Drawings__3_Powerhouse_West_Terrace_Drain_Rehab _ph2 _Garrison.pdf
PDF 5 MB Posted
- Solicitation number
- W9128F-16-R-0020
About this file
Drawings 3 Powerhouse West Terrace Drain Rehab ph2 Garrison
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
E D
G R J
C p w
C O
E
N W
O P
W O
M A .n w o .d s .u s a c e .a r m y .m il :C
E N
W O m a h a
D is t r ic t
D o c u m e n t s
C iv il W o r k s
U n it e d
S t a t e s o f
A m e r ic a
M is s o u r i R iv e r
B a s in
M is s o u r i R iv e r
M in
S t e m
G a r r is o n
C o n s t r u c t io n
E
D
G R
P o w e r h o u s
W
T r r a c in
R h a b
A b u t m e n t
S a d
B1.01
O
R K P
L
N
LEGEND
CB
154.9/3M.H.
154.7/5M.H.
EM.H.
No.Type
Removed and Replaced
Drainage Structures to be
C
F
SITE PLAN
M
SCALE
0 45'45' 22.5'
2O.R.
1O.R.
No.Type
This Contract
New Drainage Structures
M.H. 160/6 OUTFALL TEE2O.R.
M.H. 160/6 OUTFALL TEE1O.R.
TypeNo.Type
ToFrom
New Subdrain Segments This Contract
EM.H.154.7/5M.H.
155.7/3M.H.154.9/3M.H.
154.7/5M.H.154.9/3M.H.
154.9/3M.H.170' EAST OF MH 154.9/3
No.TypeNo.Type
ToFrom
Subdrain Segments to be Removed and Replaced
(SEE NOTE 10)
RE-ESTABLISHED
SLOPE TO BE
AREA REQUIRING DESIGN
INCLINOMETER
PUMPING WELL
UTILITY MANHOLE
UNDERGROUND FIBEROPTIC
UNDERGROUND COMM LINE
EXISTING PIEZOMETER
OBS. RISER THIS CONTRACT
FENCE
GUARDRAIL
CATCH BASIN
MANHOLE
WATER LINE
ELECTRICAL CONDUIT
LIGHT POLE
POWER POLE
EXTENTS AND NOTIFY THE COR OF ANY DEVIATIONS PRIOR TO SLOPE RESTORATION.
THE EXTENT OF AREA REQUIRING DESIGN SLOPE RE-ESTABLISHMENT IS APPROXIMATE AS SHOWN. CONTRACTOR SHALL VERIFY10.
THE EXISTING FRENCH DRAIN IS A 12-INCH WIDE TRENCH BACKFILLED WITH FILTER MATERIAL A.9.
THIS CONTRACT. SEE SPECIFICATION SECTION 33 66 00 FOR PROPER ABANDONMENT REQUIREMENTS.
PIEZOMETERS P-14-3 AND P-14-4 ARE TEMPORARY AND SHALL BE ABANDONED BY THE CONTRACTOR AT THE COMPLETION OF 8.
EXPLORATION AND TESTING TO BE USED IN DEVELOPMENT OF THE FINAL DEWATERING PLAN AS APPROVED BY THE COR.
TO VERIFY THE DEWATERING PLAN ASSUMPTIONS AND DESIGN. THE CONTRACTOR MAY ALSO PERFORM ADDITIONAL SUBSURFACE
PUMPING WELL AND MONITORING PIEZOMETERS ARE AVAILABLE TO PERFORM ADDITIONAL AQUIFER PERFORMANCE TESTING 7.
WAS MADE.
THE DRAIN WAS REPLACED FROM MH "B" TO APPROXIMATELY 170 FEET EAST OF MH 154.9/3 WHERE A TEMPORARY CONNECTION
A STRETCH OF SUBDRAIN BETWEEN MH 154.9/3 AND MH "B" WAS PREVIOUSLY REPLACED BY OTHERS AND SHALL BE PROTECTED.6.
SEE "FOR INFORMATION ONLY" SHEETS FOR ADDITIONAL FLUME AND GRATE INFORMATION.
SHORE AND PROTECT CONCRETE FLUMES AND GRATINGS AS NEEDED FOR SUBDRAIN REPLACEMENT ALONG BENCHES.5.
REGARDING EXISTING UTILITIES PLANS AND PROFILES MAY BE AVAILABLE UPON REQUEST.
FEATURES WILL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT. ADDITIONAL INFORMATION
EXTREME CAUTION WHILE WORKING IN THIS AREA TO ASSURE THESE UTILITIES ARE NOT DAMAGED. DAMAGE TO THESE
ARE LOCATED ALONG THE NORTH POWERHOUSE SLOPE. THE CONTRACTOR SHALL LOCATE ALL UTILITIES AND EXERCISE
A RAW WATER LINE, BURIED ELECTRICAL, CONCRETE ENCASED ELECTRICAL CONDUIT, AND COMMUNICATION LINES4.
BY THE COR.
EXCAVATED TOPSOIL AND RANDOM FILL SHALL BE STOCKPILED AND REUSED AS APPLICABLE BACKFILL MATERIALS AS APPROVED 3.
INFORMATION ONLY" DRAWINGS.
REQUIRE MINOR CHANGES TO SUIT CONDITIONS IN THE FIELD. EXISTING DRAIN AND MANHOLE DETAILS ARE SHOWN IN THE "FOR
FEATURES AND AT THE NEW INVERT ELEVATIONS SPECIFIED IN THE SCHEDULE. GRADES AND ELEVATIONS ARE APPROX. AND MAY
THE NEW NORTH SLOPE DRAINS AND MANHOLES SHALL BE INSTALLED AT THE SAME HORIZONTAL LOCATION AS THE EXISTING2.
PROJECT VERTICAL DATUMS.
CONTOURS AS SHOWN ARE IN NORTH DAKOTA STATE PLANE (NAD83, SOUTH ZONE), U.S. SURVEY FEET HORIZONTAL AND LOCAL 1.
NOTES:
.0 in
G
E D
G R J
C p w
C O
E
N W
O P
W O
M A .n w o .d s .u s a c e .a r m y .m il :C
E N
W a t r ic t
D o c u m e n t s
C iv il W o r k s
U n it e d
S t a t e s o f
A m e r ic a
M is s o u r i R iv e r
B a s in
M is s o u r i R iv in
S t e m
G a r r is o n n s t r u c t
D
G R
P o w e r h o u r r a h a b u t m e n t
S a
.1
X
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
G A
R R
IS
O N D
A M A
N D R
E S
E R
V O
IR
R J
C
R J
C D
F S
R J
C
R
IV
E R
D A
L E
N D
G R
D
J
W E
S T A
B U
T M
E N
T S
A N
D D
R A
IN
R
E H
A B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
W
F
R
M.H. "F"
PZ 118A
PZ 13-8
MH 160/6
THIS CONTRACT
NEW RISER O.R. 2
ACCESS
BENCH
PZ 130
PZ 80-5
PZ 72-12
PROTECTED
GUTTER TO BE
CONCRETE
L O
W E
R W
E S T T
A
IL
R A
C E A
C C
E S S R
O A
D
1725 1725
1730 1730 1730
5 1735 1735
1740 1740
1745 1745 1745 1745 1745
1750175017501750175017501750
1755 1755 1755 1755 1755 1755
1760 1760 1760 1760 1760
17651765 17651765
177017701770
1775 1775 1775
C
1780 1780 1780 1780
E
17851785
C
179017901790
E
W
E
180018001800
C
1805 1
MC
E
E
0 1820
F
M W
C
18251
F
W
F
E C
C
W
F
M
PW 14-2
PZ 14-4
PZ 14-5
FROM PW 14-2)
(5', 10', & 15'
PZ'S 14-2
SURGETANKS
T U
N N
E L
T U
N N
E L
T U
N N
E L
EXISTING ROADWAY
M.H. 156.8/5
M.H. "E"
M.H. 154.7/5
M.H. "C"
M.H. "B"
M.H. 155.7/3
M.H. "D"
M.H. 154.9/3
M.H. 155.6/4
DROP INLET
DROP INLET
W
W W
EEE
PAVED GUTTER
THIS CONTRACT
MANHOLE
INSTALL NEW
THIS CONTRACT
SLOTTED PVC PIPE
INSTALL NEW 12"
THIS CONTRACT
MANHOLE
INSTALL NEW
PIPE THIS CONTRACT
INSTALL NEW 18" PVC
CL WEST ABUTMENT SERVICE ROAD
(SEE NOTE 5)
CONCRETE FLUME NO. 2
(SEE NOTE 5)
FLUME NO. 1
CONCRETE
M.H. 5
M.H. 4
RW 9
RW 8
AREA 1
SEEPAGE
AREA 2
SEEPAGE
C.B. 160+00
PVC PIPE THIS CONTRACT
INSTALL NEW 12" SLOTTED
E X
S T
C .M .P
.5
EPIP .C.V .FREP "21 .TSXE
SLOPE THIS CONTRACT.
RE-ESTABLISH DESIGN
PERFORMED BY OTHERS.
EXCAVATION PREVIOUSLY
CVP DETTOLS "21 .TSXE
CV
P
D E
T T
O L
S "
1 .
T
S X
E
CVP DETTOLS "21 .TSXE CVP DETTOLS "21 .TSXE
EXST. 12" SLOTTED PVC
APPROX. 170 FEET
E X
S T P
V C
C V
P D
E T
T O
L S "
1 .
T S
X E
E
PI
P C
V P
D E
T T
O L
S "
1 .
T
S X
E
EPIP .
C.
V .
F
R E
P "
1 .
T
S X
E
THIS CONTRACT
& SLOTTED PVC PIPE
INSTALL NEW 6" TEE
SEE SHEET B2.02
EXISTING BENCH
RE-ESTABLISH
THIS CONTRACT
NEW RISER O.R. 1
ELEV: 1768.04
E: 1737937.00 N: 671327.51
CONTRACT (SEE NOTE 6)
SLOTTED PVC PIPE THIS
BEGIN INSTALL NEW 12"
(SEE NOTE 9)
EXISTING FRENCH DRAIN
INCL G71-4T
INCL G72-3T
PZ 114B
PZ 117A
PZ 70
PZ 115
PIPE (NON PERF)
EXST. 12" PVC
THIS CONTRACT
THE COMPLETION OF
TO BE ABANDONED AT
THIS CONTRACT
THE COMPLETION OF
TO BE ABANDONED AT
B1.02
SCALE
0 45'45' 22.5'
CB
W
C
F
M
W E
S T A
B U
T M
E N
T S
A N
D S
U B
S U
R F
A C
E D
A T
A P
L A
N
WEST ABUTMENT SAND SUBSURFACE DATA PLAN
XX
18.617751775P-135
561760.51757P-131
251783.71784P-130
7.91828.6-P-125
46.81749.7-864
2.61795.8-843
4.31798.31799842
21806.41714774
42.21771.51774773
28.81760.8-751
27.51805.1-750
31.41774.31774748
17.61802.41802747
39.81766.71767746
43.71773.91767712
10.51787.1-711
52.51765.91768710
32.91770.41767709
9.21769.5-708
2.21796.31749704
-NE1737703
14.41768.71768702
451782.41857635
38.617611759633
9.81818.2-632
42.71768.21767631
51.51767.71768630
17.91782.41781614
29.41757.71757611
76.61745.51746610
5.6179331788609
12.91775.71776544
-NE1716543
631754.4-456
56.61777.51774455
12.71785.2-90
57.11790.6-77
1.217873-76
5.71823.3-75
17.81811.2-74
-NE186473
12.81783-59
761752-58
57.21761176055
WEST ABUTMENT SANDS*WEST ABUTMENT SAND* BORING
THICKNESS OF WEST ELEVATION BOTTOM OFELEVATION - BOTTOM OF
CURRENT INTERPRETED CURRENT INTERPRETED HISTORICAL INTERPRETED
46.51767.00NAP-13-8
14.21821.48**NAP-13-5
52.91778.18NAP-13-4
67.71761.00**NAP-13-3
45.21775.83NAP-13-2
20.71768.20**NAP-13-1
64.31772.06NA13-7
71.81762.03**NA13-6
ABUTMENT SANDS (FT)
TABLE II: WEST ABUTMENT SAND - INTERPRETED BOTTOM ELEVATIONS AND THICKNESS
PLAN LEGEND
SURFACE (SEE NOTE 2)
ABUTMENT SAND WATER
INTERPOLATED WEST
SLOPE EXPOSURE
WEST ABUTMENT SAND
INCLINOMETER
BORING
UTILITY MANHOLE
UNDERGROUND FIBEROPTIC
UNDERGROUND COMM LINE
EXISTING PIEZOMETER
EXISTING PUMPING WELL
FENCE
GUARDRAIL
CATCH BASIN
MANHOLE
WATER LINE
ELECTRICAL CONDUIT
LIGHT POLE
POWER POLE
TABLES I & II LEGEND
SURVEY FEET.
NORTH DAKOTA STATE PLANE (NAD83, SOUTH ZONE), U.S. (83)
DEWATERING DESIGN ASSUMPTIONS.
3A LIGNITE PIEZOMETER FOR USE IN SUBDRAIN OUTFALL ***
BE BOTTOM OF THE BORING FOR MODELING PURPOSES.
BOTTOM DEPTH NOT ENCOUNTERED BUT ASSUMED TO **
ELEVATIONS IN PROJECT DATUM.*
BOTTOM OF THE WEST ABUTMENT SANDS NOT ENCOUNTERED. NE
INDICATES INFORMATION NOT USED OR UNKNOWN. -
ARE AVAILABLE UPON REQUEST.
LOCATION OF ADDITIONAL TABLE II BORINGS NOT SHOWN ON THIS PLAN SHEET 7.
SPECIFICATION SECTION 33 66 00 FOR PROPER ABANDONMENT REQUIREMENTS.
BY THE CONTRACTOR AT THE COMPLETION OF THIS CONTRACT. SEE
PIEZOMETERS P-14-3 AND P-14-4 ARE TEMPORARY AND SHALL BE ABANDONED 6.
AS APPROVED BY THE COR.
AND TESTING TO BE USED IN DEVELOPMENT OF THE FINAL DEWATERING PLAN
CONTRACTOR MAY ALSO PERFORM ADDITIONAL SUBSURFACE EXPLORATION
VERIFY THE CONTRACTOR'S DEWATERING PLAN DESIGN ASSUMPTIONS. THE
AVAILABLE TO PERFORM ADDITIONAL AQUIFER PERFORMANCE TESTING TO
PUMPING WELL PW 14-2 AND MONITORING PIEZOMETERS P-14-2 (5',10',15') ARE 5.
REPORT.
SECTIONS A-A AND B-B ARE PROVIDED ON FIGURES 2 AND 3 OF THE GEOLOGIC
SPECIFICATIONS FOR ADDITIONAL SUBSURFACE INFORMATION. CROSS
SEE 2014 WEST ABUTMENT SAND GEOLOGY REPORT PROVIDED IN THE 4.
HORIZONTAL AND LOCAL PROJECT VERTICAL DATUMS.
ARE IN NORTH DAKOTA STATE PLANE (NAD83, SOUTH ZONE), U.S. SURVEY FEET
TOPOGRAPHIC AND PIEZOMETRIC WATER SURFACE CONTOURS AS SHOWN 3.
AND/OR CRITICAL DEWATERING DESIGN ASSUMPTIONS PRIOR TO EXCAVATION.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING THESE ASSUMED CONDITIONS
PRECIPITATION, AND VARIATIONS IN STRATIGRAPHY BETWEEN BORINGS. THE
ARE SUBJECT TO CHANGE BASED ON SEASONAL RESERVOIR FLUCTUATIONS,
INTERPRETATION OF EXISTING CONDITIONS BASED ON AVAILABLE DATA AND
ON THIS SHEET. THESE CONTOURS REPRESENT THE GOVERNMENT'S
INTERPOLATED FROM THE ASSOCIATED INSTRUMENTS PROVIDED IN TABLE I
WEST ABUTMENT SAND WATER SURFACE ELEVATIONS AS SHOWN ARE 2.
INFORMATION ONLY" SHEET BF.07 FOR ADDITIONAL INFORMATION.
POWERHOUSE EXCAVATION AND IS APPROXIMATE AS SHOWN. SEE "FOR
THE WEST ABUTMENT SAND EXPOSURE WAS SURVEYED AFTER COMPLETION OF 1.
GENERAL NOTES:
5 NOV 151766.601737692.030671395.170PZ-13-8***
5 NOV 151745.901738379.720671301.900PZ-88-5
5 NOV 151788.401737698.010671535.560PZ-80-5
5 NOV 151753.301738286.220671316.530PZ-72-13
5 NOV 151778.501737813.270671384.120PZ-72-12
5 NOV 151772.201738218.520671478.700PZ-135
5 NOV 151804.681737465.746671903.796PZ-13-4
5 NOV 151814.471736960.496671636.929PZ-13-3
5 NOV 151835.331737093.563672597.277PZ-13-2
5 NOV 151831.941736374.155672325.249PZ-13-1
5 NOV 151783.601737836.310671520.440PZ-131
5 NOV 151799.301737371.940671332.400PZ-130
5 NOV 151785.291737426.404671248.061PZ-14-5
5 NOV 151777.231737786.598671355.039PZ-14-4
5 NOV 151798.66 1737375.799671316.150PW-14-2
DATEWATER ELEV.*EASTING (83)NORTHING (83)POINT ID
TABLE I - WEST ABUTMENT SAND PIEZOMETRIC DATA
.0 in
G
E D
G R J
C p w
C O
E
N W
O P
W O
M A .n w o .d s .u s a c e .a r m y .m il :C
E N
W a t r ic t
D o c u m e n t s
C iv il W o r k s
U n it e d
S t a t e s o f
A m e r ic a
M is s o u r i R iv e r
B a s in
M is s o u r i R iv in
S t e m
G a r r is o n n s t r u c t
D
G R
P o w e r h o u r r a h a b u t m e n t
S a
.1
X
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
G A
R R
IS
O N D
A M A
N D R
E S
E R
V O
IR
R J
C
R J
C D
F S
R J
C
R
IV
E R
D A
L E
N D
G R
D
J
W E
S T A
B U
T M
E N
T S
A N
D D
R A
IN
R
E H
A B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
W
F
R
A
B
M.H. "F"
M.H. "F"
PZ 118A
PZ 13-8
7 9
MH 160/6
PZ 130
PZ 80-5
PZ 72-12
D A
O R
S S
E C
C A
E C
A R
LI
A
T T
S E
W R
E W
O L
1725 1725
1730 1730 1730
5 1735 1735
1740 1740
1745 1745 1745 1745 17451745
1750175017501750175017501750
1755 1755 1755 1755 1755 1755 1755
1760 1760 1760 1760 17601760 1760
17651765 17651765
17651765
177017701770
1775 1775 1775
C
1780 1780 1780 1780
E
17851785
C
179017901790
E
W
E
180018001800
C
1805 1
MC
E
E
0 1820
F
M W
C
18251
F
W
F
E C
C
W
F
M
PW 14-2
BH 14-3
PZ 14-4
BH-14-1
PZ 14-5
FROM PW 14-2)
(5', 10', & 15'
PZ'S 14-2
NOTE 4
*SEE
NOTE 4
*SEE
B2.01
SURGETANKS
T
U N
N E
L
T U
N N
E L
T U
N N
E L
EXISTING ROADWAYM.H. 156.8/5
M.H. "E"
M.H. 154.7/5
M.H. "C"
M.H. "B"
M.H. 155.7/3
M.H. "D"
M.H. 154.9/3
M.H. 155.6/4
DROP INLET
DROP INLET
W
W W
B .0
EEE
PAVED GUTTER
B3.01
B3.01
B .0
B .0
B .0
B .0
B .0
B .0
B .0
B .0
B .0
B .0
B .0
B .0
B .0
B .0
CL WEST ABUTMENT SERVICE ROAD
EPIP .C.V .F
R
E P "2 .
T
S X
E
CV
P
D E
T T
O L
S "
1 .
T
S X
E
CVP DETTOLS "21 .TSXE
EPIP .C.V .FREP "21 .TSXE
E X
S T P
V C
EXST. 12" SLOTTED PVC
CVP DETTOLS "21 .TSXE CVP DETTOLS "21 .TSXE
E X
S T
C .M .P
M.H. 5
M.H. 4
RW 9
RW 8
B3.05
B3.05
B .0
B .0
C V
P D
E T
T O
L S "
1 .
T S
X E
E
PI
P C
V P
D E
T T
O L
S "
1 .
T
S X
E
PZ 114B
PZ 117A
PZ 70
PZ 115
160+00 C.B.
PIPE (NON PERF)
EXST. 12" PVC
4 5
E D
G R J
C p w
C O
E
N W
O P
W O
M A .n w o .d s .u s a c e .a r m y .m il :C
E N
W a t r ic t
D o c u m e n t s
C iv il W o r k s
U n it e d
S t a t e s o f
A m e r ic a
M is s o u r i R iv e r
B a s in
M is s o u r i R iv in
S t e m
G a r r is o n n s t r u c t
D
G R
P o w e r h o u r r a h a b u t m e n t
S a
B1.03
LEGEND
0 45'45' 22.5'
E R
O S
IO
N C
O N
T R
O L P
L A
N
EROSION CONTROL PLAN
AREAS TO BE MULCHED
CONTROL BLANKET
AREA REQUIRING EROSION
QUANTITY CALCULATIONS.
THE COR, ALL AREAS OUTSIDE OF THOSE SHOWN ON THIS SHEET TO AID IN TOPSOIL AND SEEDING
FOR DEWATERING SYSTEM INSTALLATION, THE CONTRACTOR SHALL STAKE, IN THE PRESENCE OF
2 DEWATERING. IF ADDITIONAL EARTHWORK IN AREAS OUTSIDE OF THE PLAN LINES IS NECESSARY
AND OPERATIONS OUTSIDE THE LINES SHOWN ON THIS PLAN SHEET SHALL BE INCLUDED IN BID ITEM
TOPSOIL, SEEDING, AND EROSION CONTROL IN AREAS DISTURBED BY DEWATERING INSTALLATION 3.
REQUIREMENTS.
PLACEMENT. SEE SPECIFICATION SECTION 32 92 19 FOR ADDITIONAL EROSION CONTROL
BE DEPENDENT ON LOCATION AND EXTENT AND SHALL BE APPROVED BY THE COR PRIOR TO
SHOWN. THE TYPE OF EROSION CONTROL MATERIAL REQUIRED IN THOSE ADDITIONAL AREAS WILL
EROSION CONTROL SHALL BE PLACED IN ADDITIONAL AREAS DISTURBED OUTSIDE OF THE LINES 2.
CONTRACTOR SHALL MINIMIZE DISTURBANCE IN AREAS OUTSIDE OF THE LINES SHOWN.1.
NOTES:
.0 in
G
E D
G R J
C p w
C O
E
N W
O P
W O
M A .n w o .d s .u s a c e .a r m y .m il :C
E N
W a t r ic t
D o c u m e n t s
C iv il W o r k s
U n it e d
S t a t e s o f
A m e r ic a
M is s o u r i R iv e r
B a s in
M is s o u r i R iv in
S t e m
G a r r is o n n s t r u c t
D
G R
P o w e r h o u r r a h a b u t m e n t
S a
.1
X
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
G A
R R
IS
O N D
A M A
N D R
E S
E R
V O
IR
R J
C
R J
C D
F S
R J
C
R
IV
E R
D A
L E
N D
G R
D
J
W E
S T A
B U
T M
E N
T S
A N
D D
R A
IN
R
E H
A B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
W
F
R
M.H. "F"
MH 160/6
MIN 15 FOOT BERM
1725 1725
1730 1730 1730
5 1735 1735
1740 1740
1745 1745 1745 1745 17451745
1750175017501750175017501750
1755 1755 1755 1755 1755 1755 1755
1760 1760 1760 1760 17601760 1760
17651765 17651765
17651765
177017701770
1775 1775 1775
1780 1780 1780 1780
17851785
179017901790
180018001800
1805 1
0 1820
18251
SURGETANKS
T U
N N
E L
T U
N N
E L
T U
N N
E L
EXISTING ROADWAYM.H. 156.8/5
M.H. 154.7/5
M.H. "C"
M.H. "B"
M.H. 155.7/3
M.H. "D"
M.H. 154.9/3
M.H. 155.6/4
CL WEST ABUTMENT SERVICE ROAD
M.H. 5
M.H. 4
C.B. 160+00
15'
15'
15'15'
MREB TOOF 51 NI
M
M.H. 156.8/5
M.H. "E"
E D
G R J
C p w
C O
E
N W
O P
W O
M A .n w o .d s .u s a c e .a r m y .m il :C
E N
W a t r ic t
D o c u m e n t s
C iv il W o r k s
U n it e d
S t a t e s o f
A m e r ic a
M is s o u r i R iv e r
B a s in
M is s o u r i R iv in
S t e m
G a r r is o n n s t r u c t
D
G R
P o w e r h o u r r a h a b u t m e n t
S a
B2.01
0 20'20' 10'
SECTION 1-1 CL PROFILE THROUGH NEW NORTH SLOPE ABUTMENT SAND SUBDRAIN
SECTION 10-10 CL PROFILE THROUGH NEW SEEPAGE AREA SUBDRAIN
S U
B D
R A
IN
P
R O
F
IL
E S
FURNISHED BY THE GOVERNMENT.
MANUFACTURER'S INSTALLATION INSTRUCTIONS TO BE
SADDLE. SADDLE AND CONNECTIONS ARE TO BE INSTALLED PER
THE 6-INCH TEE IS A SPEARS 12-INCH TO 6-INCH CLAMP ON PVC 8.
THE COR.
THE SLOPE OF SLOTTED 6-INCH DRAIN PIPES AS APPROVED BY
FIELD FIT THE 5 FOOT PERPENDICULAR SOLID 6-INCH PIPE TO 7.
DEG. BEND WILL BE FITTED.
AT APPROXIMATE SEEP AREA SUBDRAIN STA. -0+25, A 22.5 6.
6-INCH SUBDRAIN TEE JOINT IN EACH DIRECTION.
5 FEET OF SOLID PIPE WILL BE LAID PERPENDICULAR TO THE 5.
SEE SHEET B2.02 FOR FINAL BENCH GRADING PROFILE.4.
SEE SHEETS B3.01 TO B3.05 FOR CROSS SECTIONS.3.
AND DETAILS.
SEE SHEET B5.01 FOR MANHOLE AND RISER SCHEDULE 2.
TOLERANCES.
SEE SPECIFICATION SECTION 33 46 16 FOR CONSTRUCTION 1.
NOTES:
.0 in
G
E D
G R J
C p w
C O
E
N W
O P
W O
M A .n w o .d s .u s a c e .a r m y .m il :C
E N
W a t r ic t
D o c u m e n t s
C iv il W o r k s
U n it e d
S t a t e s o f
A m e r ic a
M is s o u r i R iv e r
B a s in
M is s o u r i R iv in
S t e m
G a r r is o n n s t r u c t
D
G R
P o w e r h o u r r a h a b u t m e n t
S a
.1
X
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
G A
R R
IS
O N D
A M A
N D R
E S
E R
V O
IR
R J
C
R J
C D
F S
R J
C
R
IV
E R
D A
L E
N D
G R
D
J
W E
S T A
B U
T M
E N
T S
A N
D D
R A
IN
R
E H
A B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
W
F
R
EXCAVATION
TO BE PROTECTED
CONCRETE FLUME NO 2 EXISTING M.H. "B"
INV. EL. 1770.0
APPROX. STATION 6+00 TO 8+92
UNDER PREVIOUS CONTRACT
12" PVC SLOTTED PIPE INSTALLED
APPROX. STATION 0+00 TO 6+00
NEW 12" PVC SLOTTED PIPE THIS CONTRACT
WORK PREVIOUSLY COMPLETED BY OTHERSWORK TO BE COMPLETED THIS CONTRACT
LC
BEDDING TO BE PREPARED IN ACCORDANCE WITH SPECS (SEE DETAIL B)
E L E
V A
T
IO
N F
E E
T A
B O
V E M .S .L
7+00
4+50 4+60 4+70 4+80 4+90 5+00 5+10 5+20 5+30 5+40 5+50 5+60 5+70 5+80 5+90 6+00 6+10 6+20 6+30 6+40 6+50 6+60 6+70 6+80 6+90 7+10 7+20 7+30 7+40 7+50 7+60 7+70 7+80 7+90 8+00 8+10 8+20 8+30 8+40 8+50 8+60 8+70 8+80 9+008+90
STATION (FEET)
M A
T C
H L
IN
E S
E E T
H
IS
S
H E
E T
6" TOPSOIL AND SEEDING
ELEV. 1768.04
TO BE REMOVED THIS CONTRACT
EXISTING TEMPORARY CONNECTION
S = 0.6% S = 0.6%
(SEE DETAIL B)
PERVIOUS FILTER MATERIAL
EXISTING GROUND SURFACE (SEE NOTE 4)
EXCAVATION
LC
LC
LC
THIS CONTRACT
NEW M.H. "E"
THIS CONTRACT
NEW M.H. 154.7/5
THIS CONTRACT
NEW M.H. 154.9/3
NEW 12" PVC SLOTTED PIPE THIS CONTRACT
TO BE PROTECTED
CONCRETE FLUME NO 1
%2.3 = S
%2.3 = S
SEE DETAIL B
IN ACCORDANCE WITH SPECS
BEDDING TO BE PREPARED
SEE DETAIL B
PERVIOUS FILTER MATERIAL
4+40
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80 1+90 2+00 2+10 2+20 2+30 2+40 2+50 2+60 2+70 2+80 2+90 3+00 3+10 3+20 3+30 3+40 3+50 3+60 3+70 3+80 3+90 4+00 4+10 4+20 4+30 4+50E L E
V A
T
IO
N F
E E
T A
B O
V E M .S .L
STATION (FEET)
M A
T C
H L
IN
E S
E E T
H
IS
S
H E
E T
6" TOPSOIL AND SEEDING
EXISTING GROUND SURFACE (SEE NOTE 4)
(SEE SHEET B3.04)
OUTFALL
INV. EL. 1767.0
INV. EL. 1773.0
INV. EL. 1780.0
1.1% SLOPE 1.2% SLOPE
EXISTING GROUND SURFACE
SEE NOTE 7
E: 1737506.97 N: 670859.35
INV. EL. 1702.25
E: 1737525.40 N: 670814.56
INV. EL. 1701.15
(SEE NOTE 6)
E: 1737513.78
N: 670792.42
22.5 DEG. BEND
5' 5'
SEE DETAIL D
IN ACCORDANCE WITH SPECS
BEDDING TO BE PREPARED
0+10
0+00 0+20 0+30 0+40 0+50-0+10-0+20-0+30-0+40-0+50-0+60-0+70-0+80-0+90-1+00 0+60
E L E
V A
T
IO
N F
E E
T A
B O
V E M .S .L
E L E
V A
T
IO
N F
E E
T A
B O
V E M .S .L
-1+10
STATION (FEET)
° 4
6" TOPSOIL AND SEEDING
E: 1737547.64 N: 670859.35
INV. EL. 1701.75
(SEE NOTE 5)
PIPE THIS CONTRACT
NEW 6" SOLID PVC
(SEE NOTE 8)
(THIS CONTRACT)
NEW 6" TEE
(THIS CONTRACT)
PVC DRAIN PIPE
NEW 6" SLOTTED
(THIS CONTRACT)
PVC DRAIN PIPE
NEW 6" SLOTTED
(SEE DETAIL F)
ELEV: 1713.0
E: 1737505.3 N: 670699.44
THIS CONTRACT
NEW RISER O.R.1
(SEE DETAIL F)
ELEV: 1710.0
E: 1737550.72 N: 670865.58
THIS CONTRACT
NEW RISER O.R.2
E D
G R J
C p w
C O
E
N W
O P
W O
M A .n w o .d s .u s a c e .a r m y .m il :C
E N
W a t r ic t
D o c u m e n t s
C iv il W o r k s
U n it e d
S t a t e s o f
A m e r ic a
M is s o u r i R iv e r
B a s in
M is s o u r i R iv in
S t e m
G a r r is o n n s t r u c t
D
G R
P o w e r h o u r r a h a b u t m e n t
S a
B2.02
B
N C
H G
R A
D
IN
G P
R O
F
IL
E
CL PROFILE THROUGH FINAL BENCH GRADING
ADDITIONAL FLUME AND GRATING DETAILS.
SEE "FOR INFORMATION ONLY" DRAWINGS FOR 3.
FLUME NO. 2 GRATE IS CURRENTLY COVERED BY FILL.2.
SHALL BE APPROVED BY THE COR.
ELEVATIONS. ADJUSTMENTS TO FINAL BENCH PROFILE
CONTRACTOR SHALL VERIFY FLUME NO. 1 AND 2 GRATE 1.
NOTES:
.0 in
G
E D
G R J
C p w
C O
E
N W
O P
W O
M A .n w o .d s .u s a c e .a r m y .m il :C
E N
W a t r ic t
D o c u m e n t s
C iv il W o r k s
U n it e d
S t a t e s o f
A m e r ic a
M is s o u r i R iv e r
B a s in
M is s o u r i R iv in
S t e m
G a r r is o n n s t r u c t
D
G R
P o w e r h o u r r a h a b u t m e n t
S a
.1
X
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
G A
R R
IS
O N D
A M A
N D R
E S
E R
V O
IR
R J
C
R J
C D
F S
R J
C
R
IV
E R
D A
L E
N D
G R
D
J
W E
S T A
B U
T M
E N
T S
A N
D D
R A
IN
R
E H
A B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
W
F
R
M A
T C
H L
IN
E S
E E T
H
IS
S
H E
E T
E L E
V A
T
IO
N F
E E
T A
B O
V E M .S .L
7+00
4+50 4+60 4+70 4+80 4+90 5+00 5+10 5+20 5+30 5+40 5+50 5+60 5+70 5+80 5+90 6+00 6+10 6+20 6+30 6+40 6+50 6+60 6+70 6+80 6+90 7+10 7+20 7+30 7+40 7+50 7+60 7+70 7+80 7+90 8+00 8+10 8+20 8+30 8+40 8+50 8+60 8+70 8+80 9+008+90
STATION (FEET)
EXISTING M.H. "B" LC
%0.3 = S %6.0 = S %6.0 = S
EXISTING GROUND SURFACE
FINAL GRADE
F
IN
A L E
L . 1
.1
E
X
IS
T E
L . 1
.4
E X
IS
T E
L . 1
.8
F
IN
A L E
L . 1
.8
E X
IS
T E
L . 1
.9
F
IN
A L E
L . 1
.4
F
IN
A L E
L . 1
.0
E
X
IS
T E
L . 1
.7
F
IN
A L E
L . 1
.6
E
X
IS
T E
L . 1
.7
FROM 1774.60 TO 1773.40
GRATING ELEV. VARIES
M A
T C
H L
IN
E S
E E T
H
IS
S
H E
E T1810
4+40
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80 1+90 2+00 2+10 2+20 2+30 2+40 2+50 2+60 2+70 2+80 2+90 3+00 3+10 3+20 3+30 3+40 3+50 3+60 3+70 3+80 3+90 4+00 4+10 4+20 4+30 4+50E L E
V A
T
IO
N F
E E
T A
B O
V E M .S .L
STATION (FEET)
LC
THIS CONTRACT
NEW M.H. 154.7/5
LC
THIS CONTRACT
NEW M.H. 154.9/3
LC
THIS CONTRACT
NEW M.H. "E"
%0.3 = S
%0.3 = S
EXISTING GROUND SURFACE
GRATE ELEV. 1788.40
CONCRETE FLUME NO. 1
FINAL GRADE
E X
IS
T E
L . 1
.8
F
IN
A L E
L . 1
.3
E X
IS
T E
L . 1
.0
F
IN
A L E
L . 1
.3
F
IN
A L E
L . 1
.3
E
X
IS
T E
L . 1
.1
F
IN
A L E
L . 1
.3
E
X
IS
T E
L . 1
.3
.0 f t in
G
E D
G R J
C p w
C O
E
N W
O P
W O
M A .n w o .d s .u s a c e .a r m y .m il :C
E N
W a t r ic t
D o c u m e n t s
C iv il W o r k s
U n it e d
S t a t e s o f
A m e r ic a
M is s o u r i R iv e r
B a s in
M is s o u r i R iv in
S t e m
G a r r is o n n s t r u c t
D
G R
P o w e r h o u r r a h a b u t m e n t
S a
X X X
X
R
O S
S S
E C
T
IO
N S
SECTION
SCALE
0 15'15' 7.5'
SECTION
SCALE
0 15'15' 7.5'
STATION 0+00
NEW NORTH SLOPE DRAIN
STATION 1+00
NEW NORTH SLOPE DRAIN
S H
E E
T O
F
B3.01
DESIGN ASSUMPTIONS PRIOR TO EXCAVATION.
RESPONSIBLE FOR VERIFYING THESE ASSUMED CONDITIONS AND/OR CRITICAL
CONDITIONS ARE SUBJECT TO SEASONAL VARIATIONS. THE CONTRACTOR IS
INTERPOLATED FROM THE BEST AVAILABLE DATA PROVIDED ON SHEET B1.02.
1. GROUNDWATER SURFACE ELEVATIONS AS SHOWN HAVE BEEN
NOTES:
Shale
Limestone
(CL)s - Lean Clay with
Sand
(CL-ML)s - Silty Clay with
Sand
CH - Fat Clay
CL - Lean Clay
CL-ML - Silty Clay
CL/CH - Lean to Fat Clay g(CL)s - Gravelly Lean
Clay with Sand s(CL) - Sandy Lean Clay s(CL-ML) - Sandy Silty
Lean Clay
SC - Clayey Sand
ML - Silt
ML/CL - Clayey Silt s(ML) - Sandy Silt
SC-SM - Silty, Clayey
Sand
SM - Silty Sand
SP-SC - Poorly Graded
Sand with Clay
(SP)g - Poorly Graded
Sand with Gravel
(SP-SM)g - Poorly
SP - Poorly Graded Sand
SP-SM - Poorly Graded
Sand with Silt
No Sample
Sandstone
GRAPHICS
LITHOLOGY
Graded Sand with Silt and Gravel
Coal (Lignite)
.0 f t in
G
E D
G R J
C p w
C O
E
N W
O P
W O
M A .n w o .d s .u s a c e .a r m y .m il :C
E N
W a t r ic t
D o c u m e n t s
C iv il W o r k s
U n it e d
S t a t e s o f
A m e r ic a
M is s o u r i R iv e r
B a s in
M is s o u r i R iv in
S t e m
G a r r is o n n s t r u c t
D
G R
P o w e r h o u r r a h a b u t m e n t
S a
.1
X
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
G A
R R
IS
O N D
A M A
N D R
E S
E R
V O
IR
R J
C
R J
C D
F S
R J
C
R
IV
E R
D A
L E
N D
G R
D
J
W E
S T A
B U
T M
E N
T S
A N
D D
R A
IN
R
E H
A B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
W
F
R
FORT UNION
LIGNITE 3A LIGNITE 3A
LIGNITE SEAM
ELEV 1800
LC THIS CONTRACT
NEW M.H. "E"
ACCORDANCE WITH SPECS
BEDDING TO BE PREPARED IN
1V ON 2H TO 2.5H
RUN GRAVEL
EXISTING BANK
ALL DISTURBED AREAS
6" TOPSOIL AND SEEDING
VARIES FROM 1V ON 2H TO 2.5H
STATION (FEET)
CL-ML
CL/CH
CL-ML
s(CL)
SM
CL-ML
COAL
CL
CL-ML
ELEV. 1797.0
DATE: 7/15/2014
BH-14-1 (5' RIGHT OF CL)
RUN GRAVEL
EXISTING BANK
(SEE SPECIFICATION 33 46 16)
PIPE-12" DIA THIS CONTRACT
INSTALL NEW SLOTTED DRAIN
(SEE DETAIL E)
REGRADE UPPER BENCH
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220-230-240-250
E L E
V A
T
IO
N F
E E
T A
B O
V E M .S .L
E L E
V A
T
IO
N F
E E
T A
B O
V E M .S .L
WEST ABUTMENT SAND
FORT UNION
LIGNITE 3A
LIGNITE 3A
CL-ML
(SP-SM)g
CL
CL-ML
CL
COAL
CL
SM
CL
ELEV. 1798.1
DATE: 7/23/2014
BH-14-5 (47' RIGHT OF CL)
1799.3
1798.7
1785.3
ALL DISTURBED AREAS
6" TOPSOIL AND SEEDING
ML
CL-ML
SM
CL-ML
SM
CL-ML
SM
CH
SM
CH
SP
CH
CL-ML
CH
ELEV. 1826.7
DATE: 9/21/2014
BH-14-2 (42' RIGHT OF CL)
Station 1+00
EXISTING GROUND
WEST ABUTMENT SAND
RURAL WATER
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220-230-240-250
H5.
2 OT H2
NO V
MORF
SEIRAV
STATION (FEET)
E L E
V A
T
IO
N F
E E
T A
B O
V E M .S .L
E L E
V A
T
IO
N F
E E
T A
B O
V E M .S .L
COMM
FIBER OPTIC
RUN GRAVEL
EXISTING BANK
(SEE SPECIFICATION 33 46 16)
PIPE-12" DIA THIS CONTRACT
INSTALL NEW SLOTTED DRAIN
(SEE DETAIL E)
REGRADE UPPER BENCH
RE-ESTABLISH DESIGN SLOPE
ML/CL
ML/CL
CL-ML
CH
ELEV. 1828.7
DATE: 6/25/1955
BORING AND PIEZOMETER P-130 (35' RIGHT OF CL)
SM
CL-ML
s(ML) s(ML)
SANDSTONE
s(ML)
SM
s(CL-ML)
WEST ABUTMENT SAND
| GR79 GI |
| GR79 GI |
| GR79 G0 |
| GR79 G0 |
| GR79 B1 |
| GR79 B1 |
| GR79 B1 |
| GR79 B2 |
| GR79 B2 |
| GR79 B3 |
| GR79 B3 |
| GR79 B3 |
| GR79 B3 |
| GR79 B3 |
| GR79 B5 |
| GR79 B5 |
| GR79 BF |
| GR79 BF |
| GR79 BF |
| GR79 BF |
| GR79 BF |
| GR79 BF |
| GR79 BF |
File details come from the government source that posted it. Updated .