AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Amendment No. 0002 Jul 5, 2018

U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT

CONTRACTING OFFICE

1616 CAPITOL AVE.

OMAHA, NE 68102-4901

See Item 6

W9128F-18-R-0059

25-MAY-2018

HIGH ALTITUDE RESEARCH LAB (HARL), PN 51639, PIKES PEAK, COLORADO

See attached documentation for content of the amendment revisions

Date for receipt of Proposals is 11 JUL 2018 at 1400 hours

Government Point of Contact: Zandra Hearn (402) 996-3717

Jul 5, 2018

Am #0002 - 2 (Continuation SF 30)

DEPARTMENT OF THE ARMY

Omaha District, Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901

:NOTICE: Failure to acknowledge : Solicitation No. W9128F 18 R 0059 :all amendments may cause rejec- :

:tion of the offer. See FAR : Date of Issue: 25 MAY 2018 :52.215-1 of Section 00 21 00 : NEW Date of Receiving Proposals:

11 JUL 2018

Amendment No. 0002

5 JUL 2018

SUBJECT: Amendment No. 0002 to Request for Proposal Solicitation Package for Design and Construction of

HIGH ALTITUDE RESEARCH LAB (HARL), PN 51639

PIKES PEAK, COLORADO

Solicitation No. W9128F 18 R 0059

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.

For convenience, on the revised specification pages within sections 00 10 00 and 01 45 00.00 10, changes have been identified by highlighting. (All portions of reissued specification pages shall apply whether or not changes thereon have been indicated by highlighting.)

Pages or Sections Deleted Pages or Sections Substituted or Added 00 10 00 00 10 00 01 10 00 01 10 00 01 32 34.02 ** ** **

REGISTER REGISTER

01 33 16 01 33 16 01 33 29 ** ** ** 01 45 00.00 10 01 45 00.00 10 01 74 19 01 74 19 01 78 39.00 24 01 78 39.00 24 01 91 00 01 91 00 Appendix D ** ** **

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the new Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal occasioned thereby.

a. Hand-Carried Proposals shall be delivered to the U.S. Army Corps

Am #0002 - 3 (Continuation SF 30) of Engineers, Omaha District, Contracting Division, 5475 Tech Center Drive, Suite 205, Colorado Springs, Colorado 80919.

b. Mailed Proposals shall be addressed as noted in Item 8 on Page 00 10 00-1 of Standard Form 1442.

U.S. Army Corps of Engineers, Omaha District CENWO-CT-M (Hearn) 5475 Tech Center Drive, Suite 205 Colorado Springs, Colorado 80919

Telephone: (402) 996-3713

3. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 11 JUL 2018.

Attachments:

Spec Pages listed in 1.a. above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

5 JUL 2018

jlb/2099

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

Am_0002

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

Section 00 10 00 W9128F-18-R-0059

CLIN SCHEDULE 00 10 00 - 3

OFFEROR'S NAME:____________________________

CONTRACT LINE ITEM (CLIN) PRICING SCHEDULE

ITEM

NO.

DESCRIPTION QUANTITY UNIT UNIT PRICE LINE ITEM AMOUNT

BASIC ITEMS

Design of the High Altitude Research Laboratory, including sitework and utilities.

Job

LS

XXX

All Work Complete to Construct the High Altitude Research Laboratory.

TOTAL AMOUNT (BASIC ITEMS 0001- 0002) $_____________

OPTION ITEMS

All Rough Excavation complete, in accordance with the plans and specifications, to the following extents:

5’ beyond the building line on north, south, and west sides; and 20’ beyond the building line on the east side.

All work complete to demolish existing High Altitude Research Laboratory.

TOTAL AMOUNT (BASIC ITEMS 0001 - 0002+ ALL OPTION ITEMS) $______________

OFFEROR'S NAME:____________________________

Section 00 10 00 W9128F-18-R-0059

CLIN SCHEDULE 00 10 00 - 4

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. See Section 00 21 01, INSTRUCTIONS, CONDITIONS, & NOTICES TO BIDDERS for evaluation of any options. The Government reserves the right to exercise Option Items (0003 & 0004) within 90 calendar days after issuance of Notice to Proceed.

NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Pricing Schedule. Failure to do so may result in the offer being unacceptable. Additions will be subject to verification by the Government. In case of variation between the lump-sum (L.S.) prices and the total amount, the lump-sum prices will be considered the price.

NOTE NO. 4. The primary excavation effort required for the foundation of the new High Altitude Research Laboratory will be completed by others. Rough excavation, covered in Option 0003 above, is to include the excavation of the HARL crawl space and stabilization of vertical walls (or cut banks) resulting from the primary and rough excavation efforts. All other excavation efforts, including backfill and finish excavation work, should be covered in Basic Item 0002 above.

SECTION 01 10 00

STATEMENT OF WORK

1 PROJECT OBJECTIVES

The objective is to design and construct facilities for the military that are consistent with the design and construction practices used for civilian sector projects that perform similar functions to the military projects.

Over a hundred years ago Pikes Peak was chosen as a perfect site for high altitude studies, the first Physiological Observation made on Pikes Peak was in August of 1911. The existing facility was built by the Army in the mid 1960’s and the facility was given to the United States Army Research Institute of Environmental Medicine (USARIEM) for research use in 1969. The primary function of the lab is to accommodate human subject research. The research using human subjects at altitude is generally focused on medical and physiological problems encountered by military personnel during acute and chronic exposure to high terrestrial elevations. The High Altitude Research Lab is a unique, one of a kind lab that is essential in providing the research capability necessary to develop new and improved procedures for enhancement of troop performance and the prevention and treatment of related disabilities that occur with high altitude exposure over time.

The existing lab currently resides on the summit of Pikes Peak which has been designated as a National Historic Landmark. The boundary of the National Historic Landmark is the 14,000' contour, so anything higher is within the NHL. Pikes Peak's national significance is specifically associated with western exploration in the early 1800s. The Landmark's natural landscape is a nationally significant resource and its single most character-defining feature. The Army is required to obtain and maintain a special use permit from the Forest Service to be able to use the land on top of Pikes Peak. The new facility must meet all of the Forest Service requirements.

The new High Altitude Research Lab is to be a fully functional lab that fits in with the overall aesthetic of the summit of Pikes Peak, the New Summit House (Currently being designed), and the Forest Service Design Guide.

The design of the facility shall meet the requirements in ‘The Built Environment Image Guide for the National Forests and Grasslands’ by the United States Department of Agriculture (USDA) Forest Service FS‐710, dated September 2001, Chapter 4.6 The Rocky Mountain Province. The following is a list of some of the requirements to be incorporated from this document:

1.2.3.1 Facilities shall harmonize with their landscape and grow from the character of each site, its ecology, geology, landforms, colors, and cultural setting. For example, massive vegetation suggests massive structural elements; slender vegetation suggests slender structural elements.

1.2.3.2 Incorporate climate responsive building characteristics. For example, in a cold, dry climate, promote solar gain, utilize clerestory windows, southern facing windows, and thermal mass.

1.2.3.3 The building shall be in harmony with the scale of its surroundings.

1.2.3.4 Use natural building materials that are indigenous to the setting.

1.2.3.5 Contemporary Forest Service design shall synthesize rustic precedents with contemporary needs and realities.

1.2.3.6 Roofs shall convey a strong sense of protection. Roofs in alpine situations should have a flatter pitch to avoid snow shed problems and shall be simple in design.

1.2.3.7

Provide a base to the structure to create a sense that the building is growing out of the site.

1.2.3.8 Exterior façade shall include punched windows, strong corners, and large porch to serve as an outdoor extension of the building. Provide an airlock vestibule for comfort and energy efficiency.

The Government is required by Public Law 102-486, Public Law 109-58, Executive Order 12902, and Federal Regulations 10 CFR 435 to design and construct facilities in an energy-conserving manner while considering life cycle cost over the life of the facilities. Sustainability shall be a consideration throughout the process of project development from inception.

The building shall be purposefully designed and constructed to be easily winterized, easily ramped up, and easily and efficiently sustained. Provisions for replacing the water and sewage storage tanks in the future shall be incorporated into the design.

The design shall be sensitive to the permafrost which is a problem for the existing facilities on Pikes Peak.

The new lab shall be minimally visible by visitors to the summit and from surrounding areas below. The location and the design of the lab was approved as part of a public process that involved the Summit House Design Team, the Forest Service, the Environmental Assessment process, the USACE, Colorado Springs Utilities, The Pikes Peak Highway Authority, and other parties interested in the new development on Pikes Peak. The experience of the Pikes Peak visitors is the main focus of the new master plan. The location of the lab is such that it has no visual impact on the summit and most visitors will not know the lab is there.

Lighting and moon/sun reflection from the facility toward the populated areas below the Peak to the east, west, and north shall be minimized. Windows and other exterior materials shall be selected to avoid glare and reflection.

The new lab shall be sited adjacent to the new Summit House as part of a new complex on the summit of Pikes Peak. Exact site location shall be coordinated with the Summit House replacement project. The connection between the buildings at the mechanical rooms shall be thoroughly coordinated.

Access to the facility will be provided by others as part of the Summit House project. Access to the facility is via a new service road that will be used to access the HARL and the Summit House Mechanical Room/Service Entrance. This road is also where deliveries will be made to the Summit House. Careful coordination with the Summit House project is required to ensure the final grade of the access road is appropriate for the finished floor elevation of the HARL. Deliveries of equipment at the HARL will be done at grade. Ensure there are no obstacles (stairs, curbs, etc) prohibiting large equipment from being unloaded at the service drive and loaded into the lab area. A minimum of five (5) parking spaces will also be provided by the Summit House Project.

The issue of seeing lights on the summit at night is of great concern. The new lab facility shall only have emergency lighting on the exterior of the building. This lighting shall be able to be turned off when the facility is not in use. Windows shall have shades that will fully block interior light emission from the building at night.

The HARL special use permit was amended and now expires on December 31, 2020. The terms of the extension include operations at the existing HARL, provisions for development of the new HARL, short of authorizing construction of the new HARL. The construction authority from the United States Forest Service for the new HARL is currently in process. The Forest Service owns and manages the land on the summit of Pikes Peak. All new potential construction will need to go through a National Environmental Policy Act environmental assessment process, which is currently underway, and no work on the summit can move forward without Forest Service approval.

Requirements stated in this RFP are minimums. Innovative, creative, and life-cycle cost effective solutions, which meet or exceed these requirements are encouraged.

The intent of the Government is to emphasize the placement of funds into the functional/operational requirements. Materials and methods are to reflect this by choosing the most appropriate Type of Construction allowed by code for this occupancy/project allowing the funding to be reflected in the quality of interior/exterior finishes and systems selected.

Statement of Iterative Design: The conceptual floor plan in Appendix I has been approved by the owner to meet the program requirements indicated in paragraph 3.3.1 SPACE REQUIREMENTS. Creative, innovative design solutions that deviate from the conceptual floor plan will be considered and evaluated during the selection process. However, the gross square footage shall not exceed the programmed amount of 3000 square feet. The elevations, height, and exterior materials have been approved by the Forest Service and should not be deviated from. Provide clear explanation and definitive reasons for any proposed floor plan and elevation deviations in the proposal submittal.

2 SCOPE

2.1 PROJECT OVERVIEW

2.1.1 HIGH ALTITUDE RESEARCH LAB (HARL): This project is to completely demolish and replace the existing High Altitude Research Lab on top of Pikes Peak. The new facility will include Lab Space, a Kitchen and Day Room, Restrooms and Showers, laundry/janitors closet, storage, and a Dorm/Sleeping area. The demolition of the existing lab and propane tanks will be priced as an option to this contract.

The existing lab can be used as a construction trailer during the construction of the new lab, and demolished after it is no longer needed.

2.1.1.1.1

Heating, ventilating, and air conditioning (HVAC) systems, including controls.

2.1.1.1.2

Plumbing systems and associated controls

2.1.1.1.3

Automated lighting control systems

2.1.1.1.4

Fire suppression, smoke and/or fire dampers, fire detection and alarm systems and their interfaces to other critical building system components.

2.1.1.1.5

Low voltage systems including telecommunication infrastructure, television infrastructure and building automation systems.

2.1.1.1.6

Energy conservation equipment and systems.

2.1.1.1.7

Building envelope, including exterior walls, fenestration, roofs, and openings, air barrier system.

2.1.1.2 Commissioning Leadership: Commissioning leadership structure is fully defined in Section 01 91 00.

2.1.1.2.1

The D-B contractor shall provide a Commissioning Specialist (CxS) who shall be an entity employed as a first tier subcontractor by the Design Build contractor, independent from the installing contractors. The CxS shall be responsible for commissioning activities throughout the design after award, construction and warranty phases. This includes development of all design phase commissioning documentation, including hands-on development of the Commissioning Plan and commissioning specifications to include pre-functional test checklists and functional performance tests, scheduling and coordinating all construction phase construction activities, refinement of pre-functional check lists and functional performance tests to match the specific purchased equipment, and direct oversight and reporting of the execution of the commissioning process. Full and open communication shall be exercised in all TBCx processes by all parties to maximize the benefits of the process.

2.1.1.3 Commissioning Specifications: See Section 01 91 00. Note that UFGS specification 23 08 00 is a required UFGS specification, thus must be utilized. Edit Specification 23 08 00 as required to conform to this RFP. Most of the general Commissioning requirements are located in Section 01 91 00. Discipline specific commissioning specifications are required for Architectural, Plumbing, Fire Protection, Electrical, and Low Voltage Systems. These specifications should follow the format of the revised 23 08 00.

2.1.2 SITE: The site for the new HARL has been provided by the Summit House project as part of a new Summit House Complex. The parking lot, associated retaining walls and access road and to the HARL shall be provided by the Summit House replacement project.

2.1.3 The D-B Contractor shall use UFC 4-510-01 (square footage calculations only), Section 01 10 00-03 paragraph 3.3.1, the Room Data Sheets (Appendix G), and the Equipment List (Appendix J) from the user to determine the appropriate size and requirements of each space.

2.2 GOVERNMENT-FURNISHED GOVERNMENT-INSTALLED EQUIPMENT (GFGI)

2.2.1 A room by room list of equipment is included in Appendix J. The PRC identifies Logistics Category A (contractor provided / contractor installed) and Logistics Category C (GFGI) equipment.

2.2.2 Coordinate with Government on GFGI item requirements and provide suitable structural supports, all utility connections, and space with required clearances for all equipment identified. Detailed equipment and furniture requirements shall be developed during iterative design after award.

2.2.3 The FF&E is currently GFGI but the government reserves the right to negotiate procurement thru the DB Contractor at a later date. Any FF&E (Category C) item shown on the plan is shown for coordination and size but is not included in the contract at this time.

3 GENERAL FUNCTIONAL AND AREA REQUIREMENTS

Functional and area requirements are specified in paragraph 3.3.1, Room Data Sheets (Appendix G) and the Equipment list (Appendix J). These requirements have been developed into floor plans and elevations included as part of this RFP (Appendix I). The floor plan has been approved by the user. The Government requires that clear explanations of all reasons for deviating from the plans are included as part of the proposal response.

FUNCTIONAL REQUIREMENTS

LAB: A large open, column free, flexible lab space is required. Equipment usage varies per test so flexibility is of utmost importance. The required counter space is shown on the plans. Four stationary bicycles and four treadmill ergometers are required for the test volunteers. Each station has a portable cart that holds a computer and vital sign leads. The user’s equipment list is included in Appendix J. Most equipment shall be transported via truck to the lab when it opens for the season and is removed in the fall when the lab is closed. Easy access to and from the truck and lab is important. Double doors are needed for moving the equipment in and out. Two separate freezers/refrigerators are required for storage of biological specimens. One is to be a ‐70 degree freezer and the other is a refrigerator for temporary storage of temperature sensitive samples and assay supplies. Upper and lower cabinets are required along one wall with a double compartment sink, provide an eyewash station at the sink. Provide a wall mounted communications cabinet in the Lab or the Lab storage roof to house GFGI data switch and associated equipment.

LIVING SPACES: Volunteer test subjects and sometimes researchers will stay at the facility during testing. A kitchen, laundry, day room, restrooms, and showers are to be provided. A dorm area to sleep up to 10 is also to be provided. Volunteers will sleep in bunk beds in the dorm room.

3.2.2.1 A small kitchen with typical appliances (i.e., microwave, stove, two refrigerators, sink, and trash compactor) is required.

3.2.2.2 A day room for dining and entertainment shall be located near the kitchen since most gathering is done in this area. TV shall be placed in the day room, final location of TV to be determined during design after award.

3.2.2.3 Uni‐sex bathrooms and shower facilities are required. Showers and toilets shall be accessible from the dorm room. One toilet room should be open to the day room so visitors do not have to enter the dorm area to use it. One toilet room and one shower room shall be ABA compliant.

3.2.2.4 Sleeping quarters shall be an open bay, dorm style sleeping area with bunk beds to sleep up to ten.

Provide means to separate bunk areas from each other for potential gender issues. A simple privacy curtain track in the ceiling is acceptable, ensure individual privacy and control over each curtain. At least one bunk shall be in a separate walled room. Provide a duplex outlet for each bed to support personal computers and other devices. Contractor to provide a locker for each bunk. Lighting shall be switch-zoned to optimize control by occupants. Direct access to the exterior from all sleeping areas is required by code.

3.2.2.5 An area for washer and dryer shall be provided, with an area for storage of linens and other equipment.

3.2.2.6 Garbage and recycling is to be removed from the site and taken off the summit on a daily basis by the building occupants.

SPACE REQUIREMENTS

The maximum gross area of the new facility is 3,000 gross square feet. Programmed space is:

Room/Space Net Square Feet Lab 1,000-1,500 sf Day Room 200-400 sf Kitchen 100-300 sf Dorm 600-700 sf Bathroom/Showers 200 sf / as required by code Laundry +/-100 sf Storage (2) +/-100 sf Circulation Included in rooms Vestibule +/- 35 sf Mechanical/Electrical (as required for systems and storage tanks in crawl space) TOTAL SF 3000 sf

Table indicates the net square footage (or range) requested by the users. Actual Square Footage of each space as it exists in the concept is shown in the floor plan in Appendix I. Mechanical and Electrical spaces are to be located in the crawl space, spaces in the crawl space will not count against the 3000sf allowance for the facility.

Priority for any reallocation of space during design development is in the following order: Lab area; day room; kitchen; dorm.

4 APPLICABLE CRITERIA / REFERENCE DOCUMENTS

4.1 APPLICABILITY

The following documents form a part of the Request for Proposal.

4.1.1 The absence of direct reference to these documents, in other and following Sections of the RFP does not relieve the design-builder from the requirements contained within these documents.

4.1.2 Where compliance with additional codes, standards or references are required by material, equipment or system manufacturers, as part of their design, installation or operation, those codes, standards or references shall also form a part of this Request for Proposal.

4.1.3 Where a portion of one of the listed reference documents, code and standards is indicated for emphasis in other Sections of the RFP or where one of the listed reference documents is indicated for a portion of the work for emphasis in the other Sections of the RFP, the design-builder shall comply with all of the requirements of the reference documents for all portions of the work.

4.1.4 The design developed to deliver this project shall comply with the criteria, codes and standards identified in the project RFP and herein. The Design-Build Contractor, particularly its designated Designers of Record, shall update the versions of applicable criteria to those in effect at the time when the Design- Build Contractor had completed its proposal response and submitted it to the Contracting Officer of the USACE Omaha District, which also includes those criteria referenced in UFC’s and all other applicable local, state, and federal laws and regulations.

4.1.5 In case a conflict exists between the version of referenced document issue in this Section and other Sections, the document referenced in this Section shall take precedence.

4.2 GOVERNMENT REGULATIONS AND PUBLICATIONS

4.2.1 CFR - Code of Federal Regulations, United States Government:

4.2.1.1 10 CFR 433 Energy Efficiency Standards For The Design And Construction, 2009.

4.2.1.2 10 CFR 436 Federal Energy Management and Planning Programs, 2009.

4.0.1.1.1 Title 10 CFR Part 436 Federal Energy Management and Planning Programs, Life Cycle Cost Methodology and Procedures, January 25, 1990

4.2.1.3 Accessibility Standard - Architectural Barriers Act (ABA) Accessibility Standard for Department of Defense Facilities, dated October 31, 2008; Dod Accessible policy memorandum, 36 CFR 1191 - Americans With Disabilities Act (Ada) Accessibility Guidelines For Buildings And Facilities;

Architectural Barriers Act (Aba) Accessibility Guidelines See http://www.accessboard.gov/ada-aba/aba-standards-dod.cfm.

4.0.1.1.2 The Department of Defense adopted the version stated above on 31 October 2008. See ECB 2009-20 located at the WBDG.org website. Include Accessibility Guidelines Supplement

4.2.2 MEDCOM/HFPA Interior Design & Master Plan - USA

4.2.3 U.S. Government Standards:

4.2.3.1 Department of Defense, Medical Military Construction, Medical Research Design Instruction for US Army Research Institute of Environmental Medicine (USARIEM), High Altitude Research Laboratory Pikes Peak CO Draft 22 August 2011

4.2.3.2 MILITARY HANDBOOK

4.0.1.1.3 MIL HDBK 419 - Grounding, Bonding and Shielding for Electronic Equipment and Facilities

4.0.1.1.4 MIL HDBK 1013-1A - Design Guidelines for Physical Security of Facilities

4.2.3.3 UNIFIED FACILITIES CRITERIA (UFC): The following UFCs are the minimum required;

a full list will be developed by the Design-Build Contractor during iterative design after award from the referenced criteria from these documents and from the scope of the project:

4.0.1.1.5 UFC 1-200-01, General Building Requirements, Change 2 11 November 2011.

4.0.1.1.6 UFC 1-200-02, High Performance and Sustainable Building Requirements

4.0.1.1.7 UFC 3-301-01, Structural Engineering

4.0.1.1.8 UFC 3-400-02, Engineering Weather Data

4.0.1.1.9 UFC 3-401-01, Mechanical Engineering

4.0.1.1.10 UFC 3-410-01, Heating, Ventilating and Air Conditioning

4.0.1.1.11 UFC 3-420-01, Design: Plumbing Systems

4.0.1.1.12 UFC 3-450-01, Noise and Vibration Control

4.0.1.1.13 UFC 3-501-01 Electrical Engineering

4.0.1.1.14 UFC 3-520-01 Interior Electrical Systems

4.0.1.1.15 UFC 3-530-01 Interior and Exterior Light Systems and Controls

4.0.1.1.16 UFC 3-550-01 Exterior Electrical Power Distribution

4.0.1.1.17 UFC 3-560-01 Electrical Safety, O&M

4.0.1.1.18 UFC 3-570-02A Cathodic Protection

4.0.1.1.19 UFC 3-580-01 Telecommunications Building Cabling Systems Planning and Design

4.0.1.1.20 UFC 3-600-01 Design: Fire Protection Engineering for Facilities, 26 Sep 2006, including Change 3, March 2013.

4.0.1.1.21 UFC 4-010-01 - DoD Minimum Antiterrorism Standards for Buildings, February 2012, Including Change 1, 1 October 2013.

4.2.3.4 USACE - United States Army Corps of Engineers

4.0.1.1.22 USACE ECB No. 2012-5, Exterior Lighting Performance Standard

4.0.1.1.23 USACE ECB No 2012-16, Building Air Tightness and Air Barrier Continuity Requirements

4.0.1.1.24 EM 385-1-1U.S. Army Corps of Engineers Safety and Health Requirements Manual; 2008.

4.0.1.1.25 ER 1110-1-12 (1993) Quality Management

4.0.1.1.26 Omaha District Guidelines Guide (ODDG)

4.0.1.1.27 Corps of Engineers Standard Electrical Distribution Details, http://cadlib.wes.army.mil

4.0.1.1.28 CADD Details Library, Electrical Details Electrical Service and Distribution

4.0.1.1.29 Omaha District Design Guide

4.0.1.1.30 USACERL - WinLCCID – Life Cycle Cost in Design for Windows from (Support available @ 217-333-3977).

4.2.3.5 USAISEC Technical Criteria for Installation Information Infrastructure Architecture (I3A)

4.2.3.6 United Stated Department of Agriculture, Forest Service, The Build Environment Image Guide September 2001

4.2.4 Statutory Requirements

4.2.4.1 Federal Register/Volume 46, No. 22

4.2.4.2 Safer Drinking Water Act (SDWA) of 1998

4.3 MODEL CODE ORGANIZATIONS

4.3.1 ICC - International Code Council, Inc.:

4.3.1.1 International Building Code (IBC) 2009 (Refer to UFC 1-200-01 for correct usage).

4.3.1.2 International Mechanical Code (IMC) 2015 (Refer to UFC 1-200-01 for correct usage)

4.3.1.3 International Plumbing Code (IPC) 2015 (Refer to UFC 1-200-01 for correct usage).

4.4 NON-GOVERNMENTAL STANDARDS DEVELOPING ORGANIZATIONS

The following is a list of non-governmental standards developing organizations. With a few notable exceptions, these are agencies with standards that may be referenced from UFGS specification sections as they are developed during iterative design after award. The D-B Contractor shall comply with the standards referenced in the UFGS specifications.

4.4.1 AABC - American Association of Air Balance Council

4.4.2 AAMA - American Architectural Manufacturers Association

4.4.3 AATCC - American Association of Textile Chemists & Colorists

4.4.4 AFBMA - American Bearing Manufacturers Association

4.4.5 ACI - American Concrete Institute International: Note: For the ACI documents that are specifically excluded by ACI from direct reference by the design documents; the Design-Build Contractor and Designer of Record shall restate the content of the documents in mandatory language and incorporate them into the drawings and specifications portions of the design documents. The Design Analysis submitted by the Designer of Record shall provide an outline that summarizes the extent of this effort.

4.4.6 AEIC - Association Of Edison Illuminating Companies

4.4.7 AGA - American Gas Association:

4.4.8 AISC - American Institute of Steel Construction

4.4.9 AISI - American Iron and Steel Institute

4.4.10 AMCA - Air Movement and Control Association, Inc.

4.4.11 ANSI - American National Standards Institute: Standards referenced shall include but not necessarily be limited to the following:

4.4.11.1 ANSI B16.40 - 1985 (R1994); Manually Operated Thermoplastic Valves

4.4.11.2 ANSI TIA/568-C.0 Generic Telecommunications Cabling for Customer Service

4.4.11.3 ANSI TIA/568-C.1 Commercial Building Telecommunications Cabling Standard

4.4.11.4 ANSI TIA/568-C.2 Commercial Building – Telecommunications Cabling Standard – Part 2: Balanced Twisted Pair Cabling Components

4.4.11.5 ANSI TIA/569-B Commercial Building Standards for Telecommunications Pathways and Spaces

4.4.11.6 ANSI TIA/606-A Administration Standard for the Telecommunications Infrastructure

4.4.11.7 ANSI TIA J-STD-607-A Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications

4.4.11.8 American National Standards Institute (ANSI) publications - A117.1-1998 Guidelines for Accessible and Usable Buildings and Facilities, ICC/ANSI; Z83.6, 61; Section 8 & 9; and A13.1 Schemes for Identification of Piping Systems; Z223.1.

4.4.11.9 ANSI Z2358.1, Standard for Emergency Eyewashes and Shower Equipment

4.4.12 AHRI - Air-Conditioning, Heating, and Refrigeration Institute

4.4.13 ASCE - American Society of Civil Engineers

4.4.14 ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers:

Guides, Handbooks, Standards, and Practices referenced shall include but not necessarily be limited to the following:

4.4.14.1 Guides:

4.0.1.1.31 Terminology of HVAC&R, 2nd Edition, etc.

4.0.1.1.32 Guideline 0, The Commissioning Process

4.0.1.1.33 Guideline 1, the HVAC Commissioning Process

4.0.1.1.34 Guideline 12, Minimizing the Risk of Legionellosis Associated with Building Water Systems.

4.4.14.2 Handbooks

4.0.1.1.35 2015 HVAC Applications

4.0.1.1.36 2014 Refrigeration

4.0.1.1.37 2013 Fundamental

4.0.1.1.38 2012 HVAC Systems & Equipment

4.4.14.3 Standards:

4.0.1.1.39 15-2013, Safety Standard for Refrigeration Systems

4.0.1.1.40 52.2-2007 Method of Testing General Ventilation Air Cleaning Devices for Removal Efficiency by Particle Size

4.0.1.1.41 55-2013 Thermal Environmental Conditions for Human Occupants

4.0.1.1.42 62.1-2013 Ventilation for Acceptable Indoor Air Quality

4.0.1.1.43 189.1-2014 Standard for the Design of High-Performance Green Buildings Except for Low- Rise Residential Buildings

4.4.14.4 Practices:

4.0.1.1.44 ASHRAE Terminology of HVAC&R, 2nd Edition, 1991; Pocket Guide for Air Conditioning

4.4.15 ASME – American Society of Mechanical Engineers

4.4.16 ASSE - American Society of Sanitary Engineering

4.4.17 ASTM - ASTM International

4.4.18 AWI/AWMAC - Architectural Woodwork Institute and Architectural Woodwork Manufacturers Association of Canada

4.4.19 AWS - American Welding Society

4.4.20 AWWA - American Water Works Association

4.4.21 BHMA - Builders Hardware Manufacturers Association

4.4.22 CGA - Compressed Gas Association

4.4.23 DHI - Door and Hardware Institute, Hardware for Healthcare Facilities (1993)

4.4.24 EIA - Electronic Industries Association: See TIA.

4.4.25 IEEE - The Institute of Electrical and Electronics Engineers

4.4.25.1 National Electrical Safety Code

4.4.26 IESNA - Illuminating Engineering Society of North America

4.4.26.1 Illuminating Engineering Society Handbook

4.4.27 ISA - Instrument Society of America: Standard (ISA S75.01)

4.4.28 MSS - Manufacturers Standardization Society of the Valve and Fittings Industry

4.4.29 NAAMM - National Association of Architectural Metal Manufacturers

4.4.30 NACE - NACE International

4.4.31 NEBB - National Environmental Balancing Bureau

4.4.32 NEMA - National Electrical Manufacturers Association

4.4.33 NETA - National Electrical Testing Association

4.4.34 NFPA - National Fire Protection Association

4.4.34.1 Latest edition of all NFCs are applicable (except NFPA 5000 which does not apply to military construction):

4.0.1.1.45 NFPA 13 Installation of Sprinkler Systems

4.0.1.1.46 NFPA 54 National Fuel Gas Code

4.0.1.1.47 NFPA 70 National Electrical Code

4.0.1.1.48 NFPA 72 National Fire Alarm Code

4.0.1.1.49 NFPA 90A Installation of Air Conditioning and Ventilating Systems

4.0.1.1.50 NFPA 101 Life Safety Code

4.0.1.1.51 NFPA 780 National Lightning Protection Code

4.4.35 NIOSH - National Institute For Occupational Safety And Health

4.4.36 NRCA - National Roofing Contractor's Code

4.4.37 PCI - Precast/Prestressed Concrete Institute

4.4.38 PDI Plumbing and Drainage Institute

4.4.39 SDI - Steel Deck Institute

4.4.40 SDI - Steel Door Institute

4.4.41 SJI - Steel Joist Institute

4.4.42 SMACNA - Sheet Metal and Air Conditioning Contractors' National Association, Inc.

4.4.42.1 SMACNA – HVAC Systems – Duct Design

4.4.42.2 SMACNA – HVAC Duct Construction Standard – Metal and Flexible, 2nd edition

4.4.43 TIA - Telecommunications Industry Association

4.4.44 The Joint Commission - Environment of Care Standards

4.5 PRIVATE EVALUATION ORGANIZATIONS

4.5.1 NFRC - National Fenestration Rating Council

4.5.2 MHI/CMAA - The Material Handling Institute, Inc./Crane Manufacturers Association of America, Inc.

4.5.3 UL - Underwriters Laboratories Inc.

4.5.3.1 UL 142

4.5.3.2 UL 441

4.6 SPECIFICATIONS

4.6.1 Specifications shall comply with performance criteria, products and finishes required in the various UFC’s and other criteria prescribed in this RFP.

4.6.2 The Unified Facility Guide Specifications (UFGS) shall be used for all specifications on the project. Specifications shall comply with performance criteria, products and finishes required in UFC’s and other criteria prescribed in this RFP. Although the designers of record (DOR) must tailor the specifications for this project, in doing so, the DOR shall not alter or edit the wording of the UFGS in any way that would lessen the quality of construction materials required by the various criteria and UFGS. The appropriate Specifications shall ensure that all project design requirements, current code requirements, and regulatory requirements are met.

5 SITE REQUIREMENTS

GENERAL

Provide all modifications to the site and site improvements and utilities required for proper functioning of the project and as indicated in the project program. The Summit House project will be constructing the access road, parking area and retaining walls as part of their scope prior to commencement of the HARL construction. The Rough grading (removal of granite) is an option to this contract. The HARL contractor is responsible for all construction inside the limits of the rough grading including the structural stoop and the area between the stoop and the road/parking area that was provided by the Summit House. The HARL contractor is also responsible for the electrical utility from the transformer to the building.

Site work comprises the following elements:

5.1.2.1 Site Preparation: All modifications to the site and grades required for construction of new work and for proper functioning of the project.

5.1.2.2 Site Improvements: All elements required to provide finished and durable site surfaces and outdoor improvements described in the project program.

5.1.2.3 Site Services: All outdoor and underground elements required to complete the design of services.

5.1.2.4 Site Remediation: Returning disturbed areas back to its natural state (as approved by the

Forest Service).

Where site elements also must function as elements defined within another element group, meet the requirements of both element groups.

In addition to the requirements of this section, comply with all applicable requirements of the Statement of Work.

The project site should be developed for efficiency and to convey a sense of unity or connectivity with the Overall existing conditions on the summit.

SITE DESIGN

Appearance:

5.2.1.1 Finished Surfaces:

5.2.1.1.1 Make finished surfaces smooth and uniform in appearance, without depressions that collect water or surfaces should be returned to a natural look like the untouched areas adjacent to the area of work.

5.2.1.1.2 Conceal unsightly site elements from view from the windows of the building and windows of adjacent buildings on Pikes Peak and from lower elevations.

5.2.1.1.3 Conceal the following from view from the remainder of the site:

5.2.1.1.4 Utility equipment including electrical transformers.

Health and Safety:

5.2.2.1 Safety:

5.2.2.1.1 Inhibit the intentional driving of vehicles from adjacent public rights-of-way onto the site, except at intended roadway accesses.

5.2.2.1.2 Prevent access by unauthorized persons to outdoor areas containing electrical equipment that has exposed powered components.

5.2.2.2 Maximum Slopes:

5.2.2.2.1 Slopes for Finish Grading/Gravel Areas: 7 percent for site parking, 2 percent for ADA/ABA parking, unless approved by Contracting Officer Representative (COR). No pavement.

5.2.2.2.2 Slopes With No Access From Top: Limited only by structural stability and resistance to erosion.

5.2.2.3 Vermin/Animal Control: Prevent and eliminate standing water that could become stagnant and attract mosquitoes and various vermin. Design drainage structures to prevent any standing water from not draining off the site.

5.2.2.4 Physical Security:

5.2.2.4.1 Vehicular Safety: Comply with the code and the following: Access to parking lots is to be provided by the Summit House or the Pikes Peak Highway.

5.2.2.4.2 Access to the HARL via the new Summit House service drive will need to be controlled at times. Signage stating Authorized Personnel only will also be required at the entrance to the road. Signage to be provided by others.

5.2.2.4.3 Pedestrian/Public access to the roof area shall be discouraged by guardrail along the parapet or landscape elements around the perimeter. The method chosen shall be coordinated with the Summit House design.

SITE ENGINEERING

Earthwork: Provide suitable, non-expansive fill beneath structures in accordance with the Final Geotechnical Report.

5.3.1.1 Lift Thicknesses: Place soil in successive horizontal layers not to exceed 8 inches in loose lift thickness.

5.3.1.1.1 Place lifts uniform in thickness on a soil surface that has been moistened or aerated as necessary to promote compaction.

5.3.1.1.2 Provide material for backfill or fill with a maximum particle size of 3 inches in any dimension, or as described in the Final Geotechnical Report for specific applications.

5.3.1.2 Fill Compaction: Provide compaction in accordance with ASTM D 1557, in a manner that does not result in eccentric loading upon or against the structure.

5.3.1.2.1 Compact cohesive material to at least 90 percent laboratory maximum density.

5.3.1.2.2 Compact cohesionless material to at least 95 percent laboratory maximum density.

5.3.1.2.3 Cohesionless material consists of GW, GP, SW, and SP when classified according to ASTM D 2487. Materials classified as GM and SM will be identified as cohesionless only when the fines are non-plastic.

5.3.1.2.4 Provide the minimum amount of water necessary to facilitate compaction. The Design-Builder will not use excessive amounts of water as a means to mechanically break down clayey soils.

5.3.1.3 Testing: Provide field in-place density testing in accordance with ASTM D 1556, ASTM D 2167, or ASTM D 2922 and ASTM D 3017.

5.3.1.3.1 Provide testing at frequency not to exceed one test per 200 square feet, or fraction thereof, of each lift placed by machine-powered equipment.

5.3.1.3.2 Provide testing at frequency not to exceed one test per 1500 square feet, or fraction thereof, of each lift placed by hand-operated equipment.

5.3.1.3.3 Provide testing at frequency not to exceed one test per 200 linear feet, or fraction thereof, of each lift in utility trenches.

5.3.1.3.4 Contracting Officer Representative (COR) may increase the rate of testing if frequent non-passing tests result from the above minimum testing frequencies.

5.3.1.3.5 If ASTM D 2922 is used, provide check by taking one test per ASTM D 1556 per 15 tests taken according to ASTM D 2922.

5.3.1.3.6 Provide testing for optimum moisture and laboratory maximum density at minimum frequency of one test per 100 cubic yards of fill and backfill, or when any change in material occurs that may affect optimum moisture content or laboratory maximum density.

5.3.1.4 Off-Site Soils: Test soils brought to the site from outside the project boundaries for compliance with suitable, non-expansive soils. No soils will be brought on site until test results have been approved by the Contracting Officer.

5.3.1.5 Rough Excavation: Rough excavation and granite removal needs to be coordinated with the

Summit House project and the Pikes Peak Highway Authority. The extents, means and methods (blasting, drilling etc), removal and disposal of material and any other items associated with the rough grading of the site will be coordinated. The rough grading is an option to this contract and shall be provided as a separate line item on the bid form. Removal of granite from the summit will need to be coordinated with the Forest Service. Granite can be salvaged and stored for reuse by the HARL team or the Summit House team.

5.3.1.6 General Excavation: Perform excavation accurately, to the lines and grades shown on construction drawings.

5.3.1.7 Shoring: Provide shoring in accordance with OSHA requirements.

Site Improvements

5.3.2.1 Site Fixtures, Equipment, and Services:

5.3.2.1.1 Provide foundations or other mountings as required to support the completed and operational element permanently and safely and without uncontrolled subsidence or other movement.

5.3.2.1.2 Design structural elements in accordance with code and requirements specified here in.

5.3.2.1.3 Provide Sub Surface Drainage per soils report recommendations. Water from around the perimeter of the building will need to be collected and discharged away from the facility. Sub Surface system will be designed to consider freezing potential and problems encountered with freezing temps and the adjacent subgrade. Openings will be rodent proof.

5.3.2.1.4 Radon Mitigation System, provide all work necessary to reduce and maintain radon concentration levels below 148 Bequerels per cubic meter (Bq/cu m) 4.0 picoCuries per liter (pCi/L) Perform pre-mitigation diagnostic testing and perform post-mitigation testing and monitoring for radon. Construct radon systems in accordance with EPA requirements.

5.3.2.2 Durability:

5.3.2.2.1 Soil Erosion Resistance: Comply with the code and the following:

5.3.2.2.1.1 Maintain the existing site features that contribute to erosion resistance to the greatest extent possible.

5.3.2.2.1.2 The present natural resistance to erosion is insufficient; take measures to improve the resistance to erosion.

5.3.2.2.1.3 Design to minimize soil erosion.

5.3.2.2.1.4 If erosion occurs during construction, relocation or replacement of eroded soil and repair of eroded areas shall be performed by the Design-Builder at no cost to the Government.

5.3.2.2.1.5 If erosion occurs within one year after completion, provide improved erosion control measures within one week after notification by Government.

5.3.2.2.2 Flooding:

5.3.2.2.2.1 Control storm water runoff as required to prevent damage to project elements, including runoff from the building to adjacent surfaces, vegetation, and to prevent damage to neighboring sites, including downslope vegetation.

5.3.2.2.2.2 Design storm drainage for a storm with a return period of 10 years.

5.3.2.2.2.3 Minimize increase in storm water runoff into rivers, streams, lakes, and other waterways and drainageways as required by authorities having jurisdiction.

5.3.2.2.3 Vehicular Collision: Design to minimize the probability of vehicular impact on site fixtures.

5.3.2.3 Ease of Maintenance:

5.3.2.3.1 Snow Removal: Design to facilitate removal of snow from vehicular and pedestrian trafficways using mechanized equipment or automatic means wherever possible; where not possible, design to minimize the effort required to use manual snow removal methods.

5.3.2.3.2 Theft Deterrence: Provide fixtures that are either anchored securely to the ground using fastenings not easily removable or that are too heavy for one person to carry, and that are made of materials with no intrinsic or salvage value.

Existing Exterior Primary Electrical Distribution System.

5.3.3.1 The existing primary electrical distribution system on Pikes Peak is provided by Colorado Springs Utilities (CSU). The primary electrical service is a 7200/12470 Volt, 3-phase, 4-wire (grounded neutral). The existing facility transformer is a 75KVA oil filler pad mounted unit fed from an underground #1 aluminum feeder rated at 15KV. The transformer provides power to the facility at 120/208V, 3-phase. The closest hand-hole to the existing transformer is approximately 250’ away. The feeder to the facility was replaced by CSU within the last 10 years. In the current configuration, the meter current transformers are located in the transformer and the meter is mounted to the existing facility. This configuration for a service less than 1200A is no longer permitted by CSU; they now required the current transformers to be remote from the transformer. The CSU field engineer and point of contact for Pikes Peak is Cindy Hyde, 719-668- 5887, chyde@csu.org.

5.3.3.2 The contractor shall coordinate the installation of a new transformer…