AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
MILITARTY MUNITIONS RESPONSE PROGRAM (MMRP), INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ), SINGLE AWARD TASK ORDER
CONTRACT (SATOC) IN SUPPORT OF THE US ARMY CORPS OF ENGINEERS (USACE)
THE ITEMS CHANGED IN THIS AMENDMENT ARE ATTACHED. NO ADDITIONAL CHANGES HAVE BEEN MADE. THE DUE DATE REMAINS 20
JUNE 2011, 1400HRS C.D.T.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 36
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jun-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F-11-R-0027
X 9B. DATED (SEE ITEM 11)
17-May-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jun-2011
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F-11-R-0027
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 2
Amendment #2 Information
1. One (1) inch page margins shall be utilized in proposal submissions and any fold out pages shall count as two (2) pages, EXCEPT when submitting previous experience and fold out pages will count as one (1) page.
2. In Section L, 3.1. Volume I, Section I-Previous Experience, Personnel, and Organizational Structure, a "substantially completed" for purpose of this RFP is one hundred (100) % completed.
3. RFP Section L.3.6.1.2 (pg. 118) refers to Section J Attachment 2, Table 1 as the format for the summary roll-up cost for the sample project. This document does not appear to be in the RFP.
This statement has been removed Section L. No table will be supplied for costs associated with the sample project.
4. Section M.4 on page 135 refers to a scoring checklist for the subcontracting plan provided in Section J, attachment 5 of the solicitation. This seems to be an incorrect reference.
This statement has been removed from Section M.
5. Would the District consider allowing the definition of a project to include multiple task orders at a single site?
The definition of a project will remain the same.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
3.6.1. Volume II, Subfactor 4 – Proposal for Sample Project
3.6.1.1 The offeror shall provide and clearly describe all assumptions used when developing their cost proposal as though the offeror were submitting a proposal for a new fixed-fee task order for the sample project in Section J of this solicitation.
3.6.1.2. The individual tasks associated with executing the sample project with all costs should be broken out appropriately. The offeror should apply the actual labor rates on each task and shall include any supplies, materials, travel costs, subcontracting costs, etc., that may be needed to carry out the tasks. The offeror shall provide backup material for their costs proposed (i.e., the team subcontractor(s) or other subcontractors cost proposal(s), quotes for rental equipment from at least three (3) sources, etc.). The offeror will find Service Contract Act and Davis-Bacon Wage Rates provided in Section J to be used as a minimum base rate only. The offeror should use the direct rates it would normally use unless they fall below the wage rates provided in section J. The adequacy and value of the cost data, whether the costs are realistic for the work to be performed, whether the costs reflect the offeror’s understanding of the requirements, and whether the costs are consistent with the technically proposed method used in the sample problem, will be determined from this information.
The offeror shall include all professional and support effort such as project management, professional service resources and overhead costs. Even though the technical description of the Sample Project in Section J is abbreviated, the cost proposal should represent the requirements for the full work effort. The cost estimate should utilize an industry approved software package capable of providing sufficient information to adequately and accurately capture the projected project costs. Direct costs should be detailed by labor, equipment, and material, and should include subcontractor markups, when applicable. All quotations and documentation will be noted in the proposal. Indirect cost categories such as prime contractor’s home office and field office overheads and profit should be identified, and appropriate costs included for each in the estimate. Other cost categories such as cost escalation, supervision, and administration, engineering during construction, and Government laboratory Quality Assurance will also be included in the estimate, as appropriate, to form a total project cost for the remedial action. Bonding costs are not required in this proposal.
SECTION M - EVALUATION FACTORS FOR AWARD
The following have been modified:
EVALUATION FACTORS FOR AWARD
5.4. Volume I, Section IV: Small Business Participation
Volume I, Section IV, Subfactor 1: Small Business Participation Plan (All Offerors) All Offerors are required to provide a narrative discussion of their plan, as well as provide the information requested in the below table, for utilization of small and small disadvantaged businesses
Evaluation based on best value and total dollars. Offerors submitting the best value in terms of small business participation and total dollars receives a better rating. At a minimum, the narrative shall discuss
• Demonstrate participation, by name, of Small Disadvantaged Concerns (SDB) and other Small Business Community (SBC) member in the resultant contract and task orders.
• Offeror document the commitment to utilize SDB and other SBC in the resultant contract and task orders. Enforceable commitment weighted more heavily than non-enforceable ones)
• Offerors (Other than Small only) documented demonstration of compliance with subcontracting plan, meeting or excessive subcontracting goals and monetary objectives for SDB and other SBC participation.
• The extent of participation of SDB concerns in terms of the value of the total business arrangement (i.e. contract, task order, BPA).
• Goals (total contract value) for subcontracting with SDB and other SBC members in sufficient detail to allow Government evaluators to determine that these goals are realistic, justifiable, positive and in accordance with the Government’s policy to maximize opportunities for SBC members
• The extent to which small disadvantaged businesses and where appropriate, historically black colleges and universities/minority institutions (HBCU/MI) have been identified, by name, for participation in resultant business arrangements (i.e. contract, task orders, BPA)s team.
• The Offeror’s past and present commitment to providing subcontracting opportunities and encouragement to small and small disadvantaged businesses IAW FAR 52.219-8, Utilization of Small Business Concerns and 52.219-9, Small Business Subcontracting Plan.
Volume I, Section IV, Subfactor 2: Subcontracting Plan (Applies to Other than Small Businesses only)
All Other than Small Offerors will submit a subcontracting plan with their technical and price/cost proposals. The plan shall be prepared in accordance with FAR 52.219-9. Failure to submit an acceptable subcontracting plan will render the offeror ineligible for award of contract. The submission of the subcontracting plan is in no way advantageous to Other than Small concerns over any small business in the evaluation process.
Volume I, Section IV, Subfactor 2: Subcontracting Plan (Applies to Other than Small Business only)
(End of Summary of Changes)
3.6.1. Volume II, Subfactor 4 – Proposal for Sample Project