W9128F18Q0039,_Model_Test_Generators.pdf

PDF 1 MB Posted

Attached to
Garrison Unit Modeling Testing Federal contract opportunity
Solicitation number
W9128F18Q0039
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9128F18Q0039 28-Feb-2018

b. TELEPHONE NUMBER

402-995-2589

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 09 Mar 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9128F9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

TIMOTHY B BOYTE

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W59XQG80120471

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 966567 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

COE MAINTENANCE ENGINEERING SEC

MELISSA KURTZ

USAED, OMAHADISTRICT CENWO-OD-S

1616 CAPITOL AVE

OMAHA NE 68102-4901

TEL: 402-995-2408 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$15,000,000

NAICS:

541380

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF48

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W9128F18Q0039

Section SF 1449 - CONTINUATION SHEET

PERFORMANCE WORK STATEMENT

NWO-CT PERFORMANCE WORK STATEMENT (PWS)

12 Jan 18

Garrison Unit Modeling

Part 1

General Information

1. GENERAL: This is a non-personnel services contract to provide Garrison Unit Modeling. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Garrison Unit Modeling as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: Generator owners are required to provide dynamic data information to transmission operators per North American Electric Reliability Corporation (NERC) standard MOD-32-1. Model validation testing of generators, governors, exciters, and power system stabilizers (PSSs) provide the information needed to meet the requirement. A model validation report that demonstrates compliance with all current NERC and Southwest Power Pool (SPP) requirements must be prepared and submitted to the U.S. Army Corps of Engineers (USACE) Omaha District (NWO) Reliability Coordinator.

1.2.1 Occasionally, adjustments to governor and/or excitation system settings are also needed for unit stability and model validation requirements. For this contract, no major tuning is anticipated. Additionally, no PSS tuning or tuning study is anticipated.

1.2.2 The NERC regional entity for compliance monitoring and enforcement for Omaha District Dams and one is the MRO region. It is the contractor’s responsibility to research and demonstrate compliance with all MRO requirements beyond NERC requirements.

1.3 Scope: The Contractor shall perform the testing on the the five hydro generator units at the Garrison Power Plant. The Contractor shall at a minimum provide a test team with one professional engineer, one technologist and all instruments, meters, transducers, and equipment required to perform testing. The Contractor shall perform the specific tasks listed in Part 5. All models and reports shall meet the requirements of SPP MDWG Model Development Procedures Manual v11.pdf, Ch 13, NERC MOD-32-1, MOD 27-1, and

MOD 26-1.

1.3.1 Units 1, 2, and 3 at Garrison are identical and units 4 & 5 are identical. The first unit under outage shall be designated as the primary unit which shall require complete testing and the other two units shall be designated as a sister units requiring cursory tests to compare the performance to the primary unit. Garrison will require two primary unit tests and three sister unit tests. IEEE standard models and parameters compatible with NERC / MRO unit modeling guidelines shall be provided for all generators, exciters, and hydro unit governors.

1.4 Period of Performance: 365 days. All equipment to be tested will be available during one site visit with no intentional delays between testing units. Test dates will be determined in consultation with the O&M Supervisor at each project. The mutually agreeable dates shall be approved by the Government. Contractor will request dates to perform modeling unit tests. Testing may be requested from Apr 1 2018– May 15 2019, the following dates are not available May 15, 2018 – Aug 31, 2018. During the course of the tests, each unit will be available to be operated over a range of its rated capability, from speed-no load (not synchronized) to full load and maximum over and under-excited.

1.5 General Information

1.5.1 Quality Control: The contractor shall maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.

1.5.2 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance to PRS in Section 6, Technical 1. The government must ensure that the contractor performs in accordance with the contract.

1.5.3 Recognized Holidays: The contractor is not required to perform on these days.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.5.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 7:00am - 5:30pm CST Monday thru Thursday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons.

1.5.5 Place of Performance: The work to be performed under this contract will be performed at Garrison Power Plant, Riverdale, ND.

1.5.6 Type of Contract: The government will award a firm fixed price contract.

1.5.7 Security Requirements: NA

1.5.8 Special Qualifications:

1.5.8.1 Will be Escorted in Restricted Areas: If applicable, all contract employees, including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in restricted areas.

1.5.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference calls convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5.

The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government and shall be over the phone.

1.5.10 Contracting Officer Representative (COR): For this contract a government POC will be designated to represent Government. This representative will contact the contractor and act as the primary point of exchange between the Contractor and the Government. The Government Representative will monitor all technical aspects of the contract by performing inspections as necessary and assist in contract administration.

They will also coordinate availability of government furnished property, and provide site entry of Contractor personnel and notify both the Contracting Officer and Contractor of any deficiencies. The Government Representative is not authorized to change any of the terms and conditions of the resulting contract.

1.5.11 Key Personnel: The Contractor shall at a minimum provide a test team with one professional engineer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

1.5.12 Contractor Travel: All travel requires Government approval/authorization and notification to the COR. If Contractor is authorized travel only expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract.

1.5.13 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations.

This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor.

The Government does not have privity of contract with the subcontractor.

2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

COR Contracting Officer Representative POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: The Government will provide an operator to run required tests.

3.2 Facilities: The Government will provide a workspace while on site. The work areas for parts installation will be the Generator Bay, Turbine Floor, and Machine Shop. The government will provide folding table, chairs, and available cars for the contractors use.

An area will be made available for the Contractor's expert to store any tools and equipment he/she may require.

3.3 For each primary unit, the Government will furnish the following information, as copies at least four weeks in advance of testing:

Generator capability curve

Generator open circuit saturation curve

Excitation system/Automatic voltage regulator manual and schematics

Power system stabilizer manual and schematics (if applicable)

Governor speed/droop control schematics and instruction manual

Applicable relay calibration sheets (e.g. loss of excitation, V/Hz)

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1) Personnel and Equipment. Contractor shall provide test personnel and test equipment necessary for model validation testing on the governors, exciters, and generators. Test personnel shall have experience both with the Contractor’s test equipment and test procedures, and with the operating functionality and configuration of the type of governor or exciter (both manufacturer and model) to be tested. The Government will provide powerhouse operators and technicians to participate in performing the various tests as described in the approved and agreed upon test procedures.

5.2) Test Procedure. Contractor shall prepare for approval detailed test procedures for performing model validation testing of the governors, exciters, and generators. This shall include all required connections, test equipment, test sequence, measurements, and adjustments. The contractor shall provide a detailed test procedure for each unit, two weeks prior to being on-site.

5.3) Baseline Generator Validation Testing. Contractor shall perform steady-state testing to develop and validate the generator characteristics, including magnetic characteristics. Contractor shall further develop dynamic parameters through transient testing. Steady state test results shall be submitted to the Government in a tabular format accompanying graphs demonstrating simulation and equation matching to acquired steady state data. Parameters determined through review and calculation of parameters from drawings and nameplate data shall be noted and the equations shown.

5.4) Model Validation Testing of Exciters. Contractor shall perform testing and gather information necessary to determine the dynamic responses and build, within standard SPP model library models, if appropriate, a dynamic model to describe the excitation system. Contractor shall validate the excitation system model by comparing computer simulations representing the approximate system conditions during testing and displaying test and simulation results on overlaying graphs.

5.5) Model Validation Testing of Turbine-Governors. Contractor shall perform testing and gather information necessary to determine the dynamic responses and build, within standard SPP model library models, if appropriate, a dynamic model to describe the turbine-governor system. Contractor shall validate the turbine-governor system model by comparing computer simulations representing the approximate system conditions during testing and displaying test and simulation results on overlaying graphs.

5.6) Model Validation Testing of the PSS. Contractor shall perform testing and gather information necessary to determine the dynamic responses and build, within standard SPP model library models, if appropriate, a dynamic model to describe the PSS.

Contractor shall validate the PSS model by comparing computer simulations representing the approximate system conditions during testing and displaying test and simulation results on overlaying graphs.

5.7) Overall Dynamics Validation. The Contractor shall submit graphs showing good matching between MW and mega-volt-amperes-reactive VAR (MVAR) dynamic responses to online excitation voltage reference steps of at least 2% positive and 2% negative and online power (speed) reference steps of at least ½% positive and ½% negative. The PSS damping effectiveness - if implemented and usually enabled during operation - to a voltage reference step of at least 2% positive and 2% negative shall be demonstrated by comparing MW amplitude and oscillations with PSS on and off.

Contractor shall provide graphs of sufficient size and clarity to demonstrate matching between ramp rates, overshoot, time constants, steady state settling, and other parameters necessary to validate dynamic simulation matching to actual tests. The Contractor shall submit comma-separated value (CSV) raw test data and simulation data with time in column 0, column headers, and scaling factors to allow for reproduction and review of the printed graphs.

5.8) Calculations, Data, and Formulas. The Contractor shall provide a record of the calculations made to support the model validation analysis, records of data taken, and formulas. The report shall contain calculations and formulas necessary to describe interpolations or calculations from gathered parameters to determine model parameters.

5.9) Draft model validation analysis and test report. The Contractor shall submit a test report that includes a subjective evaluation of equipment performance as well as the complete generator, turbine/governor, exciter, and PSS models with correct model parameters. Contractor shall compare actual and simulated data to validate accuracy of models. The model parameters submitted shall be acceptable to SPP for dynamic simulation purposes. This shall be submitted not more than 45 days from completing the on-site tests. Government will have 21 days to review and provide comments to the contractor.

5.10) Final model validation analysis and test report. The Contractor shall submit a final test report incorporating Government review comments or providing responses to comments for non-concurrence. The final test report shall include a subjective evaluation of equipment performance as well as the complete generator, turbine/governor, exciter, and PSS models with correct model parameters. Contractor shall compare actual and simulated data to validate accuracy of models. The model parameters submitted shall be acceptable to SPP for dynamic simulation purposes. This shall be completed 30 days after Government provides comments to the contractor.

PART 6

ATTACHMENT/TECHNICAL EXHIBIT LISTING

6. Attachment/Technical Exhibit List:

6.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

6.2 Attachment 2/Technical Exhibit 2 – Deliverables Schedule

6.3 Attachment 3/Technical Exhibit 3 - Generator Information

TECHNICAL EXHIBIT 1

Performance Requirements Summary

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective (The Service required—usually a shall statement)

Standard Performance

Threshold

Method of Surveillance

PRS # 1.

Test Procedures

a. Submittal approved as submitted, although 10%-20% substantive comments issued for submittal; and

b. No technical deficiencies identified.

Zero deviation from standard

Submittal Review

PRS # 2.

Submit Draft Model Validation Analysis and Test Report

a. Submittal approved as submitted, although 10%-20% substantive comments issued for submittal; and

b. No technical deficiencies identified.

Zero deviation from standard

Submittal Review

PRS # 3

Submit Final Model Validation Analysis and Test Report

a. Submittal approved as submitted with no substantive comments; and

b. No technical deficiencies identified.

Zero deviation from standard

Submittal Review

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To

Draft Model Validation Analysis and Test Report

Once

1 copy to be delivered 45 days after tests completed

Via approved electronic delivery method

Melissa.L.Kurtz@u sace.army.mil

Final Model Validation Analysis and Test Report

Once 1 copy to be delivered 30 days after government comments received.

Via approved electronic delivery method

Melissa.L.Kurtz@u sace.army.mil

TECHNICAL EXHIBIT 3

Generator Ratings Garrison Unit 1-3

Generator Ratings Garrison Unit 4-5

Ratings Value Units Value Units

Sbase Generator Base Power 128 MVA 115 MVA

MCR Turbine continuous rating 121.6 MW 109.3 MW

Ebase Generator Base Voltage 13.8 kV 13.8 kV rpm Rated Speed 90 rpm 90 rpm pf Power Factor 0.95 0.95 if rated Rated MVA and pf Field Current 1270 Adc 840 Adc if base Base Air-Gap Line Field Current 740 Adc 423.6 Adc ef base Base Air-Gap Line Field Voltage 249.44 Vdc 224 Vdc rf base Field Winding Resistance 0.3371 ohms 0.5288 ohms rf temp Field Winding Base Temperature 75 °C 75 °C

PTR PT Ratio 120

CTR CT Ratio 1000 mailto:Melissa.L.Kurtz@usace.army.mil

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

GA18 HYD NERC UNIT MODELING

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Garrison Unit Modeling as defined in the attached

Performance Work Statement. The contractor shall perform to the standards in this contract.

FOB: Destination

MILSTRIP: W59XQG80120471

PURCHASE REQUEST NUMBER: W59XQG80120471

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 365 dys. ADC 1 COE MAINTENANCE ENGINEERING SEC

MELISSA KURTZ

USAED, OMAHADISTRICT CENWO-OD-S

1616 CAPITOL AVE

OMAHA NE 68102-4901

402-995-2408

FOB: Destination

966567

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2016

52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017

52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

OCT 2015

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation

Support

MAY 2016

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006

252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.244-7000 Subcontracts for Commercial Items JUN 2013

252.247-7023 Transportation of Supplies by Sea APR 2014

CLAUSES INCORPORATED BY FULL TEXT

52.212-1 Addendum; Instructions to Quoters—Commercial Items

This solicitation is being advertised as a Low Price – Past Performance trade-off procurement. See FAR 52.212-2

Addendum; Evaluation—Commercial Items for specific information to be submitted with your quote.

Please provide the following information with your quote:

Company’s Name as it appears on SAM:

Company’s Address as it appears on SAM:

CAGE CODE:

DUNS:

TIN:

(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF

1449). However, the small business size standard for a concern which submits a quotation in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.

(b) Submission of quotations. Submit quotations to the office specified in this solicitation at or before the exact time specified in this solicitation. Electronic quotations are preferred over paper responses, unless other arrangements have been made. Send completed quotation to Timothy Boyte, email is, timothy.b.boyte@usace.army.mil

Quotations may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show --

(1) The solicitation number;

(2) The time specified in the solicitation for receipt of quotations;

(3) The name, address, and telephone number of the quoter;

(4) A technical description of the items being quoted in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;

(5) Terms of any express warranty;

(6) Price and any discount terms;

(7) “Remit to” address, if different than mailing address;

(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3( b ) for those representations and certifications that the quoter shall complete electronically);

(9) Acknowledgment of Solicitation Amendments;

(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and

(11) If the quotation is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Quotations that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.

(c) Reserved.

(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of quotations. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender’s request and expense, unless they are destroyed during testing.

(e) Multiple quotations. Quoters are encouraged to submit multiple quotations presenting alternative terms and conditions or commercial items for satisfying the requirements of this solicitation. Each quotation submitted will be evaluated separately.

(f) Late submissions.

(1) Quoters are responsible for submitting quotations so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is

4:30 p.m., local time, for the designated Government office on the date that quotations are due.

(2) Any quotation received at the Government office designated in the solicitation after the exact time specified for receipt of quotations is late and will not be considered unless it is received before purchase order issuance and the

Contracting Officer determines that accepting the late quotation would not unduly delay the acquisition.

(3) If an emergency or unanticipated event interrupts normal Government processes so that quotations cannot be received at the Government office designated for receipt of quotations by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of quotations will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(g) Issuance of purchase order. Quotations should contain the quoter’s best technical and price terms. The https://www.acquisition.gov/sites/default/files/current/far/html/FormsStandard67.html#wp1189284 https://www.acquisition.gov/sites/default/files/current/far/html/FormsStandard67.html#wp1189284 https://www.acquisition.gov/sites/default/files/current/far/html/52_212_213.html#wp1179194 https://www.acquisition.gov/sites/default/files/current/far/html/52_212_213.html#wp1179194 https://www.acquisition.gov/sites/default/files/current/far/html/FormsStandard67.html#wp1189284

Contracting Officer may reject any or all quotations. The Contracting Officer may issue a purchase order to other than the quoter with the lowest priced quotation. After the evaluation of quotations, the Contracting Officer may negotiate final terms with one or more quoters of the Government’s choice before issuing any purchase order. The

Contracting Officer will not negotiate with any quoters other than those of the Government’s choice and will not use the formal source selection procedures described in FAR part 15.

(h) Multiple purchase orders. The Government may issue a purchase order for any item or group of items of a quotation, unless the quoter qualifies the quotation by specific limitations. Unless otherwise provided in the

Schedule, quotations may not be submitted for quantities less than those specified. The Government reserves the right to issue a purchase order for a quantity less than the quantity quoted, at the unit prices quoted, unless the quoter specifies otherwise in the quotation.

(i) Availability of requirements documents cited in the solicitation.

(1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to-

GSA Federal Supply Service Specifications Section

Suite 8100

470 East L’Enfant Plaza, SW

Washington, DC 20407

Telephone (202) 619-8925

Facsimile (202) 619-8978.

(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision.

Additional copies will be issued for a fee.

(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:

(i) ASSIST (https://assist.dla.mil/online/start/).

(ii) Quick Search (http://quicksearch.dla.mil/).

(iii) ASSISTdocs.com (http://assistdocs.com).

(3) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point

(DoDSSP) by-

(i) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);

(ii) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or

(iii) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone

(215) 697-2667/2179, Facsimile (215) 697-1462.

(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.

(j) Data Universal Numbering System (DUNS) Number. (Applies to all quotations exceeding $3,000, and quotations of $3,000 or less if the solicitation requires the Contractor to be registered in the System for Award Management

(SAM) database.) The quoter shall enter, in the block with its name and address on the cover page of its quotation, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the quoter’s name and address. The DUNS+4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the quoter to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts

(see FAR Subpart 32.11) for the same concern. If the quoter does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one. A quoter within the United States may contact Dun and Bradstreet by calling

1-866-705-5711 or via the internet at http://fedgov.dnb.com/webform. A quoter located outside the United States must contact the local Dun and Bradstreet office for a DUNS number. The quoter should indicate that it is a quoter for a Government contract when contacting the local Dun and Bradstreet office.

(k) System for Award Management. Unless exempted by an addendum to this solicitation, by submission of a quotation, the quoter acknowledges the requirement that a prospective contractor shall be registered in the SAM database prior to purchase order issuance, during performance and through final payment of any contract resulting https://assist.dla.mil/online/start/ http://quicksearch.dla.mil/ http://assistdocs.com/ https://assist.dla.mil/wizard/index.cfm https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2032_11.html#wp1043964 http://fedgov.dnb.com/webform from this solicitation. If the quoter does not become registered in the SAM database in the time prescribed by the

Contracting Officer, the Contracting Officer will proceed to issue the purchase order to the next otherwise successful registered quoter. Quoters may obtain information on registration and annual confirmation requirements via the

SAM database accessed through https://www.acquisition.gov.

(l) Requests for information. The contracting officer will not notify unsuccessful quoters that responded to this solicitation. Quoters may request information on purchase order(s) resulting from this solicitation from the contracting officer.

(m) Insurance Required (FAR 52.228-5):

In accordance with FAR 28.307-2, “Liability,” the contractor shall procure the following minimum insurance:

Type Amount

Workman’s Compensation and Employer’s Liability Insurance $100,000

General Liability Insurance $1,000,000 per occurrence

And, when automobiles are used in connection with performing the contract:

Automobile Liability Insurance $200,000 per person

Bodily Injury $500,000 per occurrence

Property Damage $ 20,000 per occurrence

And, when aircraft is used in connection with performing the contract:

Aircraft Public and Passenger Liability Insurance $200,000 per person

Bodily Injury (other than passenger injury) $500,000 per occurrence

Property Damage $200,000 per occurrence

Passenger Liability Bodily Injury $200,000 multiplied by the number of seats or passengers, whichever is greater

And, when contract performance involves use of vessels, the Contracting Officer shall require, as determined by the agency, vessel collision liability and protection and indemnity insurance. The contractor is responsible for contacting the state for compliance with its workman’s compensation laws.

(n) State and Local Taxes:

The U.S. Army Corps of Engineers is exempt from paying state and local taxes per Title 4 United States Code 104-

107. The U.S. Army Corps of Engineers Tax ID Number is 62-1642142.

Contractors performing services for the U.S. Army Corps of Engineers are not exempt from state and local taxes in transactions with vendors, suppliers or subcontractors.

52.212-2 ADDENDUM; EVALUATION--COMMERCIAL ITEMS

(a) The Government will award a contract resulting from this solicitation to the responsible quoter whose quote conforming to the solicitation will the best value to the Government. Quotations will be evaluated using the following factors:

1. Past Performance – The quoter shall provide three references of projects completed within the past five (5) years. Experience consists of projects completed as a prime contractor or projects of qualified https://www.acquisition.gov/ subcontractors that have the capabilities to perform this work. These references need to be equal to or similar in scope of this requirement. The contractor shall provide dates and pertinent information to demonstrate how they are comparable to this requirement in size, complexity, and type. The contractor shall include points of contact, titles, telephone numbers, and email addresses (if available) for all references.

Additionally, past performance may be based on the contracting’s officer’s knowledge of and previous experience with similar purchases acquired and any information contained in the Governmentwide Past

Performance Information Retrieval System (PPIRS), contained at www.ppirs.gov.

The quoter will receive a rating of exceptional for past performance that demonstrates successful completion of similar purchases on all references and the additional information retrieved from PPIRS and from the Contracting Officer is favorable. The quoter will receive a rating of satisfactory for past performance that has at least one reference that demonstrates successful completion of similar purchases and the information from PPIRS and the Contracting Officer is favorable. The quoter will receive a rating of unsatisfactory for past performance that does not demonstrate any successfully completed similar purchases on the references and the additional information from PPIRS and the Contracting Officer is not favorable.

2. Price – The quote shall be inclusive of all costs to perform the work specified in the PWS.

The award will be based on whether the lowest priced of the quotations having the highest past performance rating possible represents the best value when compared to any lower priced quotation or offer.

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2017)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)

(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(3) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(4) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19

U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995)

(41 U.S.C. 4704 and 10 U.S.C. 2402).

____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

http://www.ppirs.gov/

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June

2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment

Act of 2009.)

XXX (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L.

109-282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.

C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.

L. 111-117, section 743 of Div. C).

XXX (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).

____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41

U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (ii) Alternate I (NOV 2011) of 52.219-3.

____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014)

(if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (ii) Alternate I (JAN 2011) of 52.219-4.

____ (13) [Reserved]

XXX (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Jan 2017) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (Nov 2016) of 52.219-9.

____ (iii) Alternate II (Nov 2016) of 52.219-9.

____ (iv) Alternate III (Nov 2016) of 52.219-9.

____ (v) Alternate IV (Nov 2016) of 52.219-9.

____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

____ (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).

____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C.

657f).

XXX (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).

____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-

Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).

____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns

Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).

XXX (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

____(26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Oct 2016) (E.O. 13126).

XXX (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

XXX (28) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).

____ (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

XXX (30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).

____ (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).

____ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.

13496).

XXX (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

____ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in

22.1803.)

____ (35) 52.222-59, Compliance with Labor Laws (Executive Order 13673) (OCT 2016). (Applies at $50 million for solicitations and resultant contracts issued from October 25, 2016 through April 24, 2017; applies at $500,000 for solicitations and resultant contracts issued after April 24, 2017).

Note to paragraph (b)(35): By a court order issued on October 24, 2016, 52.222-59 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, DoD, GSA, and NASA will publish a document in the Federal

Register advising the public of the termination of the injunction.

____ (36) 52.222-60, Paycheck Transparency (Executive Order 13673) (OCT 2016).

____ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May

2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June, 2016) (E.O. 13693).

____ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners

(June, 2016) (E.O. 13693).

____ (40) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and

13514).

____ (ii) Alternate I (OCT 2015) of 52.223-13.

____ (41)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-14.

____ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

____ (43)(i) 52.223-16, Acquisition of EPEAT[supreg]-Registered Personal Computer Products (OCT 2015) (E.O.s

13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-16.

XXX (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O.

13513).

____ (45) 52.223-20, Aerosols (June, 2016) (E.O. 13693).

____ (46) 52.223-21, Foams (June, 2016) (E.O. 13693).

____ (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

____ (ii) Alternate I (JAN 2017) of 52.224-3.

____ (48) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).

____(49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter

83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.

103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

____ (ii) Alternate I (May 2014) of 52.225-3.

____ (iii) Alternate II (May 2014) of 52.225-3.

____ (iv) Alternate III (May 2014) of 52.225-3.

____ (50) 52.225-5, Trade Agreements (Oct 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

XXX (51) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

____ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016)

(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

____ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150

____ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.

5150).

____ (55) 52.232-29, Terms for Financing…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.