KO Revised Bid Abstract - Force Main Bank Stablization - Oahe SD 7May2020.pdf

PDF 363 KB Posted

Attached to
Force Main Bank Stabilization at Oahe Dam, SD Federal contract opportunity
Solicitation number
w9128f20b0018
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This abstract of offers document summarizes bids received in response to Solicitation Number W9128F-20-B-0018 for a bank stabilization project at the Oahe Dam Outlet Works Channel. Three offers were received for furnishing all plant, labor, materials, and equipment to provide approximately 2,000 cubic yards of earth embankment, 5,000 square yards of geotextile, and 10,000 tons of riprap stone protection at the project site. Offerors provided unit pricing for items including riprap, geotextile fabric, embankment material, and choking material, with total bid prices ranging from $765,675 to $1,268,750. The apparent low offeror was A.G.E. Corporation of Fort Pierre, South Dakota at $765,675. The contracting office for this project is the Department of the Army Corps of Engineers Engineering District Omaha.

View the file

Other files for this federal contract opportunity

Other files attached to Force Main Bank Stabilization at Oahe Dam, SD, newest first.
File Type Posted
KO Bid Abstract - Force Main Bank Stablization Oahe Dam.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
Force Main Bank Stabilization Oahe Dam SD.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED3. DATE OPENED

I CERTIFY THAT I HAVE OPENED, READ AND

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

X C. REASONABLE CONTRACT

7A 7B 7C D. E. F.

ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNTUNIT PRICE ESTIMATED AMOUNT

CLIN 0001

All work complete to supply and install riprap as specified in the specifications and drawings.

8,600

TON

$68.40 $588,240.00 59.00$ $507,400.00 43.50$ $374,100.00

CLIN 0002

All work complete to supply and install geotextile fabric as specified

5,000

SY

2.40$ $12,000.00 5.50$ $27,500.00 3.00$ $15,000

CLIN 0003

All work complete to supply, haul, place, and compact embankment (cut/fill) for bank stabilization as specified.

1,500

CY

27.550$ $41,325.00 21.50$ $32,250.00 20.00$ $30,000.00

CLIN 0004

All work complete to supply and install choking material as specified.

TON

31.15$ $1,557.50 35.00$ $1,750.00 60.00$ $3,000.00

CLIN 0005

All remaining work including but not limited to:

mobilization, demobilization, access road, shaping, and maintenance, and all other work except the work listed in the items above and below. 1

JOB

XXX $96,200.00 $175,000.00 $33,000.00

$739,322.50 $743,900.00 $455,100.00

CLIN 0006

All work complete to supply and install riprap as specified.

2,050

TON

68.40$ $140,220.00 59.00$ $120,950.00 43.50$ $89,175.00

CLIN 0007

All work complete to supply and install geotextile fabric as specified.

1,250

SY

2.40$ $3,000.00 5.50$ $6,875.00 3.00$ $3,750.00

CLIN 0008

All work complete to supply, haul, place, and compact embankment (cut/fill) for bank stabilization as specified.

CY

27.55$ $6,887.50 21.50$ $5,375.00 20.00$ $5,000.00

CLIN 0009

All work complete to supply and install choking material as specified.

TON

31.15$ $311.50 35.00$ $350.00 60.00$ $600.00

CLIN 0010

All Remaing Work

JOB

XXX $11,700.00 $41,400.00 $5,000.00

$162,119.00 $174,950.00 $103,525.00

CLIN 0011

All work complete to supply and install riprap as specified.

2,050

TON

68.40$ $140,220.00 59.00$ $120,950.00 43.50$ $89,175.00

CLIN 0012

All work complete to supply and install geotextile fabric as specified.

1,250

SY

2.40$ $3,000.00 5.50$ $6,875.00 3.00$ $3,750.00

CLIN 0013

All work complete to supply, haul, place, and compact embankment (cut/fill) for bank stabilization as specified.

CY

27.55$ $6,887.50 21.50$ $5,375.00 20.00$ $5,000.00

CLIN 0014

All work complete to supply and install choking material as specified.

TON

31.15$ $311.50 35.00$ $350.00 60.00$ $600.00

CLIN 0015

All remaining work

JOB

XXX $11,700.00 $41,400.00 $5,000.00

$162,119.00 $174,950.00 $103,525.00

CLIN 0016

All work complete to supply and install riprap as specified

2,050

TON

68.40$ $140,220.00 59.00$ $120,950.00 43.50$ $89,175.00

CLIN 0017

All work complete to supply and install geotextile fabric as specified.

1,250

SY

2.40$ $3,000.00 5.50$ $6,875.00 3.00$ $3,750.00

CLIN 0018

All work complete to supply, haul, place, and compact embankment (cut/fill) for bank stabilization as specified

CY

27.55$ $6,887.50 21.50$ $5,375.00 20.00$ $5,000.00

CLIN 0019

All work complete to supply and install choking material as specified

TON

31.15$ $311.50 35.00$ $350.00 60.00$ $600.00

CLIN 0020

All Remaining Work

JOB

XXX $11,700.00 $41,400.00 $5,000.00

$162,119.00 $174,950.00 $103,525.00

TOTAL $1,225,679.50 $1,268,750.00 $765,675.00

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

l PAGES

9. OFFERS

TO THIS SOLICITATION

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type) Dean Matuszewski - Contracting Officer/ Nicole Parker - Contracting Specialist

NO. 1 NO. 2

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

W9128F-20-B-0018

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE

(Check A, B or C AND COMPLETE D, E AND F)

5. PROJECT TITLE

(Without Profit)

(Including Profit)

A. OFFEROR A. OFFEROR

704 W Highway 14 & 34 PO Box 1162

A. HIRED LABOR

IGE A-G-E corporation Morris Inc

Fort Pierre, SD 57532 Pierre, SD 57501

B. REASONABLE CONTRACT

Bid Security 20%

C. AMENDMENTS ACKNOWLEDGED 2

Bid Security 20%

C. AMENDMENTS ACKNOWLEDGED 2

6. NUMBER OF AMENDMENTS ISSUED 2

Force Main Bank Stablization

Oahe Dam, AD

2020-05-07T13:49:03-0500
MATUSZEWSKI.DEAN.P.1100724550