Q A_1_15_16.pdf

PDF 67 KB Posted

Attached to
Rehab Little Papillion Creek
Solicitation number
W9128F-16-B-0001
Issued by

View the file

Other files

File Type Posted
W9128F-16-C-0012.pdf PDF
COMPLETED_ABSTRACT_W9128F-16-B-0001.pdf PDF
Am0003.pdf PDF
Am0003_Dwgs.pdf PDF
Am0002.pdf PDF
Am0002_Dwgs.pdf PDF
Additional_Little_Papio_Contractor_Q A.pdf PDF
Am0001_Dwgs.pdf PDF
Am0001.pdf PDF
16-B-0001_Little_Papio_Dwgs.pdf PDF
16-B-0001_Little_Papio_Near_NFM_Specs.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions 01/15/2016 From CTI Companies

1. Drawing Sheet CG501 indicates a 5’ stainless steel sump at bottom of relief well.

The specified elevations do not match, please clarify.

See Amendment 0003 Drawing CG501, Elevation was changed to from 945 to

950.

2. Please clarify the gradation of the riprap, specifically the top size which is required at 100% lighter.

See Amendment 0003, Sieve sizes for the stone weights were added.

3. Is there a need for contractor grading at the disposal site for excavated soil ?

See Amendment 0003, Drawing GI101.

File details come from the government source that posted it. Updated .