BUILDING STRONG®
SOLICITATION: W9128F-18-R-0018
Repair Biggs Army Airfield
PN 85772
Ft Bliss, TX
17 May 2018
AWARENESS OF
DoD AIRFIELD REQUIREMENTS
Presented by: Gene Gutierrez
US Army Corps of Engineers
Transportation System Center (TSC) www.tsmcx.com
Europe
Bosnia Estonia France
Germany Lithuania Poland
Romania Spain
UK
Central America
El Salvador Honduras
S. America
Aruba Curacao Columbia Ecuador
Asia
Afghanistan Bahrain
Iraq Israel
Jordan Kuwait Oman
Pakistan Qatar
UAE
Egypt
Greenland
Iceland
Pacific
Guam
Hawaii Kwajalein
Palau Wake Island
Puerto Rico
SE Asia South Korea
Japan
TSC SERVICES - WORLDWIDE
OVERVIEW
• Introduction
• Certifications
• Materials
• Mix Design
• Construction
ADVERTISED DOCUMENTS:
Specification Highlights
• 32 13 14.13 – Concrete Pavement for
Airfields and Other Heavy Duty Pavements
• UFGS Dtd November 2017
• 32 12 15.13 – Hot Mix Asphalt Airfield
Paving
• UFGS November 2015
The information presented herein is not all inclusive of all requirements in the project documents. Please refer to applicable documents for additional and ALL requirements.
Early Age Pavement O&M Issues Experienced With
New Construction. Problems Include;
- Joint Spalling
- Cracking (shrinkage, plastic)
- Durability (Scaling, delaminations, etc.)
- Surface Problems (Voids, Drainage, etc.)
- Materials Related (“Pop-outs”, ASR, etc.)
- Quality of Construction & Workmanship
Using Agency Concerns
- O&M Costs for Early Rehab of “New Pavements”
- Impacts to Mission & Airfield Operations
- Disruptions to accommodate repairs
- Closure of T/W, R/W, Aprons, etc.
- FOD
- Construction of FOD Generating Pavements is
UNACCEPTABLE
-Safety Concerns - Personnel & Aircraft
-Frequent Inspection and Sweeping / Vacuuming of
Pavements
Using Agency Concerns
C-17
Aircraft Air Intake
Major Safety Issue
Jet engines can ingest debris & fragments on pavement surfaces leading to engine damage and/or failure
Construction of high quality, durable pavements cannot be over emphasized
F-16
No. 1 Problem
Airfield PCC
Pavements-??
FOD – Joint Spalling
Within 6 Months After BOD
Joint Intersections
Transverse Joints
FOD - Joint Spalling
FOD - Joint Spalling
Spalling within 3 weeks of Aircraft
Operations
FOD – Joint Spalling
WHY? Non- Compliant Mix Design; Means & Methods; Poor to NO CQC; Lack of QA Inspection and Enforcement w/in 5 months of use
Cracking
Sympathetic Cracking
Surface Blistering
Aggregate “Popouts”
FOD w/in 18 months
FOD – Surface Scaling
DoD Expectations
Portland Cement Concrete Pavements
(PCCP)
- Design and Construct Quality PCCP to
Provide 60+ Years of Service Life with
Minimal Maintenance.
- UFC Compliance
- Contract Enforcement
- Foreign Object Debris (FOD) Generating
Pavements UNACCEPTABLE
Foreign Object Debris (FOD)
• Safety Threat to Flight Personnel & Aircraft
• FOD is Unacceptable
• Highlight Specification Requirements that are OFTEN Overlooked During the Bidding Process
• Awareness to Project Specification / Technical Requirements
• Materials Quality
- Specialized Testing
• Mix Design
• Contractor Quality Control & Testing
• Construction
• Acceptance
OBJECTIVES
Earthwork / Subgrade / Base Course
CQC CMT Laboratory of Record
USACE Validated for ALL INDIVIDUAL
Test Methods Performed to Be Performed
Required to Submit a Copy of Certificate of Accreditation & Scope of Accreditation
(E 329, C 1077, D 3666, D 3740, A 880, E
543)
CQC CMT Lab(s)
• USACE Validation
Required [Para. 1.4.3]
• Each Test Method
Specified - Validation
• ERDC Inspection of
Field Lab Required
• Submit Request Early
• Payment Must be
Received PRIOR to
Inspection
Earthwork / Subgrade
Geotechnical Engineer
- Experienced
- Resume for Approval
- Must Visit Work Site
- Must Certify Inspections and
Test Data.
- Must Prepare Monthly
Reports and Assessments of
Work / Site Conditions
- Water flooding or jetting methods of compaction.
Subgrade for Airfield Pavements including shoulders and overruns
- Compact top 12 inches of subgrades to 100 percent of ASTM
D1557; compact fill and backfill material to 100 percent of
ASTM D1557.
Earthwork / Subgrade
• Nuclear (ASTM D 6938)
Calibration
Moisture
Sand Cone every 5000 SF (ASTM D 1556)
• Gradation Acceptance Based on “Completed Base” or After
Compaction Requirements Have Been Met
• Make Supplier Aware of This Requirement.
Base Course Materials
Recycled PCCP Option – Base
- ONLY Crushed Recycled Conrete Removed from Biggs AAF Runway as Part of This Project
Shall be Used for Crushed Recycled Concrete.
- Crushed Recycled Conrete From ALL Other
Sources Shall Not Be Used.
BUILDING STRONG®33
Base Course Placement
Base Course
Placement
Spreader
Box Method
CQC Personnel Qualifications
- CQC Systems Manager [Para 1.4.1]
- Graduate Engineer or Construction Management degree
- Minimum 5 Years Airfield Construction Experience
- Minimum 1 Year CQC Systems Manager on Airfield
Construction
- ACI Concrete Transportation Inspector [Para.1.4.1.b]
- Specialized CQC – All Aspects of Paving
- Present at Paving Site During Paving
CQC Sampling/Testing Lab
Personnel Qualifications
- Approved “On-Site” Laboratory Required [Para 1.4.3.3]
- All Production Sampling & Testing performed by an approved, onsite, independent commercial laboratory
- ACI Certifications for all field and laboratory personnel performing testing and compliance work [Para.1.4.2.c]
- NRMCA Plant Manager Certification at the Plant
Operator Level [Para.1.4.1.e]
CQC Sampling / Testing
Personnel Certifications
- Required by ASTM and Specifications
- ACI Certified Field Testing Technicians, Grade I
- ACI Certified Lab Testing Technicians, Grade I or II
- ACI Certified Concrete Strength Testing Technician
- ACI Certified Concrete Transportation Inspector
- ACI Concrete Flatwork Tech/Finisher (Lead Foreman)
Materials
Aggregates
Sieve Analysis
Field Sample Size – ASTM C 136
Military Airfield Aggregate Quality
DoD Specifications Mandate Use of High Quality Aggregates to Include
Strict Requirements for:
Applies to Each Size Group including Fine Aggregate
ASTM C33 – Min. Two Coarse Aggregates and Fine Aggregate
Intermediate Size May be Required to Meet CF/WF Combined Grading
ASTM C131 - Los Angeles Abrasion (Wear Test)
ASTM C88 - Soundness (Magnesium or Sodium Sulfate)
ASTM D4791 - Flat Particle Test & Elongated Particle Test
ASTM C1260 [C1567] - Alkali Silica Reactivity (ASR)
Deleterious Materials – Min. Sample Weights Use 6 Step Procedure
ASTM C666 – Durability Freeze Thaw Testing or Satisfactory Service
Record
Coarse Aggregates
• Meets ASTM C 33, No. 4, No. 67
• NMSA 1.5”, Meet Optimized Gradation Requirements
• Crushed , Uncrushed Gravel, Crushed Stone
SPECIFICATIONS REQUIRE All AGGREGATES BE WASHED
Aggregate Cleanliness
Fine Aggregate
• ASTM C 33 Grading
• Washed Sand Required
• Fineness Modulus
2.50 < FM < 3.40
9 of 10 production tests shall not vary more than 0.15 from average FM (Table 6)
Deleterious Materials in Pavement
- Clay and Shale
- Lightweight Particles
- Absorptive Aggregates
- Minus 200 Material
Petrographic Identification Requirements
• Submit resume of Petrographer for approval
• Resume shall indicate experience in Petrographic examination of concrete aggregate, classification, and mineralogy
• Subject to approval 20 days PRIOR to testing
• Follow Detailed 6-Step Specification Procedure on Coarse
Aggregate for Moderate Weather Conditions
Test Sample Size Requirements
• Field sample (ASTM D 75) with QA present
• 3 to 4 Times Larger Than Test Sample Size
• Material Quantity
No. 4 Coarse ( ¾” and larger): 200 Pounds
No 67 Coarse (No. 4 to ¾”): 25 Pounds
Fine: 10 Pounds
• No additional time, payment due to delays in testing, evaluation or personnel requirements
Deleterious Materials Comparison
Clay Lumps and Friable Particles 0.2 Max. 3.0 Max.
Shale 0.2 Max. No Req.
Material Finer Than 0.075 mm (No. 200) 0.5 Max. 1.0 Max.
Lightweight Particles (2.0 Sp.G) 0.2 Max. 0.5 Max.
Clay Ironstone 0.5 Max. No Req.
Chert and Cherty Stone (<2.4 Sp.G) 0.5 Max. 5.0 Max.
Claystone, Mudstone, Siltstone 0.1 Max. No Req.
Shaly and Argillaceous Limestone 0.2 Max. No Req.
Other Soft Particles 1.0 Max. No Req.
Total of All Deleterious Materials
Except Material Finer Than 0.075mm 2.0 Max No Req.
COARSE AGGREGATE UFGS ASTM
UFGS ASTM
- Clay Lumps and Friable Particles 1.0 Max. 3.0 Max.
- Material Finer Than 0.075 mm (No. 200) 3.0 Max. 3.0 Max.
- Lightweight Particles (Medium Sp. G = 2.0) 0.5 Max. No Req.
- Coal & Lignite ------ 0.5/1.0 Max
- Total of All Deleterious Materials 3.0 Max. No Req.
Deleterious Materials Comparison
FINE AGGREGATE
Durability Testing / Evaluation
All Coarse and Fine Aggregates
- Freeze Thaw Testing Required
- ASTM C 666 Procedure A
OR
Satisfactory Service Record Report
- Qualified and Experienced P.E. or Petrographer in Concrete/Materials and Related Distresses
- Submit Resume for Approval
- Three Concrete Pavement Projects
- Minimum 5 years Service Life
Alkali-Silica Reactivity (ASR) Testing
ASR Damage
ASR Testing (Alkali-Silica Reactivity Testing Requirements)
•Test Individual Aggregates (Coarse and Fine) (C-1260)
• Test Aggregate(s) with Expansions >0.08% Use ASTM C 1567, Project Cement & SCM or Lithium Nitrate
• Length Change Determined Over a 28-day Period
•If Test Fails- Reject Aggregate- Contractor to Submit New Source
ASTM C 1260 Specimens
• Approved Laboratory
• Recommend Varying Quantity of Mitigating Measure During
Testing
SCM Allowable Dosage Rates Supplementary Cementitious
Material
Minimum
Content
Maximum
Content
Fly Ash
Class F and Class N
SiO2 + Al2O3 + Fe2O3 > 70% 25% 35%
SiO2 + Al2O3 + Fe2O3 > 80% 20% 35%
SiO2 + Al2O3 + Fe2O3 > 90% 15% 35%
UFFA and UFP 7% 16%
GGBF Slag Cement 40% 50%
CQC TESTING
Aggregate Testing
- Quality Testing Including Deleterious Materials and ASR,
- Every 30 days OR
- Change on Source or Quality
- Increase Frequency to Every Three Months (90 days):
- Two consecutive Test Series Indicate Conformance
- Belt Samples After Start of Paving Operations for MA’s
- Meet Minimum Sample Sizes
Mix Design
Mix Design Requirements
- Approved Accredited and Validated Lab: Meeting
ASTM C 1077
- Representative Materials Complying with Specs
- ACI – 211 Methodology
- THREE Different W/C Ratios REQUIRED
- Basis for Mix Adjustments During Construction
- No Substitutions of Materials Permitted Without
Additional Testing and Approval
- Optimized Combined Gradation
- Method for Selecting Aggregate Grading for Use in
Concrete Mixes
- Additional Guidance: USAF ETL 97-5
- Treats the Combined Aggregate Grading as a
Single Component Instead of Individual Size
Gradings. Individual Size Groups must comply with
ASTM C 33 Size No 4 and 67
Gradation Requirements
USAF ETL 97-5
Aggregate Proportioning Guide
- Specified Flexural Strength: Based on Beams
- 650 PSI @ 90-days age
- Max. Allowable Water/Cement Ratio: 0.45
- 517 (470) lbs/CY Cementitious Minimum Required
- Correlation Option Between Compressive and Flexural
Allowed for Acceptance
- Establish During Trial Batches
- Strengths Determined @ 3, 7, 28, and 90 days Age
-TSC Recommends Consideration to test 56-days Age
Strength Specifmens. No Additional Cost
- Air Content: 6.0% + 1.5% at Paver
- Maximum Slump:
- Slip Form: Maximum Determined By Contactor.
Must Identify in Submittal.
- Same Slump for Pilot and “Fill-in” Lanes
- Fixed Form : 2” Maximum
- Proportion Batches at;
- Maximum Allowable Slump
- Maximum Allowable Air Content
- No HRWRA or Flowing Concrete Permitted
- Use Steel Beam Molds
Separate Trial Mixture Studies for
- Each Combination of Proposed Materials i.e. Cementitious, Admixtures
- Placement Methods i.e. Hand or Odd-
Shaped Slabs, Placing/Finishing Equipment
Acceptance and CQC
Production Strengths
-7-day Flexural To 90-day Flexural Strength (CQC
Production Control)
- 14-day Flexural To 90-day Flexural Strength
(Acceptance)
For Change in Materials: Conduct New
Mix Design Studies
- No Paving Until Approval of Mix Design
Deleterious, Quality & ASR Testing
DURING PRODUCTION REQUIRED
• Frequency: 1st test no later than time of uniformity test and then every 30 days of production o Coarse Aggregate
Deleterious Testing by 6-Step Procedure [Table 5]
Wear (L.A. Abrasion): ASTM C131
Soundness: ASTM C88
Flat Particle & Elongated Particle Test: ASTM D4791, Method A
Alkali Silica Reactivity (ASR): ASTM C1260 & C1567 o Fine Aggregate Deleterious Testing
Alkali Silica Reactivity (ASR): ASTM C1260 & C1567
Stationary Central Mix Plant
• NRMCA QC-3 Compliant w/
Certificate
• Documentation for ALL Weighing and Measuring Devices
• Uniformity / Mixer Efficiency
Mandatory
Type and Capacity
• “On- Site” Stationary (Semi / Fully Automatic)
• NRMCA QC-3 Compliant
• 250 CY / HR Capacity
Plant Manager & Responsible
Individual for Mix Adjustments
• NRMCA Ceritfied Plant Manager
• Responsible Individual with Authority to
Make Mix Adjustments (Alternate)
• Experienced and Qualified
•Aggregate Optimization Adjustments
• Major Adjustments MUST BE APPROVED by DOR and Government. NO EXCEPTIONS
Mixer Uniformity Testing
Three Full Production Sized Batches Required
DEMOLITION
Underbreak
Underbreak Runs Horizontally, Into
Pavement; No Fix - Remove and Replace
Panel
PCCP to Remain-Damage Underbreak
Methods
• Double Saw Cut
• PCCP Mechanical Demolition
Guillotine Breaker
Hydraulic Impact Hammer
• Saw Cut Panels Into Pieces
First Cut:
Diamond Saw Cut Full Depth @ Joint
Second Cut: Wheel Saw Min 1-1/2” Kerf
- Full Depth
Diamond Wet Saw / Wheel Saw
Construction of PCCP
Airfield Pavements
Slip Form Paver
- Paver-finisher Must Weigh at Least 2200 lb/foot of Lane Width
- Must be Self Propelled Specifically Designed for Paving and Finishing High Quality Pavements
- Must be Powered by an Engine Having at Least 6.0 Horsepower/foot of Lane Width.
- Multiple Lane Width Placement Permitted
BUILDING STRONG®81
Slip Form Paving
Multiple Lane Placements Permitted
BUILDING STRONG®83
Equipment Not Allowed for Main Line Paving
- Roller-Type Finishers - Vibratory Screeds
- Spinning Tube-Type Finishers
- Clary Screeds - Bridge Deck Finishers
BUILDING STRONG®84
Underlying Material
Transfer Spreader/Placers
- After the underlying material has been prepared for concrete placement, equipment is not permitted thereon with exception of the paver.
- Transfer spreader / placer Required:
Deposits concrete evenly in front of the paver. Equipment operates outside of the lane(s) being placed.
BUILDING STRONG®85
Acceptable Transfer Placer
BUILDING STRONG®86
Dumping Concrete in Front of Paving
Equipment NOT PERMITTED
Saw Cutting
Water Flushing and Vacuuming of Initial Saw Cuts Required
Curing
• Spraying machine shall be self-propelled and span paving lane
• Two coat application: 400 sq ft/gal
• One coat application: 200 sq ft/gal
• Hand operated, mechanical powered pressure sprayers used only for odd shaped slabs and concrete surfaces exposed after removal of forms
• Hand sprayer requires two coats 90 degrees to each coat
Placement of Temporary Cord (Backer Rod) and Spraying with Curing Compound Immediately after Flushing Initial Saw Cut Required.
• Concrete Surfaces Subjected to Rainfall Within 3 hours Shall Be Resprayed
Epoxy Coated Dowels Required
Epoxy Grout Retention Disks Required
Transverse Dowel
Inserters NOT Allowed
Longitudinal Dowel Inserters
NOT Allowed
Acceptance of PCCP
Pavement Lots
• One Shift NTE 1,000 CY
• 1 Lot = 4 equal Sublots
• Grade & Surface Smoothness Test Results are Evaluated on the Entire Lot
Acceptance of Lot
• Must Meet Specification Requirements – No Payment Adjustments:
- Strength
- Edge Slump
- Joint Face Deformation
• Pavement Characteristics – Pay Adjustment (Based on Scale) o Surface Smoothness o Plan Grade o Thickness
• No Excess Mortar / Paste on surface
• Surface free of voids, bug holes, discontinuities
• Must Comply with Combined Gradation Requirement (WF / CF)
Lot Payment Adjustment Computation
(Example) Pavement Characteristic Payment Percentage
Surface Smoothness
Straight Edge (18%) 75%
Profilograph (1.5 in / Mi) 95%
Grade (8%) 95%
Thickness - (0.55 in) 50%
Actual Percent Payment For Lot 50%
Contract $300.00 CY $ 150.00/CY
Other Requirements
PCCP Pavement Grinding
Unacceptable
Acceptable
Grinding PCCP
- Only Diamond Grinding
Allowed
- Maximum area corrected by grinding of PCCP 10 percent of the total area of any sublot.
- Maximum Depth of Diamond
Grinding : ¼” inch.
- New Hot Mix Asphalt Concrete Pavements Must Cure for a
Minimum of 30 days Before Grooving Permitted.
- New Portland Cement Concrete Pavements Must Cure for a Minimum of 28 Days Before Grooving Permitted.
- Submit Grooving Sequence and Method of Placing Guide
Lines to Control Grooving Operation
Pavement Grooving
Hot Mix Asphalt (HMA)
HMA Placments Require Use of
Material Transfer Vehicle (MTV)
Cutting Wheel Required for Longitudinal Construction Joints
Joints
- Density Determined by Cores
- Core Across / Bisecting the Joint
Smooth Drum Roller Damage
PCCP / HMA Joint Interface
Appearance Before and After Grinding
Appearance after Grinding
Please Refer to Specific
Detailed Requirements for
Your Project in the
Applicable Contract
Documents.
THANK YOU
FOR COMING!