2. DATE ISSUED 3. DATE OPENED
18-Sep-14 28-Oct-14
I CERTIFY THAT I HAVE OPENED, READ AND
AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED
X C. REASONABLE CONTRACT
7A 7B 7C D. E. F.
ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE EXTENDED AMOUNT UNIT PRICE EXTENDED AMOUNT UNIT PRICE EXTENDED AMOUNT
All Work Complete for Contractor Supplies Topsoil Placement as shown on the Drawings and in the specifications 30,000 CY $7.85 $235,500.00 $17.50 $525,000.00 $20.99 $629,700.00
All Work Complete for Topsoil from Stripping Placement as shown on the Drawings and in the specifications 8,500 CY $2.65 $22,525.00 $6.00 $51,000.00 $6.34 $53,890.00
All Work Complete for East Bank-West Chute Topsoil Excavation, Hauling, and Placement as shown on the drawings and in the 13,500 CY $5.45 $73,575.00 $4.00 $54,000.00 $34.60 $467,100.00
All Work Complete for Random Fill Excavation and Placement North of Road E as shown on the drawings and in the specifications 60,000 CY $2.40 $144,000.00 $3.40 $204,000.00 $4.95 $297,000.00
All Work Complete for East Bank-West Chute Random Fill Excavation, Hauling, and Placement for North of Road E as shown on 4,250 CY $5.80 $24,650.00 $8.00 $34,000.00 $41.02 $174,335.00
All Work Complete for Contractor Supplied Random Fill for North of Road E as shown on the drawings and in the specifications 40,000 CY $7.30 $292,000.00 $21.50 $860,000.00 $7.43 $297,200.00
All Work Complete for Random Fill Excavation and Placement South of Road E as shown on the drawings and in the specifications 25,000 CY $2.40 $60,000.00 $3.00 $75,000.00 $7.45 $186,250.00
All Work Complete for Random Fill Disposal South of Road E as shown on the drawings and in the specifications 15,000 CY $4.00 $60,000.00 $21.00 $315,000.00 $7.50 $112,500.00
All Work complete for Levee Surfacing as shown on the drawings and in the specifications 7,500 Ton $25.25 $189,375.00 $22.00 $165,000.00 $39.62 $297,150.00
All Work complete for Camp Ashland Culvert Replacement as shown on the drawings and in the specifications 1 Job $107,477.00 $290,000.00 $77,376.00
All Work complete for Lyman-Richey Lake Area Culverts as shown on the drawings and in the specifications 7 Job $359,863.00 $100,000.00 $260,051.00
All Work complete for Sheetpile as shown on the drawings and in the specifications 6,900 SF $36.55 $252,195.00 $60.00 $414,000.00 $34.90 $240,810.00
All Work complete for Flexible Concrete Block Erosion Control Mat as shown on the drawings and in the specifications 141,000 SF $8.15 $1,149,150.00 $6.00 $846,000.00 $5.82 $820,620.00
All Work complete for Surface Erosion Control Material as shown on the drawings and in the specifications 35,000 SY $4.65 $162,750.00 $2.00 $70,000.00 $0.87 $30,450.00
All Work complete for Geogrid as shown on the drawings and in the specifications 12,000 SY $6.30 $75,600.00 $4.00 $48,000.00 $3.36 $40,320.00
All Work compolete for East Bank-West Chute Riprap as shown on the drawings and in the specifications 100 Ton $35.80 $3,580.00 $260.00 $26,000.00 $107.00 $10,700.00
All Work complete for Rubble Pile Relocation as shown on the drawings 3,000 CY $12.25 $36,750.00 $11.00 $33,000.00 $16.54 $49,620.00
All Work complete for Seeding as shown on the drawings and in the specifications 95 Acre $1,935.00 $183,825.00 $2,000.00 $190,000.00 $1,046.00 $99,370.00
0019 All Remaining Work (Excluding Items 0001 through 0018) 1 Job $920,270.00 $350,000.00 $602,230.00
TOTAL $4,353,085.00 $4,650,000.00 $4,746,672.00
OMAHA, NE 68102-1618
1616 CAPITOL AVENUE
CONTRACTING DIVISION (CENWO-CT)
US ARMY CORPS OF ENGINEERS
l PAGES
9. OFFERS
TO THIS SOLICITATION
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type) Patricia M. Overgaard
NO. 1 NO. 2
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
W9128F-14-B-0032
4. ISSUING OFFICE
8. GOVERNMENT ESTIMATE
(Check A, B or C AND COMPLETE D, E AND F)
5. PROJECT TITLE
(Without Profit)
(Including Profit)
A. OFFEROR A. OFFEROR
302 W. 5th St. Suite 310 3131 South College Avenue, Suite B
A. HIRED LABOR
CKY American Contracting, LLC
San Pedro, CA 90731 Fort Collins, CO 80525
B. REASONABLE CONTRACT
20% 20%
4 46. NUMBER OF AMENDMENTS ISSUED --- 0004
Clear Creek Levee Improvement Project, Segment 5 Platte River, Sarpy and Saunders Counties, Nebraska
B. BID SECURITY (Type & Amount)
A B C D. E. F. E. F. E. F. E. F.
ITEM # DESCRIPTION EST. QTY UNIT UNIT PRICE EXTENDED AMOUNT UNIT PRICE EXTENDED AMOUNT UNIT PRICE EXTENDED AMOUNT UNIT PRICE EXTENDED AMOUNT
All Work Complete for Contractor Supplies Topsoil Placement as shown on the Drawings and in the specifications 30,000 CY $13.85 $415,500.00 $10.00 $300,000.00 $13.95 $418,500.00 $23.50 $705,000.00
All Work Complete for Topsoil from Stripping Placement as shown on the Drawings and in the specifications 8,500 CY $6.85 $58,225.00 $5.00 $42,500.00 $5.85 $49,725.00 $6.15 $52,275.00
Hauling, and Placement as shown on the drawings and in the specifications 13,500 CY $12.00 $162,000.00 $12.00 $162,000.00 $14.49 $195,615.00 $15.00 $202,500.00
All Work Complete for Random Fill Excavation and Placement North of Road E as shown on the drawings and in the specifications 60,000 CY $7.75 $465,000.00 $6.00 $360,000.00 $4.62 $277,200.00 $6.58 $394,800.00
All Work Complete for East Bank-West Chute Random Fill Excavation, Hauling, and Placement for North of Road E as shown on the drawings 4,250 CY $13.25 $56,312.50 $15.00 $63,750.00 $15.92 $67,660.00 $15.00 $63,750.00
All Work Complete for Contractor Supplied Random Fill for North of Road E as shown on the drawings and in the specifications 40,000 CY $7.75 $310,000.00 $9.00 $360,000.00 $10.11 $404,400.00 $10.90 $436,000.00
All Work Complete for Random Fill Excavation and Placement South of Road E as shown on the drawings and in the specifications 25,000 CY $7.35 $183,750.00 $10.00 $250,000.00 $4.62 $115,500.00 $6.75 $168,750.00
All Work Complete for Random Fill Disposal South of Road E as shown on the drawings and in the specifications 15,000 CY $5.20 $78,000.00 $5.00 $75,000.00 $7.36 $110,400.00 $4.60 $69,000.00
All Work complete for Levee Surfacing as shown on the drawings and in the specifications 7,500 Ton $26.00 $195,000.00 $24.00 $180,000.00 $33.99 $254,925.00 $28.00 $210,000.00
All Work complete for Camp Ashland Culvert Replacement as shown on the drawings and in the specifications 1 Job $45,500.00 $65,000.00 $133,729.58 $225,000.00
All Work complete for Lyman-Richey Lake Area Culverts as shown on the drawings and in the specifications 7 Job $157,500.00 $315,000.00 $456,321.39 $1,295,000.00
All Work complete for Sheetpile as shown on the drawings and in the specifications 6,900 SF $26.75 $184,575.00 $50.00 $345,000.00 $25.32 $174,708.00 $75.00 $517,500.00
All Work complete for Flexible Concrete Block Erosion Control Mat as shown on the drawings and in the specifications 141,000 SF $13.00 $1,833,000.00 $6.00 $846,000.00 $6.74 $950,340.00 $5.78 $814,980.00
All Work complete for Surface Erosion Control Material as shown on the drawings and in the specifications 35,000 SY $1.20 $42,000.00 $1.00 $35,000.00 $1.02 $35,700.00 $2.85 $99,750.00
All Work complete for Geogrid as shown on the drawings and in the specifications 12,000 SY $3.20 $38,400.00 $1.50 $18,000.00 $1.79 $21,480.00 $2.25 $27,000.00
All Work compolete for East Bank-West Chute Riprap as shown on the drawings and in the specifications 100 Ton $55.00 $5,500.00 $50.00 $5,000.00 $56.61 $5,661.00 $95.00 $9,500.00
0017 All Work complete for Rubble Pile Relocation as shown on the drawings 3,000 CY $5.00 $15,000.00 $10.00 $30,000.00 $5.77 $17,310.00 $35.00 $105,000.00
All Work complete for Seeding as shown on the drawings and in the specifications 95 Acre $1,350.00 $128,250.00 $700.00 $66,500.00 $948.14 $90,073.30 $1,800.00 $171,000.00
0019 All Remaining Work (Excluding Items 0001 through 0018) 1 Job $450,000.00 $640,000.00 $789,145.97 $1,137,800.00
TOTAL $4,823,512.50 $4,158,750.00 $4,568,394.24 $6,704,605.00
K&L Landscape & Construction
B. BID SECURITY (Type & Amount)
C. AMENDMENTS ACKNOWLEDGED
20%
NO. 5
A. OFFEROR
NO. 6
A. OFFEROR
NO. 4
Valley Corp. General ContractorsHarding Enterprises, LLC Commercial Contractors Equipment Inc.
A. OFFEROR
INSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation l PAGES
1. SOLICITATION NUMBER
sheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.
4. OFFERS (Continued)
NO. 3
A. OFFEROR
ABSTRACT OF OFFERS -
CONTINUATION SHEET
CONSTRUCTION
Platte River, Sarpy and Saunders Counties, Nebraska
2. PROJECT TITLE
Clear Creek Levee Improvement Project, Segment 5
3. CONTRACT ITEMS
Valley, NE 68064-0589 501 South Ridge Road, P.O. Box 1040 Sergeant Bluff, IA 51054
C. AMENDMENTS ACKNOWLEDGED
2320 Columbia Avenue, PO Box 1227 Prentiss, MS 39474
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
701 NW 27th Street, P.O. Box 81036 Lincoln, NE 68501
B. BID SECURITY (Type & Amount)
20% B. BID SECURITY (Type & Amount)
20%
28001 Ida Circle, P.O. Box 589
| PAGE1 |
| PAGE2 |
| 2014-10-29T14:57:05-0500 | |
| OVERGAARD.PATRICIA.M.1231360677 |
File details come from the government source that posted it. Updated .