IDCC Road Rehab for Big Bend-Lake Sharpe
Solicitation number
W9128F-16-B-0014
Issued by

About this file

Abstract.

View the file

Other files

File Type Posted
am_0001.pdf PDF
IDCC_Roads_BB_Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED

15-Jun-16 26-Jul-16

I CERTIFY THAT I HAVE OPENED, READ AND

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

26-Jul-16

X C. REASONABLE CONTRACT

7A 7B 7C D. E. F. E. F. E. F.

ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT 0001 Earthwork 0001AA Topsoil Borrow 100 CY 35.00$ 3,500.00$ 11.50$ 1,150.00$ 66.00$ 6,600.00$ 0001AB Unclassified Excavation 500 CY 18.99$ 9,495.00$ 3.75$ 1,875.00$ 24.00$ 12,000.00$ 0001AC Rock Excavation 10 CY 72.84$ 728.40$ 10.00$ 100.00$ 300.00$ 3,000.00$ 0001AD Embankment Borrow Material 500 CY 20.68$ 10,337.50$ 9.00$ 4,500.00$ 30.00$ 15,000.00$ 0001AE Select Granular Material 10 Ton 32.82$ 328.15$ 10.50$ 105.00$ 50.00$ 500.00$ 0001AF Overhaul 1 CY/MI 0.53$ 0.53$ 0.30$ 0.30$ 12.00$ 12.00$ 0002 Geotextile Fabric 0002AA Supplied in Place 300 SQ.YD. 6.00$ 1,800.00$ 2.25$ 675.00$ 5.00$ 1,500.00$ 0003 Cold Milling of Bituminous Pavement 0003AA AC 2" mill salvage & stockpile 2,500 SY 2.98$ 7,450.00$ 12.50$ 31,250.00$ 5.00$ 12,500.00$ 0003AB AC 4" mill salvage & stockpile 2,500 SY 3.91$ 9,762.50$ 12.50$ 31,250.00$ 6.00$ 15,000.00$ 0004 Crack Sealing 0004AA Asphalt 2,000 SF 1.88$ 3,750.00$ 6.25$ 12,500.00$ 2.25$ 4,500.00$ 0005 Aggregate Base Course 0005AA First 1,000 tons (stockpiled) 1,000 TON 21.50$ 21,500.00$ 12.50$ 12,500.00$ 28.00$ 28,000.00$ 0005AB Over 1,000 tons (stockpiled) 1,000 TON 21.50$ 21,500.00$ 12.00$ 12,000.00$ 28.00$ 28,000.00$ 0005AC Agg. (supplied-in-place) 1,000 TON 31.00$ 31,000.00$ 16.00$ 16,000.00$ 38.00$ 38,000.00$ 0006 Bituminous Surface Treatment 0006AA Single 10,000 SQ.YD. 5.75$ 57,500.00$ 7.25$ 72,500.00$ 6.00$ 60,000.00$ 0007 Hot Mix Asphalt -$ -$ -$ 0007AA Pave Gravel Surface 400 TON 157.50$ 63,000.00$ 265.00$ 106,000.00$ 160.00$ 64,000.00$ 0007AB Overlay Paved Surface 400 TON 157.50$ 63,000.00$ 265.00$ 106,000.00$ 160.00$ 64,000.00$ 0007AC Patch (4" deep) 400 SQ.FT. 7.88$ 3,150.00$ 15.00$ 6,000.00$ 7.75$ 3,100.00$ 0008 Concrete Work -$ -$ -$ 0008AA Pavement 4" thick 1,000 SQ.FT. 9.50$ 9,500.00$ 4.25$ 4,250.00$ 10.50$ 10,500.00$ 0008AB Pavement 6" thick 1,000 SQ.FT. 11.75$ 11,750.00$ 5.50$ 5,500.00$ 11.50$ 11,500.00$ 0008AC Curb & Gutter (Cast) 100 FT 47.00$ 4,700.00$ 35.00$ 3,500.00$ 50.00$ 5,000.00$ 0008AD Rebar 500 FT 1.88$ 937.50$ 9.50$ 4,750.00$ 1.50$ 750.00$ 0009 Pavement Markings -$ -$ -$ 0009AA Shoulder Striping 4" 10,000 FT 0.68$ 6,750.00$ 0.90$ 9,000.00$ 0.75$ 7,500.00$ 0009AB Centerline Striping 4" 5,000 FT 0.68$ 3,375.00$ 0.90$ 4,500.00$ 0.75$ 3,750.00$ 0009AC Parking Area Striping 300 FT 2.38$ 712.00$ 2.25$ 675.00$ 6.00$ 1,800.00$ 0009AD Stop Line Striping (12") 20 FT 39.00$ 780.00$ 50.00$ 1,000.00$ 40.00$ 800.00$ 0009AE Handicap & Misc. Symbols 2 EA 226.50$ 453.00$ 260.00$ 520.00$ 225.00$ 450.00$ 0010 Seeding -$ -$ -$ 0010AA Seeding 300 SQ. YD. 3.00$ 900.00$ 5.25$ 1,575.00$ 2.25$ 675.00$ 0010AB Erosion Blanket 300 SQ. YD. 2.55$ 765.00$ 3.25$ 975.00$ 10.00$ 3,000.00$ 0011 Storm Drainage Piping - Installed -$ -$ -$ 0011AA 18" CMP 0'-10' Deep 20 FT 50.50$ 1,010.00$ 45.00$ 900.00$ 275.00$ 5,500.00$

6. NUMBER OF AMENDMENTS ISSUED

IDCC Road Rehab

N/A

NONCOMPLIANT BID FORM USED

BID CANNOT BE CONSIDERED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

Jeremy Thomas Construction LLC Anderson Contractors, INC

Reliance, SD, 57569-5506 Pierre, SD 57501 B. BID SECURITY (Type & Amount)B. REASONABLE CONTRACT

(Without Profit)

(Including Profit)

A. OFFEROR A. OFFEROR

32131 Lyman Rd PO Box 442

A. HIRED LABOR

NO. 1 NO. 2

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

W9128F-16-B-0014

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE

(Check A, B or C AND COMPLETE D, E AND F)

5. PROJECT TITLE 9. OFFERS

TO THIS SOLICITATION ALEXANDER D. MUELLER

Signed

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

ALEXANDER D. MUELLER

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

1 l 2 PAGES

PAGE 1 OF

0011AB 18" CMP 10'-20' Deep 20 FT 56.50$ 1,130.00$ 65.00$ 1,300.00$ 400.00$ 8,000.00$ 0011AC Flared End 1 EA 595.00$ 595.00$ 400.00$ 400.00$ 475.00$ 475.00$ 0011AD Elbow (22.5 or 45 degree) 1 EA 543.00$ 543.00$ 350.00$ 350.00$ 675.00$ 675.00$ 0011AE 24" CMP 0'-10' Deep 20 FT 61.00$ 1,220.00$ 65.00$ 1,300.00$ 300.00$ 6,000.00$ 0011AF 24" CMP 10'-20' Deep 20 FT 69.50$ 1,390.00$ 85.00$ 1,700.00$ 425.00$ 8,500.00$ 0011AG Flared End 1 EA 725.00$ 725.00$ 500.00$ 500.00$ 500.00$ 500.00$ 0011AH 24" Elbow (22.5 or 45 degree) 1 EA 722.50$ 722.50$ 450.00$ 450.00$ 700.00$ 700.00$ 0011AI Erosion riprap 10 TON 56.00$ 560.00$ 36.00$ 360.00$ 140.00$ 1,400.00$

TOTAL YEAR 1 356,320.58$ 457,910.30$ 433,187.00$

0012 Earthwork 0012AA Topsoil Borrow 100 CY 36.05$ 3,605.00$ 11.50$ 1,150.00$ 66.00$ 6,600.00$ 0012AB Unclassified Excavation 500 CY 19.56$ 9,779.85$ 3.75$ 1,875.00$ 24.00$ 12,000.00$ 0012AC Rock Excavation 10 CY 75.03$ 750.25$ 10.00$ 100.00$ 300.00$ 3,000.00$ 0012AD Embankment Borrow Material 500 CY 21.30$ 10,647.63$ 9.00$ 4,500.00$ 30.00$ 15,000.00$ 0012AE Select Granular Material 10 Ton 33.80$ 337.99$ 10.50$ 105.00$ 50.00$ 500.00$ 0012AF Overhaul 1 CY/MI 0.54$ 0.54$ 0.30$ 0.30$ 12.00$ 12.00$ 0013 Geotextile Fabric 0013AA Supplied in Place 300 SQ.YD. 6.18$ 1,854.00$ 2.25$ 675.00$ 5.00$ 1,500.00$ 0014 Cold Milling of Bituminous Pavement 0014AA AC 2" mill salvage & stockpile 2,500 SY 3.07$ 7,673.50$ 12.50$ 31,250.00$ 5.00$ 12,500.00$ 0014AB AC 4" mill salvage & stockpile 2,500 SY 4.02$ 10,055.38$ 12.50$ 31,250.00$ 6.00$ 15,000.00$ 0015 Crack Sealing 0015AA Asphalt 2,000 SF 1.93$ 3,862.50$ 6.25$ 12,500.00$ 2.25$ 4,500.00$ 0016 Aggregate Base Course 0016AA First 1,000 tons (stockpiled) 1,000 TON 22.15$ 22,145.00$ 12.50$ 12,500.00$ 28.00$ 28,000.00$ 0016AB Over 1,000 tons (stockpiled) 1,000 TON 22.15$ 22,145.00$ 12.00$ 12,000.00$ 28.00$ 28,000.00$ 0016AC Agg. (supplied-in-place) 1,000 TON 31.93$ 31,930.00$ 16.00$ 16,000.00$ 38.00$ 38,000.00$ 0017 Bituminous Surface Treatment 0017AA Single 10,000 SQ.YD. 5.92$ 59,225.00$ 7.25$ 72,500.00$ 6.00$ 60,000.00$ 0018 Hot Mix Asphalt -$ -$ -$ 0018AA Pave Gravel Surface 400 TON 162.23$ 64,890.00$ 265.00$ 10,600.00$ 160.00$ 64,000.00$ 0018AB Overlay Paved Surface 400 TON 162.23$ 64,890.00$ 265.00$ 10,600.00$ 160.00$ 64,000.00$ 0018AC Patch (4" deep) 400 SQ.FT. 8.11$ 3,244.50$ 15.00$ 6,000.00$ 7.75$ 3,100.00$ 0019 Concrete Work -$ -$ -$ 0019AA Pavement 4" thick 1,000 SQ.FT. 9.79$ 9,785.00$ 4.25$ 4,250.00$ 10.50$ 10,500.00$ 0019AB Pavement 6" thick 1,000 SQ.FT. 12.10$ 12,102.50$ 5.50$ 5,500.00$ 11.50$ 11,500.00$ 0019AC Curb & Gutter (Cast) 100 FT 48.41$ 4,841.00$ 35.00$ 3,500.00$ 50.00$ 5,000.00$ 0019AD Rebar 500 FT 1.93$ 965.63$ 9.50$ 4,750.00$ 1.50$ 750.00$ 0020 Pavement Markings -$ -$ -$ 0020AA Shoulder Striping 4" 10,000 FT 0.70$ 6,952.50$ 0.95$ 9,500.00$ 0.75$ 7,500.00$ 0020AB Centerline Striping 4" 5,000 FT 0.70$ 3,476.25$ 0.95$ 4,750.00$ 0.75$ 3,750.00$ 0020AC Parking Area Striping 300 FT 2.45$ 733.88$ 2.30$ 690.00$ 6.00$ 1,800.00$ 0020AD Stop Line Striping (12") 20 FT 40.17$ 803.40$ 50.00$ 1,000.00$ 40.00$ 800.00$ 0020AE Handicap & Misc. Symbols 2 EA 233.30$ 466.59$ 260.00$ 520.00$ 225.00$ 450.00$ 0021 Seeding -$ -$ -$ 0021AA Seeding 300 SQ. YD. 3.09$ 927.00$ 5.25$ 1,575.00$ 2.25$ 675.00$ 0021AB Erosion Blanket 300 SQ. YD. 2.63$ 787.95$ 3.25$ 975.00$ 10.00$ 3,000.00$ 0022 Storm Drainage Piping - Installed -$ -$ -$ 0022AA 18" CMP 0'-10' Deep 20 FT 52.02$ 1,040.30$ 45.00$ 900.00$ 275.00$ 5,500.00$ 0022AB 18" CMP 10'-20' Deep 20 FT 58.20$ 1,163.90$ 65.00$ 1,300.00$ 400.00$ 8,000.00$ 0022AC Flared End 1 EA 612.85$ 612.85$ 400.00$ 400.00$ 475.00$ 475.00$ 0022AD Elbow (22.5 or 45 degree) 1 EA 559.29$ 559.29$ 350.00$ 350.00$ 675.00$ 675.00$ 0022AE 24" CMP 0'-10' Deep 20 FT 62.83$ 1,256.60$ 65.00$ 1,300.00$ 300.00$ 6,000.00$ 0022AF 24" CMP 10'-20' Deep 20 FT 71.59$ 1,431.70$ 85.00$ 1,700.00$ 425.00$ 8,500.00$ 0022AG Flared End 1 EA 746.75$ 746.75$ 500.00$ 500.00$ 500.00$ 500.00$ 0022AH 24" Elbow (22.5 or 45 degree) 1 EA 744.18$ 744.18$ 450.00$ 450.00$ 700.00$ 700.00$ 0022AI Erosion riprap 10 TON 57.68$ 576.80$ 36.00$ 360.00$ 140.00$ 1,400.00$

TOTAL YEAR 2 367,010.19$ 458,675.30$ 433,187.00$

0023 Earthwork 0023AA Topsoil Borrow 100 CY 37.28$ 3,727.50$ 11.50$ 1,150.00$ 66.00$ 6,600.00$ 0023AB Unclassified Excavation 500 CY 20.22$ 10,112.18$ 3.75$ 1,875.00$ 24.00$ 12,000.00$ 0023AC Rock Excavation 10 CY 77.57$ 775.75$ 10.00$ 100.00$ 300.00$ 3,000.00$ 0023AD Embankment Borrow Material 500 CY 22.02$ 11,009.44$ 9.00$ 4,500.00$ 30.00$ 15,000.00$ 0023AE Select Granular Material 10 Ton 34.95$ 349.48$ 15.50$ 105.00$ 50.00$ 500.00$ 0023AF Overhaul 1 CY/MI 0.56$ 0.56$ 0.30$ 0.30$ 12.00$ 12.00$ 0024 Geotextile Fabric 0024AA Supplied in Place 300 SQ.YD. 6.39$ 1,917.00$ 2.25$ 675.00$ 5.00$ 1,500.00$ 0025 Cold Milling of Bituminous Pavement 0025AA AC 2" mill salvage & stockpile 2,500 SY 3.17$ 7,934.25$ 12.50$ 31,250.00$ 5.00$ 12,500.00$ 0025AB AC 4" mill salvage & stockpile 2,500 SY 4.16$ 10,397.06$ 12.50$ 31,250.00$ 6.00$ 15,000.00$ 0026 Crack Sealing 0026AA Asphalt 2,000 SF 2.00$ 3,993.75$ 6.25$ 12,500.00$ 2.25$ 4,500.00$ 0027 Aggregate Base Course 0027AA First 1,000 tons (stockpiled) 1,000 TON 22.90$ 22,897.50$ 12.50$ 12,500.00$ 28.00$ 28,000.00$ 0027AB Over 1,000 tons (stockpiled) 1,000 TON 22.90$ 22,897.50$ 12.00$ 12,000.00$ 28.00$ 28,000.00$ 0027AC Agg. (supplied-in-place) 1,000 TON 33.02$ 33,015.00$ 16.00$ 16,000.00$ 38.00$ 38,000.00$ 0028 Bituminous Surface Treatment 0028AA Single 10,000 SQ.YD. 6.12$ 61,237.50$ 7.25$ 72,500.00$ 6.00$ 60,000.00$ 0029 Hot Mix Asphalt -$ -$ -$ 0029AA Pave Gravel Surface 400 TON 167.74$ 67,095.00$ 265.00$ 10,600.00$ 160.00$ 64,000.00$ 0029AB Overlay Paved Surface 400 TON 167.74$ 67,095.00$ 265.00$ 10,600.00$ 160.00$ 64,000.00$ 0029AC Patch (4" deep) 400 SQ.FT. 8.39$ 3,354.75$ 15.00$ 6,000.00$ 7.75$ 3,100.00$ 0030 Concrete Work -$ -$ -$ 0030AA Pavement 4" thick 1,000 SQ.FT. 10.12$ 10,117.50$ 4.25$ 4,250.00$ 10.50$ 10,500.00$ 0030AB Pavement 6" thick 1,000 SQ.FT. 12.51$ 12,512.75$ 5.50$ 5,500.00$ 11.50$ 11,500.00$ 0030AC Curb & Gutter (Cast) 100 FT 50.06$ 5,005.50$ 35.00$ 3,500.00$ 50.00$ 5,000.00$ 0030AD Rebar 500 FT 2.00$ 998.45$ 9.50$ 4,750.00$ 1.50$ 750.00$ 0031 Pavement Markings -$ -$ -$ 0031AA Shoulder Striping 4" 10,000 FT 0.72$ 7,188.75$ 1.00$ 1,000.00$ 0.75$ 7,500.00$ 0031AB Centerline Striping 4" 5,000 FT 0.72$ 3,594.38$ 1.00$ 5,000.00$ 0.75$ 3,750.00$ 0031AC Parking Area Striping 300 FT 2.53$ 758.81$ 2.35$ 705.00$ 6.00$ 1,800.00$ 0031AD Stop Line Striping (12") 20 FT 41.54$ 830.70$ 50.00$ 1,000.00$ 40.00$ 800.00$ 0031AE Handicap & Misc. Symbols 2 EA 241.22$ 482.45$ 260.00$ 520.00$ 225.00$ 450.00$ 0032 Seeding -$ -$ -$ 0032AA Seeding 300 SQ. YD. 3.20$ 958.50$ 5.25$ 1,575.00$ 2.25$ 675.00$ 0032AB Erosion Blanket 300 SQ. YD. 2.72$ 814.73$ 3.25$ 975.00$ 10.00$ 3,000.00$ 0033 Storm Drainage Piping - Installed -$ -$ -$ 0033AA 18" CMP 0'-10' Deep 20 FT 53.78$ 1,075.65$ 45.00$ 900.00$ 275.00$ 5,500.00$ 0033AB 18" CMP 10'-20' Deep 20 FT 60.17$ 1,203.45$ 65.00$ 1,300.00$ 400.00$ 8,000.00$ 0033AC Flared End 1 EA 633.68$ 633.68$ 400.00$ 400.00$ 475.00$ 475.00$ 0033AD Elbow (22.5 or 45 degree) 1 EA 578.30$ 578.30$ 350.00$ 350.00$ 675.00$ 675.00$ 0033AE 24" CMP 0'-10' Deep 20 FT 64.97$ 1,299.30$ 65.00$ 1,300.00$ 300.00$ 6,000.00$ 0033AF 24" CMP 10'-20' Deep 20 FT 74.02$ 1,480.35$ 85.00$ 1,700.00$ 425.00$ 8,500.00$ 0033AG Flared End 1 EA 772.13$ 772.13$ 500.00$ 500.00$ 500.00$ 500.00$ 0033AH 24" Elbow (22.5 or 45 degree) 1 EA 769.46$ 769.46$ 450.00$ 450.00$ 700.00$ 700.00$ 0033AI Erosion riprap 10 TON 59.64$ 596.40$ 36.00$ 360.00$ 140.00$ 1,400.00$

TOTAL YEAR 3 379,481.41$ 459,440.30$ 433,187.00$

0034 Earthwork 0034AA Topsoil Borrow 100 CY 37.80$ 3,780.00$ 11.50$ 1,150.00$ 66.00$ 6,600.00$ 0034AB Unclassified Excavation 500 CY 20.51$ 10,254.60$ 3.75$ 1,875.00$ 24.00$ 12,000.00$ 0034AC Rock Excavation 10 CY 78.67$ 786.67$ 10.00$ 100.00$ 300.00$ 3,000.00$ 0034AD Embankment Borrow Material 500 CY 22.33$ 11,164.50$ 9.00$ 4,500.00$ 30.00$ 15,000.00$

0034AE Select Granular Material 10 Ton 35.44$ 354.40$ 10.50$ 105.00$ 50.00$ 500.00$ 0034AF Overhaul 1 CY/MI 0.57$ 0.57$ 0.30$ 0.30$ 12.00$ 12.00$ 0035 Geotextile Fabric 0035AA Supplied in Place 300 SQ.YD. 6.48$ 1,944.00$ 2.25$ 675.00$ 5.00$ 1,500.00$ 0036 Cold Milling of Bituminous Pavement 0036AA AC 2" mill salvage & stockpile 2,500 SY 3.22$ 8,046.00$ 12.50$ 31,250.00$ 5.00$ 12,500.00$ 0036AB AC 4" mill salvage & stockpile 2,500 SY 4.22$ 10,543.50$ 12.50$ 31,250.00$ 6.00$ 15,000.00$ 0037 Crack Sealing 0037AA Asphalt 2,000 LF 2.03$ 4,050.00$ 6.25$ 12,500.00$ 2.25$ 4,500.00$ 0038 Aggregate Base Course 0038AA First 1,000 tons (stockpiled) 1,000 TON 23.22$ 23,220.00$ 12.50$ 12,500.00$ 28.00$ 28,000.00$ 0038AB Over 1,000 tons (stockpiled) 1,000 TON 23.22$ 23,220.00$ 12.00$ 12,000.00$ 28.00$ 28,000.00$ 0038AC Agg. (supplied-in-place) 1,000 TON 33.48$ 33,480.00$ 16.00$ 16,000.00$ 38.00$ 38,000.00$ 0039 Bituminous Surface Treatment 0039AA Single 10,000 SQ.YD. 6.21$ 62,100.00$ 7.25$ 72,500.00$ 6.00$ 60,000.00$ 0040 Hot Mix Asphalt -$ -$ -$ 0040AA Pave Gravel Surface 400 TON 170.10$ 68,040.00$ 265.00$ 106,000.00$ 160.00$ 64,000.00$ 0040AB Overlay Paved Surface 400 TON 170.10$ 68,040.00$ 265.00$ 106,000.00$ 160.00$ 64,000.00$ 0040AC Patch (4" deep) 400 SQ.FT. 8.50$ 3,402.00$ 15.00$ 6,000.00$ 7.75$ 3,100.00$ 0041 Concrete Work -$ -$ -$ 0041AA Pavement 4" thick 1,000 SQ.FT. 10.26$ 10,260.00$ 4.25$ 4,250.00$ 10.50$ 10,500.00$ 0041AB Pavement 6" thick 1,000 SQ.FT. 12.69$ 12,690.00$ 5.50$ 5,500.00$ 11.50$ 11,500.00$ 0041AC Curb & Gutter (Cast) 100 FT 50.76$ 5,076.00$ 35.00$ 3,500.00$ 50.00$ 5,000.00$ 0041AD Rebar 500 FT 2.03$ 1,012.50$ 9.50$ 4,750.00$ 1.50$ 750.00$ 0042 Pavement Markings -$ -$ -$ 0042AA Shoulder Striping 4" 10,000 FT 0.73$ 7,290.00$ 1.05$ 10,500.00$ 0.75$ 7,500.00$ 0042AB Centerline Striping 4" 5,000 FT 0.73$ 3,645.00$ 1.05$ 5,250.00$ 0.75$ 3,750.00$ 0042AC Parking Area Striping 300 FT 2.57$ 769.50$ 2.40$ 720.00$ 6.00$ 1,800.00$ 0042AD Stop Line Striping (12") 20 FT 42.12$ 842.40$ 50.00$ 1,000.00$ 40.00$ 800.00$ 0042AE Handicap & Misc. Symbols 2 EA 244.62$ 489.24$ 260.00$ 520.00$ 225.00$ 450.00$ 0043 Seeding -$ -$ -$ 0043AA Seeding 300 SQ. YD. 3.24$ 972.00$ 5.25$ 1,575.00$ 2.25$ 675.00$ 0043AB Erosion Blanket 300 SQ. YD. 2.75$ 826.50$ 3.25$ 975.00$ 10.00$ 3,000.00$ 0044 Storm Drainage Piping - Installed -$ -$ -$ 0044AA 18" CMP 0'-10' Deep 20 FT 54.54$ 1,090.80$ 45.00$ 900.00$ 275.00$ 5,500.00$ 0044AB 18" CMP 10'-20' Deep 20 FT 61.02$ 1,220.40$ 65.00$ 1,300.00$ 400.00$ 8,000.00$ 0044AC Flared End 1 EA 642.60$ 642.60$ 400.00$ 400.00$ 475.00$ 475.00$ 0044AD Elbow (22.5 or 45 degree) 1 EA 586.44$ 586.44$ 350.00$ 350.00$ 675.00$ 675.00$ 0044AE 24" CMP 0'-10' Deep 20 FT 65.88$ 1,317.60$ 65.00$ 1,300.00$ 300.00$ 6,000.00$ 0044AF 24" CMP 10'-20' Deep 20 FT 75.06$ 1,501.20$ 85.00$ 1,700.00$ 425.00$ 8,500.00$ 0044AG Flared End 1 EA 783.00$ 783.00$ 500.00$ 500.00$ 500.00$ 500.00$ 0044AH 24" Elbow (22.5 or 45 degree) 1 EA 780.30$ 780.30$ 450.00$ 450.00$ 700.00$ 700.00$ 0044AI Erosion riprap 10 TON 60.48$ 604.80$ 36.00$ 360.00$ 140.00$ 1,400.00$

TOTAL YEAR 4 384,826.22$ 460,205.30$ 433,187.00$

0045 Earthwork 0045AA Topsoil Borrow 100 CY 38.85$ 3,885.00$ 11.50$ 1,150.00$ 66.00$ 6,600.00$ 0045AB Unclassified Excavation 500 CY 21.08$ 10,539.45$ 3.75$ 1,875.00$ 24.00$ 12,000.00$ 0045AC Rock Excavation 10 CY 80.85$ 808.52$ 10.00$ 100.00$ 300.00$ 3,000.00$ 0045AD Embankment Borrow Material 500 CY 22.95$ 11,474.63$ 9.00$ 4,500.00$ 30.00$ 15,000.00$ 0045AE Select Granular Material 10 Ton 36.42$ 364.25$ 10.50$ 105.00$ 50.00$ 500.00$ 0045AF Overhaul 1 CY/MI 0.58$ 0.58$ 0.30$ 0.30$ 12.00$ 12.00$ 0046 Geotextile Fabric 0046AA Supplied in Place 300 SQ.YD. 6.66$ 1,998.00$ 2.25$ 675.00$ 5.00$ 1,500.00$ 0047 Cold Milling of Bituminous Pavement 0047AA AC 2" mill salvage & stockpile 2,500 SY 3.31$ 8,269.50$ 12.50$ 31,250.00$ 5.00$ 12,500.00$ 0047AB AC 4" mill salvage & stockpile 2,500 SY 4.33$ 10,836.38$ 12.50$ 31,250.00$ 6.00$ 15,000.00$ 0048 Crack Sealing

0048AA Asphalt 2,000 SF 2.08$ 4,162.50$ 6.25$ 12,500.00$ 2.25$ 4,500.00$ 0049 Aggregate Base Course 0049AA First 1,000 tons (stockpiled) 1,000 TON 23.87$ 23,865.00$ 12.50$ 12,500.00$ 28.00$ 28,000.00$ 0049AB Over 1,000 tons (stockpiled) 1,000 TON 23.87$ 23,865.00$ 12.00$ 12,000.00$ 28.00$ 28,000.00$ 0049AC Agg. (supplied-in-place) 1,000 TON 34.41$ 34,410.00$ 16.00$ 16,000.00$ 38.00$ 38,000.00$ 0050 Bituminous Surface Treatment 0050AA Single 10,000 SQ.YD. 6.38$ 63,825.00$ 7.25$ 72,500.00$ 6.00$ 60,000.00$ 0051 Hot Mix Asphalt -$ -$ -$ 0051AA Pave Gravel Surface 400 TON 174.83$ 69,930.00$ 265.00$ 106,000.00$ 160.00$ 64,000.00$ 0051AB Overlay Paved Surface 400 TON 174.83$ 69,930.00$ 265.00$ 106,000.00$ 160.00$ 64,000.00$ 0051AC Patch (4" deep) 400 SQ.FT. 8.74$ 3,496.50$ 15.00$ 6,000.00$ 7.75$ 3,100.00$ 0052 Concrete Work -$ -$ -$ 0052AA Pavement 4" thick 1,000 SQ.FT. 10.55$ 10,545.00$ 4.25$ 4,250.00$ 10.50$ 10,500.00$ 0052AB Pavement 6" thick 1,000 SQ.FT. 13.04$ 13,042.50$ 5.50$ 5,500.00$ 11.50$ 11,500.00$ 0052AC Curb & Gutter (Cast) 100 FT 52.17$ 5,217.00$ 35.00$ 3,500.00$ 50.00$ 5,000.00$ 0052AD Rebar 500 FT 2.08$ 1,040.63$ 9.50$ 4,750.00$ 1.50$ 750.00$ 0053 Pavement Markings -$ -$ -$ 0053AA Shoulder Striping 4" 10,000 FT 0.75$ 7,492.50$ 1.10$ 11,000.00$ 0.75$ 7,500.00$ 0053AB Centerline Striping 4" 5,000 FT 0.75$ 3,746.25$ 1.10$ 5,500.00$ 0.75$ 3,750.00$ 0053AC Parking Area Striping 300 FT 2.64$ 790.88$ 2.45$ 735.00$ 6.00$ 1,800.00$ 0053AD Stop Line Striping (12") 20 FT 43.29$ 865.80$ 50.00$ 3,500.00$ 40.00$ 800.00$ 0053AE Handicap & Misc. Symbols 2 EA 251.42$ 502.83$ 260.00$ 4,750.00$ 225.00$ 450.00$ 0054 Seeding -$ -$ -$ 0054AA Seeding 300 SQ. YD. 3.33$ 999.00$ 5.25$ 1,575.00$ 2.25$ 675.00$ 0054AB Erosion Blanket 300 SQ. YD. 2.83$ 849.15$ 3.25$ 975.00$ 10.00$ 3,000.00$ 0055 Storm Drainage Piping - Installed -$ -$ -$ 0055AA 18" CMP 0'-10' Deep 20 FT 56.06$ 1,121.10$ 45.00$ 900.00$ 275.00$ 5,500.00$ 0055AB 18" CMP 10'-20' Deep 20 FT 62.72$ 1,254.30$ 65.00$ 1,300.00$ 400.00$ 8,000.00$ 0055AC Flared End 1 EA 660.45$ 660.45$ 400.00$ 400.00$ 475.00$ 475.00$ 0055AD Elbow (22.5 or 45 degree) 1 EA 602.73$ 602.73$ 350.00$ 350.00$ 675.00$ 675.00$ 0055AE 24" CMP 0'-10' Deep 20 FT 67.71$ 1,354.20$ 65.00$ 1,300.00$ 300.00$ 6,000.00$ 0055AF 24" CMP 10'-20' Deep 20 FT 77.15$ 1,542.90$ 85.00$ 1,700.00$ 425.00$ 8,500.00$ 0055AG Flared End 1 EA 804.75$ 804.75$ 500.00$ 500.00$ 500.00$ 500.00$ 0055AH 24" Elbow (22.5 or 45 degree) 1 EA 801.98$ 801.98$ 450.00$ 450.00$ 700.00$ 700.00$ 0055AI Erosion riprap 10 TON 62.16$ 621.60$ 36.00$ 360.00$ 140.00$ 1,400.00$

TOTAL YEAR 5 365,247.80$ 460,970.30$ 433,187.00$

TOTAL 1,852,886.20$ 2,297,201.50$ 2,165,935.00$

B. BID SECURITY (Type & Amount)

A B C D. E. D. E. D. E. D. E.

ITEM # EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT

0001AA 100 CY 25.00$ 2,500.00$ 20.00$ 2,000.00$ 200.00$ 20,000.00$

0001AB 500 CY 16.00$ 8,000.00$ 15.00$ 7,500.00$ 80.00$ 40,000.00$

0001AC 10 CY 20.00$ 200.00$ 100.00$ 1,000.00$ 250.00$ 2,500.00$

0001AD 500 CY 25.00$ 12,500.00$ 19.00$ 9,500.00$ 150.00$ 75,000.00$

0001AE 10 Ton 60.00$ 600.00$ 25.00$ 250.00$ 150.00$ 1,500.00$

0001AF 1 CY/MI 300.00$ 300.00$ 3.00$ 3.00$ 100.00$ 100.00$

0002AA 300 SQ.YD. 15.00$ 4,500.00$ 5.00$ 1,500.00$ 30.00$ 9,000.00$

0003AA 2,500 SY 15.00$ 37,500.00$ 4.00$ 10,000.00$ 12.00$ 30,000.00$

0003AB 2,500 SY 15.00$ 37,500.00$ 5.00$ 12,500.00$ 18.00$ 45,000.00$

0004AA 2,000 SF 4.00$ 8,000.00$ 2.00$ 4,000.00$ 7.00$ 14,000.00$

0005AA 1,000 TON 30.00$ 30,000.00$ 22.00$ 22,000.00$ 45.00$ 45,000.00$

0005AB 1,000 TON 26.00$ 26,000.00$ 20.00$ 20,000.00$ 45.00$ 45,000.00$

0005AC 1,000 TON 40.00$ 40,000.00$ 24.00$ 24,000.00$ 60.00$ 66,000.00$

0006AA 10,000 SQ.YD. 3.00$ 30,000.00$ 4.80$ 48,000.00$ 2.82$ 28,200.00$

0007AA 400 TON 220.00$ $88,000 180.00$ 72,000.00$ 300.00$ 120,000.00$

0007AB 400 TON 240.00$ 96,000.00$ 180.00$ 72,000.00$ 300.00$ 12,000.00$

0007AC 400 SQ.FT. 12.00$ 4,800.00$ 8.00$ 3,200.00$ 30.00$ 12,000.00$

0008AA 1,000 SQ.FT. 10.00$ 1,000.00$ 6.50$ 6,500.00$ 30.00$ 30,000.00$

0008AB 1,000 SQ.FT. 15.00$ 15,000.00$ 7.50$ 7,500.00$ 60.00$ 60,000.00$

0008AC 100 FT 50.00$ 5,000.00$ 35.00$ 3,500.00$ 100.00$ 10,000.00$

0008AD 500 FT 1.00$ $500 2.00$ 1,000.00$ 10.00$ 5,000.00$

0009AA 10,000 FT 0.72$ 7,200.00$ 0.80$ 8,000.00$ 3.00$ 30,000.00$

0009AB 5,000 FT 0.72$ 3,600.00$ 0.80$ 4,000.00$ 3.00$ 15,000.00$

0009AC 300 FT 2.52$ 756.00$ 2.75$ 825.00$ 5.00$ 1,500.00$

0009AD 20 FT 48.00$ 960.00$ 52.00$ 1,040.00$ 10.00$ 200.00$

0009AE 2 EA 246.00$ 492.00$ 267.00$ 534.00$ 200.00$ 400.00$

0010AA 300 SQ. YD. 8.00$ 2,400.00$ 1.00$ 300.00$ 20.00$ 6,000.00$

0010AB 300 SQ. YD. 8.00$ 2,400.00$ 5.00$ 1,500.00$ 20.00$ 6,000.00$

C. AMENDMENTS ACKNOWLEDGED

B. BID SECURITY (Type & Amount)

N/A B. BID SECURITY (Type & Amount)

939 Sajakeed Dr St.Louis, MO 63129

PO Box 580 Ft. Pierre, SD 57532

C. AMENDMENTS ACKNOWLEDGED

PO Box 561 Relliance, SD 57569

C. AMENDMENTS ACKNOWLEDGED3. CONTRACT ITEMS

4. OFFERS (Continued)

NO. 3

A. OFFEROR

ABSTRACT OF OFFERS -

CONTINUATION SHEET

CONSTRUCTION

Big Bend IDCC Road Maintenance

2. PROJECT TITLE

INSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation l PAGES

1. SOLICITATION NUMBER

W9128F-16-B-0014 sheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.

NO. 5

A. OFFEROR

NO. 6

A. OFFEROR

NO. 4

Construction Solutions Group, LLCRP & H INC

A. OFFEROR

Sharpe Enterprises, INC

B. BID SECURITY (Type & Amount)

N/A

C. AMENDMENTS ACKNOWLEDGED

N/A

0011AA 20 FT 80.00$ 1,600.00$ 50.00$ 1,000.00$ 500.00$ 10,000.00$

0011AB 20 FT 140.00$ 2,800.00$ 70.00$ 1,400.00$ 500.00$ 10,000.00$

0011AC 1 EA 600.00$ 600.00$ 350.00$ 350.00$ 2,000.00$ 2,000.00$

0011AD 1 EA 400.00$ $400 400.00$ 400.00$ 1,000.00$ 1,000.00$

0011AE 20 FT 100.00$ 2,000.00$ 60.00$ 1,200.00$ 450.00$ 9,000.00$

0011AF 20 FT 160.00$ 3,200.00$ 80.00$ 1,600.00$ 600.00$ 14,000.00$

0011AG 1 EA 800.00$ 800.00$ 400.00$ 400.00$ 2,500.00$ 2,500.00$

0011AH 1 EA 600.00$ 600.00$ 450.00$ 450.00$ 1,200.00$ 1,200.00$

0011AI 10 TON 80.00$ 800.00$ 65.00$ 650.00$ 100.00$ 1,000.00$

TOTAL YEAR 1 $487,508 351,602.00$ 886,100.00$

0012AA 100 CY 26.75$ 2,675.00$ 20.00$ 2,000.00$ 200.00$ 20,000.00$

0012AB 500 CY 17.12$ 8,560.00$ 15.00$ 7,500.00$ 80.00$ 40,000.00$

0012AC 10 CY 21.40$ 214.00$ 100.00$ 1,000.00$ 250.00$ 2,500.00$

0012AD 500 CY 26.75$ 13,375.00$ 19.00$ 9,500.00$ 150.00$ 75,000.00$

0012AE 10 Ton 64.20$ $642 25.00$ 250.00$ 150.00$ 1,500.00$

0012AF 1 CY/MI 321.00$ 321.00$ 3.00$ 3.00$ 100.00$ 100.00$

0013AA 300 SQ.YD. 16.05$ 4,815.00$ 5.00$ 1,500.00$ 30.00$ 9,000.00$

0014AA 2,500 SY 16.05$ 40,125.00$ 4.00$ 10,000.00$ 12.00$ 30,000.00$

0014AB 2,500 SY 16.05$ 40,125.00$ 5.00$ 12,500.00$ 18.00$ 45,000.00$

0015AA 2,000 SF 4.28$ 8,560.00$ 2.00$ 4,000.00$ 7.00$ 14,000.00$

0016AA 1,000 TON 32.10$ 32,100.00$ 22.00$ 22,000.00$ 45.00$ 45,000.00$

0016AB 1,000 TON 27.82$ 27,820.00$ 20.00$ 20,000.00$ 45.00$ 45,000.00$

0016AC 1,000 TON 42.80$ 42,800.00$ 24.00$ 24,000.00$ 60.00$ 66,000.00$

0017AA 10,000 SQ.YD. 3.21$ $32,100 4.80$ 48,000.00$ 2.82$ 28,200.00$

0018AA 400 TON 235.40$ 94,160.00$ 180.00$ 72,000.00$ 300.00$ 120,000.00$

0018AB 400 TON 256.40$ 102,720.00$ 180.00$ 72,000.00$ 300.00$ 12,000.00$

0018AC 400 SQ.FT. 12.84$ 5,136.00$ 8.00$ 3,200.00$ 30.00$ 12,000.00$

0019AA 1,000 SQ.FT. 10.70$ 10,700.00$ 6.50$ 6,500.00$ 30.00$ 30,000.00$

0019AB 1,000 SQ.FT. 16.05$ $16,050 7.50$ 7,500.00$ 60.00$ 60,000.00$

0019AC 100 FT 5,350.00$ 5,350.00$ 35.00$ 3,500.00$ 100.00$ 10,000.00$

0019AD 500 FT 1.07$ 535.00$ 2.00$ 1,000.00$ 10.00$ 5,000.00$

0020AA 10,000 FT 0.77$ 7,700.00$ 0.80$ 8,000.00$ 3.00$ 30,000.00$

0020AB 5,000 FT 0.77$ 3,850.00$ 0.80$ 4,000.00$ 3.00$ 15,000.00$

0020AC 300 FT 2.70$ 810.00$ 2.75$ 825.00$ 5.00$ 1,500.00$

0020AD 20 FT 51.36$ $1,027 52.00$ 1,040.00$ 10.00$ 200.00$

0020AE 2 EA 263.22$ 526.44$ 267.00$ 534.00$ 200.00$ 400.00$

0021AA 300 SQ. YD. 8.56$ 2,568.00$ 1.00$ 300.00$ 20.00$ 6,000.00$

0021AB 300 SQ. YD. 8.56$ 2,568.00$ 5.00$ 1,500.00$ 20.00$ 6,000.00$

0022AA 20 FT 85.60$ 1,712.00$ 50.00$ 1,000.00$ 500.00$ 10,000.00$

0022AB 20 FT 149.80$ 2,996.00$ 70.00$ 1,400.00$ 500.00$ 10,000.00$

0022AC 1 EA 642.00$ 642.00$ 350.00$ 350.00$ 2,000.00$ 2,000.00$

0022AD 1 EA 428.00$ 428.00$ 400.00$ 400.00$ 1,000.00$ 1,000.00$

0022AE 20 FT 107.00$ 2,140.00$ 60.00$ 1,200.00$ 450.00$ 9,000.00$

0022AF 20 FT 171.20$ 3,424.00$ 80.00$ 1,600.00$ 600.00$ 14,000.00$

0022AG 1 EA 856.00$ 856.00$ 400.00$ 400.00$ 2,500.00$ 2,500.00$

0022AH 1 EA 642.00$ 642.00$ 450.00$ 450.00$ 1,200.00$ 1,200.00$

0022AI 10 TON 85.60$ $856 65.00$ 650.00$ 100.00$ 1,000.00$

TOTAL YEAR 2 521,628.64$ 351,602.00$ 886,100.00$

0023AA 100 CY 28.62$ 2,862.00$ 20.00$ 2,000.00$ 200.00$ 20,000.00$

0023AB 500 CY 18.32$ 9,160.00$ 15.00$ 7,500.00$ 80.00$ 40,000.00$

0023AC 10 CY 22.90$ $229 100.00$ 1,000.00$ 250.00$ 2,500.00$

0023AD 500 CY 28.62$ 14,310.00$ 19.00$ 9,500.00$ 150.00$ 75,000.00$

0023AE 10 Ton 68.69$ 686.90$ 25.00$ 250.00$ 150.00$ 1,500.00$

0023AF 1 CY/MI 343.47$ 343.47$ 3.00$ 3.00$ 100.00$ 100.00$

0024AA 300 SQ.YD. 17.17$ 5,151.00$ 5.00$ 1,500.00$ 30.00$ 9,000.00$

0025AA 2,500 SY 17.17$ $42,925 4.00$ 10,000.00$ 12.00$ 30,000.00$

0025AB 2,500 SY 17.17$ 42,925.00$ 5.00$ 12,500.00$ 18.00$ 45,000.00$

0026AA 2,000 SF 4.58$ 9,160.00$ 2.00$ 4,000.00$ 7.00$ 14,000.00$

0027AA 1,000 TON 34.35$ 34,350.00$ 22.00$ 22,000.00$ 45.00$ 45,000.00$

0027AB 1,000 TON 29.77$ 29,770.00$ 20.00$ 20,000.00$ 45.00$ 45,000.00$

0027AC 1,000 TON 45.80$ $45,800 24.00$ 24,000.00$ 60.00$ 66,000.00$

0028AA 10,000 SQ.YD. 3.43$ 34,300.00$ 4.80$ 48,000.00$ 2.82$ 28,200.00$

0029AA 400 TON 251.88$ 100,752.00$ 180.00$ 72,000.00$ 300.00$ 120,000.00$

0029AB 400 TON 274.78$ 109,912.00$ 180.00$ 72,000.00$ 300.00$ 12,000.00$

0029AC 400 SQ.FT. 13.74$ 5,496.00$ 8.00$ 3,200.00$ 30.00$ 12,000.00$

0030AA 1,000 SQ.FT. 11.40$ 11,450.00$ 6.50$ 6,500.00$ 30.00$ 30,000.00$

0030AB 1,000 SQ.FT. 17.17$ 17,170.00$ 7.50$ 7,500.00$ 60.00$ 60,000.00$

0030AC 100 FT 57.25$ 5,725.00$ 35.00$ 3,500.00$ 100.00$ 10,000.00$

0030AD 500 FT 1.14$ 570.00$ 2.00$ 1,000.00$ 10.00$ 5,000.00$

0031AA 10,000 FT 0.82$ 8,200.00$ 0.80$ 8,000.00$ 3.00$ 30,000.00$

0031AB 5,000 FT 0.82$ $4,100 0.80$ 4,000.00$ 3.00$ 15,000.00$

0031AC 300 FT 2.89$ 867.00$ 2.75$ 825.00$ 5.00$ 1,500.00$

0031AD 20 FT 54.96$ 1,099.20$ 52.00$ 1,040.00$ 10.00$ 200.00$

0031AE 2 EA 281.65$ 563.30$ 267.00$ 534.00$ 200.00$ 400.00$

0032AA 300 SQ. YD. 9.16$ 2,748.00$ 1.00$ 300.00$ 20.00$ 6,000.00$

0032AB 300 SQ. YD. 9.16$ 2,748.00$ 5.00$ 1,500.00$ 20.00$ 6,000.00$

0033AA 20 FT 91.59$ 1,831.80$ 50.00$ 1,000.00$ 500.00$ 10,000.00$

0033AB 20 FT 160.29$ 3,205.80$ 70.00$ 1,400.00$ 500.00$ 10,000.00$

0033AC 1 EA 686.94$ 686.94$ 350.00$ 350.00$ 2,000.00$ 2,000.00$

0033AD 1 EA 457.96$ 457.96$ 400.00$ 400.00$ 1,000.00$ 1,000.00$

0033AE 20 FT 114.49$ 2,289.80$ 60.00$ 1,200.00$ 450.00$ 9,000.00$

0033AF 20 FT 183.18$ 3,663.60$ 80.00$ 1,600.00$ 600.00$ 14,000.00$

0033AG 1 EA 915.92$ $916 400.00$ 400.00$ 2,500.00$ 2,500.00$

0033AH 1 EA 686.94$ 686.94$ 450.00$ 450.00$ 1,200.00$ 1,200.00$

0033AI 10 TON 91.59$ 915.90$ 65.00$ 650.00$ 100.00$ 1,000.00$

TOTAL YEAR 3 558,027.53$ 351,602.00$ 886,100.00$

0034AA 100 CY 30.62$ $3,062 20.00$ 2,000.00$ 200.00$ 20,000.00$

0034AB 500 CY 19.60$ 9,800.00$ 15.00$ 7,500.00$ 80.00$ 40,000.00$

0034AC 10 CY 24.50$ 245.00$ 100.00$ 1,000.00$ 250.00$ 2,500.00$

0034AD 500 CY 30.62$ 15,310.00$ 19.00$ 9,500.00$ 150.00$ 75,000.00$

0034AE 10 Ton 73.50$ 735.00$ 25.00$ 250.00$ 150.00$ 1,500.00$

0034AF 1 CY/MI 367.51$ 367.51$ 3.00$ 3.00$ 100.00$ 100.00$

0035AA 300 SQ.YD. 18.37$ $5,511 5.00$ 1,500.00$ 30.00$ 9,000.00$

0036AA 2,500 SY 18.37$ 45,925.00$ 4.00$ 10,000.00$ 12.00$ 30,000.00$

0036AB 2,500 SY 18.37$ 45,925.00$ 5.00$ 12,500.00$ 18.00$ 45,000.00$

0037AA 2,000 SF 4.90$ 9,800.00$ 2.00$ 4,000.00$ 7.00$ 14,000.00$

0038AA 1,000 TON 36.75$ $36,750 22.00$ 22,000.00$ 45.00$ 45,000.00$

0038AB 1,000 TON 31.85$ 31,850.00$ 20.00$ 20,000.00$ 45.00$ 45,000.00$

0038AC 1,000 TON 49.01$ 49,010.00$ 24.00$ 24,000.00$ 60.00$ 66,000.00$

0039AA 10,000 SQ.YD. 3.67$ 36,700.00$ 4.80$ 48,000.00$ 2.82$ 28,200.00$

0040AA 400 TON 269.51$ 107,804.00$ 180.00$ 72,000.00$ 300.00$ 120,000.00$

0040AB 400 TON 294.01$ $117,604 180.00$ 72,000.00$ 300.00$ 12,000.00$

0040AC 400 SQ.FT. 14.70$ 5,880.00$ 8.00$ 3,200.00$ 30.00$ 12,000.00$

0041AA 1,000 SQ.FT. 12.25$ 12,250.00$ 6.50$ 6,500.00$ 30.00$ 30,000.00$

0041AB 1,000 SQ.FT. 18.37$ 18,370.00$ 7.50$ 7,500.00$ 60.00$ 60,000.00$

0041AC 100 FT 61.26$ 6,126.00$ 35.00$ 3,500.00$ 100.00$ 10,000.00$

0041AD 500 FT 1.22$ 610.00$ 2.00$ 1,000.00$ 10.00$ 5,000.00$

0042AA 10,000 FT 0.88$ 8,800.00$ 0.80$ 8,000.00$ 3.00$ 30,000.00$

0042AB 5,000 FT 0.88$ 4,400.00$ 0.80$ 4,000.00$ 3.00$ 15,000.00$

0042AC 300 FT 3.09$ 927.00$ 2.75$ 825.00$ 5.00$ 1,500.00$

0042AD 20 FT 58.81$ 1,176.20$ 52.00$ 1,040.00$ 10.00$ 200.00$

0042AE 2 EA 301.37$ 602.74$ 267.00$ 534.00$ 200.00$ 400.00$

0043AA 300 SQ. YD. 9.80$ $2,940 1.00$ 300.00$ 20.00$ 6,000.00$

0043AB 300 SQ. YD. 9.80$ 2,940.00$ 5.00$ 1,500.00$ 20.00$ 6,000.00$

0044AA 20 FT 98.00$ 1,960.00$ 50.00$ 1,000.00$ 500.00$ 10,000.00$

0044AB 20 FT 171.51$ 3,430.20$ 70.00$ 1,400.00$ 500.00$ 10,000.00$

0044AC 1 EA 735.03$ 735.03$ 350.00$ 350.00$ 2,000.00$ 2,000.00$

0044AD 1 EA 490.02$ 490.02$ 400.00$ 400.00$ 1,000.00$ 1,000.00$

0044AE 20 FT 122.50$ $2,450 60.00$ 1,200.00$ 450.00$ 9,000.00$

0044AF 20 FT 196.00$ 3,920.00$ 80.00$ 1,600.00$ 600.00$ 14,000.00$

0044AG 1 EA 980.03$ 980.03$ 400.00$ 400.00$ 2,500.00$ 2,500.00$

0044AH 1 EA 735.03$ 735.03$ 450.00$ 450.00$ 1,200.00$ 1,200.00$

0044AI 10 TON 98.00$ 980.00$ 65.00$ 650.00$ 100.00$ 1,000.00$

TOTAL YEAR 4 597,100.76$ 351,602.00$ 886,100.00$

0045AA 100 CY 32.76$ 3,276.00$ 20.00$ 2,000.00$ 200.00$ 20,000.00$

0045AB 500 CY 20.97$ 10,485.00$ 15.00$ 7,500.00$ 80.00$ 40,000.00$

0045AC 10 CY 26.22$ 262.20$ 100.00$ 1,000.00$ 250.00$ 2,500.00$

0045AD 500 CY 32.76$ 16,380.00$ 19.00$ 9,500.00$ 150.00$ 75,000.00$

0045AE 10 Ton 78.65$ 786.50$ 25.00$ 250.00$ 150.00$ 1,500.00$

0045AF 1 CY/MI 393.24$ $393 3.00$ 3.00$ 100.00$ 100.00$

0046AA 300 SQ.YD. 19.66$ 5,898.00$ 5.00$ 1,500.00$ 30.00$ 9,000.00$

0047AA 2,500 SY 19.66$ 49,150.00$ 4.00$ 10,000.00$ 12.00$ 30,000.00$

0047AB 2,500 SY 19.66$ 49,150.00$ 5.00$ 12,500.00$ 18.00$ 45,000.00$

0048AA 2,000 SF 5.24$ $10,480 2.00$ 4,000.00$ 7.00$ 14,000.00$

0049AA 1,000 TON 36.32$ 39,320.00$ 22.00$ 22,000.00$ 45.00$ 45,000.00$

0049AB 1,000 TON 34.08$ 34,080.00$ 20.00$ 20,000.00$ 45.00$ 45,000.00$

0049AC 1,000 TON 52.44$ 52,440.00$ 24.00$ 24,000.00$ 60.00$ 66,000.00$

0050AA 10,000 SQ.YD. 3.93$ 39,300.00$ 4.80$ 48,000.00$ 2.82$ 28,200.00$

0051AA 400 TON 288.38$ 115,352.00$ 180.00$ 72,000.00$ 300.00$ 120,000.00$

0051AB 400 TON 314.59$ 125,836.00$ 180.00$ 72,000.00$ 300.00$ 12,000.00$

0051AC 400 SQ.FT. 15.73$ 6,292.00$ 8.00$ 3,200.00$ 30.00$ 12,000.00$

0052AA 1,000 SQ.FT. 13.11$ 13,110.00$ 6.50$ 6,500.00$ 30.00$ 30,000.00$

0052AB 1,000 SQ.FT. 19.66$ 19,660.00$ 7.50$ 7,500.00$ 60.00$ 60,000.00$

0052AC 100 FT 65.55$ 6,555.00$ 35.00$ 3,500.00$ 100.00$ 10,000.00$

0052AD 500 FT 1.31$ 655.00$ 2.00$ 1,000.00$ 10.00$ 5,000.00$

0053AA 10,000 FT 0.94$ 9,400.00$ 0.80$ 8,000.00$ 3.00$ 30,000.00$

0053AB 5,000 FT 0.94$ $4,700 0.80$ 4,000.00$ 3.00$ 15,000.00$

0053AC 300 FT 3.31$ 993.00$ 2.75$ 825.00$ 5.00$ 1,500.00$

0053AD 20 FT 62.93$ 1,258.60$ 52.00$ 1,040.00$ 10.00$ 200.00$

0053AE 2 EA 322.47$ 644.94$ 267.00$ 534.00$ 200.00$ 400.00$

0054AA 300 SQ. YD. 10.49$ 3,147.00$ 1.00$ 300.00$ 20.00$ 6,000.00$

0054AB 300 SQ. YD. 10.49$ 3,147.00$ 5.00$ 1,500.00$ 20.00$ 6,000.00$

0055AA 20 FT 104.86$ 2,097.20$ 50.00$ 1,000.00$ 500.00$ 10,000.00$

0055AB 20 FT 183.52$ 3,670.40$ 70.00$ 1,400.00$ 500.00$ 10,000.00$

0055AC 1 EA 786.48$ 786.48$ 350.00$ 350.00$ 2,000.00$ 2,000.00$

0055AD 1 EA 524.32$ 524.32$ 400.00$ 400.00$ 1,000.00$ 1,000.00$

0055AE 20 FT 131.08$ 2,621.60$ 60.00$ 1,200.00$ 450.00$ 9,000.00$

0055AF 20 FT 209.72$ 4,194.40$ 80.00$ 1,600.00$ 600.00$ 14,000.00$

0055AG 1 EA 1,048.63$ $1,049 400.00$ 400.00$ 2,500.00$ 2,500.00$

0055AH 1 EA 786.48$ 786.48$ 450.00$ 450.00$ 1,200.00$ 1,200.00$

0055AI 10 TON 104.86$ 1,048.60$ 65.00$ 650.00$ 100.00$ 1,000.00$

TOTAL YEAR 5 638,929.59$ 351,602.00$ 886,100.00$

Total Amt 2,803,194.52$ 1,758,010.00$ 4,430,500.00$ -$