SEE ADDENDUM
(No Collect Calls)
W9128F-17-T-0037 19-May-2017
b. TELEPHONE NUMBER
402-995-2039
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 02 Jun 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9128F9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
LYNNE D REED
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W59XQG70376669
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 9682AG 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
COE TRI-LAKES PROJECT OFFICE
SCOTT FRANKLIN
USAED, OMAHACENWO-OD-TL
9307 SOUTH WADSWORTH
LITTLETON CO 80128
TEL: 3039794120 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$7.5M
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF71
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9128F-17-T-0037
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
CHERRY CREEK DAM CRACKED STEM#2
FFP
Services for replacement of the gland may include lifting the cylinder from its foundation, investigation of the reason for the cracked gland, replacement of the gland, determination whether any other damage has occurred to the stem and re-seating of the cylinder in its normal functioning position.
FOB: Destination
MILSTRIP: W59XQG70376669
PURCHASE REQUEST NUMBER: W59XQG70376669
NET AMT
SPECIAL INSTRUCTIONS
Points of Contact (POC):
For quotation questions, contact Lynne Reed at lynne.d.reed@usace.army.mil or 402-995-2039
For technical or specification questions; contact Scott Franklin at (720) 922-3845 or j.scott.franklin@usace.army.mil.
State and Local Taxes:
The U.S. Army Corps of Engineers is exempt from paying state and local taxes per Title 4 United States Code 104-107. The U.S. Army Corps of Engineers Tax ID Number is 62-1642142.
Contractors performing services for the U.S. Army Corps of Engineers are not exempt from state and local taxes in transactions with vendors, suppliers or subcontractors.
Payments:
Payments will be made after receipt of a proper invoice or receipt of acceptable supplies or services, whichever is later. The contractor is required to include the contract number on all invoices so that receipt and payment for the item or service may be expeditiously processed.
Federal Legal Holidays:
The following Federal legal holidays are observed by this installation:
New Year's Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
If a wage determination applies, the number of holidays specified on it has priority over this clause.
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 ADDENDUM; EVALUATION--COMMERCIAL ITEMS
(a) The Government will award a contract resulting from this solicitation to the responsible quoter whose quote conforming to the solicitation will the best value to the Government. Quotations will be evaluated using the following factors:
1. Past Performance – The quoter shall provide three (3) references of projects completed within the past five
(5) years. Experience consists of projects completed as a prime contractor or projects of qualified subcontractors that have the capabilities to perform this work. These references need to be equal to or similar in scope of this requirement. The contractor shall provide dates and pertinent information to demonstrate how they are comparable to this requirement in size and complexity. The contractor shall include points of contact, titles, telephone numbers, and email addresses (if available) for all references.
Additionally, past performance may be based on the contracting officer’s knowledge of and previous experience with similar purchases acquired and any information contained in the Government-wide Past Performance Information Retrieval System (PPIRS), contained at www.ppirs.gov.
The quoter will receive a rating of exceptional for past performance that demonstrates successful completion of similar purchases on all references and the additional information retrieved from PPIRS and from the Contracting Officer is favorable. The quoter will receive a rating of satisfactory for past performance that has at least one reference that demonstrates successful completion of similar purchases and the information from PPIRS and the Contracting Officer is favorable. The quoter will receive a rating of unsatisfactory for past performance that does not demonstrate any successfully completed similar purchases on the references and the additional information from PPIRS and the Contracting Officer is not favorable.
2. Price – The quote shall be inclusive of all costs to perform the work specified in the PWS.
The award will be based on whether the lowest priced of the quotations having the highest past performance rating possible represents the best value when compared to any lower priced quotation or offer. In addition, each factor will be weighed equally in determining the successful bidder utilizing the following adjectival rating:
EXCEPTIONAL: Performance significantly exceeds contract requirements in the Government’s benefit.
SATISFACTORY: Performance meets contractual requirements.
SATISFACTORY:
Performance does not meet contractual requirements.
(b) Options. The Government will evaluate quotes for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that a quote is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
For the purpose of the award of the contract, the Government intends to evaluate the option to extend services, provided under FAR 52.217-8, as follows:
The evaluation will consider the possibility that the option can be exercised at any time, and can be exercised in increments of one to six months, but for no more than a total of six months during the life of the contract. The evaluation will assume that the prices for any option exercised under FAR 52.217-8 will be at the same rates as those in effect under the contract. The evaluation will therefore assume that the addition of the price or prices of any possible extension or extensions under FAR 52.217-8 to the total price for the basic requirement and the total price for the priced options has the same effect on the total price of all quotations relative to each other, and will not affect the ranking of proposals based on price, unless, after reviewing the quotations, the Government determines that there is a basis for finding otherwise. This evaluation will not obligate the Government to exercise any option under FAR 52.217-8.
PWS
Index
1.0 General Information
2.0 Definitions
3.0 Government Furnished Items and Services
4.0 Contractor Furnished Items and Responsibilities
5.0 Specific Tasks
6.0 Performance Requirements Summary
7.0 Attachments and Figures
1.0 General Information.
1.1 Background. Recently it was discovered that the stem water packing gland on the hoist serving Service Gate No. 2 at the US Army Corps of Engineers (USACE) Cherry Creek Dam Intake Tower in Aurora, CO is cracked and should be replaced. Although the gland is cracked, there is currently no compromise in the function of Service Gate No.2.
1.2 Scope of Work. This is a non-personal services contract to replace the cracked stem water packing gland on the hoist serving Service Gate No. 2 at Cherry Creek Dam, Aurora, CO. Services for replacement of the gland may include lifting the cylinder from its foundation, investigation of the reason for the cracked gland, replacement of the gland, determination whether any other damage has occurred to the stem and re-seating of the cylinder in its normal functioning position. In some cases removal and replacement of ancillary items may be required but not stated in the SOW, and any or all of the SOW actions may be adjusted, changed or omitted depending on actual site conditions and with authorization from USACE.
The government shall not exercise any supervision or control over the contract service provider’s performance of the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the government. This is a fixed priced, performance based service contract where the government defines and measures desired outcomes, while contractor methods are generally not constrained or directed.
Prior to the start of any work, the Contractor shall meet with Government/US Army Corps of Engineers USACE Tri-Lakes Project Office personnel to review all aspects of this contract, including a walk-thru inspection at the work site. This inspection is to protect the Contractor and USACE from any disputes of equipment damage or abuse. Notes and/or pictures shall be taken of the condition of equipment that will be used by the Contractor in the general area that might appear to have some existing damage or show signs of use. Representatives of both the USACE and the Contractor shall sign the inspection report. The Contractor shall then be free to proceed with the work.
1.3 Period of Performance. The period of performance shall be 45 calendar days after award.
1.4 Contractor Personnel
1.4.1 The contractor shall perform all work under this contract using his or her own forces except as provided in Paragraph 1.4.2 Subcontracting. Employees who perform this work shall be qualified persons on the contractor’s own payroll.
1.4.2 Subcontracting. The contractor shall not subcontract any work without written approval of the Contracting Officer. Compliance with the provisions of this contract by subcontractors shall be the responsibility of the contractor.
1.5 Quality Control
1.5.1 The contractor shall designate, in writing, an employee who shall serve as the contact for matters involving quality and performance or nonperformance of the required work stated in this PWS. The employee(s) shall be qualified and fully competent with full authority to act for, and on behalf of, the contractor as necessary to insure that the required work is performed in accordance with the standards contained herein. The contractor shall furnish the above written designation to the USACE Contracting Officer or Contracting Officer’s Representative (COR) no later than the first day of work. The contractor shall include the name(s), address(s), and telephone number(s) of the responsible individual(s).
1.5.2 The Contracting Officer reserves the right to disapprove any individual whom he considers incompetent to perform the work required. The Contracting Officer will provide a written notice of any disapproval to the contractor.
1.6 Quality Assurance. The government will use the methods stated in this PWS to ensure that the Contractor is performing the services required by this PWS in an acceptable manner. The Government may use Quality Assurance Evaluators (QAE(s)) to provide assistance with the quality assurance methods.
1.6.1 The government has the right to inspect all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The government shall perform inspections in a manner that will not delay the work.
1.6.2 If any of the services do not conform to contract requirements, the government may require the contractor to perform the services in conformity with contract requirements and at no increase in cost. If the contract requirements are not met after a second attempt the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
1.6.2.1 Upon verification of a validated customer complaint or corrective action report, the Contracting Officer or COR will notify the contractor that they are required to re-perform specific services within 14 calendar days of the verification.
1.6.3 The government may take action, if the contractor fails to perform the services again or to take the necessary action to ensure future performance is in conformity with the contract requirements. The government may (1) by contract, or otherwise, perform the services and charge to the contractor any cost incurred by the government that related to the performance of such service or (2) terminate the contract in whole or in part.
1.6.4 The contractor is responsible to replace/repair any damage to government property due to negligence, at his or her own cost. The government may take action, if the contractor fails to replace/repair any damage to government property. The government may (1) by contract, or otherwise, replace/repair damaged government property and charge to the contractor any cost incurred by the government to replace/repair any damage.
1.7 Hours of Operation. The contractor is responsible for conducting business, between the hours of 7:00am - 5:30pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government-directed facility closings. The Contractor must maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.8 Pre-Work Meeting. Prior to commencing any activities, the contractor shall arrange a Pre-work Meeting with the COR. The Meeting shall discuss the work requirements, scheduling, submittal process, review of the Activity Hazard Analysis (AHA), and Abbreviated Accident Prevention Plan (AAP). At least one (1) week prior to commencing work, the Contractor shall coordinate their proposed work schedule with the COR.
1.9. Submittals. Prior to commencement of services, the Contractor shall submit the following documents to the COR for review and approval:
1.9.1 Activity Hazard Analysis (AHA);
1.9.2 Abbreviated Accident Prevention Plan (APP)
1.9.3 List of who will perform work on this contract;
1.9.4 Proof of Insurance for Contractors and Subcontractors;
1.9.5 Technical scope of work with USACE-verified ordered steps.
1.10 Standards and Regulations. The Contractor shall perform to the standards in the contract and comply with all Local, State, and Federal Regulations during the services performed. The Contractor is responsible for ascertaining the extent to which these regulations affect the operations resulting from this contract. The Contractor shall comply will all applicable regulations. Applicable regulations include, but are not limited to the following:
1.10.1 Code of Federal Regulations (CFR), Title 36, Chapter III, Part 327, Rules and Regulations Governing Public Use on Corps of Engineers Water Resource Development Projects EP 1165-2-316 (http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_1165-2- 316.pdf?ver=2013-08-22-104526-670)
1.10.2 Engineering Manual (EM) 385-1-1 (USACE – Safety and Health Requirements Manual), dated November 2014;
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
1.10.3 Occupational Safety and Health Standards (29 CFR 1910);
1.10.4 Activity Hazard Analysis (AHA). The contractor shall prepare the AHA in accordance with Paragraph 01.A.14 or 01.A.15 of the EM 385-1-1. If using Paragraph 01.A.15, prepare the AHA IAW Figure 1-2.
Note: Contractors and other individual employer’s typically use Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools. The government considers equivalent to, and acceptable substitutes for, the USACE’s AHA provided the data collected is the same as that required by the AHA, commensurate with the type of services the contractor is performing.
1.10.5 Abbreviated Accident Prevention Plan (APP). EM 385-1-1 in its entirety may be too complex for the type of work performed under these contracts; contractors may reference Appendix A, for abbreviated Accident Prevention Plan (APP). The contractor shall only need to submit items in Appendix A that are pertinent to the contract. The contractor shall use a qualified person to prepare the site-specific abbreviated
Accident Prevention Plan (APP). The contractor shall prepare the APP in accordance with the format and requirements of the EM 385-1-1 and supplemented herein. The contractor shall sign and submit the APP for approval prior to the start of work onsite.
1.11 Physical Security
1.11.1 The contractor shall be responsible for safeguarding all government facilities, property, and materials provided for contractor use. The contractor shall secure at all times all government facilities, property, and materials. Specific security conditions may change based on threats to national defense, and based on the risk of specific facilities to these threats. The contractor shall abide by these changing conditions at all times, as applicable.
1.11.2 Key Control. The contractor shall ensure all keys issued by the government are not lost, stolen, duplicated, or used by unauthorized persons.
1.11.2.1 The Contractor shall immediately report to the COR any occurrences of lost or stolen keys.
1.11.2.2 In the event keys, other than master keys are lost or stolen, the contractor may be required, upon written direction of the COR to re-key or replace the affected lock or locks without cost to the government.
The government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the payment due the contractor. If a master key is lost or stolen, the government may need to replace all locks and keys for that system. The government will deduct the total cost to replace the locks and keys from the contractor’s invoice.
1.11.2.3 The contractor shall prohibit the use of keys issued by the government by any persons other than the contractor’s employees. The contractor shall not facilitate access of secured areas to persons other than contractor personnel or subcontractors engaged in performance of contract work requirements.
1.12 Antiterrorism/Operation Security Requirements
1.12.1 Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area access and local security policies and procedures (provided by the COR). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
1.13 Payment
1.13.1 The government will make payment upon completion of all services, after the government has inspected and accepted the services, and the government has reviewed, approved, and processed the contractor’s invoice. The contractor shall submit the invoice to the COR or any other person that the COR has designated to receive the invoice.
1.13.2 The contractor must provide the contractor’s name, address, contract number, period of services completed (i.e., for the month of January or for the period of performance of January 1 through February 23), CLIN number and specific quantities of work performed (i.e., 1 Month, 40 days, 100 acres, etc.), and total requested, for an invoice to be considered proper. The contractor shall submit the invoice by the fifth (5th) of the month for services completed the previous month or submit the invoice upon completion of all services, in accordance with the period of performance stated in the CLIN.
2.0 Definitions. The following definitions and descriptions apply wherever the word(s) or phrase(s) is/are stated in this PWS:
2.1 Acceptable Level of Performance (ALP): The maximum percent defective, the maximum number of defects per hundred units, or the number of defects in a lot considered satisfactory on the average. The allowable leeway or variance from a standard before the government will reject the specific service.
2.2 Contracting Officer’s Representative (COR): means an individual designated as authorized in writing by the Contracting Officer to perform specific technical or administrative functions.
2.3 Performance-Based Contract (FAR 2.101): Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise.
2.4Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable level of performance (ALP) for each work requirement.
3.0 Government Furnished Items and Services
3.1 Services, Facilities and Equipment. The Government will provide the tower upper-level handrail fall-protection system, the 7.5-Ton Tower Crane, tool transport box, spanner wrench, and 10-ton rigging scale. The Government will operate or supervise the raising and lowering of Gate #2 and will assist the Contractor in adding blocking under Gate #2 to allow leakage flow.
3.2 Utilities. The Government will provide existing tower 110V power for use by the Contractor. The Contractor is responsible to know the limitations of the existing power facilities and will be responsible to repair all power-related accidents or outages. The Contractor will be responsible to provide all other utilities, including but not limited to, water, restroom facilities or used oil capture or clean-up facilities, and will instruct employees in utilities conservation practices.
4.0 Contractor Furnished Items and Responsibilities
4.1 General. The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
5.0 Specific Tasks
5.1 Prior to the start of any work, the Contractor shall meet with USACE Tri-Lakes Project Office personnel to review all aspects of this contract, including a walk-through inspection at the work site. This inspection is to protect the Contractor and USACE from any disputes of equipment damage or abuse. Notes and/or pictures shall be taken of the condition of equipment that will be used by the Contractor in the general area that might appear to have some existing damage or show signs of use. Representatives of both the USACE and the Contractor shall sign the inspection report. The Contractor shall then be free to proceed with the work.
5.2 USACE personnel will train the Contractor in the operation of the gate No. 2 hydraulic cylinder. Only the gate No. 2 hoist will be operated. Under no circumstances will other hydraulic cylinders be operated.
5.3 On the upper tower level, remove gate No. 2 well covers, cover support beams and install the USACE handrail system on the upper operating level.
5.3.1 The Contractor will strictly adhere to the USACE-approved fall protection plan when working around open gate wells.
5.3.2 Use of the 7.5-Ton Crane will be used to remove the gate well covers after installing the handrail system.
5.4 Inspect the 7½-ton overhead bridge crane and prepare it to lift the cylinder from its mounting. The larger 15-ton crane cannot access the cylinder center line, and shall not be used.
5.5 Transport Contractor-furnished and installed wood cribbing blocks to the lower level using the USACE-furnished tool transport box attached to the 7½-ton crane. These blocks will be used as safety blocking to support the cylinder assembly on its bonnet face after lifting.
5.6 Using the tool transport box, transport to the lower level needed tools and a clean oil drum and / or 5 gallon buckets to contain removed oil.
5.7 USACE personnel will place an emergency gate in slot #2 so work can be completed on Service Gate #2.
Contractor will need to place Lock-Out/Tag-Out protection on Service Gates #1 & 2 and Low-Flow Gate #2.
5.8 Prepare for wet tunnel access up to the emergency gates. An air meter will be in use during all personnel access of the wet tunnel, which is a non-permit confined space. The Contractor should anticipate that there will be some water in the tunnel from leakage at the emergency gate, and so should place adequate minor blocking under Service Gate #2 when it is in the closed/down position so water does not back up behind the Service Gate. After the wet tunnel is secure, transport the USACE-furnished spanner wrench and any other required tools up the wet tunnel to remove the lower leaf nut recess cover plate and the lower alloy leaf nut. The Contractor should expect that some or all of the recess cover cap screws will be “frozen” in place, causing difficulty in removing the access cover plate, and should plan to replace all of these screws.
5.9 Attach rigging to the stem extension at the top of the cylinder using the USACE-furnished threaded eye bolt while the gate is still in the lowered position.
5.10 Using the hydraulic system, completely raise the hydraulic cylinder stem. This will push the top stem extension shaft out of the service gate and top out the piston. Note: The control valves at the operating floor are spring return to open centers.
5.11 Once retracted, close the ball valves at the wall.
5.12 Oil in the cylinder does not need to be removed for weight, but there are no isolation valves at the cylinder and the hydraulic hoses connected to the cylinder are not long enough to allow the cylinder to be raised with the hoses still connected. With the gate stem fully raised, oil shall be drained from the cylinder by removing the cap or air vent at the very bottom of the lower pipe connection (just above the bucket). As the oil is being removed it shall be collected and placed into clean containers. (There is approximately 300 gallons of oil in the cylinder when in the raised position.) No attempt shall be made to disconnect the hoist hydraulic hoses until the crane has been attached to the upper stem extension, the gate stem is in the fully raised position and the oil has been removed from the cylinder. The crane should be connected before draining oil, as the gate hanger brake may not adequately hold the stem. The Contractor shall be responsible for the loss or spill of oil. If oil is spilled the Contractor shall clean all concrete surfaces and items covered with a solvent solution. The Contractor will mitigate any oil leakage out into the stilling basin and into Cherry Creek after consultation and approval of USACE.
5.13 With the hoist connected to the stem extension, the stem fully retracted and the oil removed from the cylinder, the upper hydraulic hose shall be disconnected from the cylinder and the lower hydraulic hose shall be disconnected from the hydraulic piping, adjacent to the isolation valve. The free end of the lower hydraulic hose shall be connected to the cylinder upper hose connection. The free end of the upper hydraulic hose shall be connected to the lower hydraulic piping. This will cause the cylinder and the piping to be “looped” preventing leakage of oil from both the piping system and the cylinder.
5.14 With the crane still connected to the stem extension, relax the pull from the crane (approximately 10 inches.) Remove three (3) brass studs equally spaced around the upper flange of the cylinder / cylinder head assembly. Install three (3) Contractor furnished 1-7/8” lifting eyebolts which are capable of lifting the required load. Contractor furnished rigging and / or slings shall be installed between the newly installed lifting eyebolts and the central clevis, making sure that the rigging does not interfere with the cylinder head. The crane should now be set up to lift the cylinder and bonnet cover assembly from the cylinder upper flange, and the gate stem and piston assembly from the stem extension.
5.15 Remove the forty-two (42) 1-5/8” diameter bonnet cover nuts from the studs taking care not to damage the gasket and seal, if there is one, between the bonnet and the bonnet seat plate. Nuts and gasket shall be safely stored to prevent misplacing, loss, or damage until reinstallation. Also see Item 2.28.
5.16 Using the 7-1/2 ton crane, raise the entire cylinder assembly approximately 6 feet or until the bottom of the stem is above the bonnet seating plate.
5.17 Crib up to each end of the bonnet and lower the hoist down to rest on the cribbing. For safety, crib up as the hoist is rising. Contractor shall furnish and transport all cribbing. Lifted assembly shall at all times remain attached and “snugged” to the 7-1/2 ton crane, even when the hoist is cribbed.
5.18 Cover the opening in the floor with plywood and / or tarps for safety and to keep from dropping parts or tools into the gate well. Any items dropped shall be retrieved by the Contractor. The opening and gate well are considered confined spaces.
5.19 The Contractor shall investigate to determine whether any damage has been done to the gate stem. Any visible damage shall be reported to the USACE Representative.
5.20 The upper gate leaf nut and spacer can now be removed. MARK OR MEASURE THE POSITION OF THE LEAF NUT IN RELATION TO THE END OF THE GATE STEM. Record the information.
5.21 Re-inspect integrity of the water packing seat and re-pack with new packing if required by USACE.
5.22 Raise the entire assembly slightly to allow for the removal of cribbing and the temporary cover over the gate slot. Lower the entire assembly showing care to align the bolt holes of the bonnet and the bonnet seat plate to facilitate the bolting of the bonnet back into place and to align the gate stem such that it is not damaged during the lowering operation.
5.23 Install all bonnet cover nuts from the studs taking care not to damage the gasket between the bonnet and the bonnet seat plate, if there is one. Replace any damaged nuts.
5.24 Remove the twenty (20) 1-3/4” diameter stud bolt holding the bonnet to the cylinder. Lift the cylinder/head assembly using care to continue to align the stem during the lift. Raise the assembly to the point that the threads in the stem for the lower leaf nut move past the water packing gland such that there is room to remove the water packing gland and install the new gland. Replace the used cylinder gasket with a new one. If the cylinder gasket is damaged, it shall be replaced by the Contractor. Use care not to damage the oil packing gland, oil packing seat, or the oil packing but, if any of these items are damaged or all oil is replaced, all shall be replaced by the Contractor.
5.25 Install the new water packing gland using the four (4) brass 7/8” studs.
5.26 Lower the cylinder/head assembly using care to align the gate stem such that the brass gland is not damaged. Align the bolt holes between the cylinder and the bonnet cover and reattach the cylinder/head assembly to the bonnet cover using the twenty (20) 1-3/4” diameter stud bolts. Raise the cylinder and bonnet to reinstall the upper leaf nut and spacer.
5.27 Prior to lowering and reseating the cylinder assembly the Contractor and USACE personnel shall inspect all work on the cylinder, the bonnet gasket and the condition of the top of the service gate.
5.28 If satisfactory, the hoist can be lowered, reseating the bonnet and reinserting the gate stem into the service gate. Provide 2 beads of water-proof sealant between the bonnet cover and the bonnet seating plate. The bonnet nuts shall be reinstalled and torqued evenly and all connection to the cylinder can be restored. USACE personnel shall be present until the bonnet is seated.
5.29 The Contractor shall again travel up the tunnel to reinstall the gate leaf nut and cover plate. All cover plate brass hardware will be replaced by the Contractor with new hardware.
5.30 The Contractor will be responsible for refilling with oil and bleeding the air out of the hydraulic system to the satisfaction of USACE. It may be desirable to try and prefill what equipment one can with oil to the extent possible. Air vent valves are available on the piping at appropriate locations. Old oil may be reused or it can be recycled and new oil added. New or used oil must be filtered thru a 5 micron filter prior to added to the system.
Hydraulic oil shall be Chevron Rykon Premium Oil ISO 32.
5.31 With a USACE representative present, test the operation of the gate and cylinder while bleeding any air from the system.
5.32 Upon satisfactory completion of the project, all work areas shall be thoroughly cleaned and restored to their previous state. Access hatches shall be reinstalled. The Contractor shall lightly brush touch up the paint on any disturbed coating areas on the cylinder that were disturbed under this contract only. The silver colored paint is aluminum based enamel and any other areas shall be alkyd based enamel. Color shall match the existing.
6.0 Performance Requirements Summary. The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance
PRS # 1.
The contractor shall provide all replacement parts and install all parts in accordance with Section 5.
The contractor shall provide all replacement parts and install all parts in accordance with this PWS.
Zero Deviation from Standard 100% Inspection by the COR.
7.0 Attachments and Figures
Fig. 7.1 Plan and Section of Dam Fig.7.2 O&M Manual Sections F-F and E-E through Outlet Works Tower Fig.7.3 Plan view– Gate Chamber Fig.7.4 Section through Gate Cylinder and Bonnet Fig.7.5 Oil Gland Sections Fig.7.6 Gate Lowered and Gate Raised Fig.7.7 Gate Well Cover and Slide Gate Well Frame
Fig.7.8 Recess Cover and Leaf Nuts Fig.7.9 Section through Gate Leaf and Half Downstream Elevation Fig.7.10 USACE-Furnished Spanner Wrench Fig.7.11 Transverse Section through Typical Water Passage Fig.7.12 Rigging to Lift Entire Hoist Assembly Fig.7.13.1-7.13.3 Photos
Fig. 7.1 Plan and Section of Dam
Fig. 7.2 O&M Manual Sections F-F and E-E through Outlet Works Tower
Service Gate #2
Fig. 7.3 Plan View– Gate Chamber
Cylinder#2 and Cracked Gland
Fig. 7.4 Section through Gate Cylinder and Bonnet
Check Bonnet
Gasket or Sealant and Replace if Necessary
Check Packing and Replace if Necessary
Check Cylinder Gasket and Replace if Necessary
Fig. 7.5 Oil Gland Sections
Fig. 7.6 Gate Lowered and Gate Raised
Fig. 7.7 Gate Well Cover and Slide Gate Well Frame
Fig. 7.8 Recess Cover and Leaf Nuts
Replace Cap Screws as Needed.
Fig. 7.9 Section through Gate Leaf and Half Downstream Elevation
Fig. 7.10 USACE-Furnished Spanner Wrench
Fig. 7.11 Transverse Section through Typical Water Passage
Fig. 7.12 Rigging to Lift Entire Hoist Assembly
5-Ton wire rope, not a chain as shown.
USACE-supplied 10-Ton Scale here.
Fig. 7.13.1 Gate Chamber and Cylinder #2
Cracked Water Packing Gland Under Bonnet
Cylinder #2
Bonnet
Fig. 7.13.2 Cylinder #2, location of cracked water packing gland
Cracked Water Packing Gland
Bonnet Stem
Oil Packing Gland
Fig. 7.13.3 Cylinder #2, cracked water packing gland.
CLAUSES INCORPORATED BY REFERENCE
52.203-19 Prohibition on Requiring Certain Internal Confidentiality
Agreeements or Statements
JAN 2017
52.204-7 System for Award Management OCT 2016 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2016
52.204-13 System for Award Management Maintenance OCT 2016 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017
Crack in Water Packing Gland
52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.222-3 Convict Labor JUN 2003 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-50 Combating Trafficking in Persons MAR 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014 52.233-1 Alt I Disputes (May 2014) - Alternate I DEC 1991 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.243-7001 Pricing Of Contract Modifications DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JUL 2016)
(a) Definitions. As used in this provision--
Commercial and Government Entity (CAGE) code means—
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;
or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
Highest-level owner means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.
Immediate owner means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.
(b) The Offeror represents that it [ ___ ] has or [ ___ ] does not have an immediate owner. If the Offeror has more than one immediate owner (such as a joint venture), then the Offeror shall respond to paragraph (c) and if applicable, paragraph (d) of this provision for each participant in the joint venture.
(c) If the Offeror indicates ``has'' in paragraph (b) of this provision, enter the following information:
Immediate owner CAGE code:
Immediate owner legal name: ___
(Do not use a ``doing business as'' name)
Is the immediate owner owned or controlled by another entity?:
[ ___ ] Yes or [ ___ ] No.
(d) If the Offeror indicates ``yes'' in paragraph (c) of this provision, indicating that the immediate owner is owned or controlled by another entity, then enter the following information:
Highest-level owner CAGE code:
Highest-level owner legal name:
(Do not use a ``doing business as'' name)
(End of provision)
52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS--
REPRESENTATION (NOV 2015)
(a) Definitions. Inverted domestic corporation and subsidiary have the meaning given in the clause of this contract entitled Prohibition on Contracting with Inverted Domestic Corporations (52.209-10).
(b) Government agencies are not permitted to use appropriated (or otherwise made available) funds for contracts with either an inverted domestic corporation, or a subsidiary of an inverted domestic corporation, unless the exception at 9.108-2(b) applies or the requirement is waived in accordance with the procedures at 9.108-4.
(c) Representation. The Offeror represents that--
(1) It [ ___ ] is, [ ___ ] is not an inverted domestic corporation; and
(2) It [ ___ ] is, [ ___ ] is not a subsidiary of an inverted domestic corporation.
(End of provision)
52.212-1 Addendum; Instructions to Quoters—Commercial Items
This solicitation is being advertised as a best value procurement. See FAR 52.212-2 Addendum; Evaluation— Commercial Items for specific information to be submitted with your quote.
Please provide the following information with your quote:
Company’s Name as it appears on SAM:
Company’s Address as it appears on SAM:
CAGE CODE:
DUNS:
TIN:
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits a quotation in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of quotations. Submit quotations to the office specified in this solicitation at or before the exact time specified in this solicitation. Electronic quotations are preferred over paper responses, unless other arrangements have been made. Send completed quotation to Lynne D. Reed; lynne.d.reed@usace.army.mil.
As a minimum, offers must show --
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of quotations;
(3) The name, address, and telephone number of the quoter;
(4) A technical description of the items being quoted in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) “Remit to” address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3( b ) for those representations and certifications that the quoter shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the quotation is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Quotations that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(f) Late submissions.
(1) Quoters are responsible for submitting quotations so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that quotations are due.
(2) Any quotation received at the Government office designated in the solicitation after the exact time specified for receipt of quotations is late and will not be considered unless it is received before purchase order issuance and the Contracting Officer determines that accepting the late quotation would not unduly delay the acquisition.
(3) If an emergency or unanticipated event interrupts normal Government processes so that quotations cannot be received at the Government office designated for receipt of quotations by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of quotations will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(g) Issuance of purchase order. Quotations should contain the quoter’s best technical and price terms. The Contracting Officer may reject any or all quotations. The Contracting Officer may issue a purchase order to other than the quoter with the lowest priced quotation. After the evaluation of quotations, the Contracting Officer may negotiate final terms with one or more quoters of the Government’s choice before issuing any purchase order. The Contracting Officer will not negotiate with any quoters other than those of the Government’s choice and will not use the formal source selection procedures described in FAR part 15.
(h) Multiple purchase orders. The Government may issue a purchase order for any item or group of items of a quotation, unless the quoter qualifies the quotation by specific limitations. Unless otherwise provided in the Schedule, quotations may not be submitted for quantities less than those specified. The Government reserves the right to issue a purchase order for a quantity less than the quantity quoted, at the unit prices quoted, unless the quoter specifies otherwise in the quotation.
(i) Availability of requirements documents cited in the solicitation.
(1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to-
GSA Federal Supply Service Specifications Section Suite 8100 470 East L’Enfant Plaza, SW Washington, DC 20407 Telephone (202) 619-8925 Facsimile (202) 619-8978.
(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(i) ASSIST (https://assist.dla.mil/online/start/).
(ii) Quick Search (http://quicksearch.dla.mil/).
(iii) ASSISTdocs.com…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .