W9128F-13-B-0014 Bid Abstract

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED

9-Aug-13 9-Sep-13

I CERTIFY THAT I HAVE OPENED, READ AND

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

X C. REASONABLE CONTRACT

7A 7B 7C D. E. F. E. F. E. F.

ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNTUNIT PRICE ESTIMATED AMOUNT

Basic Items: North Side - Old Ft. Thompson Rec. Area

0001 All plant, material, and labor required for riprap, as shown in the specification and drawings/sketches. 8900 TONS 42.86$ 381,454.00$ 42.25$ 376,025.00$ 40.00$ 356,000.00$

0002 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches. 4000 CY 9.09$ 36,360.00$ 8.75$ 35,000.00$ 9.00$ 36,000.00$

0003 All plant, material, and labor required for all remaining work as shown in the specificatios and drawings/sketches JOB LS 28,058.00$ 17,500.00$ 78,000.00$

TOTAL BASIC AMOUNT 445,872.00$ 428,525.00$ 470,000.00$

Option 1: South Side (Station 0+00 to 8+00) - Spillway

Dike Rec. Area

0004 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 4400 TONS 42.86$ 188,584.00$ 41.75$ 183,700.00$ 39.00$ 171,600.00$

0005 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches 3600 CY 9.09$ 32,724.00$ 7.65$ 27,540.00$ 9.00$ 32,400.00$

0006 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 6,880.00$ 17,500.00$ 2,400.00$

TOTAL OPTION 1 AMOUNT 228,188.00$ 228,740.00$ 206,400.00$

Option 2: South Side (Station 8+00 to 18+55) - Spillway

Dike Rec. Area

0007 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 7200 TONS 42.86$ 308,592.00$ 41.10$ 295,920.00$ 39.00$ 280,800.00$

0008 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 4,344.00$ 5,000.00$ 2,400.00$

TOTAL OPTION 2 AMOUNT 312,936.00$ 300,920.00$ 283,200.00$

TOTAL AMOUNT (BASIC PLUS OPTION 1 & 2) 986,996.00$ 958,185.00$ 959,600.00$

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

l PAGES

9. OFFERS

TO THIS SOLICITATION

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type) David W. Neal

NO. 1 NO. 2

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

W9128F-13-B-0014

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE

(Check A, B or C AND COMPLETE D, E AND F)

5. PROJECT TITLE

(Without Profit)

(Including Profit)

A. OFFEROR A. OFFERORA. HIRED LABOR

Lower Brule Employment Enterprise LB Civil Construction, Inc.

B. BID SECURITY (Type & Amount)B. REASONABLE CONTRACT 20%

B. BID SECURITY (Type & Amount) 20%

C. AMENDMENTS ACKNOWLEDGED

N/A

C. AMENDMENTS ACKNOWLEDGED

N/A

6. NUMBER OF AMENDMENTS ISSUED

OLD FORT THOMPSON

SPILLWAY DIKE BANK STABILIZATION

BIG BEND DAM, SD

B. BID SECURITY (Type & Amount)

A. B. C. D. E. F. E. F. E. F.

ITEM #DESCRIPTION EST. QUANTITYUNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT

Basic Items: North Side - Old Ft. Thompson Rec. Area

0001 All plant, material, and labor required for riprap, as shown in the specification and drawings/sketches. 8900 TONS 45.00$ 400,500.00$ 62.15$ 553,135.00$ 36.49$ 324,761.00$

0002 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches. 4000 CY 8.40$ 33,600.00$ 19.50$ 78,000.00$ 5.75$ 23,000.00$

0003 All plant, material, and labor required for all remaining work as shown in the specificatios and drawings/sketches JOB LS 45,000.00$ 132,356.00$ 51,724.14$

TOTAL BASIC AMOUNT 479,100.00$ 763,491.00$ 399,485.14$

Option 1: South Side (Station 0+00 to 8+00) - Spillway

Dike Rec. Area

0004 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 4400 TONS 45.00$ 198,000.00$ 62.15$ 273,460.00$ 36.49$ 160,556.00$

0005 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches 3600 CY 8.40$ 30,240.00$ 17.50$ 63,000.00$ 5.75$ 20,700.00$

0006 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 6,000.00$ 83,435.00$ 11,494.25$

TOTAL OPTION 1 AMOUNT 234,240.00$ 419,895.00$ 192,750.25$

Option 2: South Side (Station 8+00 to 18+55) - Spillway

Dike Rec. Area

0007 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 7200 TONS 45.00$ 324,000.00$ 65.00$ 468,000.00$ 36.49$ 262,728.00$

0008 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 8,000.00$ 108,135.00$ 11,494.25$

TOTAL OPTION 2 AMOUNT 332,000.00$ 576,135.00$ 274,222.25$

TOTAL AMOUNT (BASIC PLUS OPTION 1 & 2) 1,045,340.00$ 1,759,521.00$ 866,457.64$

N/A

B. BID SECURITY (Type & Amount)

20%

C. AMENDMENTS ACKNOWLEDGED

N/A

20%

C. AMENDMENTS ACKNOWLEDGED

NO. 5

A. OFFEROR

NO. 4

Fuel Tank Maintenance Co., LLCGordon Construction of Mahnomen, Inc.

A. OFFEROR

INSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation l PAGES

1. SOLICITATION NUMBER

W9128F-13-B-0014 sheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.

4. OFFERS (Continued)

NO. 3

A. OFFEROR

ABSTRACT OF OFFERS -

CONTINUATION SHEET

CONSTRUCTION

SPILLWAY DIKE BANK STABILIZATION

2. PROJECT TITLE

OLD FORT THOMPSON

BIG BEND DAM, SD

3. CONTRACT ITEMS

Red Lake Builders, Inc.

N/A

B. BID SECURITY (Type & Amount)

20%

C. AMENDMENTS ACKNOWLEDGED

ITEM # DESCRIPTION EST. QUANTITYUNIT UNIT PRICE ESTIMATED AMOUNTUNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT

Basic Items: North Side - Old Ft. Thompson Rec. Area

0001 All plant, material, and labor required for riprap, as shown in the specification and drawings/sketches. 8900 TONS 37.50$ 333,750.00$ 49.20$ 437,880.00$ 47.00$ 418,300.00$

0002 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches. 4000 CY 8.50$ 34,000.00$ 18.80$ 75,200.00$ 11.00$ 44,000.00$

0003 All plant, material, and labor required for all remaining work as shown in the specificatios and drawings/sketches JOB LS 16,000.00$ 143,300.00$ 68,000.00$

TOTAL BASIC AMOUNT 383,750.00$ 656,380.00$ 530,300.00$

Option 1: South Side (Station 0+00 to 8+00) - Spillway

Dike Rec. Area

0004 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 4400 TONS 37.50$ 165,000.00$ 43.10$ 189,640.00$ 47.00$ 206,800.00$

0005 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches 3600 CY 8.50$ 30,600.00$ 13.70$ 49,320.00$ 11.00$ 39,600.00$

0006 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 8,000.00$ 72,700.00$ 30,000.00$

TOTAL OPTION 1 AMOUNT 203,600.00$ 311,660.00$ 276,400.00$

Option 2: South Side (Station 8+00 to 18+55) - Spillway

Dike Rec. Area

0007 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 7200 TONS 37.50$ 270,000.00$ 42.75$ 307,800.00$ 47.00$ 338,400.00$

0008 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 12,500.00$ 56,600.00$ 30,000.00$

TOTAL OPTION 2 AMOUNT 282,500.00$ 364,400.00$ 368,400.00$

TOTAL AMOUNT (BASIC PLUS OPTION 1 & 2) 869,850.00$ 1,332,440.00$ 1,175,100.00$

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

N/A N/A N/A

B. BID SECURITY (Type & Amount) B. BID SECURITY (Type & Amount)

20% 20% 20%

SPILLWAY DIKE BANK STABILIZATION A. OFFEROR A. OFFEROR A. OFFEROR

BIG BEND DAM, SD R P & H, Inc. Frontier Services, Inc. Doug O'Bryan Contracting, Inc.

CONTINUATION SHEET sheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.

2. PROJECT TITLE 4. OFFERS (Continued)

OLD FORT THOMPSON NO. 6 NO. 7 NO. 8

ABSTRACT OF OFFERS -

1. SOLICITATION NUMBER PAGE 3 OF 4

W9128F-13-B-0014 l PAGES

CONSTRUCTION INSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation

ITEM # DESCRIPTION EST. QUANTITYUNIT UNIT PRICE ESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNTUNIT PRICEESTIMATED AMOUNT

Basic Items: North Side - Old Ft. Thompson Rec. Area

0001 All plant, material, and labor required for riprap, as shown in the specification and drawings/sketches. 8900 TONS 38.00$ 338,200.00$ 37.00$ 329,300.00$ 37.00$ 329,300.00$

0002 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches. 4000 CY 6.00$ 24,000.00$ 9.00$ 36,000.00$ 8.50$ 34,000.00$

0003 All plant, material, and labor required for all remaining work as shown in the specificatios and drawings/sketches JOB LS 18,000.00$ 35,000.00$ 74,000.00$

TOTAL BASIC AMOUNT 380,200.00$ 400,300.00$ 437,300.00$

Option 1: South Side (Station 0+00 to 8+00) - Spillway

Dike Rec. Area

0004 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 4400 TONS 38.00$ 167,200.00$ 36.00$ 158,400.00$ 37.00$ 162,800.00$

0005 All plant, material, and labor required for random fill as shown in the specification and drawings/sketches 3600 CY 5.50$ 19,800.00$ 7.00$ 25,200.00$ 8.50$ 30,600.00$

0006 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 12,000.00$ 4,000.00$ 8,100.00$

TOTAL OPTION 1 AMOUNT 199,000.00$ 187,600.00$ 201,500.00$

Option 2: South Side (Station 8+00 to 18+55) - Spillway

Dike Rec. Area

0007 All plant, material, and labor required for riprap as shown in the specification and drawings/sketches 7200 TONS 38.00$ 273,600.00$ 34.50$ 248,400.00$ 37.00$ 266,400.00$

0008 All plant, material, and labor required for all remaining work as shown in the specification and drawings/sketches JOB LS 12,000.00$ 1,000.00$ 4,100.00$

TOTAL OPTION 2 AMOUNT 285,600.00$ 249,400.00$ 270,500.00$

TOTAL AMOUNT (BASIC PLUS OPTION 1 & 2) 864,800.00$ 837,300.00$ 909,300.00$

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

N/A N/A N/A

B. BID SECURITY (Type & Amount) B. BID SECURITY (Type & Amount)

20% 20% 20%

APPARENT LOW OFFEROR

SPILLWAY DIKE BANK STABILIZATION A. OFFEROR A. OFFEROR A. OFFEROR

BIG BEND DAM, SD FutureNet Group, Inc. Coastal Environmental Group, Inc. Brunow Contracting, LLC

CONTINUATION SHEET sheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.

2. PROJECT TITLE 4. OFFERS (Continued)

OLD FORT THOMPSON NO. 9 NO. 10 NO. 11

ABSTRACT OF OFFERS -

1. SOLICITATION NUMBER PAGE 4 OF 4

W9128F-13-B-0014 l PAGES

CONSTRUCTION INSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation

PAGE1
PAGE2
PAGE3
PAGE4
2013-09-09T16:13:08-0500
NEAL.DAVID.W.1115489000

File details come from the government source that posted it. Updated .