Amd_01_W9128F19Q0065,_Refuse_Collection_for_Ft._Randall.pdf

PDF 182 KB Posted

Attached to
Refuse Collection Federal contract opportunity
Solicitation number
W9128F19Q0065
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

View the file

Other files for this federal contract opportunity

Other files attached to Refuse Collection, newest first.
File Type Posted
Amd_02_W9128F19Q0065,_Refuse_Collection_for_Ft._Randall.pdf PDF
W9128F19Q0065,_Solicitation_for_Refuse_Collection_at_Fort_Randall,_South_Dakota.pdf PDF
Refuse_Contract_-_Site_Location_Map.pdf PDF
Pre-Solicitation_Notice_-_Refuse_Collection.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W59XQG90516375

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

DUMPSTER SERVICES FOR FORT RANDALL PROJECT OFFICE, SOUTH DAKOTA.

POC: Tina Keimig, Email tina.l.keimig@usace.amy.mil

The purpose of the amendment is to correct number of w eeks on line item 0001 thru 0010. All others terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Apr-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F19Q0065

X 9B. DATED (SEE ITEM 11)

10-Apr-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Apr-2019

CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9128F19Q0065

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

FR POWERHOUSE REFUSE COLLECTION (WCC 60314) --- PROJECT NO.: 464484Refuse collection.

Services include furnishing all labor, supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.BASE YEAR - 1 MAY 2019 TO 31 DECEMBER 2019Fort Randall Powerhouse (3 dumpsters emptied on Monday each week) 3 dumpsters X $_______ per dumpsters X $_______ 17 weeks = $__________ Total Cost

To:

FR POWERHOUSE REFUSE COLLECTION (WCC 60314) --- PROJECT NO.: 464484Refuse collection.

Services include furnishing all labor, supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.BASE YEAR - 1 MAY 2019 TO 31 DECEMBER 2019Fort Randall Powerhouse (3 dumpsters emptied on Monday each week) 3 dumpsters X $_______ per dumpsters X 35 weeks = $__________ Total Cost

CLIN 0002

FR OUTSIDE MAINTENANCE REFUSE COLLECTION (WCC 60610) --- PROJECT NO.: 464484Refuse collection. Services include furnishing all labor, supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.BASE YEAR - 1 MAY 2019 TO 31 DECEMBER 2019Fort Randall Outside Maintenance (1 dumpster emptied on Monday each week) 1 dumpsters X $_______ per dumpsters X $_______ 17 weeks = $_______ Total Cost

FR OUTSIDE MAINTENANCE REFUSE COLLECTION (WCC 60610) --- PROJECT NO.: 464484Refuse collection. Services include furnishing all labor, supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.BASE YEAR - 1 MAY 2019 TO 31 DECEMBER 2019Fort Randall Outside Maintenance (1 dumpster emptied on Monday each week) 1 dumpsters X $_______ per dumpsters X 35 weeks = $_______ Total Cost

CLIN 0003

FR POWERHOUSE REFUSE COLLECTION Refuse collection. Services include furnishing all labor, supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.OPTION YEAR 1 - 1 JANUARY 2020 TO 31 DECEMBER 2020.Fort Randall Powerhouse (3 dumpsters emptied on Monday each week) 3 dumpsters X $_______ per dumpsters X $_______ 26 weeks = $__________ Total Cost supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.OPTION YEAR 1 - 1 JANUARY 2020 TO 31 DECEMBER 2020.Fort Randall Powerhouse (3 dumpsters emptied on Monday each week) 3 dumpsters X $_______ per dumpsters X 52 weeks = $__________ Total Cost

CLIN 0004

FR OUTSIDE MAINTENANCE REFUSE COLLECTION Refuse collection. Services include furnishing all labor, supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.OPTION YEAR 1 - 1 JANUARY 2020 TO 31 DECEMBER 2020Fort Randall Outside Maintenance (1 dumpster emptied on Monday each week) 1 dumpsters X $_______ per dumpsters X $_______ 26 weeks = $_______ Total Cost

FR OUTSIDE MAINTENANCE REFUSE COLLECTION Refuse collection. Services include furnishing all labor, supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.OPTION YEAR 1 - 1 JANUARY 2020 TO 31 DECEMBER 2020Fort Randall Outside Maintenance (1 dumpster emptied on Monday each week) 1 dumpsters X $_______ per dumpsters X 52 weeks = $_______ Total Cost

CLIN 0005

FR POWERHOUSE REFUSE COLLECTION Refuse collection. Services include furnishing all labor, supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.OPTION YEAR 2 - 1 JANUARY 2021 TO 31 DECEMBER 2021.Fort Randall Powerhouse (3 dumpsters emptied on Monday each week) 3 dumpsters X supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.OPTION YEAR 2 - 1 JANUARY 2021 TO 31 DECEMBER 2021.Fort Randall Powerhouse (3 dumpsters emptied on Monday each week) 3 dumpsters X

CLIN 0006

FR OUTSIDE MAINTENANCE REFUSE COLLECTION Refuse collection. Services include furnishing all labor, supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.OPTION YEAR 2 - 1 JANUARY 2021 TO 31 DECEMBER 2021.Fort Randall Outside Maintenance (1 dumpster emptied on Monday each week) 1 dumpsters labor, supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.OPTION YEAR 2 - 1 JANUARY 2021 TO 31 DECEMBER 2021.Fort Randall Outside Maintenance (1 dumpster emptied on Monday each week) 1 dumpsters

CLIN 0007

FR POWERHOUSE REFUSE COLLECTION Refuse collection. Services include furnishing all labor, supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.OPTION YEAR 3 - 1 JANUARY 2022 TO 31 DECEMBER 2022.Fort Randall Powerhouse (3 dumpsters emptied on Monday each week) 3 dumpsters X supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.OPTION YEAR 3 - 1 JANUARY 2022 TO 31 DECEMBER 2022.Fort Randall Powerhouse (3 dumpsters emptied on Monday each week) 3 dumpsters X

CLIN 0008

FR OUTSIDE MAINTENANCE REFUSE COLLECTION Refuse collection. Services include furnishing all labor, supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.OPTION YEAR 3 - 1 JANUARY 2022 TO

31 DECEMBER 2022.Fort Randall Outside Maintenance (1 dumpster emptied on Monday each week) 1 dumpsters labor, supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.OPTION YEAR 3 - 1 JANUARY 2022 TO 31 DECEMBER 2022.Fort Randall Outside Maintenance (1 dumpster emptied on Monday each week) 1 dumpsters

CLIN 0009

FR POWERHOUSE REFUSE COLLECTION Refuse collection. Services include furnishing all labor, supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.OPTION YEAR 4 - 1 JANUARY 2023 TO 31 DECEMBER 2023.Fort Randall Powerhouse (3 dumpsters emptied on Monday each week) 3 dumpsters X supervision, equipment and supplies necessary for the collection and disposal of refuse from the Fort Randall Project at locations shown on the attached maps and as described herein.OPTION YEAR 4 - 1 JANUARY 2023 TO 31 DECEMBER 2023.Fort Randall Powerhouse (3 dumpsters emptied on Monday each week) 3 dumpsters X $_______ per dumpsters X 52 weeks = $__________ Total Cost

(End of Summary of Changes)