Am0002.pdf
PDF 5 MB Posted
- Attached to
- Industrial Painting and Structural Repair MATOC
- Solicitation number
- W9128F-18-R-0038
About this file
Amendment 0002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0002
Multiple Award Task Order Contract (MATOC) For: Industrial Painting and Structural Repair Missouri, Iowa, Kansas, Nebraska, South Dakota, North Dakota, Colorado, Wyoming, Montana, Idaho, Oregon, or Washington State
See attached documentation for content of the amendment revisions
Date for receipt of Proposals is 17 July 2018 at 2:00 pm
Government Point of Contact: Jessica Jackson (402) 995-2052
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F18R0038
07/06/2018
06/01/2018
07/06/2018
Am #0002 - 2 (Continuation SF 30)
DEPARTMENT OF THE ARMY
Omaha District, Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901
:NOTICE: Failure to acknowledge : Solicitation No. W9128F18R0038 :all amendments may cause rejec- :
:tion of the offer. See FAR : Date of Issue: 01 June 2018 :52.215-1 of Section 00 21 00 : Date of Receiving Proposals:
17 July 2018
Amendment No. 0002 06 July 2018
SUBJECT: Amendment No. 0002 to Request for Proposal Solicitation Package for Multiple Award Task Order Contract (MATOC) For: Industrial Painting and Structural Repair Missouri, Iowa, Kansas, Nebraska, South Dakota, North Dakota, Colorado, Wyoming, Montana, Idaho, Oregon, or Washington State.
Solicitation No. W9128F18R0038.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) MATOC Document, Section 00 22 00 Page 10, paragraph 8.2.2 Evaluation, add the following to the end of the second subparagraph: “Higher evaluation ratings may be given for project examples which are submitted by the Offerors as the prime contractor.”
(2) MATOC Document, Section 00 22 00 Page 12, paragraph 8.4.1 Submission Requirements, second subparagraph, delete “a contract duration of 720 days” and substitute “a contract duration of 900 days.
(3) Task Order 0001, Section 00 10 00 Page 4, Note 4, delete “730 days” and substitute “840 days”.
(4) Task Order 0001, Section 00 73 00 Page 2, paragraph 1.1, delete “730 calendar days” and substitute “900 calendar days”.
(5) Task Order 0001, Section 00 73 00 Page 2, paragraph 1.1.2 Work Restrictions, add the following after the first sentence. “In addition to Section 01 12 00 Paragraph 1.8 “Cooperation with Other Contractors”, contractors shall be aware that at least one other contract will be on-going during a portion of this contract. Contractor shall assume the intake bridge crane will be unavailable during 2 separate one week periods when two new intake bulkheads (total of four leafs) and a new lifting beam will be delivered to the site and installed and tested in the intake bulkhead slots downstream of the penstock gate slots.”
Am #0002 - 3
(6) Task Order 0001, Section 01 22 00 Page 3, paragraph 1.1 Work Included, delete the last sentence and substitute the following: “This work includes but is not limited to performing nondestructive testing of penstock gates, lifting beams, and bridge crane, load testing lifting beams, removing and replacing gate guides, repairing gate roller chains, installing roller chain housings, removing anodes, verifying that gates hang plumb and making adjustments as necessary, installing gate hoist attachments, repainting penstock gates and lifting beams (including the Independent Painting Inspector as required by Section 09 97 02 Paragraph 1.5.5), replacing gate seals, and disposing of the two original bulkheads and bulkhead lifting beam.”
(7) Task Order 0001, Section 01 22 00 Page 4, paragraph 2.1 Work Included, Add the following sentence at the end of the paragraph: “This work includes but is not limited to performing nondestructive testing of the emergency gate lifting beam, load testing the lifting beam, removing and replacing emergency gate guides, installing roller chain housings, verifying that the gate hangs plumb and making adjustments as necessary, and painting new guides and roller chain housings/spot painting portions of the gate and lifting beam where existing paint is damaged by work in this contract (including the Independent Painting Inspector as required by Section 09 97 02 Paragraph 1.5.5).”
(8) Task Order 0001, Section 01 30 00.24 Page 6, add the following new paragraph 1.7 and renumber subsequent paragraph accordingly:
“1.7 Power Availability
Available temporary power will be one 480 Volt, three-phase plus ground, 60 Amp receptacle (Meltric DSN60). Contractor will be responsible for supplying their own transformer for stepping voltage down for their needs.”
(9) Task Order 0001, Section 05 50 13 Page 18, paragraph 3.1 VERIFICATION OF GATE PLUMBNESS, Second-to-last sentence, delete “same surfaces at the bottom of the gate shall be measured.” and substitute “same surfaces 3’-3” from the bottom of the gate shall be measured.”
(10) Task Order 0001, Section 05 50 14 Page 3, paragraph 3.3 Nondestructive Testing,
a) Second sentence, delete “a total of 4 pins per lifting beam” and substitute “a total of 6 pins per lifting beam.”
b) At the end of the paragraph, add new sentence: “Clean, grease, and reinstall pins.”
(11) Task Order 0001, Section 09 97 02 Page 3, Part 1 General, add the following paragraph to the end of this Part. “The location of all containment areas and equipment storage areas are subject to approval from the Contracting Officer’s Representative. Contractor shall maintain access from the main overhead door to the bulkhead slots.”
(12) Task Order 0001 Section 09 97 02 Page 21, paragraph 3.2.1 General,
a) Add the following after the first sentence. "Subsequent paint layers shall not be applied until the independent 3rd party inspector has inspected, tested and approved the previous paint layer."
Am #0002 - 4
b) Delete the following sentence "The testing and inspection of all gates and of the finished coating is to be done by the approved 3rd party independent test agency." and replace it with the following "The testing and inspection of all gates and of the blasting, intermediate coats and finished coating is to be done by the approved 3rd party independent test agency.
c) Delete the following sentence “Application of initial or subsequent coatings shall not commence until the Contracting Officer has verified that atmospheric conditions and the surfaces to be coated are satisfactory.” And replace it with the following “Application of initial or subsequent coatings shall not commence until the 3RD PARTY INSPECTOR has verified that atmospheric conditions and the surfaces to be coated are satisfactory.”
(13) Task Order 0001, Section 35 20 14 Page 6, paragraph 3.1.3 Roller Assemblies, delete the last sentence and substitute the following; “If damaged parts exceeds 10% per gate, notify COR for further instruction.”
(14) Task Order 0001, Section 35 20 14 Page 6, paragraph 3.1.4 Re-Tensioning Gate Roller Chain Link Slack, delete the second sentence and substitute the following: “The roller chain slack shall be re-tensioned to within 3-3/4" (min.) to 6" (max.) from the bottom surface of the bottom roller guide to the centerline of the lowest positioned roller.”
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.
Pages or Sections Deleted Pages or Sections Substituted or Added
Attachment to Section 05 50 13 Attachment to Section 05 50 13 Existing Weld Tracking Logs Existing Weld Tracking Logs
c. Drawings (Reissued). The following drawings are revised with latest revision date of 06 July 2018, and reissued with this amendment.
(1) Sheets S-101, S-501, M-102 and M-108.
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal occasioned thereby.
3. See Section 00 22 00 on how to submit proposals.
4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 17 July 2018.
Attachments: Attachment to Section 05 50 13 Existing Weld Tracking Logs Drawings listed in 1.c above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue
Am #0002 - 5
Omaha, Nebraska 68102-4901
06 July 2018
MFS/2184
EXISTING WELD TRACKING LOGS
Am0002
1A 1B 1C 1D 1E
2A 2B 2C 2G 2H2D 2E 2F
3A 3B 3E 3F3C 3D
4A 4B 4E 4F4C 4D
5A 5B 5C 5D
6A 6B 6C 6D
7A 7B 7C 7D
8A 8B 8C 8D
9A 9B 9C 9D
10A 10B 10E 10F10C 10D
11A 11B 11E 11F11C 11D
12A 12B 12E 12F12C 12D
13A 13B 13E 13F13C 13D
Am0002
G6EDXSAD
Callout
WELD 2E-DB
G6EDXSAD
Callout
WELD 4D-UT
G6EDXSAD
Callout
WELD 3D-TR
G6EDXSAD
Callout
WELD 4D-BR
G6EDXSAD
Callout
WELD 8C-DT
G6EDXSAD
Callout
WELD 9C-UB
G6EDXSAD
Callout
WELD 3F-TL
G6EDXSAD
Callout
WELD 4F-BL
G6EDXSAD
Line
G6EDXSAD
Line
G6EDXSAD
Line
G6EDXSAD
Line
G6EDXSAD
Line
G6EDXSAD
Line
G6EDXSAD
Line
G6EDXSAD
Line
G6EDXSAD
Line
G6EDXSAD
Line
G6EDXSAD
Line
G6EDXSAD
Callout
WELD [BOX#]-UT
G6EDXSAD
Callout
WELD [BOX#]-UB
G6EDXSAD
Callout
WELD [BOX#]-UL
G6EDXSAD
Line
G6EDXSAD
Line
G6EDXSAD
Line
G6EDXSAD
Callout
WELD [BOX#]-DTL
G6EDXSAD
Callout
WELD [BOX#]-DBL
G6EDXSAD
Callout
WELD [BOX#]-DB
G6EDXSAD
Callout
WELD [BOX#]-TL
G6EDXSAD
Callout
WELD [BOX#]-BL
G6EDXSAD
Callout
WELD [BOX#]-TR
G6EDXSAD
Callout
WELD [BOX#]-UR
G6EDXSAD
Callout
WELD [BOX#]-DTR
G6EDXSAD
Callout
WELD [BOX#]-DBR
G6EDXSAD
Callout
WELD [BOX#]-BR
G6EDXSAD
Callout
WELD [BOX#]-DT
G6EDXSAD
Text Box
U = UPSTREAM
D = DOWNSTREAM
T = TOP
B = BOTTOM
L = LEFT (LOOKING UPSTREAM)
R = RIGHT (LOOKING UPSTREAM)
EXAMPLES: SEE WELDS IDENTIFIED IN SECTION CUTS ABOVE
G6EDXSAD
Callout
WELD 11D-DTR
G6EDXSAD
Callout
WELD 11D-DBR
G6EDXSAD
Callout
WELD 2H-DR1
G6EDXSAD
Callout
WELD 2H-DR2
G6EDXSAD
Callout
WELD 2H-DR3
G6EDXSAD
Callout
WELD 12F-UB1
G6EDXSAD
Callout
WELD 12F-UB2
G6EDXSAD
Callout
WELD 13D-UT
G6EDXSAD
Callout
WELD 13D-TR
G6EDXSAD
Callout
WELD 13D-DR
G6EDXSAD
Callout
WELD 13D-DT
G6EDXSAD
Callout Weld 1L
G6EDXSAD
Callout Weld 8L
G6EDXSAD
Callout Weld 4R
G6EDXSAD
Callout Weld UR
G6EDXSAD
Callout
WELD DR
G6EDXSAD
Callout Weld TL
G6EDXSAD
Callout
WELD 1A-DL1
G6EDXSAD
Callout
WELD 1A-DL2
G6EDXSAD
Callout
WELD 1A-DL3
G6EDXSAD
Callout
WELD 1A-X1
G6EDXSAD
Callout
WELD 1A-X2
G6EDXSAD
Callout
WELD 1B-XL2
G6EDXSAD
Callout
WELD 1B-XL1
G6EDXSAD
Callout
WELD 1B-XR1
G6EDXSAD
Callout
WELD
1B-XR2
G6EDXSAD
Callout
WELD 1C-XC1
G6EDXSAD
Callout
WELD 1C-XC2
G6EDXSAD
Callout
WELD 1E-DR1
G6EDXSAD
Callout
WELD 1E-DR2
G6EDXSAD
Callout
WELD 1E-DR3
EXISTING WELD INSPECTION TRACKING LOG
1A-BL
1A-UB
1A-BR
1A-DB
1A-UL
1A-UR
1A-DR
1A-DL1
1A-DL2
1A-DL3
1A-TL
1A-UT
1A-DT
1A-X1
1A-X2
1B-BL
1B-UB
1B-BR
1B-DB
1B-UL
1B-UR
1B-DR
1B-DL
1B-XL1
1B-XL2
1B-XR1
1B-XR2
1C-BL
Weld # Defect Length
Defect Location (measured from upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
Weld # Defect Length
Defect Location (measured from upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
1C-UB
1C-BR
1C-DB
1C-UL
1C-UR
1C-DR
1C-DL
1C-XC1
1C-XC2
1C-XL1
1C-XL2
1C-XR1
1C-XR2
1D-BL
1D-UB
1D-BR
1D-DB
1D-UL
1D-UR
1D-DR
1D-DL
1D-XL1
1D-XL2
1D-XR1
1D-XR2
1E-BL
1E-UB
1E-BR
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
1E-DB
1E-UL
1E-UR
1E-DR1
1E-DR2
1E-DR3
1E-DL
1E-UT
1E-TR
1E-DT
1E-X1
1E-X2
2A-BL
2A-UB
2A-BR
2A-DB
2A-UL
2A-UR
2A-DTR
2A-DBR
2A-DL1
2A-DL2
2A-DL3
2A-TL
2A-UT
2A-TR
2A-DT
2B-BL
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
2B-UB
2B-BR
2B-DB
2B-UL
2B-UR
2B-DTR
2B-DBR
2B-DTL
2B-DBL
2B-TL
2B-UT
2B-TR
2B-DT
2C-BL
2C-UB
2C-BR
2C-DB
2C-UL
2C-UR
2C-DTR
2C-DBR
2C-DTL
2C-DBL
2C-TL
2C-UT
2C-TR
2C-DT
2D-BL
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
2D-UB
2D-BR
2D-DB
2D-UL
2D-UR
2D-DTR
2D-DBR
2D-DTL
2D-DBL
2D-TL
2D-UT
2D-TR
2D-DT
2D-XT Weld around U-bolt, top
2D-XB Weld around U-bolt, bottom
2E-BL
2E-UB
2E-BR
2E-DB
2E-UL
2E-UR
2E-DTR
2E-DBR
2E-DTL
2E-DBL
2E-TL
2E-UT
2E-TR
2E-DT
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
2E-XT Weld around U-bolt, top
2E-XB Weld around U-bolt, bottom
2F-BL
2F-UB
2F-BR
2F-DB
2F-UL
2F-UR
2F-DTR
2F-DBR
2F-DTL
2F-DBL
2F-TL
2F-UT
2F-TR
2F-DT
2G-BL
2G-UB
2G-BR
2G-DB
2G-UL
2G-UR
2G-DTR
2G-DBR
2G-DTL
2G-DBL
2G-TL
2G-UT
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
2G-TR
2G-DT
2H-BL
2H-UB
2H-BR
2H-DB
2H-UL
2H-UR
2H-DR1
2H-DR2
2H-DR3
2H-DTL
2H-DBL
2H-TL
2H-UT
2H-TR
2H-DT
3A-BL
3A-UB
3A-BR
3A-DB
3A-UL
3A-UR
3A-DTR
3A-DBR
3A-DL1
3A-DL2
3A-DL3
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
3A-TL
3A-UT
3A-TR
3A-DT
3B-BL
3B-UB
3B-BR
3B-DB
3B-UL
3B-UR
3B-DTR
3B-DBR
3B-DTL
3B-DBL
3B-TL
3B-UT
3B-TR
3B-DT
3C-BL
3C-UB
3C-BR
3C-DB
3C-UL
3C-UR
3C-DTR
3C-DBR
3C-DTL
3C-DBL
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
3C-TL
3C-UT
3C-TR
3C-DT
3C-XT Weld around U-bolt, top
3C-XB Weld around U-bolt, bottom
3D-BL
3D-UB
3D-BR
3D-DB
3D-UL
3D-UR
3D-DTR
3D-DBR
3D-DTL
3D-DBL
3D-TL
3D-UT
3D-TR
3D-DT
3D-XT Weld around U-bolt, top
3D-XB Weld around U-bolt, bottom
3E-BL
3E-UB
3E-BR
3E-DB
3E-UL
3E-UR
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
3E-DTR
3E-DBR
3E-DTL
3E-DBL
3E-TL
3E-UT
3E-TR
3E-DT
3F-BL
3F-UB
3F-BR
3F-DB
3F-UL
3F-UR
3F-DR1
3F-DR2
3F-DR3
3F-DTL
3F-DBL
3F-TL
3F-UT
3F-TR
3F-DT
4A-BL
4A-UB
4A-BR
4A-DB
4A-UL
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
4A-UR
4A-DTR
4A-DBR
4A-DL1
4A-DL2
4A-DL3
4A-TL
4A-UT
4A-TR
4A-DT
4B-BL
4B-UB
4B-BR
4B-DB
4B-UL
4B-UR
4B-DTR
4B-DBR
4B-DTL
4B-DBL
4B-TL
4B-UT
4B-TR
4B-DT
4C-BL
4C-UB
4C-BR
4C-DB
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
4C-UL
4C-UR
4C-DTR
4C-DBR
4C-DTL
4C-DBL
4C-TL
4C-UT
4C-TR
4C-DT
4C-XT Weld around U-bolt, top
4C-XB1 Weld around nut, bottom
4C-XB2 Add'l reinf plate weld to web
4D-BL
4D-UB
4D-BR
4D-DB
4D-UL
4D-UR
4D-DTR
4D-DBR
4D-DTL
4D-DBL
4D-TL
4D-UT
4D-TR
4D-DT
4D-XT Weld around U-bolt, top
4D-XB1 Weld around nut, bottom upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
4D-XB2 Add'l reinf plate weld to web
4E-BL
4E-UB
4E-BR
4E-DB
4E-UL
4E-UR
4E-DTR
4E-DBR
4E-DTL
4E-DBL
4E-TL
4E-UT
4E-TR
4E-DT
4F-BL
4F-UB
4F-BR
4F-DB
4F-UL
4F-UR
4F-DR1
4F-DR2
4F-DR3
4F-DTL
4F-DBL
4F-TL
4F-UT
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
4F-TR
4F-DT
5A-BL
5A-UB
5A-BR
5A-DB
5A-UL
5A-UR
5A-DTR
5A-DBR
5A-DL1
5A-DL2
5A-DL3
5A-TL
5A-UT
5A-TR
5A-DT
5B-BL
5B-UB
5B-BR
5B-DB
5B-UL
5B-UR
5B-DTR
5B-DBR
5B-DTL
5B-DBL
5B-TL
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
5B-UT
5B-TR
5B-DT
5B-X1 Weld around U-bolt nut
5B-X2 Add'l reinf plate weld to web
5C-BL
5C-UB
5C-BR
5C-DB
5C-UL
5C-UR
5C-DTR
5C-DBR
5C-DTL
5C-DBL
5C-TL
5C-UT
5C-TR
5C-DT
5C-X1 Weld around U-bolt nut
5C-X2 Add'l reinf plate weld to web
5D-BL
5D-UB
5D-BR
5D-DB
5D-UL
5D-UR
5D-DR1
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
5D-DR2
5D-DR3
5D-DTL
5D-DBL
5D-TL
5D-UT
5D-TR
5D-DT
6A-BL
6A-UB
6A-BR
6A-DB
6A-UL
6A-UR
6A-DTR
6A-DBR
6A-DL1
6A-DL2
6A-DL3
6A-TL
6A-UT
6A-TR
6A-DT
6B-BL
6B-UB
6B-BR
6B-DB
6B-UL
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
6B-UR
6B-DTR
6B-DBR
6B-DTL
6B-DBL
6B-TL
6B-UT
6B-TR
6B-DT
6C-BL
6C-UB
6C-BR
6C-DB
6C-UL
6C-UR
6C-DTR
6C-DBR
6C-DTL
6C-DBL
6C-TL
6C-UT
6C-TR
6C-DT
6D-BL
6D-UB
6D-BR
6D-DB
6D-UL
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
6D-UR
6D-DR1
6D-DR2
6D-DR3
6D-DTL
6D-DBL
6D-TL
6D-UT
6D-TR
6D-DT
7A-BL
7A-UB
7A-BR
7A-DB
7A-UL
7A-UR
7A-DTR
7A-DBR
7A-DL1
7A-DL2
7A-DL3
7A-TL
7A-UT
7A-TR
7A-DT
7B-BL
7B-UB
7B-BR
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
7B-DB
7B-UL
7B-UR
7B-DTR
7B-DBR
7B-DTL
7B-DBL
7B-TL
7B-UT
7B-TR
7B-DT
7C-BL
7C-UB
7C-BR
7C-DB
7C-UL
7C-UR
7C-DTR
7C-DBR
7C-DTL
7C-DBL
7C-TL
7C-UT
7C-TR
7C-DT
7D-BL
7D-UB
7D-BR
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
7D-DB
7D-UL
7D-UR
7D-DR1
7D-DR2
7D-DR3
7D-DTL
7D-DBL
7D-TL
7D-UT
7D-TR
7D-DT
8A-BL
8A-UB
8A-BR
8A-DB
8A-UL
8A-UR
8A-DTR
8A-DBR
8A-DL1
8A-DL2
8A-DL3
8A-TL
8A-UT
8A-TR
8A-DT
8B-BL
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
8B-UB
8B-BR
8B-DB
8B-UL
8B-UR
8B-DTR
8B-DBR
8B-DTL
8B-DBL
8B-TL
8B-UT
8B-TR
8B-DT
8C-BL
8C-UB
8C-BR
8C-DB
8C-UL
8C-UR
8C-DTR
8C-DBR
8C-DTL
8C-DBL
8C-TL
8C-UT
8C-TR
8C-DT
8D-BL
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
8D-UB
8D-BR
8D-DB
8D-UL
8D-UR
8D-DR1
8D-DR2
8D-DR3
8D-DTL
8D-DBL
8D-TL
8D-UT
8D-TR
8D-DT
9A-BL
9A-UB
9A-BR
9A-DB
9A-UL
9A-UR
9A-DTR
9A-DBR
9A-DL1
9A-DL2
9A-DL3
9A-TL
9A-UT
9A-TR
9A-DT
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
9B-BL
9B-UB
9B-BR
9B-DB
9B-UL
9B-UR
9B-DTR
9B-DBR
9B-DTL
9B-DBL
9B-TL
9B-UT
9B-TR
9B-DT
9C-BL
9C-UB
9C-BR
9C-DB
9C-UL
9C-UR
9C-DTR
9C-DBR
9C-DTL
9C-DBL
9C-TL
9C-UT
9C-TR
9C-DT
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
9D-BL
9D-UB
9D-BR
9D-DB
9D-UL
9D-UR
9D-DR1
9D-DR2
9D-DR3
9D-DTL
9D-DBL
9D-TL
9D-UT
9D-TR
9D-DT
10A-BL
10A-UB
10A-BR
10A-DB
10A-UL
10A-UR
10A-DTR
10A-DBR
10A-DL1
10A-DL2
10A-DL3
10A-TL
10A-UT
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
10A-TR
10A-DT
10B-BL
10B-UB
10B-BR
10B-DB
10B-UL
10B-UR
10B-DTR
10B-DBR
10B-DTL
10B-DBL
10B-TL
10B-UT
10B-TR
10B-DT
10C-BL
10C-UB
10C-BR
10C-DB
10C-UL
10C-UR
10C-DTR
10C-DBR
10C-DTL
10C-DBL
10C-TL
10C-UT
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
10C-TR
10C-DT
10D-BL
10D-UB
10D-BR
10D-DB
10D-UL
10D-UR
10D-DTR
10D-DBR
10D-DTL
10D-DBL
10D-TL
10D-UT
10D-TR
10D-DT
10E-BL
10E-UB
10E-BR
10E-DB
10E-UL
10E-UR
10E-DTR
10E-DBR
10E-DTL
10E-DBL
10E-TL
10E-UT
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
10E-TR
10E-DT
10F-BL
10F-UB
10F-BR
10F-DB
10F-UL
10F-UR
10F-DR1
10F-DR2
10F-DR3
10F-DTL
10F-DBL
10F-TL
10F-UT
10F-TR
10F-DT
11A-BL
11A-UB
11A-BR
11A-DB
11A-UL
11A-UR
11A-DTR
11A-DBR
11A-DL1
11A-DL2
11A-DL3
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
11A-TL
11A-UT
11A-TR
11A-DT
11B-BL
11B-UB
11B-BR
11B-DB
11B-UL
11B-UR
11B-DTR
11B-DBR
11B-DTL
11B-DBL
11B-TL
11B-UT
11B-TR
11B-DT
11C-BL
11C-UB
11C-BR
11C-DB
11C-UL
11C-UR
11C-DTR
11C-DBR
11C-DTL
11C-DBL
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
11C-TL
11C-UT
11C-TR
11C-DT
11D-BL
11D-UB
11D-BR
11D-DB
11D-UL
11D-UR
11D-DTR
11D-DBR
11D-DTL
11D-DBL
11D-TL
11D-UT
11D-TR
11D-DT
11E-BL
11E-UB
11E-BR
11E-DB
11E-UL
11E-UR
11E-DTR
11E-DBR
11E-DTL
11E-DBL
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
11E-TL
11E-UT
11E-TR
11E-DT
11F-BL
11F-UB
11F-BR
11F-DB
11F-UL
11F-UR
11F-DR1
11F-DR2
11F-DR3
11F-DTL
11F-DBL
11F-TL
11F-UT
11F-TR
11F-DT
12A-BL
12A-UB1
12A-UB2
12A-BR
12A-DB
12A-UL
12A-UR
12A-DTR
12A-DBR
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
12A-DL1
12A-DL2
12A-DL3
12A-TL
12A-UT
12A-TR
12A-DT
12B-BL
12B-UB1
12B-UB2
12B-BR
12B-DB
12B-UL
12B-UR
12B-DTR
12B-DBR
12B-DTL
12B-DBL
12B-TL
12B-UT
12B-TR
12B-DT
12C-BL
12C-UB1
12C-UB2
12C-BR
12C-DB
12C-UL
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
12C-UR
12C-DTR
12C-DBR
12C-DTL
12C-DBL
12C-TL
12C-UT
12C-TR
12C-DT
12D-BL
12D-UB1
12D-UB2
12D-BR
12D-DB
12D-UL
12D-UR
12D-DTR
12D-DBR
12D-DTL
12D-DBL
12D-TL
12D-UT
12D-TR
12D-DT
12E-BL
12E-UB1
12E-UB2
12E-BR
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
12E-DB
12E-UL
12E-UR
12E-DTR
12E-DBR
12E-DTL
12E-DBL
12E-TL
12E-UT
12E-TR
12E-DT
12F-BL
12F-UB1
12F-UB2
12F-BR
12F-DB
12F-UL
12F-UR
12F-DR1
12F-DR2
12F-DR3
12F-DTL
12F-DBL
12F-TL
12F-UT
12F-TR
12F-DT
13A-TL
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
13A-UT
13A-TR
13A-DT
13A-DL
13A-DR
13B-TL
13B-UT
13B-TR
13B-DT
13B-DL
13B-DR
13C-TL
13C-UT
13C-TR
13C-DT
13C-DL
13C-DR
13D-TL
13D-UT
13D-TR
13D-DT
13D-DL
13D-DR
13E-TL
13E-UT
13E-TR
upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
13E-DT
13E-DL
13E-DR
13F-TL
13F-UT
13F-TR
13F-DT
13F-DL
13F-DR
TL
UL
DL
TR
UR
DR
1L
2L
3L
4L
5L
6L
7L
8L
9L
10L
11L
12L upstream/top/left -looking upstream- of weld to crack start) NotesDefect Type
Inspection Type (Visual/MT/Eddy current)
13L
1R
2R
3R
4R
5R
6R
7R
8R
9R
10R
11R
12R
13R
EXISTING WELD REPAIR TRACKING LOG
1A-BL
1A-UB
1A-BR
1A-DB
1A-UL
1A-UR
1A-DR
1A-DL1
1A-DL2
1A-DL3
1A-TL
1A-UT
1A-DT
1A-X1
1A-X2
1B-BL
1B-UB
1B-BR
1B-DB
1B-UL
1B-UR
1B-DR
1B-DL
1B-XL1
1B-XL2
1B-XR1
1B-XR2
1C-BL
Date of Weld Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
Date of Weld Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
1C-UB
1C-BR
1C-DB
1C-UL
1C-UR
1C-DR
1C-DL
1C-XC1
1C-XC2
1C-XL1
1C-XL2
1C-XR1
1C-XR2
1D-BL
1D-UB
1D-BR
1D-DB
1D-UL
1D-UR
1D-DR
1D-DL
1D-XL1
1D-XL2
1D-XR1
1D-XR2
1E-BL
1E-UB
1E-BR
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
1E-DB
1E-UL
1E-UR
1E-DR1
1E-DR2
1E-DR3
1E-DL
1E-UT
1E-TR
1E-DT
1E-X1
1E-X2
2A-BL
2A-UB
2A-BR
2A-DB
2A-UL
2A-UR
2A-DTR
2A-DBR
2A-DL1
2A-DL2
2A-DL3
2A-TL
2A-UT
2A-TR
2A-DT
2B-BL
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
2B-UB
2B-BR
2B-DB
2B-UL
2B-UR
2B-DTR
2B-DBR
2B-DTL
2B-DBL
2B-TL
2B-UT
2B-TR
2B-DT
2C-BL
2C-UB
2C-BR
2C-DB
2C-UL
2C-UR
2C-DTR
2C-DBR
2C-DTL
2C-DBL
2C-TL
2C-UT
2C-TR
2C-DT
2D-BL
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
2D-UB
2D-BR
2D-DB
2D-UL
2D-UR
2D-DTR
2D-DBR
2D-DTL
2D-DBL
2D-TL
2D-UT
2D-TR
2D-DT
2D-XT
2D-XB
2E-BL
2E-UB
2E-BR
2E-DB
2E-UL
2E-UR
2E-DTR
2E-DBR
2E-DTL
2E-DBL
2E-TL
2E-UT
2E-TR
2E-DT
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
2E-XT
2E-XB
2F-BL
2F-UB
2F-BR
2F-DB
2F-UL
2F-UR
2F-DTR
2F-DBR
2F-DTL
2F-DBL
2F-TL
2F-UT
2F-TR
2F-DT
2G-BL
2G-UB
2G-BR
2G-DB
2G-UL
2G-UR
2G-DTR
2G-DBR
2G-DTL
2G-DBL
2G-TL
2G-UT
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
2G-TR
2G-DT
2H-BL
2H-UB
2H-BR
2H-DB
2H-UL
2H-UR
2H-DR1
2H-DR2
2H-DR3
2H-DTL
2H-DBL
2H-TL
2H-UT
2H-TR
2H-DT
3A-BL
3A-UB
3A-BR
3A-DB
3A-UL
3A-UR
3A-DTR
3A-DBR
3A-DL1
3A-DL2
3A-DL3
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
3A-TL
3A-UT
3A-TR
3A-DT
3B-BL
3B-UB
3B-BR
3B-DB
3B-UL
3B-UR
3B-DTR
3B-DBR
3B-DTL
3B-DBL
3B-TL
3B-UT
3B-TR
3B-DT
3C-BL
3C-UB
3C-BR
3C-DB
3C-UL
3C-UR
3C-DTR
3C-DBR
3C-DTL
3C-DBL
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
3C-TL
3C-UT
3C-TR
3C-DT
3C-XT
3C-XB
3D-BL
3D-UB
3D-BR
3D-DB
3D-UL
3D-UR
3D-DTR
3D-DBR
3D-DTL
3D-DBL
3D-TL
3D-UT
3D-TR
3D-DT
3D-XT
3D-XB
3E-BL
3E-UB
3E-BR
3E-DB
3E-UL
3E-UR
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
3E-DTR
3E-DBR
3E-DTL
3E-DBL
3E-TL
3E-UT
3E-TR
3E-DT
3F-BL
3F-UB
3F-BR
3F-DB
3F-UL
3F-UR
3F-DR1
3F-DR2
3F-DR3
3F-DTL
3F-DBL
3F-TL
3F-UT
3F-TR
3F-DT
4A-BL
4A-UB
4A-BR
4A-DB
4A-UL
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
4A-UR
4A-DTR
4A-DBR
4A-DL1
4A-DL2
4A-DL3
4A-TL
4A-UT
4A-TR
4A-DT
4B-BL
4B-UB
4B-BR
4B-DB
4B-UL
4B-UR
4B-DTR
4B-DBR
4B-DTL
4B-DBL
4B-TL
4B-UT
4B-TR
4B-DT
4C-BL
4C-UB
4C-BR
4C-DB
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
4C-UL
4C-UR
4C-DTR
4C-DBR
4C-DTL
4C-DBL
4C-TL
4C-UT
4C-TR
4C-DT
4C-XT
4C-XB1
4C-XB2
4D-BL
4D-UB
4D-BR
4D-DB
4D-UL
4D-UR
4D-DTR
4D-DBR
4D-DTL
4D-DBL
4D-TL
4D-UT
4D-TR
4D-DT
4D-XT
4D-XB1
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
4D-XB2
4E-BL
4E-UB
4E-BR
4E-DB
4E-UL
4E-UR
4E-DTR
4E-DBR
4E-DTL
4E-DBL
4E-TL
4E-UT
4E-TR
4E-DT
4F-BL
4F-UB
4F-BR
4F-DB
4F-UL
4F-UR
4F-DR1
4F-DR2
4F-DR3
4F-DTL
4F-DBL
4F-TL
4F-UT
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
4F-TR
4F-DT
5A-BL
5A-UB
5A-BR
5A-DB
5A-UL
5A-UR
5A-DTR
5A-DBR
5A-DL1
5A-DL2
5A-DL3
5A-TL
5A-UT
5A-TR
5A-DT
5B-BL
5B-UB
5B-BR
5B-DB
5B-UL
5B-UR
5B-DTR
5B-DBR
5B-DTL
5B-DBL
5B-TL
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
5B-UT
5B-TR
5B-DT
5B-X1
5B-X2
5C-BL
5C-UB
5C-BR
5C-DB
5C-UL
5C-UR
5C-DTR
5C-DBR
5C-DTL
5C-DBL
5C-TL
5C-UT
5C-TR
5C-DT
5C-X1
5C-X2
5D-BL
5D-UB
5D-BR
5D-DB
5D-UL
5D-UR
5D-DR1
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
5D-DR2
5D-DR3
5D-DTL
5D-DBL
5D-TL
5D-UT
5D-TR
5D-DT
6A-BL
6A-UB
6A-BR
6A-DB
6A-UL
6A-UR
6A-DTR
6A-DBR
6A-DL1
6A-DL2
6A-DL3
6A-TL
6A-UT
6A-TR
6A-DT
6B-BL
6B-UB
6B-BR
6B-DB
6B-UL
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
6B-UR
6B-DTR
6B-DBR
6B-DTL
6B-DBL
6B-TL
6B-UT
6B-TR
6B-DT
6C-BL
6C-UB
6C-BR
6C-DB
6C-UL
6C-UR
6C-DTR
6C-DBR
6C-DTL
6C-DBL
6C-TL
6C-UT
6C-TR
6C-DT
6D-BL
6D-UB
6D-BR
6D-DB
6D-UL
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
6D-UR
6D-DR1
6D-DR2
6D-DR3
6D-DTL
6D-DBL
6D-TL
6D-UT
6D-TR
6D-DT
7A-BL
7A-UB
7A-BR
7A-DB
7A-UL
7A-UR
7A-DTR
7A-DBR
7A-DL1
7A-DL2
7A-DL3
7A-TL
7A-UT
7A-TR
7A-DT
7B-BL
7B-UB
7B-BR
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
7B-DB
7B-UL
7B-UR
7B-DTR
7B-DBR
7B-DTL
7B-DBL
7B-TL
7B-UT
7B-TR
7B-DT
7C-BL
7C-UB
7C-BR
7C-DB
7C-UL
7C-UR
7C-DTR
7C-DBR
7C-DTL
7C-DBL
7C-TL
7C-UT
7C-TR
7C-DT
7D-BL
7D-UB
7D-BR
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
7D-DB
7D-UL
7D-UR
7D-DR1
7D-DR2
7D-DR3
7D-DTL
7D-DBL
7D-TL
7D-UT
7D-TR
7D-DT
8A-BL
8A-UB
8A-BR
8A-DB
8A-UL
8A-UR
8A-DTR
8A-DBR
8A-DL1
8A-DL2
8A-DL3
8A-TL
8A-UT
8A-TR
8A-DT
8B-BL
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
8B-UB
8B-BR
8B-DB
8B-UL
8B-UR
8B-DTR
8B-DBR
8B-DTL
8B-DBL
8B-TL
8B-UT
8B-TR
8B-DT
8C-BL
8C-UB
8C-BR
8C-DB
8C-UL
8C-UR
8C-DTR
8C-DBR
8C-DTL
8C-DBL
8C-TL
8C-UT
8C-TR
8C-DT
8D-BL
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
8D-UB
8D-BR
8D-DB
8D-UL
8D-UR
8D-DR1
8D-DR2
8D-DR3
8D-DTL
8D-DBL
8D-TL
8D-UT
8D-TR
8D-DT
9A-BL
9A-UB
9A-BR
9A-DB
9A-UL
9A-UR
9A-DTR
9A-DBR
9A-DL1
9A-DL2
9A-DL3
9A-TL
9A-UT
9A-TR
9A-DT
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
9B-BL
9B-UB
9B-BR
9B-DB
9B-UL
9B-UR
9B-DTR
9B-DBR
9B-DTL
9B-DBL
9B-TL
9B-UT
9B-TR
9B-DT
9C-BL
9C-UB
9C-BR
9C-DB
9C-UL
9C-UR
9C-DTR
9C-DBR
9C-DTL
9C-DBL
9C-TL
9C-UT
9C-TR
9C-DT
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
9D-BL
9D-UB
9D-BR
9D-DB
9D-UL
9D-UR
9D-DR1
9D-DR2
9D-DR3
9D-DTL
9D-DBL
9D-TL
9D-UT
9D-TR
9D-DT
10A-BL
10A-UB
10A-BR
10A-DB
10A-UL
10A-UR
10A-DTR
10A-DBR
10A-DL1
10A-DL2
10A-DL3
10A-TL
10A-UT
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
10A-TR
10A-DT
10B-BL
10B-UB
10B-BR
10B-DB
10B-UL
10B-UR
10B-DTR
10B-DBR
10B-DTL
10B-DBL
10B-TL
10B-UT
10B-TR
10B-DT
10C-BL
10C-UB
10C-BR
10C-DB
10C-UL
10C-UR
10C-DTR
10C-DBR
10C-DTL
10C-DBL
10C-TL
10C-UT
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
10C-TR
10C-DT
10D-BL
10D-UB
10D-BR
10D-DB
10D-UL
10D-UR
10D-DTR
10D-DBR
10D-DTL
10D-DBL
10D-TL
10D-UT
10D-TR
10D-DT
10E-BL
10E-UB
10E-BR
10E-DB
10E-UL
10E-UR
10E-DTR
10E-DBR
10E-DTL
10E-DBL
10E-TL
10E-UT
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
10E-TR
10E-DT
10F-BL
10F-UB
10F-BR
10F-DB
10F-UL
10F-UR
10F-DR1
10F-DR2
10F-DR3
10F-DTL
10F-DBL
10F-TL
10F-UT
10F-TR
10F-DT
11A-BL
11A-UB
11A-BR
11A-DB
11A-UL
11A-UR
11A-DTR
11A-DBR
11A-DL1
11A-DL2
11A-DL3
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
11A-TL
11A-UT
11A-TR
11A-DT
11B-BL
11B-UB
11B-BR
11B-DB
11B-UL
11B-UR
11B-DTR
11B-DBR
11B-DTL
11B-DBL
11B-TL
11B-UT
11B-TR
11B-DT
11C-BL
11C-UB
11C-BR
11C-DB
11C-UL
11C-UR
11C-DTR
11C-DBR
11C-DTL
11C-DBL
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
11C-TL
11C-UT
11C-TR
11C-DT
11D-BL
11D-UB
11D-BR
11D-DB
11D-UL
11D-UR
11D-DTR
11D-DBR
11D-DTL
11D-DBL
11D-TL
11D-UT
11D-TR
11D-DT
11E-BL
11E-UB
11E-BR
11E-DB
11E-UL
11E-UR
11E-DTR
11E-DBR
11E-DTL
11E-DBL
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
11E-TL
11E-UT
11E-TR
11E-DT
11F-BL
11F-UB
11F-BR
11F-DB
11F-UL
11F-UR
11F-DR1
11F-DR2
11F-DR3
11F-DTL
11F-DBL
11F-TL
11F-UT
11F-TR
11F-DT
12A-BL
12A-UB1
12A-UB2
12A-BR
12A-DB
12A-UL
12A-UR
12A-DTR
12A-DBR
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
12A-DL1
12A-DL2
12A-DL3
12A-TL
12A-UT
12A-TR
12A-DT
12B-BL
12B-UB1
12B-UB2
12B-BR
12B-DB
12B-UL
12B-UR
12B-DTR
12B-DBR
12B-DTL
12B-DBL
12B-TL
12B-UT
12B-TR
12B-DT
12C-BL
12C-UB1
12C-UB2
12C-BR
12C-DB
12C-UL
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
12C-UR
12C-DTR
12C-DBR
12C-DTL
12C-DBL
12C-TL
12C-UT
12C-TR
12C-DT
12D-BL
12D-UB1
12D-UB2
12D-BR
12D-DB
12D-UL
12D-UR
12D-DTR
12D-DBR
12D-DTL
12D-DBL
12D-TL
12D-UT
12D-TR
12D-DT
12E-BL
12E-UB1
12E-UB2
12E-BR
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
12E-DB
12E-UL
12E-UR
12E-DTR
12E-DBR
12E-DTL
12E-DBL
12E-TL
12E-UT
12E-TR
12E-DT
12F-BL
12F-UB1
12F-UB2
12F-BR
12F-DB
12F-UL
12F-UR
12F-DR1
12F-DR2
12F-DR3
12F-DTL
12F-DBL
12F-TL
12F-UT
12F-TR
12F-DT
13A-TL
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
13A-UT
13A-TR
13A-DT
13A-DL
13A-DR
13B-TL
13B-UT
13B-TR
13B-DT
13B-DL
13B-DR
13C-TL
13C-UT
13C-TR
13C-DT
13C-DL
13C-DR
13D-TL
13D-UT
13D-TR
13D-DT
13D-DL
13D-DR
13E-TL
13E-UT
13E-TR
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
13E-DT
13E-DL
13E-DR
13F-TL
13F-UT
13F-TR
13F-DT
13F-DL
13F-DR
TL
UL
DL
TR
UR
DR
1L
2L
3L
4L
5L
6L
7L
8L
9L
10L
11L
12L
Inspection
Weld Accepted (Y/N)
Repair Weld Type & Position
WPS
Reference
AWS Joint Prep Designation
Type of Inspection(s)
Names of CWI & NDT technician verifying weld acceptabilityWeld # Welder Name
Name(s) of CWI/NDT Technician Verifying Removal
Date of Defect Removal
Date of Weld Replacement
13L
1R
2R
3R
4R
5R
6R
7R
8R
9R
10R
11R
12R
13R
| SF30-good |
| am_0002 |
| 05 50 13 - Attachment2 - Revised |
| WeldInspectionLog.pdf |
| Sheet |
| WeldRepairLog.pdf |
| Sheet |
File details come from the government source that posted it.