2. DATE ISSUED 3. DATE OPENED
9-Aug-13 9-Sep-13
I CERTIFY THAT I HAVE OPENED, READ AND
AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED
X C. REASONABLE CONTRACT
7A 7B 7C D. E. F. E. F. E. F.
ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNTUNIT PRICE ESTIMATED AMOUNT
Basic Items: North Side - Old Ft. Thompson Rec. Area
0001 All plant, material, and labor required for riprap, as shown in the specification and drawings/sketches. 8900 TONS 42.86$ 381,454.00$ 42.25$ 376,025.00$ 40.00$ 356,000.00$
0002 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches. 4000 CY 9.09$ 36,360.00$ 8.75$ 35,000.00$ 9.00$ 36,000.00$
0003 All plant, material, and labor required for all remaining work as shown in the specificatios and drawings/sketches JOB LS 28,058.00$ 17,500.00$ 78,000.00$
TOTAL BASIC AMOUNT 445,872.00$ 428,525.00$ 470,000.00$
Option 1: South Side (Station 0+00 to 8+00) - Spillway
Dike Rec. Area
0004 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 4400 TONS 42.86$ 188,584.00$ 41.75$ 183,700.00$ 39.00$ 171,600.00$
0005 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches 3600 CY 9.09$ 32,724.00$ 7.65$ 27,540.00$ 9.00$ 32,400.00$
0006 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 6,880.00$ 17,500.00$ 2,400.00$
TOTAL OPTION 1 AMOUNT 228,188.00$ 228,740.00$ 206,400.00$
Option 2: South Side (Station 8+00 to 18+55) - Spillway
Dike Rec. Area
0007 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 7200 TONS 42.86$ 308,592.00$ 41.10$ 295,920.00$ 39.00$ 280,800.00$
0008 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 4,344.00$ 5,000.00$ 2,400.00$
TOTAL OPTION 2 AMOUNT 312,936.00$ 300,920.00$ 283,200.00$
TOTAL AMOUNT (BASIC PLUS OPTION 1 & 2) 986,996.00$ 958,185.00$ 959,600.00$
OMAHA, NE 68102-1618
1616 CAPITOL AVENUE
CONTRACTING DIVISION (CENWO-CT)
US ARMY CORPS OF ENGINEERS
l PAGES
9. OFFERS
TO THIS SOLICITATION
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type) David W. Neal
NO. 1 NO. 2
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
W9128F-13-B-0014
4. ISSUING OFFICE
8. GOVERNMENT ESTIMATE
(Check A, B or C AND COMPLETE D, E AND F)
5. PROJECT TITLE
(Without Profit)
(Including Profit)
A. OFFEROR A. OFFERORA. HIRED LABOR
Lower Brule Employment Enterprise LB Civil Construction, Inc.
B. BID SECURITY (Type & Amount)B. REASONABLE CONTRACT 20%
B. BID SECURITY (Type & Amount) 20%
C. AMENDMENTS ACKNOWLEDGED
N/A
C. AMENDMENTS ACKNOWLEDGED
N/A
6. NUMBER OF AMENDMENTS ISSUED
OLD FORT THOMPSON
SPILLWAY DIKE BANK STABILIZATION
BIG BEND DAM, SD
B. BID SECURITY (Type & Amount)
A. B. C. D. E. F. E. F. E. F.
ITEM #DESCRIPTION EST. QUANTITYUNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT
Basic Items: North Side - Old Ft. Thompson Rec. Area
0001 All plant, material, and labor required for riprap, as shown in the specification and drawings/sketches. 8900 TONS 45.00$ 400,500.00$ 62.15$ 553,135.00$ 36.49$ 324,761.00$
0002 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches. 4000 CY 8.40$ 33,600.00$ 19.50$ 78,000.00$ 5.75$ 23,000.00$
0003 All plant, material, and labor required for all remaining work as shown in the specificatios and drawings/sketches JOB LS 45,000.00$ 132,356.00$ 51,724.14$
TOTAL BASIC AMOUNT 479,100.00$ 763,491.00$ 399,485.14$
Option 1: South Side (Station 0+00 to 8+00) - Spillway
Dike Rec. Area
0004 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 4400 TONS 45.00$ 198,000.00$ 62.15$ 273,460.00$ 36.49$ 160,556.00$
0005 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches 3600 CY 8.40$ 30,240.00$ 17.50$ 63,000.00$ 5.75$ 20,700.00$
0006 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 6,000.00$ 83,435.00$ 11,494.25$
TOTAL OPTION 1 AMOUNT 234,240.00$ 419,895.00$ 192,750.25$
Option 2: South Side (Station 8+00 to 18+55) - Spillway
Dike Rec. Area
0007 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 7200 TONS 45.00$ 324,000.00$ 65.00$ 468,000.00$ 36.49$ 262,728.00$
0008 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 8,000.00$ 108,135.00$ 11,494.25$
TOTAL OPTION 2 AMOUNT 332,000.00$ 576,135.00$ 274,222.25$
TOTAL AMOUNT (BASIC PLUS OPTION 1 & 2) 1,045,340.00$ 1,759,521.00$ 866,457.64$
N/A
B. BID SECURITY (Type & Amount)
20%
C. AMENDMENTS ACKNOWLEDGED
N/A
20%
C. AMENDMENTS ACKNOWLEDGED
NO. 5
A. OFFEROR
NO. 4
Fuel Tank Maintenance Co., LLCGordon Construction of Mahnomen, Inc.
A. OFFEROR
INSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation l PAGES
1. SOLICITATION NUMBER
W9128F-13-B-0014 sheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.
4. OFFERS (Continued)
NO. 3
A. OFFEROR
ABSTRACT OF OFFERS -
CONTINUATION SHEET
CONSTRUCTION
SPILLWAY DIKE BANK STABILIZATION
2. PROJECT TITLE
OLD FORT THOMPSON
BIG BEND DAM, SD
3. CONTRACT ITEMS
Red Lake Builders, Inc.
N/A
B. BID SECURITY (Type & Amount)
20%
C. AMENDMENTS ACKNOWLEDGED
ITEM # DESCRIPTION EST. QUANTITYUNIT UNIT PRICE ESTIMATED AMOUNTUNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT
Basic Items: North Side - Old Ft. Thompson Rec. Area
0001 All plant, material, and labor required for riprap, as shown in the specification and drawings/sketches. 8900 TONS 37.50$ 333,750.00$ 49.20$ 437,880.00$ 47.00$ 418,300.00$
0002 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches. 4000 CY 8.50$ 34,000.00$ 18.80$ 75,200.00$ 11.00$ 44,000.00$
0003 All plant, material, and labor required for all remaining work as shown in the specificatios and drawings/sketches JOB LS 16,000.00$ 143,300.00$ 68,000.00$
TOTAL BASIC AMOUNT 383,750.00$ 656,380.00$ 530,300.00$
Option 1: South Side (Station 0+00 to 8+00) - Spillway
Dike Rec. Area
0004 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 4400 TONS 37.50$ 165,000.00$ 43.10$ 189,640.00$ 47.00$ 206,800.00$
0005 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches 3600 CY 8.50$ 30,600.00$ 13.70$ 49,320.00$ 11.00$ 39,600.00$
0006 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 8,000.00$ 72,700.00$ 30,000.00$
TOTAL OPTION 1 AMOUNT 203,600.00$ 311,660.00$ 276,400.00$
Option 2: South Side (Station 8+00 to 18+55) - Spillway
Dike Rec. Area
0007 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 7200 TONS 37.50$ 270,000.00$ 42.75$ 307,800.00$ 47.00$ 338,400.00$
0008 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 12,500.00$ 56,600.00$ 30,000.00$
TOTAL OPTION 2 AMOUNT 282,500.00$ 364,400.00$ 368,400.00$
TOTAL AMOUNT (BASIC PLUS OPTION 1 & 2) 869,850.00$ 1,332,440.00$ 1,175,100.00$
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
N/A N/A N/A
B. BID SECURITY (Type & Amount) B. BID SECURITY (Type & Amount)
20% 20% 20%
SPILLWAY DIKE BANK STABILIZATION A. OFFEROR A. OFFEROR A. OFFEROR
BIG BEND DAM, SD R P & H, Inc. Frontier Services, Inc. Doug O'Bryan Contracting, Inc.
CONTINUATION SHEET sheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.
2. PROJECT TITLE 4. OFFERS (Continued)
OLD FORT THOMPSON NO. 6 NO. 7 NO. 8
ABSTRACT OF OFFERS -
1. SOLICITATION NUMBER PAGE 3 OF 4
W9128F-13-B-0014 l PAGES
CONSTRUCTION INSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation
ITEM # DESCRIPTION EST. QUANTITYUNIT UNIT PRICE ESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNT
Basic Items: North Side - Old Ft. Thompson Rec. Area
0001 All plant, material, and labor required for riprap, as shown in the specification and drawings/sketches. 8900 TONS 38.00$ 338,200.00$ 37.00$ 329,300.00$ 37.00$ 329,300.00$
0002 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches. 4000 CY 6.00$ 24,000.00$ 9.00$ 36,000.00$ 8.50$ 34,000.00$
0003 All plant, material, and labor required for all remaining work as shown in the specificatios and drawings/sketches JOB LS 18,000.00$ 35,000.00$ 74,000.00$
TOTAL BASIC AMOUNT 380,200.00$ 400,300.00$ 437,300.00$
Option 1: South Side (Station 0+00 to 8+00) - Spillway
Dike Rec. Area
0004 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 4400 TONS 38.00$ 167,200.00$ 36.00$ 158,400.00$ 37.00$ 162,800.00$
0005 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches 3600 CY 5.50$ 19,800.00$ 7.00$ 25,200.00$ 8.50$ 30,600.00$
0006 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 12,000.00$ 4,000.00$ 8,100.00$
TOTAL OPTION 1 AMOUNT 199,000.00$ 187,600.00$ 201,500.00$
Option 2: South Side (Station 8+00 to 18+55) - Spillway
Dike Rec. Area
0007 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 7200 TONS 38.00$ 273,600.00$ 34.50$ 248,400.00$ 37.00$ 266,400.00$
0008 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 12,000.00$ 1,000.00$ 4,100.00$
TOTAL OPTION 2 AMOUNT 285,600.00$ 249,400.00$ 270,500.00$
TOTAL AMOUNT (BASIC PLUS OPTION 1 & 2) 864,800.00$ 837,300.00$ 909,300.00$
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
N/A N/A N/A
B. BID SECURITY (Type & Amount) B. BID SECURITY (Type & Amount)
20% 20% 20%
APPARENT LOW OFFEROR
SPILLWAY DIKE BANK STABILIZATION A. OFFEROR A. OFFEROR A. OFFEROR
BIG BEND DAM, SD FutureNet Group, Inc. Coastal Environmental Group, Inc. Brunow Contracting, LLC
CONTINUATION SHEET sheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.
2. PROJECT TITLE 4. OFFERS (Continued)
OLD FORT THOMPSON NO. 9 NO. 10 NO. 11
ABSTRACT OF OFFERS -
1. SOLICITATION NUMBER PAGE 4 OF 4
W9128F-13-B-0014 l PAGES
CONSTRUCTION INSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation
| PAGE1 |
| PAGE2 |
| PAGE3 |
| PAGE4 |
| 2013-09-09T16:13:08-0500 | |
| NEAL.DAVID.W.1115489000 |
File details come from the government source that posted it. Updated .