Am0002.pdf

PDF 5 MB Posted

Attached to
Industrial Painting and Structural Repair MATOC
Solicitation number
W9128F-18-R-0038
Issued by

About this file

Amendment 0002

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No. 0002

Multiple Award Task Order Contract (MATOC) For: Industrial Painting and Structural Repair Missouri, Iowa, Kansas, Nebraska, South Dakota, North Dakota, Colorado, Wyoming, Montana, Idaho, Oregon, or Washington State

See attached documentation for content of the amendment revisions

Date for receipt of Proposals is 17 July 2018 at 2:00 pm

Government Point of Contact: Jessica Jackson (402) 995-2052

U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT

CONTRACTING OFFICE

1616 CAPITOL AVE.

OMAHA, NE 68102-4901

See Item 6

W9128F18R0038

07/06/2018

06/01/2018

07/06/2018

Am #0002 - 2 (Continuation SF 30)

DEPARTMENT OF THE ARMY

Omaha District, Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901

:NOTICE: Failure to acknowledge : Solicitation No. W9128F18R0038 :all amendments may cause rejec- :

:tion of the offer. See FAR : Date of Issue: 01 June 2018 :52.215-1 of Section 00 21 00 : Date of Receiving Proposals:

17 July 2018

Amendment No. 0002 06 July 2018

SUBJECT: Amendment No. 0002 to Request for Proposal Solicitation Package for Multiple Award Task Order Contract (MATOC) For: Industrial Painting and Structural Repair Missouri, Iowa, Kansas, Nebraska, South Dakota, North Dakota, Colorado, Wyoming, Montana, Idaho, Oregon, or Washington State.

Solicitation No. W9128F18R0038.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

(1) MATOC Document, Section 00 22 00 Page 10, paragraph 8.2.2 Evaluation, add the following to the end of the second subparagraph: “Higher evaluation ratings may be given for project examples which are submitted by the Offerors as the prime contractor.”

(2) MATOC Document, Section 00 22 00 Page 12, paragraph 8.4.1 Submission Requirements, second subparagraph, delete “a contract duration of 720 days” and substitute “a contract duration of 900 days.

(3) Task Order 0001, Section 00 10 00 Page 4, Note 4, delete “730 days” and substitute “840 days”.

(4) Task Order 0001, Section 00 73 00 Page 2, paragraph 1.1, delete “730 calendar days” and substitute “900 calendar days”.

(5) Task Order 0001, Section 00 73 00 Page 2, paragraph 1.1.2 Work Restrictions, add the following after the first sentence. “In addition to Section 01 12 00 Paragraph 1.8 “Cooperation with Other Contractors”, contractors shall be aware that at least one other contract will be on-going during a portion of this contract. Contractor shall assume the intake bridge crane will be unavailable during 2 separate one week periods when two new intake bulkheads (total of four leafs) and a new lifting beam will be delivered to the site and installed and tested in the intake bulkhead slots downstream of the penstock gate slots.”

Am #0002 - 3

(6) Task Order 0001, Section 01 22 00 Page 3, paragraph 1.1 Work Included, delete the last sentence and substitute the following: “This work includes but is not limited to performing nondestructive testing of penstock gates, lifting beams, and bridge crane, load testing lifting beams, removing and replacing gate guides, repairing gate roller chains, installing roller chain housings, removing anodes, verifying that gates hang plumb and making adjustments as necessary, installing gate hoist attachments, repainting penstock gates and lifting beams (including the Independent Painting Inspector as required by Section 09 97 02 Paragraph 1.5.5), replacing gate seals, and disposing of the two original bulkheads and bulkhead lifting beam.”

(7) Task Order 0001, Section 01 22 00 Page 4, paragraph 2.1 Work Included, Add the following sentence at the end of the paragraph: “This work includes but is not limited to performing nondestructive testing of the emergency gate lifting beam, load testing the lifting beam, removing and replacing emergency gate guides, installing roller chain housings, verifying that the gate hangs plumb and making adjustments as necessary, and painting new guides and roller chain housings/spot painting portions of the gate and lifting beam where existing paint is damaged by work in this contract (including the Independent Painting Inspector as required by Section 09 97 02 Paragraph 1.5.5).”

(8) Task Order 0001, Section 01 30 00.24 Page 6, add the following new paragraph 1.7 and renumber subsequent paragraph accordingly:

“1.7 Power Availability

Available temporary power will be one 480 Volt, three-phase plus ground, 60 Amp receptacle (Meltric DSN60). Contractor will be responsible for supplying their own transformer for stepping voltage down for their needs.”

(9) Task Order 0001, Section 05 50 13 Page 18, paragraph 3.1 VERIFICATION OF GATE PLUMBNESS, Second-to-last sentence, delete “same surfaces at the bottom of the gate shall be measured.” and substitute “same surfaces 3’-3” from the bottom of the gate shall be measured.”

(10) Task Order 0001, Section 05 50 14 Page 3, paragraph 3.3 Nondestructive Testing,

a) Second sentence, delete “a total of 4 pins per lifting beam” and substitute “a total of 6 pins per lifting beam.”

b) At the end of the paragraph, add new sentence: “Clean, grease, and reinstall pins.”

(11) Task Order 0001, Section 09 97 02 Page 3, Part 1 General, add the following paragraph to the end of this Part. “The location of all containment areas and equipment storage areas are subject to approval from the Contracting Officer’s Representative. Contractor shall maintain access from the main overhead door to the bulkhead slots.”

(12) Task Order 0001 Section 09 97 02 Page 21, paragraph 3.2.1 General,

a) Add the following after the first sentence. "Subsequent paint layers shall not be applied until the independent 3rd party inspector has inspected, tested and approved the previous paint layer."

Am #0002 - 4

b) Delete the following sentence "The testing and inspection of all gates and of the finished coating is to be done by the approved 3rd party independent test agency." and replace it with the following "The testing and inspection of all gates and of the blasting, intermediate coats and finished coating is to be done by the approved 3rd party independent test agency.

c) Delete the following sentence “Application of initial or subsequent coatings shall not commence until the Contracting Officer has verified that atmospheric conditions and the surfaces to be coated are satisfactory.” And replace it with the following “Application of initial or subsequent coatings shall not commence until the 3RD PARTY INSPECTOR has verified that atmospheric conditions and the surfaces to be coated are satisfactory.”

(13) Task Order 0001, Section 35 20 14 Page 6, paragraph 3.1.3 Roller Assemblies, delete the last sentence and substitute the following; “If damaged parts exceeds 10% per gate, notify COR for further instruction.”

(14) Task Order 0001, Section 35 20 14 Page 6, paragraph 3.1.4 Re-Tensioning Gate Roller Chain Link Slack, delete the second sentence and substitute the following: “The roller chain slack shall be re-tensioned to within 3-3/4" (min.) to 6" (max.) from the bottom surface of the bottom roller guide to the centerline of the lowest positioned roller.”

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.

Pages or Sections Deleted Pages or Sections Substituted or Added

Attachment to Section 05 50 13 Attachment to Section 05 50 13 Existing Weld Tracking Logs Existing Weld Tracking Logs

c. Drawings (Reissued). The following drawings are revised with latest revision date of 06 July 2018, and reissued with this amendment.

(1) Sheets S-101, S-501, M-102 and M-108.

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal occasioned thereby.

3. See Section 00 22 00 on how to submit proposals.

4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 17 July 2018.

Attachments: Attachment to Section 05 50 13 Existing Weld Tracking Logs Drawings listed in 1.c above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue

Am #0002 - 5

Omaha, Nebraska 68102-4901

06 July 2018

MFS/2184

EXISTING WELD TRACKING LOGS

Am0002

1A 1B 1C 1D 1E

2A 2B 2C 2G 2H2D 2E 2F

3A 3B 3E 3F3C 3D

4A 4B 4E 4F4C 4D

5A 5B 5C 5D

6A 6B 6C 6D

7A 7B 7C 7D

8A 8B 8C 8D

9A 9B 9C 9D

10A 10B 10E 10F10C 10D

11A 11B 11E 11F11C 11D

12A 12B 12E 12F12C 12D

13A 13B 13E 13F13C 13D

Am0002

G6EDXSAD

Callout

WELD 2E-DB

G6EDXSAD

Callout

WELD 4D-UT

G6EDXSAD

Callout

WELD 3D-TR

G6EDXSAD

Callout

WELD 4D-BR

G6EDXSAD

Callout

WELD 8C-DT

G6EDXSAD

Callout

WELD 9C-UB

G6EDXSAD

Callout

WELD 3F-TL

G6EDXSAD

Callout

WELD 4F-BL

G6EDXSAD

Line

G6EDXSAD

Line

G6EDXSAD

Line

G6EDXSAD

Line

G6EDXSAD

Line

G6EDXSAD

Line

G6EDXSAD

Line

G6EDXSAD

Line

G6EDXSAD

Line

G6EDXSAD

Line

G6EDXSAD

Line

G6EDXSAD

Callout

WELD [BOX#]-UT

G6EDXSAD

Callout

WELD [BOX#]-UB

G6EDXSAD

Callout

WELD [BOX#]-UL

G6EDXSAD

Line

G6EDXSAD

Line

G6EDXSAD

Line

G6EDXSAD

Callout

WELD [BOX#]-DTL

G6EDXSAD

Callout

WELD [BOX#]-DBL

G6EDXSAD

Callout

WELD [BOX#]-DB

G6EDXSAD

Callout

WELD [BOX#]-TL

G6EDXSAD

Callout

WELD [BOX#]-BL

G6EDXSAD

Callout

WELD [BOX#]-TR

G6EDXSAD

Callout

WELD [BOX#]-UR

G6EDXSAD

Callout

WELD [BOX#]-DTR

G6EDXSAD

Callout

WELD [BOX#]-DBR

G6EDXSAD

Callout

WELD [BOX#]-BR

G6EDXSAD

Callout

WELD [BOX#]-DT

G6EDXSAD

Text Box

U = UPSTREAM

D = DOWNSTREAM

T = TOP

B = BOTTOM

L = LEFT (LOOKING UPSTREAM)

R = RIGHT (LOOKING UPSTREAM)

EXAMPLES: SEE WELDS IDENTIFIED IN SECTION CUTS ABOVE

G6EDXSAD

Callout

WELD 11D-DTR

G6EDXSAD

Callout

WELD 11D-DBR

G6EDXSAD

Callout

WELD 2H-DR1

G6EDXSAD

Callout

WELD 2H-DR2

G6EDXSAD

Callout

WELD 2H-DR3

G6EDXSAD

Callout

WELD 12F-UB1

G6EDXSAD

Callout

WELD 12F-UB2

G6EDXSAD

Callout

WELD 13D-UT

G6EDXSAD

Callout

WELD 13D-TR

G6EDXSAD

Callout

WELD 13D-DR

G6EDXSAD

Callout

WELD 13D-DT

G6EDXSAD

Callout Weld 1L

G6EDXSAD

Callout Weld 8L

G6EDXSAD

Callout Weld 4R

G6EDXSAD

Callout Weld UR

G6EDXSAD

Callout

WELD DR

G6EDXSAD

Callout Weld TL

G6EDXSAD

Callout

WELD 1A-DL1

G6EDXSAD

Callout

WELD 1A-DL2

G6EDXSAD

Callout

WELD 1A-DL3

G6EDXSAD

Callout

WELD 1A-X1

G6EDXSAD

Callout

WELD 1A-X2

G6EDXSAD

Callout

WELD 1B-XL2

G6EDXSAD

Callout

WELD 1B-XL1

G6EDXSAD

Callout

WELD 1B-XR1

G6EDXSAD

Callout

WELD

1B-XR2

G6EDXSAD

Callout

WELD 1C-XC1

G6EDXSAD

Callout

WELD 1C-XC2

G6EDXSAD

Callout

WELD 1E-DR1

G6EDXSAD

Callout

WELD 1E-DR2

G6EDXSAD

Callout

WELD 1E-DR3

EXISTING WELD INSPECTION TRACKING LOG

1A-BL

1A-UB

1A-BR

1A-DB

1A-UL

1A-UR

1A-DR

1A-DL1

1A-DL2

1A-DL3

1A-TL

1A-UT

1A-DT

1A-X1

1A-X2

1B-BL

1B-UB

1B-BR

1B-DB

1B-UL

1B-UR

1B-DR

1B-DL

1B-XL1

1B-XL2

1B-XR1

1B-XR2

1C-BL

Weld # Defect Length

Defect Location (measured from upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

Weld # Defect Length

Defect Location (measured from upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

1C-UB

1C-BR

1C-DB

1C-UL

1C-UR

1C-DR

1C-DL

1C-XC1

1C-XC2

1C-XL1

1C-XL2

1C-XR1

1C-XR2

1D-BL

1D-UB

1D-BR

1D-DB

1D-UL

1D-UR

1D-DR

1D-DL

1D-XL1

1D-XL2

1D-XR1

1D-XR2

1E-BL

1E-UB

1E-BR

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

1E-DB

1E-UL

1E-UR

1E-DR1

1E-DR2

1E-DR3

1E-DL

1E-UT

1E-TR

1E-DT

1E-X1

1E-X2

2A-BL

2A-UB

2A-BR

2A-DB

2A-UL

2A-UR

2A-DTR

2A-DBR

2A-DL1

2A-DL2

2A-DL3

2A-TL

2A-UT

2A-TR

2A-DT

2B-BL

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

2B-UB

2B-BR

2B-DB

2B-UL

2B-UR

2B-DTR

2B-DBR

2B-DTL

2B-DBL

2B-TL

2B-UT

2B-TR

2B-DT

2C-BL

2C-UB

2C-BR

2C-DB

2C-UL

2C-UR

2C-DTR

2C-DBR

2C-DTL

2C-DBL

2C-TL

2C-UT

2C-TR

2C-DT

2D-BL

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

2D-UB

2D-BR

2D-DB

2D-UL

2D-UR

2D-DTR

2D-DBR

2D-DTL

2D-DBL

2D-TL

2D-UT

2D-TR

2D-DT

2D-XT Weld around U-bolt, top

2D-XB Weld around U-bolt, bottom

2E-BL

2E-UB

2E-BR

2E-DB

2E-UL

2E-UR

2E-DTR

2E-DBR

2E-DTL

2E-DBL

2E-TL

2E-UT

2E-TR

2E-DT

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

2E-XT Weld around U-bolt, top

2E-XB Weld around U-bolt, bottom

2F-BL

2F-UB

2F-BR

2F-DB

2F-UL

2F-UR

2F-DTR

2F-DBR

2F-DTL

2F-DBL

2F-TL

2F-UT

2F-TR

2F-DT

2G-BL

2G-UB

2G-BR

2G-DB

2G-UL

2G-UR

2G-DTR

2G-DBR

2G-DTL

2G-DBL

2G-TL

2G-UT

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

2G-TR

2G-DT

2H-BL

2H-UB

2H-BR

2H-DB

2H-UL

2H-UR

2H-DR1

2H-DR2

2H-DR3

2H-DTL

2H-DBL

2H-TL

2H-UT

2H-TR

2H-DT

3A-BL

3A-UB

3A-BR

3A-DB

3A-UL

3A-UR

3A-DTR

3A-DBR

3A-DL1

3A-DL2

3A-DL3

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

3A-TL

3A-UT

3A-TR

3A-DT

3B-BL

3B-UB

3B-BR

3B-DB

3B-UL

3B-UR

3B-DTR

3B-DBR

3B-DTL

3B-DBL

3B-TL

3B-UT

3B-TR

3B-DT

3C-BL

3C-UB

3C-BR

3C-DB

3C-UL

3C-UR

3C-DTR

3C-DBR

3C-DTL

3C-DBL

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

3C-TL

3C-UT

3C-TR

3C-DT

3C-XT Weld around U-bolt, top

3C-XB Weld around U-bolt, bottom

3D-BL

3D-UB

3D-BR

3D-DB

3D-UL

3D-UR

3D-DTR

3D-DBR

3D-DTL

3D-DBL

3D-TL

3D-UT

3D-TR

3D-DT

3D-XT Weld around U-bolt, top

3D-XB Weld around U-bolt, bottom

3E-BL

3E-UB

3E-BR

3E-DB

3E-UL

3E-UR

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

3E-DTR

3E-DBR

3E-DTL

3E-DBL

3E-TL

3E-UT

3E-TR

3E-DT

3F-BL

3F-UB

3F-BR

3F-DB

3F-UL

3F-UR

3F-DR1

3F-DR2

3F-DR3

3F-DTL

3F-DBL

3F-TL

3F-UT

3F-TR

3F-DT

4A-BL

4A-UB

4A-BR

4A-DB

4A-UL

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

4A-UR

4A-DTR

4A-DBR

4A-DL1

4A-DL2

4A-DL3

4A-TL

4A-UT

4A-TR

4A-DT

4B-BL

4B-UB

4B-BR

4B-DB

4B-UL

4B-UR

4B-DTR

4B-DBR

4B-DTL

4B-DBL

4B-TL

4B-UT

4B-TR

4B-DT

4C-BL

4C-UB

4C-BR

4C-DB

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

4C-UL

4C-UR

4C-DTR

4C-DBR

4C-DTL

4C-DBL

4C-TL

4C-UT

4C-TR

4C-DT

4C-XT Weld around U-bolt, top

4C-XB1 Weld around nut, bottom

4C-XB2 Add'l reinf plate weld to web

4D-BL

4D-UB

4D-BR

4D-DB

4D-UL

4D-UR

4D-DTR

4D-DBR

4D-DTL

4D-DBL

4D-TL

4D-UT

4D-TR

4D-DT

4D-XT Weld around U-bolt, top

4D-XB1 Weld around nut, bottom upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

4D-XB2 Add'l reinf plate weld to web

4E-BL

4E-UB

4E-BR

4E-DB

4E-UL

4E-UR

4E-DTR

4E-DBR

4E-DTL

4E-DBL

4E-TL

4E-UT

4E-TR

4E-DT

4F-BL

4F-UB

4F-BR

4F-DB

4F-UL

4F-UR

4F-DR1

4F-DR2

4F-DR3

4F-DTL

4F-DBL

4F-TL

4F-UT

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

4F-TR

4F-DT

5A-BL

5A-UB

5A-BR

5A-DB

5A-UL

5A-UR

5A-DTR

5A-DBR

5A-DL1

5A-DL2

5A-DL3

5A-TL

5A-UT

5A-TR

5A-DT

5B-BL

5B-UB

5B-BR

5B-DB

5B-UL

5B-UR

5B-DTR

5B-DBR

5B-DTL

5B-DBL

5B-TL

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

5B-UT

5B-TR

5B-DT

5B-X1 Weld around U-bolt nut

5B-X2 Add'l reinf plate weld to web

5C-BL

5C-UB

5C-BR

5C-DB

5C-UL

5C-UR

5C-DTR

5C-DBR

5C-DTL

5C-DBL

5C-TL

5C-UT

5C-TR

5C-DT

5C-X1 Weld around U-bolt nut

5C-X2 Add'l reinf plate weld to web

5D-BL

5D-UB

5D-BR

5D-DB

5D-UL

5D-UR

5D-DR1

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

5D-DR2

5D-DR3

5D-DTL

5D-DBL

5D-TL

5D-UT

5D-TR

5D-DT

6A-BL

6A-UB

6A-BR

6A-DB

6A-UL

6A-UR

6A-DTR

6A-DBR

6A-DL1

6A-DL2

6A-DL3

6A-TL

6A-UT

6A-TR

6A-DT

6B-BL

6B-UB

6B-BR

6B-DB

6B-UL

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

6B-UR

6B-DTR

6B-DBR

6B-DTL

6B-DBL

6B-TL

6B-UT

6B-TR

6B-DT

6C-BL

6C-UB

6C-BR

6C-DB

6C-UL

6C-UR

6C-DTR

6C-DBR

6C-DTL

6C-DBL

6C-TL

6C-UT

6C-TR

6C-DT

6D-BL

6D-UB

6D-BR

6D-DB

6D-UL

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

6D-UR

6D-DR1

6D-DR2

6D-DR3

6D-DTL

6D-DBL

6D-TL

6D-UT

6D-TR

6D-DT

7A-BL

7A-UB

7A-BR

7A-DB

7A-UL

7A-UR

7A-DTR

7A-DBR

7A-DL1

7A-DL2

7A-DL3

7A-TL

7A-UT

7A-TR

7A-DT

7B-BL

7B-UB

7B-BR

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

7B-DB

7B-UL

7B-UR

7B-DTR

7B-DBR

7B-DTL

7B-DBL

7B-TL

7B-UT

7B-TR

7B-DT

7C-BL

7C-UB

7C-BR

7C-DB

7C-UL

7C-UR

7C-DTR

7C-DBR

7C-DTL

7C-DBL

7C-TL

7C-UT

7C-TR

7C-DT

7D-BL

7D-UB

7D-BR

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

7D-DB

7D-UL

7D-UR

7D-DR1

7D-DR2

7D-DR3

7D-DTL

7D-DBL

7D-TL

7D-UT

7D-TR

7D-DT

8A-BL

8A-UB

8A-BR

8A-DB

8A-UL

8A-UR

8A-DTR

8A-DBR

8A-DL1

8A-DL2

8A-DL3

8A-TL

8A-UT

8A-TR

8A-DT

8B-BL

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

8B-UB

8B-BR

8B-DB

8B-UL

8B-UR

8B-DTR

8B-DBR

8B-DTL

8B-DBL

8B-TL

8B-UT

8B-TR

8B-DT

8C-BL

8C-UB

8C-BR

8C-DB

8C-UL

8C-UR

8C-DTR

8C-DBR

8C-DTL

8C-DBL

8C-TL

8C-UT

8C-TR

8C-DT

8D-BL

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

8D-UB

8D-BR

8D-DB

8D-UL

8D-UR

8D-DR1

8D-DR2

8D-DR3

8D-DTL

8D-DBL

8D-TL

8D-UT

8D-TR

8D-DT

9A-BL

9A-UB

9A-BR

9A-DB

9A-UL

9A-UR

9A-DTR

9A-DBR

9A-DL1

9A-DL2

9A-DL3

9A-TL

9A-UT

9A-TR

9A-DT

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

9B-BL

9B-UB

9B-BR

9B-DB

9B-UL

9B-UR

9B-DTR

9B-DBR

9B-DTL

9B-DBL

9B-TL

9B-UT

9B-TR

9B-DT

9C-BL

9C-UB

9C-BR

9C-DB

9C-UL

9C-UR

9C-DTR

9C-DBR

9C-DTL

9C-DBL

9C-TL

9C-UT

9C-TR

9C-DT

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

9D-BL

9D-UB

9D-BR

9D-DB

9D-UL

9D-UR

9D-DR1

9D-DR2

9D-DR3

9D-DTL

9D-DBL

9D-TL

9D-UT

9D-TR

9D-DT

10A-BL

10A-UB

10A-BR

10A-DB

10A-UL

10A-UR

10A-DTR

10A-DBR

10A-DL1

10A-DL2

10A-DL3

10A-TL

10A-UT

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

10A-TR

10A-DT

10B-BL

10B-UB

10B-BR

10B-DB

10B-UL

10B-UR

10B-DTR

10B-DBR

10B-DTL

10B-DBL

10B-TL

10B-UT

10B-TR

10B-DT

10C-BL

10C-UB

10C-BR

10C-DB

10C-UL

10C-UR

10C-DTR

10C-DBR

10C-DTL

10C-DBL

10C-TL

10C-UT

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

10C-TR

10C-DT

10D-BL

10D-UB

10D-BR

10D-DB

10D-UL

10D-UR

10D-DTR

10D-DBR

10D-DTL

10D-DBL

10D-TL

10D-UT

10D-TR

10D-DT

10E-BL

10E-UB

10E-BR

10E-DB

10E-UL

10E-UR

10E-DTR

10E-DBR

10E-DTL

10E-DBL

10E-TL

10E-UT

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

10E-TR

10E-DT

10F-BL

10F-UB

10F-BR

10F-DB

10F-UL

10F-UR

10F-DR1

10F-DR2

10F-DR3

10F-DTL

10F-DBL

10F-TL

10F-UT

10F-TR

10F-DT

11A-BL

11A-UB

11A-BR

11A-DB

11A-UL

11A-UR

11A-DTR

11A-DBR

11A-DL1

11A-DL2

11A-DL3

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

11A-TL

11A-UT

11A-TR

11A-DT

11B-BL

11B-UB

11B-BR

11B-DB

11B-UL

11B-UR

11B-DTR

11B-DBR

11B-DTL

11B-DBL

11B-TL

11B-UT

11B-TR

11B-DT

11C-BL

11C-UB

11C-BR

11C-DB

11C-UL

11C-UR

11C-DTR

11C-DBR

11C-DTL

11C-DBL

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

11C-TL

11C-UT

11C-TR

11C-DT

11D-BL

11D-UB

11D-BR

11D-DB

11D-UL

11D-UR

11D-DTR

11D-DBR

11D-DTL

11D-DBL

11D-TL

11D-UT

11D-TR

11D-DT

11E-BL

11E-UB

11E-BR

11E-DB

11E-UL

11E-UR

11E-DTR

11E-DBR

11E-DTL

11E-DBL

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

11E-TL

11E-UT

11E-TR

11E-DT

11F-BL

11F-UB

11F-BR

11F-DB

11F-UL

11F-UR

11F-DR1

11F-DR2

11F-DR3

11F-DTL

11F-DBL

11F-TL

11F-UT

11F-TR

11F-DT

12A-BL

12A-UB1

12A-UB2

12A-BR

12A-DB

12A-UL

12A-UR

12A-DTR

12A-DBR

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

12A-DL1

12A-DL2

12A-DL3

12A-TL

12A-UT

12A-TR

12A-DT

12B-BL

12B-UB1

12B-UB2

12B-BR

12B-DB

12B-UL

12B-UR

12B-DTR

12B-DBR

12B-DTL

12B-DBL

12B-TL

12B-UT

12B-TR

12B-DT

12C-BL

12C-UB1

12C-UB2

12C-BR

12C-DB

12C-UL

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

12C-UR

12C-DTR

12C-DBR

12C-DTL

12C-DBL

12C-TL

12C-UT

12C-TR

12C-DT

12D-BL

12D-UB1

12D-UB2

12D-BR

12D-DB

12D-UL

12D-UR

12D-DTR

12D-DBR

12D-DTL

12D-DBL

12D-TL

12D-UT

12D-TR

12D-DT

12E-BL

12E-UB1

12E-UB2

12E-BR

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

12E-DB

12E-UL

12E-UR

12E-DTR

12E-DBR

12E-DTL

12E-DBL

12E-TL

12E-UT

12E-TR

12E-DT

12F-BL

12F-UB1

12F-UB2

12F-BR

12F-DB

12F-UL

12F-UR

12F-DR1

12F-DR2

12F-DR3

12F-DTL

12F-DBL

12F-TL

12F-UT

12F-TR

12F-DT

13A-TL

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

13A-UT

13A-TR

13A-DT

13A-DL

13A-DR

13B-TL

13B-UT

13B-TR

13B-DT

13B-DL

13B-DR

13C-TL

13C-UT

13C-TR

13C-DT

13C-DL

13C-DR

13D-TL

13D-UT

13D-TR

13D-DT

13D-DL

13D-DR

13E-TL

13E-UT

13E-TR

upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

13E-DT

13E-DL

13E-DR

13F-TL

13F-UT

13F-TR

13F-DT

13F-DL

13F-DR

TL

UL

DL

TR

UR

DR

1L

2L

3L

4L

5L

6L

7L

8L

9L

10L

11L

12L upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type

Inspection Type (Visual/MT/Eddy current)

13L

1R

2R

3R

4R

5R

6R

7R

8R

9R

10R

11R

12R

13R

EXISTING WELD REPAIR TRACKING LOG

1A-BL

1A-UB

1A-BR

1A-DB

1A-UL

1A-UR

1A-DR

1A-DL1

1A-DL2

1A-DL3

1A-TL

1A-UT

1A-DT

1A-X1

1A-X2

1B-BL

1B-UB

1B-BR

1B-DB

1B-UL

1B-UR

1B-DR

1B-DL

1B-XL1

1B-XL2

1B-XR1

1B-XR2

1C-BL

Date of Weld Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

Date of Weld Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

1C-UB

1C-BR

1C-DB

1C-UL

1C-UR

1C-DR

1C-DL

1C-XC1

1C-XC2

1C-XL1

1C-XL2

1C-XR1

1C-XR2

1D-BL

1D-UB

1D-BR

1D-DB

1D-UL

1D-UR

1D-DR

1D-DL

1D-XL1

1D-XL2

1D-XR1

1D-XR2

1E-BL

1E-UB

1E-BR

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

1E-DB

1E-UL

1E-UR

1E-DR1

1E-DR2

1E-DR3

1E-DL

1E-UT

1E-TR

1E-DT

1E-X1

1E-X2

2A-BL

2A-UB

2A-BR

2A-DB

2A-UL

2A-UR

2A-DTR

2A-DBR

2A-DL1

2A-DL2

2A-DL3

2A-TL

2A-UT

2A-TR

2A-DT

2B-BL

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

2B-UB

2B-BR

2B-DB

2B-UL

2B-UR

2B-DTR

2B-DBR

2B-DTL

2B-DBL

2B-TL

2B-UT

2B-TR

2B-DT

2C-BL

2C-UB

2C-BR

2C-DB

2C-UL

2C-UR

2C-DTR

2C-DBR

2C-DTL

2C-DBL

2C-TL

2C-UT

2C-TR

2C-DT

2D-BL

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

2D-UB

2D-BR

2D-DB

2D-UL

2D-UR

2D-DTR

2D-DBR

2D-DTL

2D-DBL

2D-TL

2D-UT

2D-TR

2D-DT

2D-XT

2D-XB

2E-BL

2E-UB

2E-BR

2E-DB

2E-UL

2E-UR

2E-DTR

2E-DBR

2E-DTL

2E-DBL

2E-TL

2E-UT

2E-TR

2E-DT

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

2E-XT

2E-XB

2F-BL

2F-UB

2F-BR

2F-DB

2F-UL

2F-UR

2F-DTR

2F-DBR

2F-DTL

2F-DBL

2F-TL

2F-UT

2F-TR

2F-DT

2G-BL

2G-UB

2G-BR

2G-DB

2G-UL

2G-UR

2G-DTR

2G-DBR

2G-DTL

2G-DBL

2G-TL

2G-UT

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

2G-TR

2G-DT

2H-BL

2H-UB

2H-BR

2H-DB

2H-UL

2H-UR

2H-DR1

2H-DR2

2H-DR3

2H-DTL

2H-DBL

2H-TL

2H-UT

2H-TR

2H-DT

3A-BL

3A-UB

3A-BR

3A-DB

3A-UL

3A-UR

3A-DTR

3A-DBR

3A-DL1

3A-DL2

3A-DL3

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

3A-TL

3A-UT

3A-TR

3A-DT

3B-BL

3B-UB

3B-BR

3B-DB

3B-UL

3B-UR

3B-DTR

3B-DBR

3B-DTL

3B-DBL

3B-TL

3B-UT

3B-TR

3B-DT

3C-BL

3C-UB

3C-BR

3C-DB

3C-UL

3C-UR

3C-DTR

3C-DBR

3C-DTL

3C-DBL

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

3C-TL

3C-UT

3C-TR

3C-DT

3C-XT

3C-XB

3D-BL

3D-UB

3D-BR

3D-DB

3D-UL

3D-UR

3D-DTR

3D-DBR

3D-DTL

3D-DBL

3D-TL

3D-UT

3D-TR

3D-DT

3D-XT

3D-XB

3E-BL

3E-UB

3E-BR

3E-DB

3E-UL

3E-UR

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

3E-DTR

3E-DBR

3E-DTL

3E-DBL

3E-TL

3E-UT

3E-TR

3E-DT

3F-BL

3F-UB

3F-BR

3F-DB

3F-UL

3F-UR

3F-DR1

3F-DR2

3F-DR3

3F-DTL

3F-DBL

3F-TL

3F-UT

3F-TR

3F-DT

4A-BL

4A-UB

4A-BR

4A-DB

4A-UL

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

4A-UR

4A-DTR

4A-DBR

4A-DL1

4A-DL2

4A-DL3

4A-TL

4A-UT

4A-TR

4A-DT

4B-BL

4B-UB

4B-BR

4B-DB

4B-UL

4B-UR

4B-DTR

4B-DBR

4B-DTL

4B-DBL

4B-TL

4B-UT

4B-TR

4B-DT

4C-BL

4C-UB

4C-BR

4C-DB

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

4C-UL

4C-UR

4C-DTR

4C-DBR

4C-DTL

4C-DBL

4C-TL

4C-UT

4C-TR

4C-DT

4C-XT

4C-XB1

4C-XB2

4D-BL

4D-UB

4D-BR

4D-DB

4D-UL

4D-UR

4D-DTR

4D-DBR

4D-DTL

4D-DBL

4D-TL

4D-UT

4D-TR

4D-DT

4D-XT

4D-XB1

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

4D-XB2

4E-BL

4E-UB

4E-BR

4E-DB

4E-UL

4E-UR

4E-DTR

4E-DBR

4E-DTL

4E-DBL

4E-TL

4E-UT

4E-TR

4E-DT

4F-BL

4F-UB

4F-BR

4F-DB

4F-UL

4F-UR

4F-DR1

4F-DR2

4F-DR3

4F-DTL

4F-DBL

4F-TL

4F-UT

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

4F-TR

4F-DT

5A-BL

5A-UB

5A-BR

5A-DB

5A-UL

5A-UR

5A-DTR

5A-DBR

5A-DL1

5A-DL2

5A-DL3

5A-TL

5A-UT

5A-TR

5A-DT

5B-BL

5B-UB

5B-BR

5B-DB

5B-UL

5B-UR

5B-DTR

5B-DBR

5B-DTL

5B-DBL

5B-TL

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

5B-UT

5B-TR

5B-DT

5B-X1

5B-X2

5C-BL

5C-UB

5C-BR

5C-DB

5C-UL

5C-UR

5C-DTR

5C-DBR

5C-DTL

5C-DBL

5C-TL

5C-UT

5C-TR

5C-DT

5C-X1

5C-X2

5D-BL

5D-UB

5D-BR

5D-DB

5D-UL

5D-UR

5D-DR1

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

5D-DR2

5D-DR3

5D-DTL

5D-DBL

5D-TL

5D-UT

5D-TR

5D-DT

6A-BL

6A-UB

6A-BR

6A-DB

6A-UL

6A-UR

6A-DTR

6A-DBR

6A-DL1

6A-DL2

6A-DL3

6A-TL

6A-UT

6A-TR

6A-DT

6B-BL

6B-UB

6B-BR

6B-DB

6B-UL

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

6B-UR

6B-DTR

6B-DBR

6B-DTL

6B-DBL

6B-TL

6B-UT

6B-TR

6B-DT

6C-BL

6C-UB

6C-BR

6C-DB

6C-UL

6C-UR

6C-DTR

6C-DBR

6C-DTL

6C-DBL

6C-TL

6C-UT

6C-TR

6C-DT

6D-BL

6D-UB

6D-BR

6D-DB

6D-UL

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

6D-UR

6D-DR1

6D-DR2

6D-DR3

6D-DTL

6D-DBL

6D-TL

6D-UT

6D-TR

6D-DT

7A-BL

7A-UB

7A-BR

7A-DB

7A-UL

7A-UR

7A-DTR

7A-DBR

7A-DL1

7A-DL2

7A-DL3

7A-TL

7A-UT

7A-TR

7A-DT

7B-BL

7B-UB

7B-BR

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

7B-DB

7B-UL

7B-UR

7B-DTR

7B-DBR

7B-DTL

7B-DBL

7B-TL

7B-UT

7B-TR

7B-DT

7C-BL

7C-UB

7C-BR

7C-DB

7C-UL

7C-UR

7C-DTR

7C-DBR

7C-DTL

7C-DBL

7C-TL

7C-UT

7C-TR

7C-DT

7D-BL

7D-UB

7D-BR

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

7D-DB

7D-UL

7D-UR

7D-DR1

7D-DR2

7D-DR3

7D-DTL

7D-DBL

7D-TL

7D-UT

7D-TR

7D-DT

8A-BL

8A-UB

8A-BR

8A-DB

8A-UL

8A-UR

8A-DTR

8A-DBR

8A-DL1

8A-DL2

8A-DL3

8A-TL

8A-UT

8A-TR

8A-DT

8B-BL

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

8B-UB

8B-BR

8B-DB

8B-UL

8B-UR

8B-DTR

8B-DBR

8B-DTL

8B-DBL

8B-TL

8B-UT

8B-TR

8B-DT

8C-BL

8C-UB

8C-BR

8C-DB

8C-UL

8C-UR

8C-DTR

8C-DBR

8C-DTL

8C-DBL

8C-TL

8C-UT

8C-TR

8C-DT

8D-BL

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

8D-UB

8D-BR

8D-DB

8D-UL

8D-UR

8D-DR1

8D-DR2

8D-DR3

8D-DTL

8D-DBL

8D-TL

8D-UT

8D-TR

8D-DT

9A-BL

9A-UB

9A-BR

9A-DB

9A-UL

9A-UR

9A-DTR

9A-DBR

9A-DL1

9A-DL2

9A-DL3

9A-TL

9A-UT

9A-TR

9A-DT

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

9B-BL

9B-UB

9B-BR

9B-DB

9B-UL

9B-UR

9B-DTR

9B-DBR

9B-DTL

9B-DBL

9B-TL

9B-UT

9B-TR

9B-DT

9C-BL

9C-UB

9C-BR

9C-DB

9C-UL

9C-UR

9C-DTR

9C-DBR

9C-DTL

9C-DBL

9C-TL

9C-UT

9C-TR

9C-DT

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

9D-BL

9D-UB

9D-BR

9D-DB

9D-UL

9D-UR

9D-DR1

9D-DR2

9D-DR3

9D-DTL

9D-DBL

9D-TL

9D-UT

9D-TR

9D-DT

10A-BL

10A-UB

10A-BR

10A-DB

10A-UL

10A-UR

10A-DTR

10A-DBR

10A-DL1

10A-DL2

10A-DL3

10A-TL

10A-UT

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

10A-TR

10A-DT

10B-BL

10B-UB

10B-BR

10B-DB

10B-UL

10B-UR

10B-DTR

10B-DBR

10B-DTL

10B-DBL

10B-TL

10B-UT

10B-TR

10B-DT

10C-BL

10C-UB

10C-BR

10C-DB

10C-UL

10C-UR

10C-DTR

10C-DBR

10C-DTL

10C-DBL

10C-TL

10C-UT

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

10C-TR

10C-DT

10D-BL

10D-UB

10D-BR

10D-DB

10D-UL

10D-UR

10D-DTR

10D-DBR

10D-DTL

10D-DBL

10D-TL

10D-UT

10D-TR

10D-DT

10E-BL

10E-UB

10E-BR

10E-DB

10E-UL

10E-UR

10E-DTR

10E-DBR

10E-DTL

10E-DBL

10E-TL

10E-UT

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

10E-TR

10E-DT

10F-BL

10F-UB

10F-BR

10F-DB

10F-UL

10F-UR

10F-DR1

10F-DR2

10F-DR3

10F-DTL

10F-DBL

10F-TL

10F-UT

10F-TR

10F-DT

11A-BL

11A-UB

11A-BR

11A-DB

11A-UL

11A-UR

11A-DTR

11A-DBR

11A-DL1

11A-DL2

11A-DL3

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

11A-TL

11A-UT

11A-TR

11A-DT

11B-BL

11B-UB

11B-BR

11B-DB

11B-UL

11B-UR

11B-DTR

11B-DBR

11B-DTL

11B-DBL

11B-TL

11B-UT

11B-TR

11B-DT

11C-BL

11C-UB

11C-BR

11C-DB

11C-UL

11C-UR

11C-DTR

11C-DBR

11C-DTL

11C-DBL

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

11C-TL

11C-UT

11C-TR

11C-DT

11D-BL

11D-UB

11D-BR

11D-DB

11D-UL

11D-UR

11D-DTR

11D-DBR

11D-DTL

11D-DBL

11D-TL

11D-UT

11D-TR

11D-DT

11E-BL

11E-UB

11E-BR

11E-DB

11E-UL

11E-UR

11E-DTR

11E-DBR

11E-DTL

11E-DBL

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

11E-TL

11E-UT

11E-TR

11E-DT

11F-BL

11F-UB

11F-BR

11F-DB

11F-UL

11F-UR

11F-DR1

11F-DR2

11F-DR3

11F-DTL

11F-DBL

11F-TL

11F-UT

11F-TR

11F-DT

12A-BL

12A-UB1

12A-UB2

12A-BR

12A-DB

12A-UL

12A-UR

12A-DTR

12A-DBR

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

12A-DL1

12A-DL2

12A-DL3

12A-TL

12A-UT

12A-TR

12A-DT

12B-BL

12B-UB1

12B-UB2

12B-BR

12B-DB

12B-UL

12B-UR

12B-DTR

12B-DBR

12B-DTL

12B-DBL

12B-TL

12B-UT

12B-TR

12B-DT

12C-BL

12C-UB1

12C-UB2

12C-BR

12C-DB

12C-UL

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

12C-UR

12C-DTR

12C-DBR

12C-DTL

12C-DBL

12C-TL

12C-UT

12C-TR

12C-DT

12D-BL

12D-UB1

12D-UB2

12D-BR

12D-DB

12D-UL

12D-UR

12D-DTR

12D-DBR

12D-DTL

12D-DBL

12D-TL

12D-UT

12D-TR

12D-DT

12E-BL

12E-UB1

12E-UB2

12E-BR

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

12E-DB

12E-UL

12E-UR

12E-DTR

12E-DBR

12E-DTL

12E-DBL

12E-TL

12E-UT

12E-TR

12E-DT

12F-BL

12F-UB1

12F-UB2

12F-BR

12F-DB

12F-UL

12F-UR

12F-DR1

12F-DR2

12F-DR3

12F-DTL

12F-DBL

12F-TL

12F-UT

12F-TR

12F-DT

13A-TL

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

13A-UT

13A-TR

13A-DT

13A-DL

13A-DR

13B-TL

13B-UT

13B-TR

13B-DT

13B-DL

13B-DR

13C-TL

13C-UT

13C-TR

13C-DT

13C-DL

13C-DR

13D-TL

13D-UT

13D-TR

13D-DT

13D-DL

13D-DR

13E-TL

13E-UT

13E-TR

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

13E-DT

13E-DL

13E-DR

13F-TL

13F-UT

13F-TR

13F-DT

13F-DL

13F-DR

TL

UL

DL

TR

UR

DR

1L

2L

3L

4L

5L

6L

7L

8L

9L

10L

11L

12L

Inspection

Weld Accepted (Y/N)

Repair Weld Type & Position

WPS

Reference

AWS Joint Prep Designation

Type of Inspection(s)

Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name

Name(s) of CWI/NDT Technician Verifying Removal

Date of Defect Removal

Date of Weld Replacement

13L

1R

2R

3R

4R

5R

6R

7R

8R

9R

10R

11R

12R

13R

SF30-good
am_0002
05 50 13 - Attachment2 - Revised
WeldInspectionLog.pdf
Sheet
WeldRepairLog.pdf
Sheet

File details come from the government source that posted it.