W9128F-18-R-0012_Amend_1.pdf
PDF 377 KB Posted
- Solicitation number
- W9128F18R0012
About this file
This document is an amendment to a request for proposal for a multiple award task order contract for crane rehabilitation and replacement work. The scope of work involves the design, construction, rehabilitation and replacement of various cranes and lifting devices at U.S. Army Corps of Engineers hydropower, navigation and flood risk management facilities located within the Northwestern Division area of responsibility. The contract is for a base period of five years with a total value not to exceed $99.9 million to be issued through firm-fixed price task orders ranging from $150,000 to $20 million. The amendment provides clarification regarding project experience requirements, preferences for prime contractor experience, and additional details on ordering procedures. The proposal due date for this opportunity is extended to June 1, 2018.
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAFT_RFP_-_W9128F18R0012_-_NWD_Crane_MATOC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0001
NWD Crane Rehabilitation and Replacement MATOC, NE, IA, SD, ND, KS, MO, WY, CO, MT, ID, OR, WA
See attached documentation for content of the amendment revisions
Date for receipt of Proposals is 01 June 2018 at 2:00 pm
Government Point of Contact: Glenda Canty,Contract Specialist, (402) 995-2059
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F18R0012
05/11/2018
05/02/2018
05/11/2018
Am #0001 - 2 (Continuation SF 30)
DEPARTMENT OF THE ARMY
Omaha District, Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901 :NOTICE: Failure to acknowledge : Solicitation No. W9128F18R0012 :all amendments may cause rejec- :
:tion of the offer. See FAR : Date of Issue: 02 May 2018 :52.215-1 of Section 00 21 00 : Date of Receiving Proposals:
01 June 2018
Amendment No. 0001 11 May 2018
SUBJECT: Amendment No. 0001 to Request for Proposal Solicitation Package for NWD Crane Rehabilitation and Replacement MATOC, NE, IA, SD, ND, KS, MO, WY, CO, MT, ID, OR, WA. Solicitation No. W9128F18R0012
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Section 00 22 00 Page 11, paragraph 16.1.1, Submission Requirements, Criteria 1, last line delete “are not acceptable” and substitute “are not preferred”.
(2) Section 00 22 00 Page 11, paragraph 16.1.1. Submission Requirements, add the following to the end of Criteria 4: “Each project must involve the design, manufacture, or installation of a new or rehabilitated crane/hoist with a capacity of at least 100 tons. NOTE: Although each project submitted need not demonstrate experience in all three major project phases (design, manufacture, and installation), the Offeror’s Factor 1 proposal in its totality must demonstrate that the Offeror has experience in all three major project phases: design, manufacture, and installation."
(3) Section 00 22 00 Page 12, paragraph 16.1.1. Submission Requirements, delete “Projects submitted for this evaluation factor shall be limited to projects completed by the Offeror/Prime Contractor entity ONLY.” and substitute “It is preferred that projects submitted for this evaluation factor should be limited to projects completed by the Offeror/Prime Contractor.”
(4) Section 00 22 00 Page 12, paragraph 16.1.2. Evaluation Criteria, first paragraph, delete “experience in performing the type of crane, hoists and lifting device construction and rehabilitation work described” and substitute “experience in performing the type of crane, hoists and lifting device construction, rehabilitation and replacement, design, manufacturing/fabrication, and installation work described”.
Am #0001 - 3
(5) Section 00 22 00 Page 12, paragraph 16.1.2. Evaluation Criteria, under Strengths and Significant Strength, delete bullet #6, “Demonstrated experience with similar codes, standards, and professional engineering license requirements (electrical, mechanical, and structural) as required by the RFP.”
(6) Section 00 22 00 Page 12, paragraph 16.1.2. Evaluation Criteria, under Weakness or Significant Weaknesses, add the following to the list of bullets “• Any project example submitted for which the Offeror was not the Prime Contractor or Joint Venture participant at the time of project execution; any project example submitted for which the Offeror was a subcontractor.”
(7) Section 00 22 00 Page 13, paragraph 16.1.2. Evaluation Criteria, under Deficiencies, delete the bullet reading “• Any project example submitted for which the Offeror was not the Prime Contractor or Joint Venture participant at the time of project execution; any project example submitted for which the Offeror was a subcontractor.”
(8) Section 00 73 00 Page 3, paragraph 1.5, ORDERING PROCEDURES FOR TASK ORDER, add the following new subparagraph e.
“e. The Contracting Officer reserves the right to make award of a Task Order without competition based upon:
i. One of the circumstances described below:
1. The agency need for the supplies or services are so urgent that providing a fair opportunity would result in unacceptable delays;
2. Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized;
3. The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order; or
4. It is necessary to place an order to satisfy a minimum guarantee; or
5. In accordance with section 1331 of Public Law 111-240 (15 U.S.C. 644(r)), the Federal Register Part 125/Vol. 78, No.
191 dated October 2, 2013 and the Jobs Act guidance, contracting officers may, at their discretion, set-aside orders for any of the small concerns, the specific Small Business program eligibility requirements identified in Part 19 apply.
ii. In accordance with the Federal Register Part 125 /Vol. 78, No. 191 dated October 2, 2013 and the Jobs Act guidance, a statute expressly authorizes or requires that the purchase be made from a specific source.”
Am #0001 - 4
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged.
a. See Section 00 22 10 for proposal submission instructions.
3. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 01 June 2018.
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
11 May 2018
MFS/2184
| sf30-good |
| am 0001 |
File details come from the government source that posted it. Updated .