SCALE: NTS
VICINITY MAP
SCALE: NTS
PROJECT SITE MAP
INDEX TO DRAWINGS
DESIGN FILE DESCRIPTION
CONTRACT DRAWINGS
GR88_E-601XXX.dgn
GR88_G-403XXX.dgn
GR88_G-402XXX.dgn
GR88_G-401XXX.dgn
GR88_G-002XXX.dgn
GR88_G-001XXX.dgn
E-601
G-403
G-402
G-401
G-002
G-001
ONE LINE DIAGRAM
CRANE TROLLEY ARRANGEMENT
CRANE GENERAL INFORMATION
CRANE GENERAL ARRANGEMENT
CONTRACTOR WARK AND STAGING AREAS
COVER SHEET, LOCATION MAP & INDEX TO DRAWINGS
SHEET NO.
DRAWING PLOT SIZE: ANSI B
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
1 2 3 4 5 6
E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/1
/2
BORDER VERSION UPDATE [09-2012]
G-001SHEET NAME:g2hdcatt Andrew TierneyBY USERNAME:DATE AND TIME PLOTTED: 2/12/2018 10:28:42 AMDRAWING PLOT SIZE: ANSI B
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
1 2 3 4 5 6
E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/1
/2
BORDER VERSION UPDATE [09-2012]
G-001SHEET NAME:g2hdcatt Andrew TierneyBY USERNAME:DATE AND TIME PLOTTED: 2/12/2018 10:28:42 AM
F L O
W
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
T
S
M
IL
E S P
E
A N
S I F
G R
G -0
X X
X .d g n
IN
D E
X T
O D
R A
W
IN
G S
C O
V E
R S
H E
E T L
O C
A T
IO
N M
A P
G-001
M
IS
S O
U R I
R
IV
E R
G A
R R
IS
O N D
A M A
N D R
E S
E R
V O
IRNN
S
D E
M E
A U
X
GARRISON DAM
B
B E
L L P
E
J A
G
GENERAL NOTES:
WITH SPECIFICATIONS.
ARRANGEMENTS AND SUBMIT FOR APPROVAL IN ACCORDANCE
F. CONTRACTOR SHALL DESIGN COMPONENTS, SYSTEMS,
E. SOME COMPONENTS MAY NOT BE SHOWN TO SCALE.
CONDITIONS.
D. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND
CODE OR FROM SPECIFICATIONS.
SHALL NOT BE CONSTRUED AS PERMITTING DEVIATIONS FROM
C. OMISSION OF COMPONENTS OR DETAILS FROM DRAWINGS
OMITTED FOR CLARITY.
B. SOME COMPONENTS AND FEATURES ON DRAWINGS ARE
DRAWING SET.
A. THE FOLLOWING NOTES APPLY TO ALL DRAWINGS IN THIS
G A
R R
IS
O N I
N T
A K
E S
T R
U C
T U
R E
B R
C R
A N
E E
M E
R G
E N
C Y R
E P
A
IR
W F
R
ISSUE DATE: 12 FEBRUARY 2018
CONTRACT NO.: XXXXXX-XX-X-XXXX
W9128F18R0008SOLICITATION NO.:
/1
/2
INTAKE BRIDGE CRANE MAIN HOIST - EMERGENCY REPAIR
GARRISON INTAKE STRUCTURE
MISSOURI RIVER, NORTH DAKOTA
GARRISON DAM
Omaha District of Engineers
US Army Corps
OMAHA DISTRICT
9101112131415 8 7 6 5 4 3 2 1
A6A5A4A3A2A1
B7
B6B5B4B3B1 B2
A8
CABLE TRAY DUCT
A9
A10
A11 B8
B9B10B11B12B13
AIR RECEIVER
35 CU. FT. H.P. AFTERCOOKER
B14 2P 2L
L.P. COMP.
L.P. COMP.
L.P. COMP.
AIR COMPRESSOR ROOM
B15
COMP.
H.P.
COMP.
H.P.
GATE WELL
BULKHEAD
GATE WELL
PENSTOCK
CONTROLLER
TEL.
DRINKING WATER COOLER
B16
UNIT HEATERS
MANHOLE
GATE WELL
BULKHEAD
A14
WASH ROOM
TOILET AND
GATE WELL
PENSTOCK
A12 1P
1L
SAND FILTER
80 GAL. TANK
DEEP WALL PUMPS
ROOM
WATER TREATMENT
CONTROLLER
A7
A13
600 GAL. TANKS
FILTER
AIR COMPRESSOR
H.P. - 1.34 C.F.M.4
DE-ICER SYSTEM CONTROL VALVE BANK
CONSTRUCTION TRAILERS
AREA AVAILABLE FOR
BUILDING ACCESS
DO NOT BLOCK
FOR STAGING
AREA AVAILABLE
WELL COVERS
DO NOT BLOCK
DRAWING PLOT SIZE: ANSI B
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
1 2 3 4 5 6
E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/1
/2
BORDER VERSION UPDATE [09-2012]
G-002SHEET NAME:g2hdcatt Andrew TierneyBY USERNAME:DATE AND TIME PLOTTED: 2/12/2018 10:28:45 AM
POWER PANEL
LIGHTING PANEL
UNIT HEATER (INDICATING DIRECTION OF AIR FLOW)
EXTERIOR TELEPHONE
INTERIOR TELEPHONE
TWIN HORN
PLAN
BLOCK ABLOCK B
E A
S T E
N D
LEGEND
SCALE: NTS
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
M
IL
E S P
E
A N
S I F
G R
G -0
X X
X .d
G-002
S O
U R I
R
IV
R R
IS
O N D
A M A
N D R
E S
E R
V O
IR
S
D E
M E
A U
X
B
B E
L L P
E
J A
G
C O
N T
R A
C T
O R W
O R
K A
N D
S T
A G
IN
G A
R E
A S
NOTES:
G A
R R
IS
O N I
N T
A K
E S
T R
U C
T U
R E
B R
C R
A N
E E
M E
R G
E N
C Y R
E P
IR
W
F
R
/1
/2
MADE ACCESSIBLE.
HATCHES SHALL BE PROTECTED, BUT SHALL BE MARKED AND
TO PROTECT THE INTAKE STRUCTURE FLOOR. THE ACCESS
3. PROVIDE AND INSTALL CONSTRUCTION PAPER AND PLYWOOD
GOVERNMENT.
BAY FLOOR HATCHES WITHOUT PRIOR APPROVAL FROM THE
2. HEAVY EQUIPMENT SHALL NOT BE PLACED ON THE ERECTION
1. MAXIMUM LIVE LOAD ON ERECTION BAY FLOOR IS 1000 PSF.
TROLLEY POSITION
UPSTREAM
TROLLEY POSITION
DOWNSTREAM
24"
H O
O K
T
O N
H O
O K
T
O N
H O
O K
T
O N
H O
O K
T
O
NC
C
C
C
L
L
L
L
WEST SIDE OF TROLLEY
EAST SIDE OF TROLLEY
170"
(TO REMAIN)
AUXILIARY HOIST EQUIPMENT
(FOR REFERENCE ONLY)
FUTURE CONTROL PANELS
CONTRACT.
5. BOLD LINE WEIGHT INDICATES ITEMS AFFECTED BY THIS
REQUIREMENTS.
PANEL REQUIREMENTS INCLUDING WORKING CLEARANCE
4. SEE SPECIFICATION SECTION 41 01 20.73 26 FOR NEW MAIN HOIST
AGAINST THE STRUCTURE WALL.
FITS BETWEEN THE BUILDING COLUMNS WHEN THE BRIDGE IS
BE VERIFIED PRIOR TO DESIGN, TO ENSURE THAT THE EXTENSION
3. WALKWAY ADDITION PLACEMENT ALONG EXISTING WALKWAY TO
G-403 FOR FULL DETAILS OF EXISTING EQUIPMENT.
2. MAIN HOIST EQUIPMENT IS TO BE REPLACED IN KIND. SEE SHEET
DISASSEMBLY AND INSTALLATION OF MAIN HOIST EQUIPMENT.
1. PROTECT ALL AUXILIARY HOIST EQUIPMENT DURING
NOTES:
COMP.
BUMPER
FREE
BUMPER
BUMPER FREE
MIN.
BUMPER FREE
MIN.
TRAVEL
HOOK
SPAN
O.A.
BASE
WHEEL
W H
E E
L B
A S
E
T R
U C
K
W H
E E
L B
A S
E
T R
U C
K
"2 130'-6
42'-11"
"8 144'-1
2'-0"4'-3"
17 16
"2 113'-5
"2 15'-10
3'-0"5'-0"
7'-1"
8'-0"
"2 15'-2
D E F
L
D E F
L
MAIN HOIST EQUIPMENT
STRUCURAL BUILDING COLUMNS
NEW BRIDGE WALKWAY TO FIT BETWEEN
SPECIFICATIONS ARE ACHIEVED.
ENSURE WORKING SPACES PER
AND DYNAMIC BRAKING RESISTORS.
NEW MAIN HOIST VFD ENCLOSURE
DRAWING PLOT SIZE: ANSI B
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
1 2 3 4 5 6
E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/1
/2
BORDER VERSION UPDATE [09-2012]
G-501SHEET NAME:g2hdcatt Andrew TierneyBY USERNAME:DATE AND TIME PLOTTED: 2/12/2018 10:28:48 AM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
M
IL
E S P
E
A N
S I F
G R
G -4
X X
X .d
G-401
S O
U R I
R
IV
R R
IS
O N D
A M A
N D R
E S
E R
V O
IR
S
D E
M E
A U
X
B
B E
L L P
E
J
C
A N
E G
E N
E R
A L A
R R
A N
G E
M E
N T
G A
R R
IS
O N I
N T
A K
E S
T R
U C
T U
R E
B R
C R
A N
E E
M E
R G
E N
C Y R
E P
A
IR
W F
R
/1
/2
11220
D
R
5R
R
24R
24R
R4
R2
R2
R4
A
H O
O K
S
EACH BUMPER.
AT 7"=15000 LB.,
DEFLECTION-FORCE
MAX. BUMPER
EL. 1903.46
EL. 1908.65
BUMPER
EL. 1914.23
TROLLEY
OVERALL
CAB
PER.
GAGE
EACH SIDE OF BRIDGE
AS SHOWN, ONE
BLACK-2 REQ'D.
SIGN-YELLOW &
21X38 ENAMEL
H O
O K
T
D N
PLATEFORM)
(BOTTOM ACCESS
EL. 1900.96
MAXIMUM
EL. 1901.52
MAXIMUM
EL. 1897.06
RAIL-ARA-A100#, 41'-11" LONG, 2 REQ'D.
MOFFETT
100/20 TON
OAKLAND CALIFN/IC
TROLLEY ACCESS LADDER
(CRANE HIGH POINT)
EL. 1914.23
(TOP OF RAIL)
EL. 1908.65
(TOP OF RAIL)
EL. 1903.46
(BY GOVERNMENT)
RUNWAY RAIL-AREA 100#
(BOTTOM OF CAB)
EL. 1896.17
U P
S T
R E
A M R
A
IL
H O
O K
T
O N
CAB
(BOTTOM 2/0 OF CONDUCTORS)
EL. 1901.92
6'-9"
2'-0"13'-6"2'-0"
3'-6"
"2 12'-3 1'-3"6'-5"1'-3"
3'-11"4'-7""2 14'-5"2
14'-54'-7"3'-11"
"2 112'-11"2
112'-11
25'-11"
"2 11'-45'-0"6'-7"
"2 12'-32
1'-6" 9
"2 13'-11
"4 33'-10
10" MAX., BUMPER COMPRESSED
"2 13'-9
3'-0"5'-0"
2'-2"
3'-7"4'-0"4'-0"
1'-2"
"8 144'-1
42'-11"
OVERALL
SPAN
8" MAX., BUMPER COMPRESSED
2'-0"4'-3"
"4 17'-2"2
130'-6"4 15'-2
FREE
MIN., BUMPERS HOOK TRAVEL
FREE
MIN., BUMPERS
M
IN
M
IN
CL
C
C
C C C
METALSHEET SIDING
FLOW
"R2 12'-3
REMOVABLE SCREEN
L
IF
T
M
IN
M
IN
L
IF
T
L
L L L
L
D O
W N S
T R
E A
M R
A
IL
D
MOTION H.P.
(FULL L.)
R.P.M.
MFG.
NO
TYPE
NO.
FRAME
HYDRAULIC BRAKE
ELECTRICAL &
(FULL LOAD)
MAX. SPEED F.P.M.
(100 TON CAP'Y)
MAIN HOIST
(20 TON CAP'Y)
AUX. HOIST
TROLLEY
BRIDGE
WEST
WEST
WEST
WEST CIP
CIP
CIP
CIP 444
(THRUSTOR)
G.E. CR 9516-464S
(THRUSTOR)
G.E. CR 9516-464S
(SOLENOID)
G.E. C.R. 9516-461E
WAGNER 10X4, TYPE H
G.E. CR 9516-463A &
(6 PART DOUBLE REEVING)
4.74
(2 PART DOUBLE REEVING)
20.7
47.0
114.8
MOTORS-BRAKES-SPEEDS
WEIGHTS (EST.):
GIRDERS & DRIVE- 53,300 LB.
END TRUCKS- 20,500
TROLLEY- 55,000
CAB- 4,400
TOTAL- 133,200 LB.
MAX. WHEEL LOADS:
BRIDGE-65,300 LB.; TROLLEY-63,750 LB.
POWER SUPPLY:
100 TON CAP'Y. HOOK DETAIL
"=1'-0"2
1SCALE: 1
20 TON CAP'Y. HOOK DETAIL
"=1'-0"2
1SCALE: 1
WIRE ROPE
ACTIVE WRAPS 780 FEET
IDLE 200 FEET
TOTAL 980 FEET
FURNISHED 985 FEET
ACTIVE WRAPS 920 FEET
IDLE 75 FEET
TOTAL 995 FEET
FURNISHED 1,000 FEET
1MAIN: 1
RR-R-571A TYPE XXX111, PREFORMED, UNCOATED
MAIN & AUX. AS PER FEDERAL SPECS.
7AUX:
ELEVATION FROM DOWNSTREAM
SCALE: 1/2"=1'-0"
NOTES:
CONTRACT.
1. BOLD LINE WEIGHT INDICATES ITEMS AFFECTED BY THIS
SECTION 41 01 20.73 26.
COLLECTOR SYSTEM PER SPECIFICATION
NEW CRANE RUNWAY CONDUCTOR AND
AND COLLECTOR SYSTEM AND INSTALL
REMOVE EXISTING RUNWAY CONDUCTOR
DRAWING PLOT SIZE: ANSI B
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
1 2 3 4 5 6
E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/1
/2
BORDER VERSION UPDATE [09-2012]
G-502SHEET NAME:g2hdcatt Andrew TierneyBY USERNAME:DATE AND TIME PLOTTED: 2/12/2018 10:28:51 AM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
M
IL
E S P
E
A N
S I F
G R
G -4
X X
X .d
G-402
S O
U R I
R
IV
R R
IS
O N D
A M A
N D R
E S
E R
V O
IR
S
D E
M E
A U
X
B
B E
L L P
E
J
A N
E G
E N
E R
A L I
N F
O R
M A
T
IO
N
G A
R R
IS
O N I
N T
A K
E S
T R
U C
T U
R E
B R
C R
A N
E E
M E
R G
E N
C Y R
E P
A
IR
W F
R
/1
/2
L
3,001"
2,999 "B.
SEAL 30022
BRG. A-1211-TS
BRG. N.D. 5212
BRG. A-1211-TS
HYATT
XHA
I.D. O.D.
BRAKE C.R. 461E
SOL.
G.E.
S T
D
C P
L G
A
W A
L D
R O
N
XHB
XHC
BRG. 85SD22
C.R. SEAL 500328
FELT SEAL
XHE
XHF
C .R S
E A
L
XHD
BRG. N.D. 5212
CR-462316
SEAL
I.D.
O.D.
BRONZE
85SD22
BRG. TORRING
SEAL
OIL
FELT
D22
85S
BRG.
24 2413'-6" GAGE
17'-6"
55" WRAP LENGTH
PITCH4
144 WRAPS @ 1
7"
55" WRAP LENGTH
PITCH4
144 WRAPS @ 1
P .D
23 23
55" TOTAL WRAP LENGTH
55 WRAPS @ 1" PITCH
55" TOTAL WRAP LENGTH
55 WRAPS @ 1" PITCH
M A
IN
R
U N
N
IN
G E
Q U
A L
IZ
E R
T
O N H
O
IS
T S
H E
A V
E S
L
G
B U
S H
O .D
X
I.
D
X
L
O N
G
O .D
P .D
1160 R.P.M.
FR. 405-30 H.P.
WESTINGHOUSE
462316
C.R. SEAL
DRIVE
WORM
TROLLEY
C TRUCK
C
GAGE
LOAD &
13.75 X4.50 X4
15" P.D., BUSHING
EQUAL. SHEAVE
C TRUCK
CHKR. P WALKWAY16
LG.8
1 X44
1X4
BUSH 3.500
C
WALDRON
CR 9516-464S
BRAKE
G.E. THRUSTOR
L
L
L L
B R
A K
E A
S S
E M
B L
Y
S
IZ
E
L
O A
D
STD. CPLG. 2A
D
GEAR
XHA
XHB
XHC
XHD
XHE
XHF
D.P.
N T.
PITCH D.
2.571
20.000
4.250
24.000
7.500
41.500
TOOTH FRM.
HERR.; CONT.
STUB
OUTSIDE DIA.
2.800
20.229
4.650
24.400
8.300
42.300
BORE
INTERGRAL
2.875"-2.876"
SEE DETAIL
INTEGRAL
4.250"-4.251"
32.375"-32.3775"
KEY ST.
NONE
NONE
FACE
MATERIAL BHNO
STUB
STUB
PINE @
SAE 4140 HT & SR
CAST STEEL CL. 4A2
SAE 4140 HT & SR
CAST STEEL CL. 4A2
SAE 4140 (FORGE)
SAE 1035 (FORGE)
& NORMALIZE.
GEAR
HA
HB
HC
HD
HE
HF
D.P.
N T.
PITCH D.
3.429
10.857
4.250
24.000
6.800
30.000
TOOTH FRM.
HERR. CONT.
STUB
OUTSIDE DIA.
3.658
11.0856
4.650
24.400
7.440
30.640
BORE
3.250"-3.251"
INTEGRAL
INTEGRAL
4.750"-4.751"
KEY ST.
NONE
NONE
NONE
NONE
FACE
MATERIAL BHNO
STUB
STUB
SAE 4140 HT & SR
SAE 4140 HT & SR
CAST ST. CL. 4A2
SAE 4140 HT & SR
CAST ST. CL. 4A2
SAE 4140HG
HH
10.667
52.000
STUB
STUB
11.733
53.067
INTEGRAL
4.750"-4.751"
35.540"-35.542" 8
SAE 1045 (NORM).
CAST ST. CL. 4A2
DO NOT SCALE THIS DRAWING ALL DIMENSIONS IN INCHES-REMOVE ALL SHARP, EDGES
MAIN HOISTGEAR SCHEDULESAUXILLIARY HOIST
INTEGRAL
3X4
5X8
31X
DOWL2
16 2
3X4
5X4
5X4
" DOWL2
NOTES:
CONTRACT.
3. BOLD LINE WEIGHT INDICATES ITEMS AFFECTED BY THIS
OUTPUT SHAFT.
FOR RE-INSTALLATION TO NEW GEAR BOX
2. EXISTING MAIN HOIST PINION TO BE REMOVED AND RETAINED
OF EXISTING EQUIPMENT.
1. NEW EQUIPMENT TO MATCH FOOTPRINT AND LOAD TRANSFER
85SD22
TORRINGTON
85SD22
SEAL
FELT
HH
FELT SEAL
C.R. SEAL 550412
TORRINGTON
BRG. 95SD22
OPP. SIDE 85SD22
C.R. SEAL 6255
HF
HE
BRG. N.D. 3214.
A2
1STD. CPLG. 2
WALDRON
BRG. 80SD22
TORRINGTON
HYATT
BRG. N.D. 3214
BRGS. A-1214TS
SEAL C.R. 350212
HA
HB
HG
C
CR 9516-464S
BRAKE
G.E. THRUSTOR
P .D
1160 R.P.M.
FR. 444 40 H.P.
WESTINGHOUSE
H .P
7F R
W E
S T
HD
HC
B R
A K
E A
S S
E M
B L
Y
S
IZ
E
L
O A
D
C
LOAD & WHEEL BASE
L G
X
.5
X
B R
O N
Z E B
S H
G
L
I.
D
O .D
L
D "
AUXILIARY HOIST EQUIPMENT
AUXILIARY HOIST DRUM
AUXILIARY HOIST DRUM END
UPSTREAM SIDE OF TROLLEY
DOWNSTREAM SIDE OF TROLLEY
WEST SIDE OF TROLLEY
HOLDING BRAKE
MAIN HOIST
MOTOR
MAIN HOIST
MAIN HOIST GEAR BOX
OUTPUT SHAFT
MAIN HOIST GEAR BOX
ROTARY SWITCH
NEW MAIN HOIST LIMIT
(TO REMAIN)
PINION GEAR
MAIN HOIST
EAST SIDE OF TROLLEY
(TO REMAIN)
MAIN HOIST DRUM
(TO REMAIN)
MAIN HOIST DRUM END
(TO REMAIN)
PINION GEAR
MAIN HOIST
DRAWING PLOT SIZE: ANSI B
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
1 2 3 4 5 6
E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/1
/2
BORDER VERSION UPDATE [09-2012]
G-503SHEET NAME:g2hdcatt Andrew TierneyBY USERNAME:DATE AND TIME PLOTTED: 2/12/2018 10:28:53 AM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O M
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
M
IL
E S P
E
A N
S I F
G R
G -4
X X
X .d
G-403
S O
U R I
R
IV
E R
W F
R
R R
IS
O N D
A M A
N D R
E S
E R
V O
IR
S
D E
M E
A U
X
B
B E
L L P
E
J A
G
/1
/2
A N
E T
R O
L L E
Y A
R R
A N
G E
M E
N T
G A
R R
IS
O N I
N T
A K
E S
T R
U C
T U
R E
B R
C R
A N
E E
M E
R G
E N
C Y R
E P
IR
B
HP
CONTROLLER
BRAKE
NOTES:
BRAKE
BRIDGE
BRIDGE
HP
B
CONTROLLER
BRAKE
BRAKE
AUX HOIST
B
CONTROLLER
BRAKE
HP
7.5
RESISTORS
SECONDARY
AUX HOIST
AUX HOIST TROLLEY
RESISTORS
SECONDARY
TROLLEY
BRAKE
TROLLEY
RESISTORS
SECONDARY
BRIDGE
VFD
CONTROLLER
BRAKE
HP
MAIN HOIST
B
BRAKE
MAIN HOIST
LINE REACTOR
LOAD REACTOR
CONTROLLER
WOUND ROTOR
CONTROLLER
WOUND ROTOR
CONTROLLER
WOUND ROTOR
RESISTORS
DYNAMIC BRAKING
DISCONNECT
MAIN LINE
RECEPTACLE
CAB
LIGHT
CAB FLOODLIGHTS
XFMR
UTILITY
480V-120V
CIRCUIT BREAKER
UTILITY TRANSFORMER
MAIN
PANEL
XFMR
CONTROL
480V-120VCONTACTOR
MAIN LINE
SYSTEM
NEW FESTOON
SYSTEM
NEW FESTOON
SYSTEM
NEW FESTOON
SYSTEM
NEW FESTOON
SYSTEM
NEW FESTOON
SYSTEM
NEW FESTOON
480V/60HZ 3 PH. 4 CONDUCTOR
RUNWAY CONDUCTORS
CB #4
480V/60HZ
COLLECTORS
CONDUCTOR
RUNWAY
HOIST CONTROLS)
(TO NEW MAIN
(AUX HOIST, TROLLEY, BRIDGE)
CIRCUITS
CONTROL
120VAC PANELBOARD
POWER PANEL 3P (REUSED)
TESTED PER SPECIFICATIONS.
ALL CRANE FUNCTIONS MUST BE FULLY FUNCTIONAL AND
8. NEW EQUIPMENT WILL INTERFACE WITH EXISTING EQUIPMENT.
CONDITIONS.
7. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND
SPECIFICATION.
BREAKERS AND CIRCUITS ARE REQUIRED TO MEET THE
6. THE BREAKER/CIRCUIT QUANTITY IS CONCEPTUAL, MORE
DEVIATION FROM CODE OR FROM THE SPECIFICATIONS.
DRAWING SHALL NOT BE CONSTRUED AS PERMITTING
DEVICES, WIRING, AND OTHER COMPONENTS FROM THIS
5. DRAWING IS CONCEPTUAL, OMISSION OF PROTECTIVE
TERMINATION ON THE BRIDGE.
BOX ON THE BRIDGE TO FIRST POINT OF EXISTING
4. REPLACE ALL CONDUCTORS FROM NEW FESTOON JUNCTION
ON THE TROLLEY.
BOX ON TROLLEY TO FIRST POINT OF EXISTING TERMINATION
3. REPLACE ALL CONDUCTORS FROM NEW FESTOON JUNCTION
EQUIPMENT IS SHOWN IN LARGER LINE WEIGHT/ BOLD.
2. NEW EQUIPMENT THAT INTERFACES WITH EXISTING
1. FOR CLARITY, NOT ALL COMPONENTS ARE SHOWN.
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
E V
E N R
M
IL
E S P .E
E-601
N
E L
IN
E D
IA
G R
A M
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
M
IS
S O
U R I
R
IV
H D
C M
G T
R
B O
N A
C K
E R
IN
S
T A
A H
A
N E
B R
A S
K A
O M
A H
A D
IS
T R
IC
T
F P -6
-6 -A -2
/1
G R
E -6
X X
X .d g n
G A
R R
IS
O N D
A M A
N D R
E S
E R
V O
IR
G A
R R
IS
O N I
N T
A K
E S
T R
U C
T U
R E
B R
C R
A N
E E
M E
R G
E N
C Y R
E P
A
IR
/1
/2
W F
R
DRAWING PLOT SIZE: ANSI B
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
1 2 3 4 5 6
E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/1
/2
BORDER VERSION UPDATE [09-2012]
E-601 SHEETSHEET NAME:g2hdcatt Andrew TierneyBY USERNAME:DATE AND TIME PLOTTED: 2/12/2018 10:28:55 AM
| GR88_G-001XXX |
| GR88_G-002XXX |
| GR88_G-401XXX |
| GR88_G-402XXX |
| GR88_G-403XXX |
| GR88_E-601XXX |
File details come from the government source that posted it.