Specs Big Sioux Ph 2C.PDF
PDF 13 MB Posted
- Attached to
- Flood Protections Project Phase 2C, Big Sioux River and Skunk Creek, Sioux Falls, South Dakota
- Solicitation number
- W9128F-10-R-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| am0004.pdf | ||
| Am0003.pdf | ||
| Drawings Am 0003.pdf | ||
| AutoCad Survey2003.dwg | DWG drawing | |
| Drawings AM 0002.pdf | ||
| Am0002.pdf | ||
| Survey2003.dgn | — | |
| am0001.pdf | ||
| AM 0001 Drawings.pdf | ||
| Drawings 1 of 3.pdf | ||
| Drawings 2 of 3.pdf | ||
| Drawings 3 of 3.pdf | ||
| sf20gerosion.dgn | — | |
| sf20gplan.dgn | — | |
| sf20gplan.dwg | DWG drawing | |
| sf20gerosion.dwg | DWG drawing |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
(For Construction Contract)
Solicitation No. W9128F-10-R-0001______
Flood Protection Project Phase 2C Big Sioux River and Skunk Creek Sioux Falls, SD
October 2009
US Army Corps of Engineers Omaha District
This page was intentionally left blank for duplex printing.
FLOOD PROTECTION PROJECT
PHASE 2C
BIG SIOUX RIVER AND SKUNK CREEK
SIOUX FALLS, SD
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00 SOLICITATION OFFER AND AWARD FORM 1442
00 21 00 INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
00 22 00 PROPOSAL INSTRUCTION, SUBMISSION REQUIREMENTS AND
EVALUATION
00 45 00 REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF
OFFERORS
00 72 00 CONTRACT CLAUSES
00 73 00 SPECIAL CONTRACT REQUIREMENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 12 00 CONSTRUCTION GENERAL
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 41 26.01 24 (SOUTH DAKOTA) NPDES PERMIT REQUIREMENTS FOR STORM WATER
DISCHARGES FROM CONSTRUCTION SITES
01 45 01 USACE QUALITY CONTROL
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23.00 10 STORM WATER POLLUTION PREVENTION MEASURES
01 78 36.00 24 WARRANTY OF CONSTRUCTION
01 78 39.00 24 AS-BUILT DRAWINGS
01 80 00 AS-BUILT SURVEYS, DIGITAL TERRAIN MODELS AND QUANTITIES
DIVISION 02 - EXISTING CONDITIONS
02 24 50 STONE (RIPRAP) PROTECTION
02 31 00 DRAINAGE STRUCTURES FOR LEVEES
02 41 00 DEMOLITION
02 56 10 SOUTH DAKOTA PAVEMENTS FOR SMALL PROJECTS
DIVISION 03 - CONCRETE
03 11 13 STRUCTURAL CONCRETE FORMWORK
03 15 14 EXPANSION, CONTRACTION AND CONSTRUCTION JOINTS IN
CONCRETE FOR CIVIL WORKS
03 20 01 CONCRETE REINFORCEMENT
03 31 01 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS
DIVISION 04 - MASONRY
04 72 00 ARCHITECTURAL CAST STONE
DIVISION 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 72 00 DECORATIVE METAL FENCE AND GATE SPECIALTIES
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00 FLUID-APPLIED WATERPROOFING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 71 00 DOOR HARDWARE
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 69 00 FIBERGLASS FLOOR GRATING
09 96 41.00 PAINTING: HYDRAULIC STRUCTURES
DIVISION 22 - PLUMBING
22 11 23.00 15 SUBMERSIBLE PUMP, AXIAL-FLOW AND MIXED-FLOW TYPE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
DIVISION 26 - ELECTRICAL
26 20 00 ELECTRICAL DISTRIBUTION SYSTEM
26 51 00 LIGHTING
DIVISION 31 - EARTHWORK
31 41 16 METAL SHEET PILING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL
32 92 20 SEEDING
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 01 42.00 15 ELECTRIC GATE OPERATOR
35 20 16.53 VERTICAL LIFT GATES
35 20 20 ELECTRICAL EQUIPMENT FOR GATE HOIST
35 20 25 DEWATERING
35 41 00 LEVEE CONSTRUCTION
35 41 00.24 24 DRAINAGE STRUCTURES FOR LEVEES
City Of Sioux Falls Specs City Of Sioux Falls Sanitary Sewer Spec City Of Sioux Falls Water Main Spec
-- End of Project Table of Contents --
00 11 00 - 1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W9128F-10-R-0001
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
23 Oct 2009
PAGES OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
7. ISSUED BY CODE CT 8. ADDRESS OFFER TO
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Contracting Division (CENWO-CT) 1616 Capitol Avenue Omaha, Nebraska 68102-4901
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Attn: CONTRACTING DIVISION (CENWO-CT)
9. FOR INFORMATION
CALL:
A. NAME
Stephanie Rostermundt
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(402) 995-2083
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
FLOOD PROTECTION PROJECT
PHASE 2C
BIG SIOUX RIVER AND SKUNK CREEK
SIOUX FALLS, SD
This solicitation is UNRESTRICTED AND OPEN TO LARGE AND SMALL BUSINESS PARTICIPATION.
RETURN WITH PROPOSAL: INFORMATION REQUIRED BY SECTION 00 11 00 (SF1442), SECTION 00 45 00, AND CONTRACT CLAUSES.
11. The Contractor shall begin performance within _10_________ calendar days and complete it within __720__ calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and ___**___ copies to perform the work required are due at the place specified in Item 8 by_2:00 pm____ (hour) local time 02 Dec 2009 . If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than __60______ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101
STANDARD FORM 1442(REV. 4-85)
Prescribed by GSA FAR(48 CFR) 53.236-1(e)
00 11 00 - 2
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
DUNS Number:
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within __60__ calendar days after the date offers are due.
AMOUNTS
SEE ATTACHED PRICING SCHEDULE & PRICING SUPPORT DOCUMENT
Contractor’s Fax No.____________ CAGE CODE ________________ Contractor’s E-Mail address_______________
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
U.S. Army Engineer District, Omaha
USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
STANDARD FORM 1442 BACK (REV. 4-85)
00 11 00 Page 3
PROPOSAL SCHEDULE
Basic – Reach 1, 2A, 2B, 3, Concrete/Steel Dam
Item Estimated Unit No. Description Quantity Unit Price Amount
0001 All plant, material, and labor required for earthwork to construct in-place compacted levee embankment including all ramps
Compacted Embankment 210,900 C.Y. $________ $_______
0002 All plant, material, and labor required for placing topsoil
Topsoil Job L.S. -- $________
0003 All plant, material, and labor required to construct levee crest and ramp surfacing
Asphalt/Aggregate Base Course Job L.S. -- $________ Gravel Surfacing Job L.S -- $________
0004 All removals shown on drawings Job L.S. -- $________
0005 All plant, material, and labor required to remove, install, or modify drainage structures, including earthwork and riprap
0005a Drainage Structure #1 Job L.S. -- $________ 0005b Drainage Structure #2 Job L.S. -- $________ 0005c Drainage Structure #3 Job L.S. -- $________ 0005d Drainage Structure #13 Job L.S. -- $________ 0005e Drainage Structure #15 Job L.S. -- $________ 0005f Drainage Structure #17 Job L.S. -- $________ 0005g Drainage Structure #18 Job L.S. -- $________ 0005h Drainage Structure #19 Job L.S. -- $________ 0005i Drainage Structure #20 Job L.S. -- $________
Total Drainage Structures Job L.S. -- $________
0006 All plant, material, and labor required for seeding, mulching and erosion control Job L.S. -- $________
0007 All plant, material, and labor required for construction of concrete/steel dam, complete Job L.S. -- $________
0008 All dewatering complete Job L.S. -- $________
00 11 00 Page 4
0009 All remaining work for the Basic excluding Items 0001 – 0008 above Job L.S. -- $________
BASIC TOTAL AMOUNT (Items 0001 through 0009) $__________
Option No. 01 – Reach 4
No. Description Quantity Unit Price Amount
0010 All plant, material, and labor required for earthwork to
Compacted Embankment 38,600 C.Y. $_______ $_______
0011 All plant, material, and labor required for placing topsoil
Topsoil Job L.S. -- $_______
0012 All plant, material, and labor
Gravel Surfacing Job L.S. -- $________
0013 All removals shown on drawings Job L.S. -- $________
0014 All plant, material, and labor required to remove, install, 0014a Drainage Structure #4 Job L.S. -- $________
Total Drainage Structures Job L.S. -- $________
0015 All plant, material, and labor
0016 All dewatering, complete Job L.S. -- $________
0017 All remaining work for Option
No. 01 excluding Items #0010 – 0016, above Job L.S. -- $________
OPTION No. O1 TOTAL AMOUNT (Items 0010 through 0017) $__________
00 11 00 Page 5
Option No. 02 – Reach 5
Item Estimated Unit No. Description Quantity Unit Price Amount
0018 All plant, material, and labor required for earthwork to
Compacted Embankment 36,700 C.Y. $_______ $_______
0019 All plant, material, and labor required for placing topsoil
Topsoil Job L.S. -- $_______
0020 All plant, material, and labor
Gravel Surfacing Job L.S. -- $________
0021 All removals shown on drawings Job L.S. -- $________
0022 All plant, material, and labor required to remove, install, 0022a Drainage Structure #6 Job L.S. -- $________ 0022b Drainage Structure #8 Job L.S. -- $________ 0022c Drainage Structure #8A Job L.S. -- $________ 0022d Drainage Structure #9 Job L.S. -- $________ 0022e Drainage Structure #10 Job L.S. -- $________ 0222f Drainage Structure #10A Job L.S. -- $________
Total Drainage Structures Job L.S. -- $________
0023 All plant, material, and labor
0024 All dewatering, complete Job L.S. -- $________
0025 All remaining work for Option
No. 02 excluding Items #0018 – 0024, above Job L.S. -- $________
OPTION No. O2 TOTAL AMOUNT (Items 0018 through 0025) $__________
00 11 00 Page 6
Option No. 03 – Reach 6
Item Estimated Unit No. Description Quantity Unit Price Amount
0026 All plant, material, and labor required for earthwork to
Compacted Embankment 7,600 C.Y. $_______ $_______
0027 All plant, material, and labor required for placing topsoil
Topsoil Job L.S. -- $_______
0028 All removals shown on drawings Job L.S. -- $________
0029 All plant, material, and labor required to remove, install, 0029a Drainage Structure #5 Job L.S. -- $________
Total Drainage Structures Job L.S. -- $________
0030 All plant, material, and labor
0031 All dewatering, complete Job L.S. -- $________
0032 All remaining work for Option
No. 03 excluding Items #0026 – 0031, above Job L.S. -- $________
OPTION No. 03 TOTAL AMOUNT (Items 0026 through 0032) $__________
Option No. 04 – Reach 7
No. Description Quantity Unit Price Amount
0033 All plant, material, and labor required for earthwork to
Compacted Embankment 3,200 C.Y. $_______ $_______
00 11 00 Page 7
0034 All plant, material, and labor required for placing topsoil
Topsoil Job L.S. -- $_______
0035 All removals shown on drawings Job L.S. -- $________
0036 All plant, material, and labor
0037 All remaining work for Option
No. 04 excluding Items #0033 – 0036, above Job L.S. -- $________
OPTION No. O4 TOTAL AMOUNT (Items 0033 through 0037) $__________
Option No. 05 – Tree Mitigation Areas 1, 2, 3 and Wetland Mitigation Area
No. Description Quantity Unit Price Amount
0038 All plant, material, and labor required for construction of tree mitigation area #1, complete Job L.S. -- $________
0039 All plant, material, and labor tree mitigation area #2, 0040 All plant, material, and labor tree mitigation area #3, 0041 All plant, material, and labor wetland mitigation area, OPTION No. 05 TOTAL AMOUNT (Items 0038 through 0041) $__________
TOTAL (BASIC + OPTIONS 01 thru 05) $_______________
00 11 00 Page 8
Notes for Proposal Schedule (Basic and Options):
1. Prices must be entered for all items on the schedule. Total amount submitted without prices being entered on individual items will be rejected. Extensions will be subject to verification by the Government.
In case of variation between the unit price and the extension, the unit price will be considered the proposal. In case of variation between individual item prices and the total amount, the individual prices will be considered the proposal.
2. Reference Specification Section 00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES
TO OFFERORS for evaluation of options. The Government reserves the right to exercise any combination of options at the time of awarding the base contract.
3. Estimated earthwork quantities to construct the compacted embankment are as follows:
Basic – 210,900 C.Y.
Option No. 01 – 38,600 C.Y.
Option No. 02 – 36,700 C.Y.
Option No. 03 – 7,600 C.Y.
Option No. 04 – 3,200 C.Y.
Wetland Mitigation Area (Option No. 05) – 22,900 C.Y. (cut)
Estimated earthwork volumes are based on stationing shown on the drawings, and included below. The basic and options are separated into “reaches” extending along the Big Sioux River and Skunk Creek. Stationing for all reaches and tree mitigation and wetland mitigation areas are shown on drawings G1.51 and G1.52
Reach 1: Sta. SK 133+50.00 – SK 163+52.40 Reach 2A: Sta. SK 60+48.00 – SK 131+70.00 Reach 2B: Sta. BSL 142+26.29 – BSL 199+00.00 Reach 3: Sta. BSR 144+53.58 – BSR 178+62.40 Reach 4: Sta. BSR 180+90.51 – BSR 214+10.05 Reach 5: Sta. SK 12+71.26 – SK 57+64.00 Reach 6: Sta. BSR 215+02.54 – BSR 227+86.31 Reach 7: Sta. SK 4+28.00 – SK 11+85.00
4. A modification to a proposal, which provides for a single adjustment to the total amount, should state the application of the adjustment to each respective unit price and lump sum price affected. If the modification is not so apportioned, the single adjustment will be applied to the “All Remaining Work” item.
5. Reference Specification Section 01 22 00.00 10, MEASUREMENT AND PAYMENT, for additional information on proposal items.
6. Proposal quantities for compacted embankment and wetland mitigation area included on this proposal sheet have been calculated by the Government.
The Contractor shall be responsible for proving any discrepancy between proposal and actual quantities during construction by performing before and after surveys, and submitting this information to the Government.
SECTION 00 21 00 Page 1
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
(6/07; Rev 3/09)
INDEX
Attachment: Required Central Contractor Registration
1 (FAR 52.204-6) DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER (APR 2008)
2 (FAR 52.211-2) AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM
DESCRIPTIONS LISTED IN THE ACQUISITION STREAMLINING AND STANDARDIZATION
INFORMATION SYSTEM (ASSIST) (JAN 2006)
3 (FAR 52.215-1) INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)
4 (FAR 52.216-1) TYPE OF CONTRACT (APR 1984).
5 (FAR 52.217-5) EVALUATION OF OPTIONS (JUL 1990)
6 (FAR 52.233-2) SERVICE OF PROTEST (SEPT 2006).
7 (FAR 52.236-28) PREPARATION OF PROPOSALS—CONSTRUCTION (OCT 1997)
8 (FAR 52.236-27) SITE VISIT (CONSTRUCTION) (FEB 1995).
9 DFARS 252.215-7003 EXCESSIVE PASS-THROUGH CHARGES – IDENTIFICATION OF
SUBCONTRACT EFFORT (MAY 2008)
10 SOLICITATION RESTRICTIONS
10.1 GENERAL CONTRACTOR
10.2 ESTIMATED CONSTRUCTION COST
10.3 SOLICITATION FUNDING
10.4 SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS
10.5 SUBMISSION DEADLINE
10.6 RETURN ADDRESS REQUIREMENTS
10.7 CADD AND ELECTRONIC DESIGN FILES (PROVIDED)
11 INSTRUCTIONS TO OFFEROR
11.1 DEFINITIONS
11.2 AMENDMENTS TO SOLICITATIONS
11.3 SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSAL
11.4 OFFER EXPIRATION DATE
11.5 CONTRACT AWARD
12 CHANGES PRIOR TO RECEIVING OFFERS
13 SMALL BUSINESS SIZE STANDARD.
14 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS).
15 OFFEROR'S QUESTIONS AND COMMENTS.
15.1 PLAN HOLDER'S LIST
16 GENERAL DESCRIPTION OF WORK
17 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION AND CONTRACT AWARD
18 SOURCE SELECTION BOARD (SSB)
19 TAXES - STATE OF SOUTH DAKOTA
19.1 EXCISE TAX
19.2 INFORMATION
20 SUBCONTRACTING PLAN/SUBCONTRACTING GOALS REGARDING THE UTILIZATION OF
SMALL BUSINESS CONCERNS
SECTION 00 21 00 Page 2
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1 (FAR 52.204-6) DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER (APR 2008)
a) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS number or “DUNS+4” that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number is a nine-digit number assigned by Dun and Bradstreet, Inc. The DUNS+4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the offeror to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see Subpart 32.11) for the same concern.
(b) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1- 866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and ZIP Code.
(iv) Company mailing address, city, state and ZIP Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(End of provision)
2 (FAR 52.211-2) AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM
DESCRIPTIONS LISTED IN THE ACQUISITION STREAMLINING AND STANDARDIZATION
INFORMATION SYSTEM (ASSIST) (JAN 2006)
(a) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(1) ASSIST ( http://assist.daps.dla.mil);
(2) Quick Search ( http://assist.daps.dla.mil/quicksearch);
(3) ASSISTdocs.com ( http://assistdocs.com).
(b) Documents not available from ASSIST may be ordered from the
Department of Defense Single Stock Point (DoDSSP) by—
SECTION 00 21 00 Page 3
(1) Using the ASSIST Shopping Wizard ( http://assist.daps.dla.mil/wizard);
(2) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon- Fri, 0730 to 1600 EST; or
(3) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile
(215) 697-1462.
3 (FAR 52.215-1) INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN
2004)
(a) Definitions. As used in this provision— “Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.
“In writing,” “writing,” or “written” means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time,” if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals.
(1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show—
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation;
and
(v) Name, title, and signature of person authorized to sign
SECTION 00 21 00 Page 4 the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, revision, and withdrawal of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and—
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.
(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit
SECTION 00 21 00 Page 5 modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award.
Withdrawals are effective upon receipt of notice by the Contracting Officer.
(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).
(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall—
(1) Mark the title page with the following legend:
This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of—or in connection with—the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract.
This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend:
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(f) Contract award. (1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
(2) The Government may reject any or all proposals if such action is in the Government’s interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.
(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.
(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total
SECTION 00 21 00 Page 6 evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.
(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(i) The agency’s evaluation of the significant weak or deficient factors in the debriefed offeror’s offer.
(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(iv) A summary of the rationale for award.
(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.
(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
4 (FAR 52.216-1) TYPE OF CONTRACT (APR 1984).
The Government contemplates award of a firm fixed price contract resulting from this solicitation.
5 (FAR 52.217-5) EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
6 (FAR 52.233-2) SERVICE OF PROTEST (SEPT 2006).
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from District Counsel, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.
SECTION 00 21 00 Page 7
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
7 (FAR 52.236-28) PREPARATION OF PROPOSALS—CONSTRUCTION (OCT 1997)
(a) Proposals must be (1) submitted on the forms furnished by the
Government or on copies of those forms; and (2) manually signed. The person signing a proposal must initial each erasure or change appearing on any proposal form.
(b) The proposal form may require offerors to submit proposed prices for one or more items on various bases, including—
(1) Lump sum price;
(2) Alternate prices;
(3) Units of construction; or
(4) Any combination of paragraphs (b)(1) through (b)(3) of this provision.
(c) If the solicitation requires submission of a proposal on all items, failure to do so may result in the proposal being rejected without further consideration. If a proposal on all items is not required, offerors should insert the words "no proposal" in the space provided for any item on which no price is submitted.
(d) Alternate proposals will not be considered unless this solicitation authorizes their submission.
8 (FAR 52.236-27) SITE VISIT (CONSTRUCTION) (FEB 1995).
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
b) The project site is located on public property; Contractor’s are welcome to self tour the site at anytime. Note: vehicles are not allowed on the levee, foot traffic only. A formal site visit is planned for Wednesday, November 4th, from 1:00 pm to 3:00 pm; meeting location is Caille Library, 4100 S. Carnegie Circle, Sioux Falls, South Dakota. Contact for the site visit is Dwight Pochant, US Army Corps of Engineers, Phone Number: 605-923- 2983.
9 DFARS 252.215-7003 EXCESSIVE PASS-THROUGH CHARGES – IDENTIFICATION OF
SUBCONTRACT EFFORT (MAY 2008)
(a) Definitions. “Added value,” “excessive pass-through charge,” “subcontract,” and “subcontractor,” as used in this provision, are defined in the clause of this solicitation entitled “Excessive Pass-Through Charges”
(DFARS 252.215-7004).
(b) General. The offeror’s proposal shall exclude excessive pass-through charges.
SECTION 00 21 00 Page 8
(c) Performance of work by the Contractor or a subcontractor.
(1) The offeror shall identify in its proposal the total cost of the work to be performed by the offeror, and the total cost of the work to be performed by each subcontractor, under the contract, task order, or delivery order.
(2) If the offeror intends to subcontract more than 70 percent of the total cost of work to be performed under the contract, task order, or delivery order, the offeror shall identify in its proposal—
(i) The amount of the offeror’s indirect costs and profit applicable to the work to be performed by the subcontractor(s); and
(ii) A description of the added value provided by the offeror as related to the work to be performed by the subcontractor(s).
(3) If any subcontractor proposed under the contract, task order, or delivery order intends to subcontract to a lower-tier subcontractor more than 70 percent of the total cost of work to be performed under its subcontract, the offeror shall identify in its proposal—
(i) The amount of the subcontractor’s indirect costs and profit applicable to the work to be performed by the lower-tier subcontractor(s); and
(ii) A description of the added value provided by the subcontractor as related to the work to be performed by the lower-tier subcontractor(s). (End of provision)
10 SOLICITATION RESTRICTIONS
10.1 GENERAL CONTRACTOR
This solicitation is UNRESTRICTED, open to both large and small business participation.
10.2 ESTIMATED CONSTRUCTION COST
The estimated construction cost of this project is between $7,500,000 and $10,000,000.
10.3 SOLICITATION FUNDING
This project will be funded under the American Recovery and Relief Act.
10.4 SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS
See FAR 52.215-1 INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISTION, subparagraph “(c) Submission, modification, revision, and withdrawal of proposals.” below for acceptable methods. Note: Electronic commerce or facsimile are not acceptable methods, unless indicated otherwise.
SECTION 00 21 00 Page 9
10.5 SUBMISSION DEADLINE
Offers shall be submitted at the location stated and by the time and date as specified in Section 00 11 00, Page 1.
Due to heightened security at Government installations, those offerors who have their proposals hand-carried* shall contact Stephanie Rostermundt, Contract Specialist at (402) 995-2083 prior to delivering to the U.S. Army Corps of Engineer District, Omaha, 1616 Capitol Ave, Omaha, NE 68102-4901.
On the date specified and for thirty (30) minutes prior to the specified time, a Contracting representative will be in the lobby to receive proposals.
Containers (i.e. envelopes, packages, boxes) will be screened for security purposes. Hand-carried means the individual must be able to carry on their person. If due to size or volume, packages or boxes need to be wheeled in on a cart or dolly, you will be required to go to the dock area located on the northeast side of the facility. After inspection and screening, you will be allowed in the building after presenting valid photo identification. At the time specified in Section 00 11 00, Page 1, local time, it will be announced that receipt of proposals is closed. Official time will be established by time/stamp clock designated by the Contract Specialist.
*This instruction shall also apply to those proposals delivered through a delivery or parcel service.
NOTE: No parking on the street in front of the facility entrances will be allowed. Passenger vehicles will need to locate parking meters or parking garages before delivering proposals. Delivery trucks must go to the dock.
The vehicle will be inspected and packages screened at the dock. After inspection and screening, the delivery person will be allowed into the building.
10.6 RETURN ADDRESS REQUIREMENTS
Offeror(s) must ensure that ALL mail sent to the Omaha District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bid guarantees, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at 1616 Capitol Avenue, Omaha, Nebraska 68102-4901 if it does not contain a return mailing address. THERE WILL BE NO
EXCEPTIONS.
10.7 CADD AND ELECTRONIC DESIGN FILES (PROVIDED)
Electronic CADD design files identified below have been included with the solicitation for website access, reference http://www.fbo.gov/. Electronic design files are provided to assist the Contractor in determining quantities for their proposal using their own commercially purchased estimating software. The Contractor shall take all professionally prudent and reasonable actions to verify accuracy of the data provided and shall assume all liability from the use of these files. The Contractor shall be responsible for obtaining all software necessary to view the files provided.
No other CADD design files will be provided for proposal preparation other than those listed below.
SECTION 00 21 00 Page 10
Design drawings were completed using Microstation V8 software. Electronic design files are provided in Microstation V8 and AutoCAD format. AutoCAD files were created by converting the original Microstation V8 files. As a result, AutoCAD files may not appear exactly as the parent Microstation files; with differences in font, line style, symbology, etc., to be expected.
The original (Microstation) files shall govern in the event of a discrepancy with converted (AutoCAD) files.
SF20gplan.dgn- New Grading SF20gerosion.dgn Levee surfacing requirements, seeding survey2003.dgn Existing topographic survey
11 INSTRUCTIONS TO OFFEROR
11.1 DEFINITIONS
As used in this paragraph— “Discussions” are negotiations that occur that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.
“In writing,” “writing,” or “written” means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time,” if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
11.2 AMENDMENTS TO SOLICITATIONS
If this solicitation is amended, all terms and conditions that are not amended remain unchanged. The Offeror shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
11.3 SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSAL
(1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages
(i) addressed to the office specified in the solicitation, and
(ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.
If the Offeror uses a commercial carrier, they should ensure that the
SECTION 00 21 00 Page 11 proposal is marked on the outermost wrapper with the information in paragraphs (1)(i) and (1)(ii) above.
(2) The first page of the proposal must show—
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation;
and
(v) Name, title, and signature of person authorized to sign the proposal.
(3) The Offeror is responsible for submitting its proposal, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation, unless arranged otherwise with the Contract Specialist (Stephanie Rostermundt) identified in paragraph: OFFEROR'S QUESTIONS AND COMMENTS below.
(4) Proposals may be withdrawn by written notice received at any time before award.
(5) Offeror shall submit its proposal in response to this solicitation in English.
(6) The Offeror may submit modifications to its proposal at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offeror may submit a revised proposal only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award.
Withdrawals are effective upon receipt of notice by the Contracting Officer.
11.4 OFFER EXPIRATION DATE
The proposal in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).
11.5 CONTRACT AWARD
(1) The Government intends to award a contract for the entire contract, unless indicated otherwise.
(2) The Government may reject the proposals if such action is in the Government’s interest.
(3) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
SECTION 00 21 00 Page 12
12 CHANGES PRIOR TO RECEIVING OFFERS
The right is reserved, as the interest of the Government may require, to revise the specifications and/or Request For Proposal drawings prior to the date set for receiving offers. Such revisions will be announced by an amendment or amendments to this Request For Proposal It shall be the responsibility of the prospective offeror, subcontractor or supplier to obtain copies of amendments from the website link for this project from FeDTeDS via http://www.fbo.gov/.
13 SMALL BUSINESS SIZE STANDARD.
The small business size standard for this procurement is $33.5 million in gross annual receipts for the preceding 3 fiscal years.
14 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS).
In accordance with Sector 23 of the NAICS Manual, the work in this solicitation is assigned classification code 236220.
15 OFFEROR'S QUESTIONS AND COMMENTS.
Questions and/or comments relative to these documents should be submitted via e-mail or mailed to: U.S. Army Corps of Engineers, Omaha District, ATTN:
CENWO-CT-C 1616 Capitol Avenue, Omaha, NE 68102-4901. Comments should reach this office no later than 20 calendar days prior to the date set for receiving of proposals, if feasible, in order that changes, if needed, may be added by amendment. E-mail addresses, FAX numbers, items for question and points of contact are listed below. Phone calls with questions should be made between 8:30 a.m. and 3:30 p.m. (Central Standard Time) Monday through Friday.
Note: A courtesy copy of all questions shall be sent to the Contract Specialist (Contractual Matters Point of Contact), the Program Manager and the Specifications Section (Technical Contents Points of Contact), except for Small Business questions. Small Business questions shall go to the Small Business Matters point of contact.
Items for Question Points of Contact/ E-mail Addresses Phone numbers/ FAX Numbers
Contractual Matters: Stephanie Rostermundt Stephanie.A.Rostermundt@usace.army.mil 402-995-2083 (phone)
Planholder's List See paragraph: PLAN HOLDER'S LIST, below.
Small Business Hubert Carter Hubert.J.Carter@usace.army.mil Matters 402-995-2910 (phone)
Technical Contents Program Manager Louis.E.Uptmor@usace.army.mil Of Proposal Louis Uptmor
SECTION 00 21 00 Page 13
Documents 402-995-2713 (phone)
Or
Specifications Marylee.F.Stobbe.usace.army.mil Section Marylee Stobbe 402-995-2184 (Phone)
Site Inspection See Paragraph: SITE VISIT (CONSTRUCTION), above
** - It shall be the Contractor's, Subcontractor's and Supplier's responsibility to check for amendments (Link available at:
http://www.fbo.gov/).
15.1 PLAN HOLDER'S LIST
For Viewing a List of Interested Vendors (i.e. planholders List) and Receiving Notifications or e-mail of changes regarding a solicitation, Federal Business Opportunities has these features available (www.fbo.gov.)
For a solicitation, go to www.fbo.gov and register as a vendor or enter user name and password to login. If you wish for General Contractors, Subcontractors, Suppliers, Plan Rooms or Print Shops to have the ability to contact you, click on the “Add me to Interested Vendors” for the solicitation.
16 GENERAL DESCRIPTION OF WORK
Scope of project includes all work required to construct approximately two miles (basic bid plus options) of existing levee will be raised two to five feet in order to provide 100-year flood protection along the Big Sioux River within the City of Sioux Falls. In addition, a concrete gated structure with automated controls will be constructed on the Big Sioux River immediately above the confluence with Skunk Creek. Three areas of tree mitigation and one wetland mitigation area are also required (option).
17 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION AND CONTRACT AWARD
See Section 00 22 00 PROPOSAL INSTRUCTIONS, SUBMISSION REQUIREMENTS, AND
EVALUATION.
18 SOURCE SELECTION BOARD (SSB)
The Contracting Officer has established a Source Selection Board to conduct an evaluation of each proposal received in response to this Solicitation. The evaluation will be based exclusively on the merits and content of the proposal and any subsequent discussion required. The identities of the SSB personnel are confidential, and any attempt by the proposers to contact these individuals is prohibited.
Note: In addition to the requirements of FAR 52.229-3 FEDERAL, STATE, AND LOCAL TAXES the following known taxes are applicable.
SECTION 00 21 00 Page 14
19 TAXES -…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .