09-T-0036-0002.pdf
PDF 28 KB Posted
- Attached to
- RECOVERY--J--Repair Spillway Stop Logs
- Solicitation number
- W9128F-09-T-0036
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 09-T-0036-0004.pdf | ||
| 09-T-0036-0003.pdf | ||
| 09-T-0036, AM0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W59XQG90277758
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FORT PECK DAM, MT, REPAIR WELDS AND PAINT SPILLWAY STOPLOGS
CONTRACTING POC: RHONDA SHICK 402-995-2079; EMAIL: rhonda.shick@usace.army.mil
PLEASE SEE ATTACHED DESCRIPTION OF AMENDMENT.
1. CONTRACT ID CODE PAGE OF PAGES
J
FAR (48 CFR) 53.243
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Apr-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F-09-T-0036
X 9B. DATED (SEE ITEM 11)
01-Apr-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Apr-2009
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F-09-T-0036
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
DESCRIPTION OF AMENDMENT
THE PURPOSE OF THIS AMENDMENT IS TO REVISE DRAWING SHEETS, CHANGE SECTION 35 20
14, AND EXTEND THE OFFER DUE DATE.
THE SOLICIATION DUE DATE IS EXTENED. OFFER DUE DATE/TIME IS 11 MAY 2009 AT
1:00 PM CDT.
The following drawing sheet(s) of drawing code MFP218-056 are revised as of this amendment.
The drawings are not reissued with this amendment.
(2) Sheet S-3. GENERAL WORK SEQUENCE, second note #2, add at end of note:
“REPLACE ALL NON-METALIC PARTS, INCLUDING SEALS, WITH NEW PARTS MEETING
CURRENT ASME REQUIREMENTS FOR APPLICATIONS OF THIS TYPE.”
(3) Sheet S-3. GENERAL WORK SEQUENCE, add between notes #5 and #6:
“6. STAMP STOPLOGS WITH SEQUENCED NUMERIC IDENTIFICATION PER SPECIFICATION
SECTION 35 20 14.”
(4) Sheet S-3. GENERAL WORK SEQUENCE, renumber notes after first note #2, sequentially, from 3 to 12.
(5) Sheet S-4. GENERAL NOTES, note #4, add at end of note:
“CUT HOLES, NOT TO EXCEED 1 ½” DIAMETER, IN DIAPHRAGM PLATES AND WT TRUSS
MEMBERS AS REQUIRED TO ALLOW NEW WELDS TO BE MADE CONTINUOUS ALONG
STOPLOG WEB TO FLANGE JOINTS. GRIND EDGES OF HOLES SMOOTH.”
(6) Sheet S-4. GENERAL NOTES, note #5, add at end of note:
“CONTINUOUS FLANGE TO WEB PLATE WELDS SHALL BE MADE IN BACK-STEPPED SEGMENTS
SEQUENCED TO MINIMIZE STRESSES AND DISTORTION INDUCED BY WELDING.”
(7) Sheet S-4. SECTIONS 1, 2 and 3, replace “12” x 43” FACE PLATE” with “1/2” x 43” FACE PLATE”.
Descriptive change to Section 35 20 14 Stoplogs and Lifting Beam, page 7: add after paragraph 3.1.3:
“3.1.4. Identification Numerical Stamping
After stoplogs have been cleaned, sandblasted, welded and inspected, in preparation for painting, each stoplog shall have a sequential identifying number imprinted on its surface by stamping with a die. Numbers shall be from 1 to 16. The figures shall be a minimum of 1/2" in height, and shall be stamped deep enough into the metal to be easily legible after the stoplog is painted. Numbers shall be stamped in the top surface of the uppermost ½” thick web plate, within 6 inches of the roller assembly, at the west facing end of the stoplog relative to its installed position. The stamp location shall be recorded on the as-built record drawings at the completion of the project.”
W9128F-09-T-0036
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 04-May-2009 01:00 PM to 11-May-2009 01:00 PM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .