Repair Intake Structure Curtain Walls; Fort Randall Dam, SD
Solicitation number
W9128F-16-B-0022
Issued by

About this file

Amendment No. 0001 to Specifications and Drawings for Construction of Repair Intake Structure Curtain Walls Fort Randall Dam SD Solicitation No. W9128F 16 B 0022.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Am #0001 - 1

DEPARTMENT OF THE ARMY

Omaha District, Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901 :NOTICE: Failure to acknowledge : Solicitation No. W9128F 16 B 0022 :all amendments may cause rejec- :

:tion of the bid. See FAR : Date of Issue: 23 August 2016 :52.214-3 of Section 00 21 00 : Date of Opening: 23 September 2016

Amendment No. 0001 15 September 2016

SUBJECT: Amendment No. 0001 to Specifications and Drawings for Construction of Repair Intake Structure Curtain Walls, Fort Randall Dam, SD Solicitation No. W9128F 16 B 0022.

TO: Prospective Bidders and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

(1) Section 00 73 00 Page 2, paragraph 1.1, delete “180 calendar days” and substitute “360 calendar days”.

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages as noted below. The substituted pages are revised and reissued with this amendment.

Pages Deleted Pages Substituted or Added

00 10 00-1 thru 00 10 00-4 00 10 00-1 thru 00 10 00-4

c. Drawings (Reissued). The following drawings are revised with latest revision date of 09 September 2016, and reissued with this amendment.

(1) Sheet CG102 and CG104.

2. This amendment is a part of the bidding papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the specifications remain unchanged. If the bids have been mailed prior to receiving this amendment, you will notify the office where bids are opened, in the specified manner, immediately of its receipt and of any changes in your bid occasioned thereby.

a. Hand-Carried Bids shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.

b. Mailed Bids shall be addressed as noted in Item 8 on Page 00 10 00-1 of Standard Form 1442.

3. Bids will be received until 2:00 p.m., local time at place of bid opening, 23 September 2016.

Am #0001 - 2

Attachments: Bidding Schedule Pages 10 00-1 thru 00 10 00-4 Dwgs. listed in 1.c. above Questions and Answers from Site Visit dated September 8, 2016 (For Information Only)

U.S. Army Engineer District, Omaha Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901

15 Sep 2016

MFS/2184

00 10 00 - 1 Am0001

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W9128F-16-B-0022

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

23 August 2016

PAGES OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY CODE CT 8. ADDRESS OFFER TO

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901

Attn: CONTRACTING DIVISION (CENWO-CT)

9. FOR INFORMATION

CALL:

A. NAME

Patrick Mally

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(402) 995-2070

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

The offeror hereby agrees to do all work described in the documents entitled:

Repair Intake Structure Curtain Walls, Fort Randall Dam, SD

RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), AND SECTION 00 45 00.

THIS SOLICITATION IS UNRESTRICTED AND OPEN TO LARGE AND SMALL BUSINESS INTERESTS.

This solicitation contains additional security requirements that were not in effect prior to 2014. Please reference Section 01 30 00.24, Paragraph 1.4.

11. The Contractor shall begin performance within 10 calendar days and complete it within 360 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable.

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 2:00 pm (hour) local time 23 September 2016. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than ___60_____ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442(REV. 4-85)

Prescribed by GSA FAR(48 CFR) 53.236-1(d)

00 10 00 - 2 Am0001

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

DUNS Number:

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 60 calendar days after the date offers are due.

AMOUNTS

SEE ATTACHED BIDDING SCHEDULE

Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

U.S. Army Engineer District, Omaha 1616 Capitol Ave.

Omaha, Nebraska 68102-4901

USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,

(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

STANDARD FORM 1442 BACK (REV. 4-85)

BIDDING SCHEDULE

00 10 00 Page 3 Am0001

Item No._

Description

Estimated Quantity_

Unit

Unit Price

Amount

BASIC ITEMS

0001 All plant, material, and labor required for drain extensions at curtain walls

EA

0002 All plant, material, and labor required for drain repair at expansion joints

EA

0003 All plant, material, and labor required for sealant & backing rod (horizontal)

230 LF $________ $_______________

0004 All remaining work for basic items 1 Job xxx $_______________

OPTION 1

0005 All plant, material, and labor for crack repairs

0005AA First 5 GAL injected 5 GAL $________ $_______________

0005AB Next 5 GAL injected 5 GAL $________ $_______________

0005AC Over 10 GAL injected 5 GAL $________ $_______________

0006 All plant, material, and labor for spall repairs including removal, preparation, and placement

0006AA First 15 CF 15 CF $________ $_______________

0006AB Next 10 CF 10 CF $________ $_______________

0006AC Over 25 CF 10 CF $________ $_______________

0007 All remaining work for Option 1 1 Job xxx $_______________

OPTION 2

0008 All plant, material, and labor required for sealant & backing rod up & downstream curtain wall (vertical) 1 Job xxx $_______________

OPTION 3

0009 All plant, material, and labor required for removal & disposal of asbestos contaminated asphalt from around 91 drains on the intake deck and replacement with grout.

80 CF $________ $_______________

BASIC BID TOTAL (ITEMS 0001 thru 0004) $_______________ OPTION 1 TOTAL (ITEMS 0005 thru 0007) $_______________

OPTION 2 TOTAL (ITEM 0008) $_______________

OPTION 3 TOTAL (ITEM 0009) $_______________

BASIC PLUS OPTIONS TOTAL (ITEMS 0001 thru 0009) $_______________

00 10 00 – Page 4 Am0001

NOTES:

1. Bid prices must be entered for all items of the schedule. Total amounts submitted without bid prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the unit prices and the total amount for each CLIN, the unit prices will be considered the bid.

2. A modification to a bid which provides for a single adjustment to the total amount bid, should state the application of the adjustment to each respective Job price affected. If the modification is not so apportioned, the single adjustment will be applied to Item No. 0004

3. See SECTION 00 21 00, INSTRUCTIONS, CONDITIONS, & NOTICES TO BIDDERS for evaluation of options.

The Government reserves the right to exercise the options within 120 days after issuance of Notice to Proceed.

Q & A Page 1 For Information Only

MEETING AGENDA

PRE-BID MEETING

NAME OF PROJECT: Fort Randall – Repair Intake Structure Curtain Walls MEETING LOCATION: Project Site DATE & TIME: September 8, 2016 @ 10:00 a.m.

SOLICITATION #: W9128F-16-B-0022

A. Introductions

B. Contract Items

1. Period of Performance: The Contractor shall begin performance within 10 calendar days and complete it within 180 calendar days after receiving notice to proceed.

2. Bonding Required:

• Bid Guarantee – submitted with bid (see specification section 00 72 00 part 1.64)

• Performance Bond – within 10 calendar days of contract award (see specification section 00 72 00 part 1.70)

• Payment Bond– within 10 calendar days of contract award (see specification section 00 72 00 part 1.70)

3. Liquidated Damages: If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $470 for each calendar day of delay until the work is completed or accepted.

4. Contractor Allowed Working Hours: The contractor will have access to the job site for work during normal plant business hours from 0630 to 1630 hours Monday through Friday excluding any federally recognized holiday

5. Use of Gantry Crane: Use of the gantry crane will be permitted in accordance with Specification section 01 12 00. The Government will operate the crane during the normal daytime working hours of 7:30 am to 4:30 pm, Monday thru Thursday, less holidays. The Contractor will be allowed up to 8 man-hours of crane operator travel to/from the Intake Structure/Powerhouse and crane time during the life of the Contract.

1 2 3 7 5 6 9 8 10 11 12 4

Q & A Page 2

6. Bids are due on September 23, 2016 at 2:00pm Central Time. Bids shall be submitted to

Attn: CONTRACTING DIVISION (CENWO-CT)

C. Bid Schedule

1. This job consist of a base bid section with 3 option bid sections.

D. Construction Items

1. Base Bid Item #2 - Drain Repair (trench drains)

a) Reference Detail on sheet S-102

b) Contractor shall assume sealant being removed contains asbestos

c) Armor angle cleaning shall be accomplished by sandblasting or wire brushing

d) Refer to Specification 07 92 00 for material requirements for the replacement of sealant, drain tubes, trough,

e) Galvanizing repair as required by specification section 05 50 13 part 2.2

2. Option 3- Removal/replacement of asbestos contaminated asphalt around 91 drains

a) Remove asphalt patch material around deck drains. Sealant around asphalt may contain asbestos. Replace with concrete grout.

3. Base Bid Item #1 - Drain Extensions / Deflectors

a) Reference Detail on sheet S-102

b) Note – The downstream pipes outlet at a higher elevation than the upstream pipes

c) Use of catwalks is allowed as long as loading does not exceed 500 lbs. See notes on sheet S-903.

4. Base Bid Item #3 - Backer Rod and Sealant for Horizontal Joints

a) See detail on sheet CG-102 (note – this plan sheet and the corresponding quantity shown on the bid schedule have been modified with this amendment)

5. Option 1 – Crack Repairs and Spall Repairs

a) See notes on sheet S-101 and see details on sheets R-012 & R-013

b) This option item includes crack and spall repairs on the vertical and horizontal surfaces of curtain walls, the curtain wall bearing areas on the towers, and the upstream walkway between towers 8 & 9

c) 20 curtain wall locations, 20 curtain wall bearing locations, & 1 walkway spall

d) Spalls will be repaired by removal of unsound material and reconstructing with a cementitious repair material. Removal of unsound material shall be in accordance with Specification section 03 01 32 parts 1.3.2, 1.5.5.1, & 3.2. Any exposed steel shall be sandblasted/wire-brushed prior to placement of patch material.

Q & A Page 3

e) Cracks shall be repaired by injection of structural epoxy, as described in Specification section 03 01 32 part 3.6

6. Option 2 – Vertical Sealing on upstream & downstream curtain walls

a) Seal interior and exterior vertical joints on the downstream curtain walls as shown below

• Sealant on Exterior Face

• Sealant on Interior Face

b) Seal interior and exterior vertical joints on the upstream curtain wall as shown below

• Sealant on Exterior Face

• Sealant on Interior Face

EL = 1392.00

EL = 1368.00

EL = 1368.00

EL = 1392.00

EL = 1380.12

Q & A Page 4

E. Miscellaneous Items

1. Government Assistance

a) Aside from those specifically listed, the Contractor is to be aware that no government tools, equipment, or personnel will be made available for Contractor use or assistance at any time during the project.

2. Power / Water

a) The Government will make available, from existing outlets and supplies, all reasonably required amounts of water and electricity required in the performance of the work without charge to the Contractor. Note – water made available by the government will be lake water. Contractor must supply their own potable water for cleaning concrete surfaces prior to patching operations.

3. Portable Toilets

a) Toilet facilities will not be available for Contractor's use. The Contractor shall provide and maintain portable toilets for use by the Contractor's staff

4. Parking / Staging

a) Potential Staging as shown on sheet S-001

b) The contractor will not be allowed to use Government desks/tables inside the intake structure. If there is a need for a desk, the Contractor shall request government space. If space is provided, the Contractor shall provide his own desks/tables/chairs etc.

5. QCS System

a) The Government will use the RMS system to assist in its monitoring and administration of this contract. This system is described in detail in specification section 01 45 00.10 10

F. Questions

- Will dry ice blasting be permitted to clean armor angles?

- Yes- the goal for cleaning the armor angles is to remove any loosely adhered oxidation and contaminants. A white metal finish is not required, but the contractor must provide a smooth surface free of dirt and other contaminants.

- Is the trench drain a pre-fab off the shelf item?

- No – the trench drain components will have to be fabricated to fit and shall be placed at the required slope to drain to the contractor supplied and installed drain tubes.

Q & A Page 5

- How deep is the asphalt around the drains for option 3?

- There are several types of drains, with some being dimensioned different than others. Refer to sheet CG-103 for a location map of the typical drain types. Refer to sheet R-008 for dimensions of the ‘drain pockets’ around drain types A, B, C, and D. Also, refer to sheet R-009 for dimensions of the ‘drain pockets’ around drain types E, F, and J.

- What is the required depth of sealant removal on the rake deck?

- Sealant shall be removed to a depth of 1” for all joints included under base bid item #3.

- Could new trench drain cover plates be provided rather than heat straightening the existing ones?

- No, the contractor shall use the existing material and shall modify to fit.

- Is an asbestos test result available for this project?

Test results can be found at the end of specification section 02 82 14.00 10. Some items were tested positive for asbestos while other similar items did not. Due to variability in results, USACE has assumed all items to be positive for asbestos. The contractor may choose to test any items as desired. All testing will be done at the Contractor’s expense.

- What is the distance from the access ledge to the interior face of the curtain wall where the trench drains are?

- Refer to “END ELEVATION” details on sheet R-005

- What is the typical water depth around the intake structure?

- As shown on the details on sheet S-001, the elevation at the bottom of the intake structure is

1227 feet. The water level changes throughout the year and varies due to several factors.

- Summer pool elevations normally range from 1355’ to 1365’ above msl. During the fall draw down (apprx. September thru November), pool elevations are normally between 1337’ and 1355’ above msl.

- The following link can be used to see historical water level fluctuation records http://www.nwd-mr.usace.army.mil/rcc/projdata/ftra.pdf

- These values are approximate and are in no way guaranteed. Levels fluctuate based on rain/flooding conditions and other uncontrollable and various factors. Contractor may use the above numbers as an average and/or basis for their bid, but shall be aware that such conditions are in no way guaranteed by the government.

- What is the total burden cost per hour for additional use over 8 hours of the crane?

- Operating the crane using USACE staff will require 2 men at $100 per man-hour.

Q & A Page 6

Contacts:

Evan Schmitz Civil Engineer, P.E.

U.S. Army Corps of Engineers Fort Randall Project

605.487.7845 X 3269

Jake Russell Civil Engineering Tech U.S. Army Corps of Engineers Fort Randall Project

605.487.7845 X 3261

am_0001
00 10 00
Bid Schedule Am0001
Pre-Bid Meeting Q&A