ABSTRACT_W9128F-14-B-0018.pdf
PDF 20 KB Posted
- Attached to
- IDCC Road Rehab For Oahe Dam-Lake Oahe, SD
- Solicitation number
- W9128F-14-B-0018
About this file
Abstract W9128F-14-B-0018
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED
15-May-14 16-Jun-14
I CERTIFY THAT I HAVE OPENED, READ AND
AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED
16-Jun-14
X C. REASONABLE CONTRACT
7A 7B 7C D. E. F. E. F. E. F.
ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT 0001 Earthwork
0001AA 100-499 CY 100 CY 29.64$ 2,964.00$ 25.00$ 2,500.00$ 24.00$ 2,400.00$
0001AB Over 500 CY 500 CY 17.79$ 8,895.00$ 12.00$ 6,000.00$ 12.00$ 6,000.00$ 0002 Stabilized Aggregate Base Course 0002AA First 1000 Tons Stockpiled 1,000 TN 44.40$ 44,400.00$ 23.00$ 23,000.00$ 20.00$ 20,000.00$ 0002AB Over 1000 Tons Stockpiled 500 TN 44.40$ 22,200.00$ 23.00$ 11,500.00$ 20.00$ 10,000.00$ 0002AC Aggregate Supplied in Place 1,000 TN 47.36$ 47,360.00$ 32.50$ 32,500.00$ 30.00$ 30,000.00$ 0003 Concrete Work 0003AA Pavement 4" Thick 800 SF 8.89$ 7,112.00$ 8.50$ 6,800.00$ 10.50$ 8,400.00$ 0003AB Pavement 6" Thick 800 SF 10.84$ 8,672.00$ 12.00$ 9,600.00$ 11.50$ 9,200.00$ 0003AC Structure Concrete 30 CY 717.80$ 21,534.00$ 1,000.00$ 30,000.00$ 1,000.00$ 30,000.00$ 0003AD Straight Curb 100 FT 29.73$ 2,973.00$ 44.00$ 4,400.00$ 50.00$ 5,000.00$ 0003AE Curb & Gutter Cast 100 FT 29.73$ 2,973.00$ 44.00$ 4,400.00$ 50.00$ 5,000.00$ 0003AF Curb & Gutter Slip Form 1000 FT 21.85$ 21,850.00$ 32.50$ 32,500.00$ 32.00$ 32,000.00$ 0003AG Rebar #3 or #4 200 FT 2.80$ 560.00$ 2.50$ 500.00$ 1.25$ 250.00$ 0004 Crack Sealing 0004AA Asphalt 20000 FT 1.15$ 23,000.00$ 1.75$ 35,000.00$ 2.00$ 40,000.00$ 0004AB Concrete 500 FT 4.34$ 2,170.00$ 3.00$ 1,500.00$ 3.00$ 1,500.00$ 0005 Bituminous Surface Treatment 0005AA Single 10000 SY 5.31$ 53,100.00$ 5.50$ 55,000.00$ 6.00$ 60,000.00$ 0005AB Double 5000 SY 7.25$ 36,250.00$ 9.50$ 47,500.00$ 9.00$ 45,000.00$ 0006 Hot Mix Asphalt 0006AA Pave Gravel Surface 400 TN 153.54$ 61,416.00$ 160.00$ 64,000.00$ 155.00$ 62,000.00$ 0006AB Overlay Paved Surface 400 TN 151.52$ 60,608.00$ 160.00$ 64,000.00$ 155.00$ 62,000.00$ 0007 Asphalt Pothole Repair 0007AA Skin Patch 1"-2" 400 SF 13.16$ 5,264.00$ 5.25$ 2,100.00$ 5.00$ 2,000.00$ 0007AB Deep Patch 4" 400 SF 18.17$ 7,268.00$ 8.00$ 3,200.00$ 7.75$ 3,100.00$ 0008 Pavement Markings 0008AA Shoulder Striping 10000 FT 2.58$ 25,800.00$ 0.60$ 6,000.00$ 0.75$ 7,500.00$ 0008AB Centerline Striping 5000 FT 3.71$ 18,550.00$ 0.60$ 3,000.00$ 0.75$ 3,750.00$ 0008AC Parking Area Striping 300 FT 2.03$ 609.00$ 2.50$ 750.00$ 2.25$ 675.00$ 0008AD Stop Line Striping 20 FT 24.54$ 490.80$ 40.00$ 800.00$ 38.00$ 760.00$ 0008AE Handicap & Misc. Symbols 2 EA 239.06$ 478.12$ 228.00$ 456.00$ 225.00$ 450.00$ 0009 Seed & Sodding 0009AA Seeding 300 SY 4.12$ 1,236.00$ 3.00$ 900.00$ 3.00$ 900.00$ 0009AB Sodding 300 SY 20.15$ 6,045.00$ 7.50$ 2,250.00$ 6.00$ 1,800.00$ 0010 Cold Milling Biuminous Pavements 0010AA Salvage & Processing 2500 SY 1.30$ 3,250.00$ 5.25$ 13,125.00$ 5.00$ 12,500.00$ 0010AB Salvage & Stockpile 2500 SY 2.34$ 5,850.00$ 6.50$ 16,250.00$ 6.00$ 15,000.00$ 0010AC Spread Stockpiled Material 200 CY 44.45$ 8,890.00$ 15.50$ 3,100.00$ 10.00$ 2,000.00$ 0011 Geotextile Fabric 0011AA Supplied in Place 100 SY 11.25$ 1,125.00$ 6.00$ 600.00$ 6.00$ 600.00$
Total Year 1 Amt 512,892.92$ 483,231.00$ 479,785.00$
0012 Earthwork
0012AA 100-499 CY 100 CY 32.48$ 3,248.00$ 25.00$ 2,500.00$ 24.00$ 2,400.00$
0012AB Over 500 CY 500 CY 19.48$ 9,740.00$ 12.00$ 6,000.00$ 12.00$ 6,000.00$ 0013 Stabilized Aggregate Base Course 0013AA First 1000 Tons Stockpiled 1,000 TN 48.64$ 48,640.00$ 23.00$ 23,000.00$ 20.00$ 20,000.00$ 0013AB Over 1000 Tons Stockpiled 500 TN 48.64$ 24,320.00$ 23.00$ 11,500.00$ 20.00$ 10,000.00$ 0013AC Aggregate Supplied in Place 1,000 TN 51.88$ 51,880.00$ 32.50$ 32,500.00$ 30.00$ 30,000.00$ 0014 Concrete Work 0014AA Pavement 4" Thick 800 SF 9.81$ 7,848.00$ 8.50$ 6,800.00$ 10.50$ 8,400.00$ 0014AB Pavement 6" Thick 800 SF 11.98$ 9,584.00$ 12.00$ 9,600.00$ 11.50$ 9,200.00$ 0014AC Structure Concrete 30 CY 807.42$ 24,222.60$ 1,000.00$ 30,000.00$ 1,000.00$ 30,000.00$ 0014AD Straight Curb 100 FT 32.69$ 3,269.00$ 44.00$ 4,400.00$ 50.00$ 5,000.00$ 0014AE Curb & Gutter Cast 100 FT 32.69$ 3,269.00$ 44.00$ 4,400.00$ 50.00$ 5,000.00$ 0014AF Curb & Gutter Slip Form 1000 FT 24.06$ 24,060.00$ 32.50$ 32,500.00$ 32.00$ 32,000.00$ 0014AG Rebar #3 or #4 200 FT 3.05$ 610.00$ 2.50$ 500.00$ 1.25$ 250.00$ 0015 Crack Sealing 0015AA Asphalt 20000 FT 1.28$ 25,600.00$ 1.75$ 35,000.00$ 2.00$ 40,000.00$ 0015AB Concrete 500 FT 4.68$ 2,340.00$ 3.00$ 1,500.00$ 3.00$ 1,500.00$ 0016 Bituminous Surface Treatment 0016AA Single 10000 SY 5.89$ 58,900.00$ 5.50$ 55,000.00$ 6.00$ 60,000.00$ 0016AB Double 5000 SY 7.92$ 39,600.00$ 9.50$ 47,500.00$ 9.00$ 45,000.00$ 0017 Hot Mix Asphalt 0017AA Pave Gravel Surface 400 TN 175.66$ 70,264.00$ 160.00$ 64,000.00$ 155.00$ 62,000.00$ 0017AB Overlay Paved Surface 400 TN 173.33$ 69,332.00$ 160.00$ 64,000.00$ 155.00$ 62,000.00$ 0018 Asphalt Pothole Repair 0018AA Skin Patch 1"-2" 400 SF 14.06$ 5,624.00$ 5.25$ 2,100.00$ 5.00$ 2,000.00$ 0018AB Deep Patch 4" 400 SF 19.42$ 7,768.00$ 8.00$ 3,200.00$ 7.75$ 3,100.00$ 0019 Pavement Markings 0019AA Shoulder Striping 10000 FT 2.74$ 27,400.00$ 0.70$ 7,000.00$ 0.75$ 7,500.00$ 0019AB Centerline Striping 5000 FT 3.93$ 19,650.00$ 0.70$ 3,500.00$ 0.75$ 3,750.00$ 0019AC Parking Area Striping 300 FT 2.27$ 681.00$ 2.50$ 750.00$ 2.50$ 750.00$ 0019AD Stop Line Striping 20 FT 28.13$ 562.60$ 45.00$ 900.00$ 45.00$ 900.00$ 0019AE Handicap & Misc. Symbols 2 EA 264.49$ 528.98$ 235.00$ 470.00$ 225.00$ 450.00$ 0020 Seed & Sodding 0020AA Seeding 300 SY 4.66$ 1,398.00$ 3.00$ 900.00$ 3.00$ 900.00$ 0020AB Sodding 300 SY 21.83$ 6,549.00$ 7.50$ 2,250.00$ 6.00$ 1,800.00$ 0021 Cold Milling Biuminous Pavements 0021AA Salvage & Processing 2500 SY 1.43$ 3,575.00$ 5.25$ 13,125.00$ 5.00$ 12,500.00$ 0022AB Salvage & Stockpile 2500 SY 2.57$ 6,425.00$ 6.50$ 16,250.00$ 6.00$ 15,000.00$ 0023AC Spread Stockpiled Material 200 CY 48.70$ 9,740.00$ 15.50$ 3,100.00$ 10.00$ 2,000.00$ 0022 Geotextile Fabric 0022AA Supplied in Place 100 SY 12.32$ 1,232.00$ 6.00$ 600.00$ 6.00$ 600.00$
Total Year 2 Amt 567,860.18$ 484,845.00$ 480,000.00$
0023 Earthwork
0023AA 100-499 CY 100 CY 34.88$ 3,488.00$ 25.00$ 2,500.00$ 24.00$ 2,400.00$
0023AB Over 500 CY 500 CY 20.92$ 10,460.00$ 12.00$ 6,000.00$ 12.00$ 6,000.00$ 0024 Stabilized Aggregate Base Course 0024AA First 1000 Tons Stockpiled 1,000 TN 52.23$ 52,230.00$ 23.00$ 23,000.00$ 20.00$ 20,000.00$ 0024AB Over 1000 Tons Stockpiled 500 TN 52.23$ 26,115.00$ 23.00$ 11,500.00$ 20.00$ 10,000.00$ 0024AC Aggregate Supplied in Place 1,000 TN 55.71$ 55,710.00$ 32.50$ 32,500.00$ 30.00$ 30,000.00$ 0025 Concrete Work 0025AA Pavement 4" Thick 800 SF 10.57$ 8,456.00$ 8.50$ 6,800.00$ 10.50$ 8,400.00$ 0025AB Pavement 6" Thick 800 SF 12.93$ 10,344.00$ 12.00$ 9,600.00$ 11.50$ 9,200.00$ 0025AC Structure Concrete 30 CY 878.95$ 26,368.50$ 1,000.00$ 30,000.00$ 1,000.00$ 30,000.00$ 0025AD Straight Curb 100 FT 35.18$ 3,518.00$ 44.00$ 4,400.00$ 50.00$ 5,000.00$ 0025AE Curb & Gutter Cast 100 FT 35.18$ 3,518.00$ 44.00$ 4,400.00$ 50.00$ 5,000.00$ 0025AF Curb & Gutter Slip Form 1000 FT 25.93$ 25,930.00$ 32.50$ 32,500.00$ 32.00$ 32,000.00$ 0025AG Rebar #3 or #4 200 FT 3.25$ 650.00$ 2.50$ 500.00$ 1.25$ 250.00$ 0026 Crack Sealing 0026AA Asphalt 20000 FT 1.38$ 27,600.00$ 1.75$ 35,000.00$ 2.00$ 40,000.00$ 0026AB Concrete 500 FT 4.99$ 2,495.00$ 3.00$ 1,500.00$ 3.00$ 1,500.00$ 0027 Bituminous Surface Treatment 0027AA Single 10000 SY 6.36$ 63,600.00$ 5.50$ 55,000.00$ 6.00$ 60,000.00$ 0027AB Double 5000 SY 8.49$ 42,450.00$ 9.50$ 47,500.00$ 9.00$ 45,000.00$ 0028 Hot Mix Asphalt 0028AA Pave Gravel Surface 400 TN 188.68$ 75,472.00$ 160.00$ 64,000.00$ 155.00$ 62,000.00$ 0028AB Overlay Paved Surface 400 TN 186.13$ 74,452.00$ 160.00$ 64,000.00$ 155.00$ 62,000.00$ 0029 Asphalt Pothole Repair 0029AA Skin Patch 1"-2" 400 SF 15.10$ 6,040.00$ 5.25$ 2,100.00$ 5.00$ 2,000.00$ 0029AB Deep Patch 4" 400 SF 20.86$ 8,344.00$ 8.00$ 3,200.00$ 7.75$ 3,100.00$ 0030 Pavement Markings 0030AA Shoulder Striping 10000 FT 2.89$ 28,900.00$ 0.75$ 7,500.00$ 0.75$ 7,500.00$ 0030AB Centerline Striping 5000 FT 4.14$ 20,700.00$ 0.75$ 3,750.00$ 0.75$ 3,750.00$ 0030AC Parking Area Striping 300 FT 2.46$ 738.00$ 2.50$ 750.00$ 2.50$ 750.00$ 0030AD Stop Line Striping 20 FT 30.88$ 617.60$ 55.00$ 1,100.00$ 50.00$ 1,000.00$ 0030AE Handicap & Misc. Symbols 2 EA 285.45$ 570.90$ 250.00$ 500.00$ 250.00$ 500.00$ 0031 Seed & Sodding 0031AA Seeding 300 SY 5.09$ 1,527.00$ 3.00$ 900.00$ 3.00$ 900.00$ 0031AB Sodding 300 SY 23.31$ 6,993.00$ 7.50$ 2,250.00$ 6.00$ 1,800.00$ 0032 Cold Milling Biuminous Pavements 0032AA Salvage & Processing 2500 SY 1.54$ 3,850.00$ 5.25$ 13,125.00$ 5.00$ 12,500.00$ 0032AB Salvage & Stockpile 2500 SY 2.76$ 6,900.00$ 6.50$ 16,250.00$ 6.00$ 15,000.00$ 0032AC Spread Stockpiled Material 200 CY 52.30$ 10,460.00$ 15.50$ 3,100.00$ 10.00$ 2,000.00$ 0033 Geotextile Fabric 0033AA Supplied in Place 100 SY 13.23$ 1,323.00$ 6.00$ 600.00$ 6.00$ 600.00$
Total Year 3 Amt 609,820.00$ 485,825.00$ 480,150.00$ Total Amount Years 1, 2, & 3 1,690,573.10$ 1,453,901.00$ 1,439,935.00$
6. NUMBER OF AMENDMENTS ISSUED
IDCC Road Rehab for Oahe Dam Lake Oahe, SD
N/A B. BID SECURITY (Type & Amount)
N/A
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
Ready Plumbing & Heating Anderson Contractors Inc
Reliance, SD 57569 Fort Pierre, SD 57532 B. BID SECURITY (Type & Amount)B. REASONABLE CONTRACT
(Without Profit)
(Including Profit)
A. OFFEROR A. OFFEROR
205 N. 4th Ave 210 W Highway 14
A. HIRED LABOR
NO. 1 NO. 2
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
W9128F-14-B-0018
4. ISSUING OFFICE
8. GOVERNMENT ESTIMATE
(Check A, B or C AND COMPLETE D, E AND F)
5. PROJECT TITLE 9. OFFERS
TO THIS SOLICITATION DONALD D. MILLER
Signed
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
DONALD D. MILLER
OMAHA, NE 68102-1618
1616 CAPITOL AVENUE
CONTRACTING DIVISION (CENWO-CT)
US ARMY CORPS OF ENGINEERS
l PAGES
File details come from the government source that posted it. Updated .