 7B. 7C. 7D. 7E. 7F. 7E. F. E. F.

ITEM # DESCRIPTION EST. QTY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT

Basic Items

Entire work, complete, for quarried stone as shown on the drawings and in the specifications for Upper Hamburg (4 Structures) 23,568 TONS

87.87$ 2,070,920.16$ 83.50$ 1,967,928.00$ 91.00$ 2,144,688.00$

Entire work, complete, for quarried stone as shown on the drawings and in the specifications for Lower Hamburg (2 Structures) 19,377 TONS

87.87$ 1,702,656.99$ 81.00$ 1,569,537.00$ 93.00$ 1,802,061.00$

0003 All remaining work Except for Option Items listed below 1 JOB 476,400.00$ 476,400.00$ 128,000.00$ 128,000.00$ 584,000.00$ 584,000.00$ All remaining work Except for Option I tems listed below (Items 0001 thru 0003)

4,249,977.15$ 3,665,465.00$ 4,530,749.00$

Option 1

Entire work, complete, for quarried stone as shown on the drawings and in the specifications for Upper Hamburg (8 Structures) 4,585 TONS

87.87$ 402,883.95$ 75.00$ 343,875.00$ 89.00$ 408,065.00$

All remaining work in the option area as shown on the drawings and in the specifications 1 JOB

29,630.00$ 29,630.00$ 25,000.00$ 25,000.00$ 120,000.00$ 120,000.00$

Total Amount - Option 1 (Items 0004 & 0005) 432,513.95$ 368,875.00$ 528,065.00$

Option 2

Entire work, complete, for quarried stone as shown on the drawings and in the specifications for Lower Hamburg (2 Structures) 17,823 JOB

87.87$ 1,566,107.01$ 60.00$ 1,069,380.00$ 72.00$ 1,283,256.00$

All remaining work in the option area as shown on the drawings and in the specifications 1 JOB

85,360.00$ 85,360.00$ 5,000.00$ 5,000.00$ 130,000.00$ 130,000.00$

Total Amount - Option 2 (Items 0006 & 0007) 1,651,467.01$ 1,074,380.00$ 1,413,256.00$

Option 3

Entire work, complete, for quarried stone as shown on the drawings and in the specifications for Kansas Bend (3 Structures) 5,425 TONS

87.87$ 476,694.75$ 80.00$ 434,000.00$ 87.00$ 471,975.00$

All remaining work in the option area as shown on the drawings and in the specifications 1 JOB

33,520.00$ 33,520.00$ 15,000.00$ 15,000.00$ 70,000.00$ 70,000.00$

Total Amount - Option 3 (Items 0008 & 0009) 510,214.75$ 449,000.00$ 541,975.00$

Option 4

Entire work, complete, for quarried stone as shown on the drawings and in the specifications for Nishnabotna (3 Structures) 9,735 TONS

87.87$ 855,414.45$ 70.00$ 681,450.00$ 93.00$ 905,355.00$

All remaining work in the option area as shown on the drawings and in the specifications 1 JOB

51,670.00$ 51,670.00$ 7,500.00$ 7,500.00$ 40,000.00$ 40,000.00$

Total Amount - Option 4 (Items 0010 & 0011) 907,084.45$ 688,950.00$ 945,355.00$

Option 5

Entire work, complete, for quarried stone as shown on the drawings and in the specifications for Upper Hamburg (2 Structures) 13,790 TONS 87.87$

1,211,727.30$ 60.00$

827,400.00$ 77.00$

1,061,830.00$

All remaining work in the option area as shown on the drawings and in the specifications 1 JOB 68,510.00$

68,510.00$ 5,000.00$

5,000.00$ 40,000.00$

40,000.00$

Total Amount - Option 5 (Items 0012 & 0013) 1,280,237.30$ 832,400.00$ 1,101,830.00$

Option 6

Entire work, complete, for quarried stone as shown on the drawings and in the specifications for Lower Hamburg (1 Structures) 446 TONS 87.87$

39,190.02$ 99.00$

44,154.00$ 125.00$

55,750.00$

All remaining work in the option area as shown on the drawings and in the specifications 1 JOB 12,130.00$

12,130.00$ 10,000.00$

10,000.00$ 60,000.00$

60,000.00$

Total Amount - Option 6 (Items 0014 & 0015) 51,320.02$ 54,154.00$ 115,750.00$

Option 7

Entire work, complete, for quarried stone as shown on the drawings and in the specifications for Nishnabotna (3 Structures) 7,669 TONS 87.87$

673,875.03$ 70.00$

536,830.00$ 93.00$

713,217.00$

All remaining work in the option area as shown on the drawings and in the specifications 1 JOB 42,590.00$

42,590.00$ 7,500.00$

7,500.00$ 40,000.00$

40,000.00$

Total Amount - Option 7 (Items 0016 & 0017) 716,465.03$ 544,330.00$ 753,217.00$

Option 8

Entire work, complete, for quarried stone as shown on the drawings and in the specifications for Nishnabotna (1 Structures) 1,320 TONS 87.87$

115,988.40$ 70.00$

92,400.00$ 72.00$

95,040.00$

All remaining work in the option area as shown on the drawings and in the specifications 1 JOB 16,020.00$

16,020.00$ 7,500.00$

7,500.00$ 40,000.00$

40,000.00$

Total Amount - Option 8 (Items 0018 & 0019) 132,008.40$ 99,900.00$ 135,040.00$

TOTAL BASIC AMOUNT (Item 0001 thru 0003) 4,249,977.15$ 3,665,465.00$ 4,530,749.00$

TOTAL AMOUNT BASIC PLUS 9,931,288.06$ 7,777,454.00$ 10,065,237.00$

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

l PAGES

TO THIS SOLICITATION

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

NO. 2

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

W9128F20B0027

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE

(Check A, B or C AND COMPLETE D, E AND F)

5. PROJECT TITLE 9. OFFERS

Bid Bond 20%

A. OFFEROR A. OFFEROR

5 Jones Street

A. HIRED LABOR

GOVERNMENT ESTIMATE

Dubuque Barge & Fleeting Service DBA Newt Marine Service

Dubuque, IA 52001

C. AMENDMENTS ACKNOWLEDGED

B. BID SECURITY (Type & Amount) B. BID SECURITY (Type & Amount) Bid Bond 20%

C. AMENDMENTS ACKNOWLEDGED

705 Douglas Street

B. REASONABLE CONTRACT

(Including Profit)

(Without Profit)

6. NUMBER OF AMENDMENTS ISSUED

Sioux City, IA 51101

2020 MMRP O&M Projects (South) Missouri River, IA, MO, & NE

Missouri River Recovery Fish & Wildlife Mitigation Western Contracting Corporation

NO. 1

File details come from the government source that posted it. Updated .