W9128F19Q0113_Specs_and_Related_Data.pdf
PDF 17 MB Posted
- Attached to
- Downstream Campground Rural Water Installation Federal contract opportunity
- Solicitation number
- W9128F19Q0113
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F19Q0113_Question_and_Answer.docx | DOCX document | |
| Site_Visit_28_AUG_19.pdf | ||
| W9128F19Q0113_Solicitation.pdf | ||
| W9128F19Q0113_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 33 11 00
WATER UTILITY DISTRIBUTION PIPING
02/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C500 (2009) Metal-Seated Gate Valves for Water Supply Service
AWWA C504 (2015) Standard for Rubber-Seated Butterfly Valves
AWWA C509 (2015) Resilient-Seated Gate Valves for Water Supply Service
AWWA C511 (2017) Reduced-Pressure Principle Backflow Prevention Assembly
AWWA C515 (2015) Reduced-Wall, Resilient-Seated Gate Valves for Water Supply Service
AWWA C550 (2017) Protective Interior Coatings for Valves and Hydrants
AWWA C605 (2014) Underground Installation of Polyvinyl Chloride (PVC) and Molecularly Oriented Polyvinyl Chloride (PVCO) Pressure Pipe and Fittings
AWWA C651 (2014) Standard for Disinfecting Water Mains
AWWA C655 (2009) Field Dechlorination
AWWA C704 (2015) Propeller-Type Meters for
Waterworks Applications
AWWA C800 (2014) Underground Service Line Valves and Fittings
AWWA M23 (2002; 2nd Ed) Manual: PVC Pipe - Design and Installation
AWWA M55 (2006) PE Pipe - Design and Installation
AWWA M6 (2012) Water Meters - Selection, Installation, Testing, and Maintenance
ASME INTERNATIONAL (ASME)
ASME B1.20.1 (2013) Pipe Threads, General Purpose (Inch)
ASME B1.20.3 (1976; R 2013) Dryseal Pipe Threads (Inch)
ASME B16.1 (2015) Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125, and 250
ASME B16.18 (2018) Cast Copper Alloy Solder Joint Pressure Fittings
ASME B16.26 (2013) Standard for Cast Copper Alloy Fittings for Flared Copper Tubes
ASME B16.3 (2016) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.4 (2011) Standard for Gray Iron Threaded Fittings; Classes 125 and 250
ASME B18.2.2 (2015) Nuts for General Applications:
Machine Screw Nuts, Hex, Square, Hex Flange, and Coupling Nuts (Inch Series)
ASME B18.5.2.1M (2006; R 2011) Metric Round Head Short Square Neck Bolts
ASME B18.5.2.2M (1982; R 2010) Metric Round Head Square Neck Bolts
ASTM INTERNATIONAL (ASTM)
ASTM A276/A276M (2017) Standard Specification for Stainless Steel Bars and Shapes
ASTM A307 (2014; E 2017) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength
ASTM A47/A47M (1999; R 2018; E 2018) Standard Specification for Ferritic Malleable Iron Castings
ASTM A48/A48M (2003; R 2012) Standard Specification for Gray Iron Castings
ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A536 (1984; R 2014) Standard Specification for Ductile Iron Castings
ASTM A563 (2015) Standard Specification for Carbon and Alloy Steel Nuts
ASTM A563M (2007; R 2013) Standard Specification for Carbon and Alloy Steel Nuts (Metric)
ASTM A746 (2018) Standard Specification for Ductile Iron Gravity Sewer Pipe
ASTM B32 (2008; R 2014) Standard Specification for Solder Metal
ASTM B584 (2014) Standard Specification for Copper Alloy Sand Castings for General Applications
ASTM B61 (2015) Standard Specification for Steam or Valve Bronze Castings
ASTM B62 (2017) Standard Specification for Composition Bronze or Ounce Metal Castings
ASTM B88 (2016) Standard Specification for Seamless Copper Water Tube
ASTM B88M (2018) Standard Specification for Seamless Copper Water Tube (Metric)
ASTM C1433 (2016b) Standard Specification for Precast Reinforced Concrete Monolithic Box Sections for Culverts, Storm Drains, and Sewers
ASTM C150/C150M (2018) Standard Specification for Portland Cement
ASTM C94/C94M (2018) Standard Specification for Ready-Mixed Concrete
ASTM D1599 (2014; E 2015) Resistance to Short-Time Hydraulic Failure Pressure of Plastic Pipe, Tubing, and Fittings
ASTM D1784 (2011) Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds
ASTM D1785 (2015; E 2018) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120
ASTM D2241 (2015) Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series)
ASTM D2466 (2017) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40
ASTM D2467 (2015) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80
ASTM D2774 (2012) Underground Installation of Thermoplastic Pressure Piping
ASTM D2855 (2015) Standard Practice for Making Solvent-Cemented Joints with Poly(Vinyl Chloride) (PVC) Pipe and Fittings
ASTM D3035 (2015) Polyethylene (PE) Plastic Pipe (DR-PR) Based on Controlled Outside Diameter
ASTM D3139 (1998; R 2011) Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals
ASTM D3261 (2016) Standard Specification for Butt Heat Fusion Polyethylene (PE) Plastic Fittings for Polyethylene (PE) Plastic Pipe and Tubing
ASTM D3839 (2014) Underground Installation of "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Pipe
ASTM D4161 (2014) "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Pipe Joints Using Flexible Elastomeric Seals
ASTM F1483 (2017) Standard Specification for Oriented Poly(Vinyl Chloride), PVCO, Pressure Pipe
ASTM F1674 (2011) Standard Test Method for Joint Restraint Products for Use with PVC Pipe
ASTM F1962 (2011) Standard Guide for Use of Maxi-Horizontal Directional Drilling for Placement of Polyethylene Pipe or Conduit Under Obstacles, Including River Crossings
ASTM F2164 (2013) Standard Practice for Field Leak Testing of Polyethylene (PE) and
Crosslinked Polyethylene (PEX) Pressure Piping Systems Using Hydrostatic Pressure
ASTM F2620 (2013) Standard Practice for Heat Fusion Joining of Polyethylene Pipe and Fittings
ASTM F402 (2005; R 2012) Safe Handling of Solvent Cements, Primers, and Cleaners Used for Joining Thermoplastic Pipe and Fittings
ASTM F477 (2014) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
ASTM F714 (2013) Polyethylene (PE) Plastic Pipe (SDR-PR) Based on Outside Diameter
FOUNDATION FOR CROSS-CONNECTION CONTROL AND HYDRAULIC RESEARCH
(FCCCHR)
FCCCHR List (continuously updated) List of Approved Backflow Prevention Assemblies
FCCCHR Manual (10th Edition) Manual of Cross-Connection Control
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-80 (2013) Bronze Gate, Globe, Angle and Check Valves
NSF INTERNATIONAL (NSF)
NSF 372 (2016) Drinking Water System Components - Lead Content
NSF/ANSI 14 (2018) Plastics Piping System Components and Related Materials
NSF/ANSI 61 (2017) Drinking Water System Components - Health Effects
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-600-01 (2016; with Change 2, 2018) Fire Protection Engineering for Facilities
UNDERWRITERS LABORATORIES (UL)
UL 246 (2011; Reprint Dec 2018) UL Standard for Safety Hydrants for Fire-Protection Service
UL 262 (2004; Reprint Oct 2011) Gate Valves for Fire-Protection Service
UL 312 (2010; Reprint Mar 2018) UL Standard for Safety Check Valves for Fire-Protection Service
UNI-BELL PVC PIPE ASSOCIATION (UBPPA)
UBPPA UNI-PUB-08 (2016) Tapping Guide for PVC Pressure Pipe
1.2 DEFINITIONS
1.2.1 Water Service Lines
Water service lines include water piping from a water main to a camp loop service at a point approximately 25 feet from the point indicated on the drawings, specific materials, methods of joining and any appurtenances deemed necessary for a satisfactory system.
1.2.2 Additional Definitions
For additional definitions refer to the definitions in the applicable referenced standard.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following submittals to the Garrison Project Office:
SD-01 Preconstruction Submittals
Connections; G, GPO
SD-03 Product Data
Pipe, Fittings, Joints and Couplings; G, GPO
Valves; G, GPO
Valve Boxes; G, GPO
Tapping Sleeves; G, GPO
Disinfection Procedures; G, GPO
SD-06 Test Reports
Bacteriological Samples; G, GPO
Post-Construction Fusion Report; G, GPO
Leakage Test; G, GPO
Hydrostatic Test; G, GPO
SD-07 Certificates
Pipe, Fittings, Joints and Couplings; G, GPO
SD-08 Manufacturer's Instructions
PVC Piping
Polyethylene (PE) Pipe
PVC Piping For Service Lines
1.4 QUALITY CONTROL
1.4.1 Regulatory Requirements
Comply with NSF/ANSI 14 or NSF/ANSI 61 and NSF 372 for materials for potable water systems; comply with lead content requirements for "lead-free" plumbing as defined by the U.S. Safe Drinking Water Act effective January 2014. Provide materials bearing the seal of the National Sanitation Foundation (NSF) for potable water service.
1.4.2 Qualifications
1.4.2.1 Fusion Technician Qualifications
Submit a certificate from the manufacturer of the fusible pipe that shows the fusion technician is fully qualified to install fusible pipe of the types and sizes being used. Qualification must be current as of the actual date of fusion performance on the project.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery and Storage
Inspect materials delivered to site for damage. Unload and store with minimum handling and in accordance with manufacturer's instructions. Store materials on site in enclosures or under protective covering. Store plastic piping, jointing materials and rubber gaskets under cover out of direct sunlight. Do not store materials directly on the ground. Keep inside of pipes, fittings, valves, yard hydrants, and other accessories free of dirt and debris.
1.5.2 Handling
Handle pipe, fittings, valves, yard hydrants and other accessories in accordance with manufacturer's instructions and in a manner to ensure delivery to the trench in sound undamaged condition. Avoid injury to coatings and linings on pipe and fittings; make repairs if coatings or linings are damaged. Do not place other material, hooks, or pipe inside a pipe or fitting after the coating has been applied. Inspect the pipe for defects before installation. Carry, do not drag pipe to the trench. Use of pinch bars and tongs for aligning or turning pipe will be permitted only on the bare ends of the pipe. Clean the interior of pipe and accessories of foreign matter before being lowered into the trench and keep them clean during laying operations by plugging. Replace defective material without additional expense to the Government. Store rubber gaskets, not immediately installed, under cover or out of direct sunlight.
Handle PVC , fittings, and accessories in accordance with AWWA C605.
Handle PE pipe, fittings, and accessories in accordance with AWWA M55.
PART 2 PRODUCTS
MATERIALS
Provide all materials in accordance with AWWA C800 and as indicated herein. Provide valves and fittings with pressure ratings equivalent to the pressure ratings of the pipe.
2.1 Pipe, Fittings, Joints And Couplings
Submit manufacturer's standard drawings or catalog cuts, except submit both drawings and cuts for push-on and rubber-gasketed bell-and-spigot joints.
Include information concerning gaskets with submittal for joints and couplings.
2.2 PLASTIC Piping
2.2.1 PVC Piping
ASTM D2241, Gasket bell end, with a minimum Pressure Class 200 (DR 21.
2.2.2 Fittings for PVC Pipe
Gray iron or ductile iron fittings, AWWA C110/A21.10 or AWWA C153/A21.53, with cement-mortar lining for fittings, AWWA C104/A21.4, standard thickness. Fittings with push-on joint ends are to conform to the same requirements as fittings with mechanical-joint ends, except that bell design is to be factory modified for push-on joint compatible for use with PVC plastic pipe specified in this paragraph. Provide cement-mortar lined iron fittings and specials in accordance with AWWA C104/A21.4. Fittings and specials of the same material as the pipe with elastomeric gaskets, in conformance with AWWA C605. Manufacture pipe couplings and fittings for PVCO plastic from material that meets ASTM F1483 and ASTM D1784, Class 12454-B.
2.2.3 Joints and Jointing Material for PVC
Provide push-on joints ASTM D3139 between pipes, pipes and metal fittings, valves, and other accessories or compression-type joints/mechanical joints, ASTM D3139 and AWWA C111/A21.11. Provide each joint connection with an elastomeric gasket compatible for the bell or coupling with which it is to be used. Gaskets for push-on joints for pipe, ASTM F477. Gaskets for push-on joints and compression-type joints/mechanical joints for joint connections between pipe and metal fittings, valves, and other accessories, AWWA C111/A21.11, respectively, for push-on joints and mechanical joints.
Utilize mechanically coupled joints using a sleeve-type mechanical coupling, as specified in the paragraph SLEEVE-TYPE MECHANICAL COUPLINGS, as an optional jointing method in lieu of push-on joints on plain-end PVC plastic pipe, subject to the limitations specified for mechanically coupled joints using a sleeve-type mechanical coupling and to the use of internal stiffeners as specified for compression-type joints in ASTM D3139.
2.3 PVC Piping for Service Lines
2.3.1 Pipe and Fittings
ASTM D2241, with SDR 21 as necessary to provide 200 psi minimum pressure rating. Fittings, ASTM D2467. Provide pipe and fittings of the same PVC plastic material and of the following pipe/fitting combinations, as marked on the pipe and fitting, respectively: PVC 1120/PVC I; PVC 1220/PVC 12; PVC
2120/PVC II; PVC 2116/PVC II.
2.3.2 Joints and Jointing Materials
Provide elastomeric-gasket or solvent cement joints. Solvent cement for jointing, ASTM D2564. Test pipe couplings, when used as required by
ASTM D2464.
2.4 Polyethylene (PE) Pipe
ASTM D3035, PE4710, material designation code CC2 or CC3 with a minimum Pressure Class 200 (DR11)
2.4.1 Fittings For PE Pipe
AWWA M55, ASTM D3035, molded and manufactured to comply with ASTM F714.
AWWA M55, ASTM D3261 for butt fusion fittings ANSI Class 250 or as necessary to provide minimum pressure rating
2.4.2 Joints and Jointing Materials
a. Mechanical Joint: DIOD Mechanical joint adapter and gaskets for mechanical joints for joint connections between pipe and metal fittings, valves, and other accessories, AWWA C111/A21.11.
b. Butt Fusion: Jointing is to comply with ASTM D2657, Butt Fusion. No offset in alignment between adjacent pipe joints of fittings is permitted.
2.5 Valves
2.5.1 Gate Valves 3 Inch Size and Larger on Buried Piping
Valves matching requirements of: AWWA C509: nonrising stem type with mechanical-joint ends or resilient-seated gate valves 3 to 12 inches in size. Valves open by counterclockwise rotation of the valve stem.
Stuffing boxes have 0-ring stem seals. Stuffing boxes are bolted and constructed so as to permit easy removal of parts for repair. Use valves with special ends for connection to cement piping or to sleeve-type mechanical coupling in lieu of mechanical-joint ends and push-on joint ends. Provide valve ends and gaskets for connection to cement piping or to sleeve-type mechanical couplings that conform to the requirements specified respectively for the joint or coupling. Provide a protective interior coating in accordance with AWWA C550
2.5.2 Pressure Reducing Valves
Provided by the Government
2.5.3 Valve Boxes
Provide a valve box for each gate valve on buried piping. Construct adjustable valve boxes manufactured from cast iron or precast concrete of a size compatible for the valve on which it is used. Provide cast iron valve boxes with a minimum cover and wall thickness of 3/16 inch and conforming to ASTM A48/A48M, Class 35B. Coat the cast-iron box with a heavy coat of bituminous paint. Provide a round head. Cast the word "WATER" on the lid. The minimum diameter of the shaft of the box is 5 1/4 inches[as indicated.
2.6 Meters
Will be provided by the Government
2.7 Backflow Preventers
Will be provided by the Government.
2.8 Yard Hydrants
Hydrants shall be Merril Model: AFNL7508 3/4-inch x 8 feet or similar
2.9 Disinfection
Chlorinating materials are to conform to: Chlorine, Liquid: AWWA B301;
Hypochlorite, Calcium and Sodium: AWWA B300
2.10 Vault
Vault shall be #48 Nodak Pump Chamber by Monarch Concrete Products or similar
2.11 Tapping Sleeves
Provide cast gray, ductile, malleable iron or stainless steel, split-sleeve type tapping sleeves of the sizes indicated for connection to existing main with flanged or grooved outlet, and with bolts, follower rings and gaskets on each end of the sleeve. Utilize similar metals for bolts, nuts, and washers to minimize the possibility of galvanic corrosion. Provide dielectric gaskets where dissimilar metals adjoin. Provide a tapping sleeve assembly with a maximum working pressure of 150 psi. Provide bolts with square heads and hexagonal nuts. Longitudinal gaskets and mechanical joints with gaskets as recommended by the manufacturer of the sleeve. When using grooved mechanical tee, utilize an upper housing with full locating collar for rigid positioning which engages a machine-cut hole in pipe, encasing an elastomeric gasket which conforms to the pipe outside diameter around the hole and a lower housing with positioning lugs, secured together during assembly by nuts and bolts as specified, pre-torqued to 50 foot-pound.
2.12 Water Service Line Appurtenances
2.12.1 Curb or Service Stops
Ground key, round way, inverted key type; made of lead-free bronze, ASTM B61 or ASTM B62; and compatible with the working pressure of the system.
Provide compatible ends for connection to the service piping. Cast an arrow into body of the curb or service stop indicating direction of flow.
2.12.2 Service Clamps
Provide single or double flattened strap type service clamps used for repairing damaged cast-iron, steel or PVC pipe with a pressure rating not less than that of the pipe being repaired. Provide clamps with a galvanized malleable-iron body with cadmium plated straps and nuts and a rubber gasket cemented to the body.
2.12.3 Curb Boxes
Provide a curb box for each curb or service stop manufactured from cast iron, size capable of containing the stop where it is used. Provide a round head. Cast the word "WATER" on the lid. Factory coat the box with a heavy coat of bituminous paint.
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Connections to Existing System
Perform all connections to the existing water system in the presence of the Contracting Officer.
3.1.2 Operation of Existing Valves
Do not operate valves within or directly connected to the existing water system unless expressly directed to do so by the Contracting Officer.
3.1.3 Earthwork
Perform earthwork operations in accordance with Section 31 00 00.
3.2 INSTALLATION
Install all materials in accordance with the applicable reference standard, manufacturers instructions and as indicated herein.
3.2.1 Piping
3.2.1.1 General Requirements
Install pipe, fittings, joints and couplings in accordance with the applicable referenced standard, the manufacturer's instructions and as specified herein.
3.2.1.1.1 Termination of Water Lines
Do not lay water lines in the same trench with gas lines, fuel lines, electric wiring, or any other utility. Where nonferrous metallic pipe (i.e., copper tubing) crosses any ferrous piping, provide a minimum vertical separation of 12 inches between pipes.
3.2.1.1.2 Pipe Laying and Jointing
Remove fins and burrs from pipe and fittings. Before placing in position, clean pipe, fittings, valves, and accessories, and maintain in a clean condition. Provide proper facilities for lowering sections of pipe into trenches. Under no circumstances is it permissible to drop or dump pipe, fittings, valves, or other water line material into trenches. Cut pipe cleanly, squarely, and accurately to the length established at the site and work into place without springing or forcing. Replace a pipe or fitting that does not allow sufficient space for installation of jointing material. Blocking or wedging between bells and spigots is not permitted.
Lay bell-and-spigot pipe with the bell end pointing in the direction of laying. Grade the pipeline in straight lines; avoid the formation of dips and low points. Support pipe at the design elevation and grade. Secure firm, uniform support. Wood support blocking is not permitted. Lay pipe so that the full length of each section of pipe and each fitting rests solidly on the pipe bedding; excavate recesses to accommodate bells, joints, and couplings. Provide anchors and supports for fastening work into place. Make provision for expansion and contraction of pipelines.
Keep trenches free of water until joints have been assembled. At the end of each work day, close open ends of pipe temporarily with wood blocks or bulkheads. Do not lay pipe when conditions of trench or weather prevent installation. Provide a minimum of 8 feet depth of cover over top of pipe.
3.2.1.1.3 Connections to Existing Water Lines
Make connections to existing water lines after coordination with the facility and with a minimum interruption of service on the existing line.
Make connections to existing lines under pressure in accordance with the recommended procedures of the manufacturer of the pipe being tapped and as indicated.
3.2.1.1.4 Sewer Manholes
No water piping is to pass through or come in contact with any part of a sewer manhole.
3.2.1.1.5 Water Piping Parallel With Sewer Piping
Where the location of the water line is not clearly defined by dimensions on the drawings, do not lay water line closer than 10 feet, horizontally, from any sewer line.
a. Normal Conditions: Lay water piping at least 10 feet horizontally from sewer or sewer manhole whenever possible. Measure the distance from outside edge to outside edge of pipe or outside edge of manhole. When local conditions prevent horizontal separation install water piping in a separate trench with the bottom of the water piping at least 18 inches above the top of the sewer piping.
b. Unusual Conditions: When local conditions prevent vertical separation, construct sewer piping of AWWA compliant ductile iron water piping and perform hydrostatic sewer test, without leakage, prior to backfilling.
When local conditions prevent vertical separation, test the sewer manhole in place to ensure watertight construction.
3.2.1.1.6 Water Piping Crossing Sewer Piping
a. Normal Conditions: Provide a separation of at least 18 inches between the bottom of the water piping and the top of the sewer piping in cases where water piping crosses above sewer piping.
b. Unusual Conditions: When local conditions prevent a vertical separation described above, construct sewer piping passing over or under water piping of AWWA compliant ductile iron water piping and perform hydrostatic sewer test, without leakage, prior to backfilling.
Construct sewer crossing with a minimum 20 feet length of the AWWA compliant ductile iron water piping, centered at the point of the crossing so that joints are equidistant and as far as possible from the water piping. Protect water piping passing under sewer piping by providing a vertical separation of at least 18 inches between the bottom of the sewer piping and the top of the water piping; adequate structural support for the sewer piping to prevent excessive deflection of the joints and the settling on or damage to the water piping.
3.2.1.2 PVC Water Main Pipe
Unless otherwise specified, install pipe and fittings in accordance with the paragraph GENERAL REQUIREMENTS and with the requirements of AWWA C605 for laying of pipe, joining PVC pipe to fittings and accessories, valves, and fittings; and with the recommendations for pipe joint assembly and appurtenance installation in AWWA M23, Chapter 7, "Installation."
a. Jointing: Make push-on joints with the elastomeric gaskets specified for this type joint, using either elastomeric-gasket bell-end pipe or elastomeric-gasket couplings. For pipe-to-pipe push-on joint connections, use only pipe with push-on joint ends having factory-made bevel; for push-on joint connections to metal fittings, valves, and other accessories, cut spigot end of pipe off square and re-bevel pipe end to a bevel approximately the same as that on ductile-iron pipe used for the same type of joint. Use a lubricant recommended by the pipe manufacturer for push-on joints. Assemble push-on joints for pipe-to-pipe joint connections in accordance with the requirements of AWWA C605 for laying the pipe and the recommendations in AWWA M23, Chapter 7, "Installation," for pipe joint assembly. Assemble push-on joints for connection to fittings, valves, and other accessories in accordance with the requirements of AWWA C605 for joining PVC pipe to fittings and accessories and with the requirements of AWWA C600 for joint assembly. Make compression-type joints/mechanical joints with the gaskets, glands, bolts, nuts, and internal stiffeners previously specified for this type joint; assemble in accordance with the requirements of AWWA C605 for joining PVC pipe to fittings and accessories, with the requirements of AWWA C600 for joint assembly, and with the recommendations of Appendix A to AWWA C111/A21.11. Cut off spigot end of pipe for compression-type joint/mechanical-joint connections and do not re-bevel. Assemble joints made with sleeve-type mechanical couplings in accordance with the recommendations of the coupling manufacturer using internal stiffeners as previously specified for compression-type joints.
b. Joint Offset: Construct joint offset in accordance AWWA C605. Do not exceed the minimum longitudinal bending as indicated by AWWA C605.
c. Fittings: Install in accordance with AWWA C605.
3.2.1.3 Polyethylene (PE) Piping
Install PE pipes in accordance with AWWA M55 and ASTM D2774.
3.2.1.4 Screwed Joints
Make screwed joints up tight with a stiff mixture of graphite and oil, inert filler and oil, or graphite compound; apply to male threads only or with PTFE Tape, for use with threaded pipe. Threads are to be full cut; do not leave more than three threads on the pipe exposed after assembling the joint.
3.2.1.5 Plastic Service Piping
Install pipe and fittings in accordance with the paragraph GENERAL REQUIREMENTS and with the applicable requirements of ASTM D2774 [and ASTM D2855], unless otherwise specified. Handle solvent cements used to join plastic piping in accordance with ASTM F402.
3.2.1.5.1 Jointing
Make solvent-cemented joints for PVC piping using the solvent cement previously specified for this material; assemble joints in accordance with ASTM D2855. Make plastic pipe joints to other pipe materials in accordance with the recommendations of the plastic pipe manufacturer.
3.2.1.5.2 Plastic Pipe Connections to Appurtenances
Connect plastic service lines to curb stops and gate valves in accordance with the recommendations of the plastic pipe manufacturer.
3.2.1.6 Trenchless Piping
3.2.1.6.1 Butt Fusion
Fusible pipe will be fused by qualified fusion technicians, as required by manufacturer of the fusion equipment. Record and log each fusion joint by an electronic monitoring device (data logger) connected to the fusion machine. Log fusion data and create Post-Construction Fusion Report with software specifically developed for the pipe material being fused.
Software must record the parameters required by the fusion equipment manufacturer and these specifications. Manual log data not logged by the data logger and be included in the Post-Construction Fusion Report.
Assemble fusible PVC and PE pipe lengths in the field with butt-fused joints. Follow the manufacturer's fusion equipment procedures.
a. Install butt fused PE Pipe in accordance with ASTM F1962.
b. For butt fused PVC Pipe provide joints meeting the requirements of
ASTM F1674.
3.2.1.6.2 Post-Construction Fusion Report
Include the following data for each fusible connection in the report:
a. Pipe Size and Thickness
b. Machine Size
c. Fusion Technician Identification
d. Job Identification
e. Fusion Joint Number
f. Fusion, Heating, and Drag Pressure Settings
g. Heat Plate Temperature
h. Time Stamp
i. Heating and Cool Down Time of Fusion
j. Ambient Temperature
3.2.1.7 Water Service Piping
3.2.1.7.1 Water Service Line Connections to Water Mains
Connect water service lines 2 inch size to the main with a rigid connection and install a curb stop on service line below the frostline as indicated.
Connect water service lines to PVC water mains in accordance with UBPPA UNI-PUB-08 and the recommendations of AWWA M23, Chapter 9, "Service Connections."
3.2.2 Meters
Install meters and meter boxes vaults at the locations shown on the drawings. Center meters in the vaults to allow for reading and ease of removal or maintenance. Set top of box or vault at finished grade.
3.2.3 Backflow Preventers
Install backflow preventers of type, size, and capacity indicated a minimum of 12 inch and a maximum of 36 inch above concrete base. Include valves and test cocks. Install according to the manufacturers requirements and the requirements of plumbing and health department and authorities having jurisdiction. Support NPS 2 1/2 inch and larger backflow preventers, valves, and piping near floor with 12 inch minimum air gap, and on concrete piers or steel pipe supports. Do not install backflow preventers that have a relief drain in vault or in other spaces subject to flooding. Do not install by-pass piping around backflow preventers.
3.2.4 Disinfection
Prior to disinfection, provide disinfection procedures, proposed neutralization and disposal methods of waste water from disinfection as part of the disinfection submittal. Disinfect new water piping and existing water piping affected by Contractor's operations in accordance with AWWA C651. Disinfect new water piping using the AWWA C651 continuous-feed method of chlorination.[ Ensure a free chlorine residual of not less than 10 parts per million after 24 hour holding period and prior to performing bacteriological tests.
3.2.5 Flushing
Perform bacteriological tests prior to flushing. Flush solution from the systems with domestic water until maximum residual chlorine content is within the range of 0.2 to 0.5 parts per million, the residual chlorine content of the distribution system, or acceptable for domestic use. Use AWWA C655 neutralizing chemicals.
3.2.6 Valves
3.2.6.1 Gate Valves
Install gate valves, AWWA C509, in accordance with the requirements of AWWA C600 for valve-and-fitting installation and with the recommendations of the Appendix ("Installation, Operation, and Maintenance of Gate Valves") to AWWA C509. Install gate valves on PVC water mains in accordance with the recommendations for appurtenance installation in AWWA M23, Chapter 7, "Installation." Make and assemble joints to gate valves as specified for making and assembling the same type joints between pipe and fittings.
3.2.7 Pressure Reducing Valve
Install PRV assemblies as indicated on the drawings or in accordance with the manufactures recommendations.
3.3 FIELD QUALITY CONTROL
3.3.1 Tests
Notify the Contracting Officer a minimum of five days in advance of hydrostatic testing. Coordinate the proposed method for disposal of waste water from hydrostatic testing. Perform field tests, and provide labor, equipment, and incidentals required for testing[, except that water needed for field tests will be furnished as set forth in paragraph AVAILABILITY AND USE OF UTILITY SERVICES in Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS]. Provide documentation that all items of work have been constructed in accordance with the Contract documents.
3.3.1.1 Hydrostatic Test
Test the water system in accordance with the applicable AWWA standard specified below. Test PVC plastic water systems made with PVC pipe in accordance with the requirements of AWWA C605 for pressure and leakage tests. The amount of leakage on pipelines made of PVC water main pipe is not to exceed the amounts given in AWWA C605, except that at joints made with sleeve-type mechanical couplings, no leakage will be allowed. Test water service lines in accordance with requirements of AWWA C600 for hydrostatic testing. No leakage will be allowed at plastic pipe joints, flanged joints, screwed joints. Do not backfill utility trench or begin testing on any section of a pipeline where concrete thrust blocks have been provided until at least 7 days after placing of the concrete.
3.3.1.2 Leakage Test
For leakage test, use a hydrostatic pressure not less than the maximum working pressure of the system. Leakage test may be performed at the same time and at the same test pressure as the pressure test.
For PE perform leak testing in accordance with ASTM F2164.
3.3.1.3 Bacteriological Testing
Perform bacteriological tests in accordance with AWWA C651. New water mains obtain two sets of samples for coliform analysis, each sample being collected at least 16 hours apart. Take samples at a yard hydrant in each camp loop plus one set from the end of the line and at least one from each branch greater than one pipe length. Analyze samples by a certified laboratory, and submit the results of the bacteriological samples.
3.4 SYSTEM STARTUP
Water mains and appurtenances must be completely installed, disinfected, flushed, and satisfactory bacteriological sample results received prior to permanent connections being made to the active distribution system. Obtain approval by the Contracting Officer prior to the new water piping being placed into service.
3.5 CLEANUP
Upon completion of the installation of water lines and appurtenances, remove all debris and surplus materials resulting from the work.
-- End of Section --
SECTION 33 05 23.13
UTILITY HORIZONTAL DIRECTIONAL DRILLING
11/13
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.652 Safety and Health Regulations for Construction; Subpart P, Excavations;
Requirements for Protective Systems
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following submittals to the Garrison Project Office:
SD-01 Preconstruction Submittals
Statement of Qualifications and Records; G, GPO
SD-03 Product Data
Polyethylene Pipe; G, GPO
Drilling Fluids; G, GPO
Additives; G, GPO
Mixtures; G, GPO
Safety Data Sheets; G, GPO
1.3 QUALITY CONTROL
1.3.1 Qualifications
Ensure that the field supervisor and workers assigned to this project are experienced in work of this nature and have successfully completed similar projects of similar length, pipe type, pipe size, and soil type using directional drilling in the last three (3) years. As part of the bid submission, submit a description of such project(s) which include, at a minimum, a listing of the location(s), date of project(s), owner, pipe type, size installed, length of installation, type, and manufacturer of equipment used, and other information relevant to the successful completion of the project.
1.3.2 Safety
Include in directional drilling equipment machine safety requirements a common grounding system to prevent electrical shock in the event of underground electrical cable strike. Ensure the grounding system connects all pieces of interconnecting machinery; the drill, mud mixing system, drill power unit, drill rod trailer, operators booth, worker grounding mats, and any other interconnected equipment to a common ground. Equip the drill with an "electrical strike" audible and visual warning system that notifies the system operators of an electrical strike.
1.4 DELIVERY, STORAGE, AND HANDLING
Prior to commencement of the work, submit the following:
a. AWWA C906, ASTM D3035, PE4710, material designation code CC2, CC3 with a minimum Pressure Class 200 (DR11)Polyethylene Pipe
b. Safety Data Sheets
Provide written documentation of conformance with AASHTO T 180. Submit a complete list of all drilling fluids, additives, and mixtures to be used along with Safety Data Sheets.
Inspect materials delivered to the site for damage. All materials found during inspection or during the progress of work to have cracks, flaws, surface abrasions, or other defects will be rejected. Remove defective materials from the job site.
PART 2 PRODUCTS
2.1 EQUIPMENT
2.1.1 Drill Rod
Select the appropriate drill rod to be used.
2.2 MATERIALS
2.2.1 Drilling Fluids
Use a high quality bentonite drilling fluid to ensure hole stability, cuttings transport, bit and electronics cooling, and hole lubrication to reduce drag on the drill pipe and the product pipe. Use only fluid with a composition which complies with all Federal, State, and local environmental regulations.
PART 3 EXECUTION
3.1 INSTALLATION
Ensure all utilities are located and clearly marked prior to start of excavation or drilling.
3.1.1 Drill Set-Up
Design and construct the drill entrance and exit pits.
3.1.1.1 Drilling Fluids
Mix the bentonite drilling fluid with potable water (of proper pH) to ensure no contamination is introduced into the soil during the drilling, reaming, or pipe installation process. Make any required pH adjustments.
3.1.2 Drill Entrance and Exit Pits
Drill entrance and exit pits are required. Maintain at minimum size to allow only the minimum amount of drilling fluid storage prior to transfer to mud recycling or processing system or removal from the site.
Do not allow drilling mud to flow freely on the site or around the entrance or exit pits. Remove spilled mud and restore ground to original condition.
Drilling near wetlands or water courses requires secondary containment to prevent drilling fluids from entering the wetlands. Secure written approval of a secondary containment plan from the Contracting Officer.
3.1.3 Drill Entrance and Exit Angle
Ensure entrance and exit angles and elevation profile maintains adequate cover to reduce risk of drilling fluid breakouts and ground exit occurs as specified herein.
3.1.4 Pilot Hole
The type and size of the pilot string cutting head and the diameter of the drill pipe is at the Contractor's discretion.
a. Mandatory pipeline cover requirements are as shown on the drawings or as specified.
3.1.5 Reaming
Conduct reaming operations at the Contractor's discretion. Determine the type of back reamer to be utilized by the type of subsurface soil conditions that are encountered during the pilot hole drilling operation.
The reamer type is at the Contractor's discretion.
3.1.6 Pull Back
Fully assemble the entire pipeline to be installed via direction drill prior to commencement of pull back operations.
Support the pipeline during pullback operations in a manner to enable it to move freely and prevent damage. Install the pipeline in one continuous pull.
Minimize torsion stress by using a swivel to connect the pull section to the reaming assembly.
Maximum allowable tensile force imposed on the pull section is not to exceed 90 percent of the pipe manufacturer's safe pull (or tensile) strength. If the pull section is made up of multiple pipe size or materials, the lowest safe pull strength value governs and the maximum allowable tensile force is not to exceed 90 percent of this value.
Minimize external pressure during installation of the pullback section in the reamed hole. Replace damaged pipe resulting from external pressure at no cost to the Government. Buoyancy modification is at the discretion of the Contractor.
3.1.7 Drilling Fluids Disposal
Collect drilling fluid returns in the entrance pit, exit pit, or spoils recovery pit. Immediately clean up any drilling fluid spills or overflows from these pits.
Dispose of fluids in a manner that is in compliance with all permits and applicable Federal, State, and local regulations. Disposal of the drilling fluids may occur on approved land owned by the Government subject to written approval from the Contracting Officer. Spread the drilling slurry over the Government-approved disposal area and plow into the soil.
Conduct disposal in compliance with all relative environmental regulations, right-of-way and work space agreements, and permit requirements.
3.1.8 Connection of Product Pipe to Pipeline
After the product pipe has been successfully installed, allow the product pipe to recover for 24 hours prior to connection of the pipeline. Ensure that a sufficient length of the product pipe has been pulled through the hole so that the pull-nose is not pulled back into bore hole due to stretch recovery of the product pipe.
3.2 FIELD QUALITY CONTROL
Maintain drilling logs that accurately provide drill bit location (both horizontally and vertically) at least every 2-inches along the drill path.
In addition, keep logs that record, as a minimum the following, every 15 minutes throughout each drill pass, back ream pass, or pipe installation pass:
a. Drilling Fluid Pressure
b. Drilling Fluid Flow Rate
c. Drill Thrust Pressure
d. Drill Pullback Pressure
e. Drill Head Torque
Make all instrumentation, readings, and logs available to the Contracting Officer at all times during operation.
3.3 CLOSEOUT ACTIVITIES
Immediately upon completion of work, remove all rubbish and debris from the job site. Remove all construction equipment and implements of service leaving the entire area involved in a neat condition acceptable of the Contracting Officer.
Immediately clean "blow holes" or "breakouts" of drilling fluid to the surface and return the surface area to its original condition. Dispose of all drilling fluids, soils, and separated materials in compliance with Federal, State, and local environmental regulations.
Mark the final horizontal and vertical location in the field to be surveyed by the government.
SECTION 31 00 00
EARTHWORK
08/08
PART 1 GENERAL
1.1 Piping Trench Excavation
Payment for trench excavation, boring, backfill, and compaction shall be included in the unit price of pipe per linear foot measured along the centerline of the pipe.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C600 (2017) Installation of Ductile-Iron Mains and Their Appurtenances
ASTM INTERNATIONAL (ASTM)
ASTM D2487 (2017) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D4318 (2017; E 2018) Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils
ASTM D698
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 600/4-79/020 (1983) Methods for Chemical Analysis of Water and Wastes
EPA SW-846.3-3 (1999, Third Edition, Update III-A) Test Methods for Evaluating Solid Waste:
Physical/Chemical Methods
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
CID A-A-203 (Rev C; Notice 3) Paper, Kraft, Untreated
1.3 DEFINITIONS
1.3.1 Satisfactory Materials
Satisfactory backfill materials comprise by ASTM D2487 as CL or CH and SP.
Backfill in contact with pipe shall not contain rocks larger than 1/2-inch in dimension.
1.3.2 Unsatisfactory Materials
Materials which do not comply with the requirements for satisfactory materials are unsatisfactory. Unsatisfactory materials also include man-made fills; trash; refuse; backfills from previous construction; and material classified as satisfactory which contains root and other organic matter or frozen material. Notify the Contracting Officer when encountering any contaminated materials.
1.3.3 Unstable Material
Unstable materials are too wet to properly support the utility pipe, conduit, or appurtenant structure.
1.3.4 Initial Backfill Material
Initial backfill consists satisfactory excavated materials free from rocks 1/2 inches or larger in any dimension or free from rocks of such size as recommended by the pipe manufacturer, whichever is smaller.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
PART 2 PRODUCTS
2.1 BURIED WARNING AND IDENTIFICATION TAPE
Provide polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines. Provide tape on rolls, 3 inches minimum width, color coded as specified below for the intended utility with warning and identification imprinted in bold black letters continuously over the entire tape length. Warning and identification to read, "CAUTION, BURIED (intended service) LINE BELOW" or similar wording.
Provide permanent color and printing, unaffected by moisture or soil.
Warning Tape Color Codes
Red Electric
Yellow Gas, Oil; Dangerous Materials
Orange Telephone and Other Communications
Blue Water Systems
Green Sewer Systems
White Steam Systems
Gray Compressed Air
2.1.1 Detectable Warning Tape for Non-Metallic Piping
Provide polyethylene plastic tape conforming to the width, color, and printing requirements specified above, with a minimum thickness of 0.004 inch, and a minimum strength of 1500 psi lengthwise and 1250 psi crosswise. Manufacture tape with integral wires, foil backing, or other means of enabling detection by a metal detector when tape is buried up to 3 feet deep. Encase metallic element of the tape in a protective jacket or provide with other means of corrosion protection.
PART 3 EXECUTION
3.1 STRIPPING OF TOPSOIL
Where indicated or directed, strip topsoil to a depth of 4 inches. Spread topsoil on areas already graded and prepared for topsoil, or transport and deposit in stockpiles convenient to areas that are to receive application of the topsoil later, or at locations indicated. Keep topsoil separate from other excavated materials, brush, litter, objectionable weeds, roots, stones larger than 2 inches in diameter, and other materials that would interfere with planting and maintenance operations. Remove from the work site any surplus of topsoil from excavations and gradings.
3.2 Clearing and Grubbing
Remove trees, shrubs, and stumps located within the water main corridor.
Prune branches and remove loose bark on trees and shrubs that were broken, cut, or scarred during construction activities. Place removed trees, stumps, shrubs and branches in stockpiles designated by the contracting officer adjacent to the water main corridor. These stockpiles will be disposed by the government.
3.3 GENERAL EXCAVATION
Perform excavation of every type of material encountered within the limits of the project to the lines, grades, and elevations indicated and as specified. Excavation also includes the removal of trees and roots encountered and any other debris. Perform the grading in accordance with the typical sections shown and the tolerances specified in paragraph FINISHING. Transport satisfactory excavated materials and place in fill or embankment within the limits of the work. Excavate unsatisfactory materials encountered within the limits of the work below grade and replace with satisfactory materials as directed. Include such excavated material and the satisfactory material ordered as replacement in excavation.
Dispose surplus satisfactory excavated material not required for fill or embankment in areas approved for surplus material storage or designated waste areas. Dispose unsatisfactory excavated material in designated waste or spoil areas. During construction, perform excavation and fill in a manner and sequence that will provide proper drainage at all times.
Excavate material required for fill or embankment in excess of that produced by excavation within the grading limits from other approved areas selected by the Contractor as specified.
3.3.1 Drainage
Provide for the collection and disposal of surface and subsurface water encountered during construction. Completely drain construction site during periods of construction to keep soil materials sufficiently dry. Construct storm drainage features (ponds/basins) at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity [and] [or] provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed.
3.3.2 Dewatering
Control groundwater flowing toward or into excavations to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. Do not permit French drains, sumps, ditches or trenches within 3 feet of the foundation of any structure, except with specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Take control measures by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. While the excavation is open, maintain the water level continuously, at least one foot below the working level. Operate dewatering system continuously until construction work below existing water levels is complete. Submit performance records weekly. Measure and record performance of dewatering system at same time each day by use of observation wells or piezometers installed in conjunction with the dewatering system.
3.3.3 Trench Excavation Requirements
Excavate the trench as recommended by the manufacturer of the pipe to be installed.