CONSTRUCTION OF PERMANENT PARTY CHAPEL PN 21640 AT FORT Lee Virginia

View the file

Other files

File Type Posted
Am_0002.pdf PDF
am_0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Build Request For Proposal

Solicitation No. W9128F-08-R0034

PERMANENT PARTY CHAPEL

PN 21640, FY2008

FORT LEE, Virginia

JUNE 2008

This page was intentionally left blank for duplex printing.

Section 00 01 10 W9128F-08-R-0034

00 01 10, Page 1

SECTION 00 01 10

TABLE OF CONTENTS

REQUEST FOR PROPOSAL

Permanent Party Chapel

Fort Lee, VA

PROPOSAL REQUIREMENTS, CONTRACT FORMS AND CONDITIONS

Sections

00 11 00 SF1442/CLIN SCHEDULE

00 21 00 Instructions, Conditions And Notices To Offerors

00 22 11 Proposal Submission Requirements, Evaluation Criteria And Basis Of Award

00 45 00 Representations, Certifications & Other Statements Of Offerors

00 72 00 Contract Clauses

00 73 00 Special Contract Requirements

DIVISION 01 - General Requirements

Sections

01 10 00 Statement of Work

01 32 01.00 10 Project Schedule

01 33 00 Submittal Procedures

01 33 16 Design After Award

01 45 02.00 10 Quality Control System (QCS)

01 45 04.00 10 Contractor Quality Control

01 50 02 Temporary Construction Facilities

01 57 20.00 10 Environmental Protection

01 62 35 Recycled/Recovered Materials

01 78 02.00 10 Closeout Submittals

Section 00 01 10 W9128F-08-R-0034

00 01 10, Page 2

Appendices

Appendix A Geotechnical Information

Appendix B List of Drawings

Appendix C Utility Connections

Appendix D Results of Fire Flow Tests

Appendix E Environmental Information

Appendix F Photos of surrounding buildings

Appendix G GIS Data

Appendix H Exterior Signage

Appendix I Acceptable Plants List

Appendix J Drawings

Appendix K Life Cycle Cost Analysis Fuel Cost Information

Appendix L LEED Project Credit Guidance

Appendix M LEED Owner’s Project Requirements

Appendix N LEED Requirements for Multiple Contractor Combined Projects

Appendix O LEED Strategy Tables

Appendix P Special Plumbing and HVAC Information

Appendix Q Substantiation

Appendix R Installation Design Guide

Appendix S Project Work Requirements and Restrictions VA080032 Wage Determination Schedule - Building

End of Table of Contents

00 11 00 - 1

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W9128F-08-R-0034

2. TYPE OF SOLICITATION

SEALED BID (IFB)

X NEGOTIATED (RFP)

3. DATE ISSUED

4 JUN 2008

PAGES OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY CODE CT 8. ADDRESS OFFER TO

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Contracting Division (CENWO-CT) 1616 Capital Ave Omaha, Nebraska 68102-4901

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Attn: CONTRACTING DIVISION (CENWO-CT) 1616 Capital Ave

9. FOR INFORMATION

CALL:

A. NAME

DIANA VANDERZANDEN

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(402) 995-2066

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

The offeror hereby agrees to do all work described in the documents entitled:

PERMANENT PARTY CHAPEL

PN 21640

FORT LEE, VIRGINIA

*BLOCK 13A. – REFER TO SECTION 00 22 11 FOR THE NUMBER OF COPIES TO BE SUBMITTED WITH THE ORIGINAL OFFER.

11. The Contractor shall begin performance within _8_________ calendar days and complete it within ___*____ calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See CLIN Pricing Schedule_________)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and ___*____ copies to perform the work required are due at the place specified in Item 8 by__1400___ (hour) local time 15 JUL 2008 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than __60______ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101

STANDARD FORM 1442(REV. 4-85)

Prescribed by GSA FAR(48 CFR) 53.236-1(e)

00 11 00 - 2

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

DUNS Number:

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ** calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement

AMOUNTS

SEE ATTACHED CLIN PRICING SCHEDULE

Contractor’s Fax No.____________ CAGE CODE ________________ Contractor’s E-Mail address_______________

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

U.S. Army Engineer District, Omaha 1616 Capital Ave.

USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,

(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

STANDARD FORM 1442 BACK (REV. 4-85)

CLIN SCHEDULE Attachment to 00 11 00 (SF1442) - 3 W9128F-08-R-0034

RFP NUMBER:________________________________

OFFEROR'S NAME:____________________________

CONTRACT LINE ITEM (CLIN) PRICING SCHEDULE

ITEM

NO.

DESCRIPTION QUANTITY UNIT UNIT

PRICE

LINE ITEM AMOUNT

Design of Permanent Party Chapel, PN 21640, including sitework and utilities.

Job

1- L.S.

XXX

Construction of

SITEWORK AND

UTILITIES, complete to from the five-foot line of the Permanent Party Chapel, PN 21640 to the limits of construction.

Construction of Permanent Party Chapel, PN 21640, complete to the five-foot line.

TOTAL OFFER ( ITEMS 0001, 0002, AND 0003) $_____________________

CONTRACT COST LIMITATION (CCL)

Should not exceed $ 6,000,000.00

CLIN SCHEDULE Attachment to 00 11 00 (SF1442) - 4 W9128F-08-R-0034

Performance Duration in Calendar Days After the Notice to Proceed is Received Should Not to Exceed benchmark duration of 460 Days.

(See Note No. 11) ____________ DAYS

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) Pricing schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Pricing Schedule. Failure to do so may result in the offer being unacceptable. Additions will be subject to verification by the Government. In case of variation between the lump-sum (L.S.) prices and the total amount, the lump-sum prices will be considered the price. In case of variation between the unit prices and the extensions, the unit prices will be considered the amount proposed.

NOTE NO. 3. Not Used.

NOTE NO. 4. Not Used.

NOTE NO. 5. Not Used.

NOTE NO. 6. Not Used.

NOTE NO. 7. This procurement is restricted to Hubzone Small Business..

NOTE NO. 8. CLIN 0001, Design of Permanent Party Chapel, PN 21640, includes costs for efforts related to the design of the complex, as well as any related costs for the constructor’s coordination during design (see Special Contract Requirement (SCR):

Constructor’s Role During Design). The Offeror shall distribute costs for the designer’s role during construction into the construction CLIN’s, as appropriate for those efforts, including any costs associated with as-built documentation. In general, include engineering and designer costs for efforts after the Design Complete or Issued for Construction documents in the construction CLIN’s.

NOTE NO. 9. Not Used.

NOTE NO. 10. Not Used.

NOTE NO. 11. The Offeror shall propose a performance duration in number of calendar days after the Notice to Proceed (NTP) is received by the Contractor, whether via electronic means or hard copy, whichever is the earliest method of delivery. The total number of proposed calendar days for design and construction through completion, ready for turnover should not exceed 460 calendar days. The proposed duration shall become the required contract duration. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP. See also Section 00 22 11 and SCR: COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK.

Section 00 21 00 W9128F-08-R-0034

Section 00 21 00, Page 1

SECTION 00 21 00

INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK

1.2 CONTRACT COST CEILING LIMITATION FOR DESIGN AND CONTRUCTION COSTS

1.3 GOVERNMENT SECURITY REQUIREMENTS

1.4 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

1.5 OFFEROR'S QUESTIONS AND COMMENTS

1.6 SMALL BUSINESS SIZE STANDARD/NAICS CODE

1.7 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

1.8 PRE-PROPOSAL CONFERENCE

1.9 ACCURACY IN PROPOSALS

1.10 PROPOSAL SUBMITTALS

1.11 PROPOSAL FORMAT

1.12 JOINT VENTURE PROPOSAL REQUIREMENTS

1.13 UTILIZATION OF SMALL BUSINESS CONCERNS

1.14 SOLICITATION PROVISIONS

Section 00 21 00, Page 2

1.0 GENERAL INFORMATION

1.1. GENERAL DESCRIPTION OF WORK

The scope of project includes all work required to design and construct a Permanent Party Chapel located at Fort Lee, VA. The work shall be in accordance with Request for Proposal documents.

General Description of Work: Design and construct a Chapel as prescribed by the Army CoS design criteria.

1.2. CONTRACT COST CEILING LIMITATION FOR DESIGN AND CONSTRUCTION COSTS

The design and construction costs will be subject to the funds available for this project. The total contract award should not exceed $6,000,000.00 for this contract. Offerors are notified that they are under no obligation to approach this ceiling. However the Government is likely not to make an award, if the dollar ceiling set for this project is exceeded.

1.3. GOVERNMENT SECURITY REQUIREMENTS

The Offeror(s) must ensure that ALL mail sent to the U.S. Army Corps of Engineers, Omaha District District, U.S.

Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at 106 South 15th Street, Omaha, NE 68102-1618 if it does not contain a return mailing address. There will be no exceptions.

1.4. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted through the Army’s Single Face to Industry (AFSI) to the Federal Business Opportunities website at:

https://www.fbo.gov/index?s=opportunity&mode=form&id=7beeeacf1b8e7a53b4bf1a163d7be0a6&tab=core&_cvie w=0

It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.

A list of interested vendors (potential offerors and subcontractors) is available on the federal business opportunities web site (registration required) is available at: website above..

1.5. OFFEROR'S QUESTIONS AND COMMENTS

Questions and/or comments relative to these documents should be submitted via e-mail or mailed to:

Section 00 21 00, Page 3

Contract Specialist – Primary POC

U.S. Army Corps of Engineers, U.S. Army Corps of Engineers, Omaha District District

ATTN: CENWO-CT-M, Diana L. Vanderzanden

1616 Capital Ave, Omaha, NE 68102-4901

Phone: (402) 995-2066 Fax: (402) 221-4199

Email: Diana.L.Vanderzanden@usace.army.mil

Note: All questions and/or comments should reach the above referenced Contracting Office no later than Seven (7) calendar days after the pre-proposal conference, in order that they may be given consideration or actions taken prior to receipt of offers.

1.5.1 Bidder Inquiry

1.5.1.1 Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via e-mail to Contract Specialist above..

1.5.1.2 Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

1.6. SMALL BUSINESS SIZE STANDARD/NAICS CODE

See Section 00 45 00, FAR 52.219-1 for the small business size standard/NAICS Code.

1.7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

1.8. PRE-PROPOSAL CONFERENCE

The Government intends to hold the pre-proposal conference at TBD- located at Fort Lee , on 17 June 2008.. The offeror must submit in writing, via fax or e-mail, the firm’s name, address, point of contact, telephone number, and number of personnel planning to attend to the following no later than five (5) working days prior to the conference:

U.S. Army Corps of Engineers, U.S. Army Corps of Engineers, Norfolk District

ATTN: Jonathon Winkler

803 Front St

Norfolk, VA 23510 Phone: 757-201-7037 Fax: 757-201-7329

Email: Jonathan.M.Winkler@usace.army.mil

Section 00 21 00, Page 4

All interested offerors are urged to attend. During this conference, the requirements set forth in the solicitation will be reviewed and discussed, with part of the conference to include a question and answer period.

1.9. ACCURACY IN PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments).

The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.10. PROPOSAL SUBMITTALS

Due to heightened security at Government installations, those offerors who have their proposals hand-delivered shall contact Diana L. Vanderzanden, Contract Specialist, at (402) 995-2066 or [not supplied], Contract Specialist, at [not supplied] or the Contracting Office Main Desk, at (402) 995-2066, prior to delivering to the address shown below.

On the date specified, and thirty minutes prior to the time specified on Standard Form SF 1442, Page 1, Item 9, a Contracting representative will be in the lobby to accept proposals. At the time specified on Standard Form SF 1442, Page 1, Item 9, it will be announced that receipt of proposals is closed. Official time will be established by the clock located in the area where the proposals are received. Recent terrorist threats have resulted in more time-consuming sign-in and escort procedures and may impact the timely delivery of offers. See FAR 52.215-1 for rules concerning late proposals.

As stated on Standard Form SF 1442: Proposals will be received until 1400 hours on 15 July 2008 at:

U.S. Army Corps of Engineers, U.S. Army Corps of Engineers, Omaha District District

ATTN: CENWO-CT-M, Diana L. Vanderzanden

1616 Capital Ave,, Omaha, NE 68102-4901

The Packaging that contains the Proposals shall be marked:

”Proposals for Solicitation Number: W9128F-08-R-0034, DO NOT OPEN”

1.11. PROPOSAL FORMAT

a Written materials: 8 ½” x 11” format, using 10 point or larger font size, in bound volumes, using 3-ring binders (except that Pro Forma material and price proposal shall be submitted in a closed manila envelope. Each bound volume will contain a Title Sheet on the cover for ready identification of the proposal and a full table of contents, separated by Tabs, as prescribed herein

(i) The prime, consortium, or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number shall appear in the lower left corner of the title page of any document/volume to be evaluated.

(ii) Volume number, section and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary).

(a) Drawing sheets: Use 22” x 34” for full size drawings.

Section 00 21 00, Page 5

(b) Electronic Format: Provide two CDs in read-only format, preferably using .pdf files. All price breakdown information to aide in the price evaluation shall be submitted in Excel format.

(c) Number of copies: Submit one original and Five (5) copies of drawings and printed matter (Bound Volumes), as well as Two (2) CDs. For Pro Forma information required: Submit the original and one copy and one separate CD.

1.12. JOINT VENTURE PROPOSAL REQUIREMENTS

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is a HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 126.

1.13. UTILIZATION OF SMALL BUSINESS CONCERNS

(a) Application. This clause applies to all offerors submitting proposals.

(b) Federal Acquisition Regulations (FAR). Attention is directed to the following FAR and DFARS provisions contained in this solicitation:

52.219-8, Utilization of Small Business Concerns (Alternate I)

1.14. SOLICITIATION PROVISIONS

PROVISIONS INCORPORATED BY REFERENCE

(FAR 52.204-6) DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER (OCT 2003)

(FAR 52.215-1) INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)

(FAR 52.217-5) EVALUATION OF OPTIONS (JUL 1990)

(FAR 52.232-18) AVAILABILITY OF FUNDS (APR 1984)

(FAR 52.236-28) PREPARATION OF PROPOSALS—CONSTRUCTION (OCT 1997)

PROVISONS INCORPORATED BY FULL TEXT

FAR 52.211-2 AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM

DESCRIPTIONS LISTED IN THE ACQUISITION STREAMLINING AND STANDARDIZATION

INFORMATION SYSTEM (ASSIST) (JAN 2006)

(a) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST

Section 00 21 00, Page 6 websites:

(1) ASSIST ( http://assist.daps.dla.mil);

(2) Quick Search ( http://assist.daps.dla.mil/quicksearch);

(3) ASSISTdocs.com ( http://assistdocs.com).

(b) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by—

(1) Using the ASSIST Shopping Wizard ( http://assist.daps.dla.mil/wizard);

(2) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or

(3) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.

(End of provision)

FAR 52.216-1 TYPE OF CONTRACT (APR 1984).

The Government contemplates award of a firm fixed price contract resulting from this solicitation.

(End of provision)

FAR 52.233-2 SERVICE OF PROTEST (SEPT 2006).

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgement of receipt from District Counsel, 1616 Capital Ave, Omaha, Nebraska 68102- 4901.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

Section 00 22 11 W9128-F-08-R-0034

Section 00 22 11 Page 1

SECTION 00 22 11

PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF AWARD

1 OVERVIEW

2 BASIS OF AWARD

3 GENERAL INSTRUCTIONS

4 PROPOSALINFORMATION AND RELATED EVALUATION FACTORS, SUBFACTORS

AND ELEMENTS

4.1 VOLUME 1 – DESIGN-TECHNICAL

4.2 VOLUME 2 – PERFORMANCE CAPABILITY/UTILIZATION OF SMALL BUSINESS

4.3 VOLUME 3 – PRICE AND PRO-FORMA INFORMATION

5 VOLUME 1 – FACTOR 1 -DESIGN TECHNICAL

5.1 GENERAL

5.2 TAB A –SUBFACTOR 1 – BUILDING FUNCTIONAL, AESTHETICS AND SPACE

5.3 TAB B –SUBFACTOR 2 – QUALITY OF BUILDING SYSTEMS AND MATERIALS

5.4 TAB C –SUBFACTOR 3 – SITE DESIGN

5.5 TAB D – SUBFACTOR 4 SUSTAINABILITY REQUIREMENTS

6 VOLUME 2 –FACTOR 2 -PERFORMANCE CAPABILITY

6.1 TAB A –SUBFACTOR 1 – SPECIALIZED EXPERIENCE

6.2 TAB B –SUBFACTOR 2 – PAST PERFORMANCE

6.3 TAB C – SUBFACTOR 3 – PROPOSED CONTRACT DURATION AND SUMMARY

SCHEDULE

6.4 TAB D –SUBFACTOR 4 – ORGANIZATION/TECHNICAL APPROACH

6.5 TAB E – SUBFACTOR 5 – KEY PERSONNEL CAPABILITIES AND EXPERIENCE

7 VOLUME 3 – PRICE AND PRO FORMA INFORMATION

7.1 GENERAL

7.2 TAB A – FACTOR 3 – PRICE (STANDARD FORM 1442, PROPOSAL DATA SHEET AND

CONTRACT LINE ITEM SCHEDULE)

Section 00 22 11 Page 2

7.3 TAB B –EVIDENCE OF BONDABILITY

7.4 TAB C– REQUIRED PRE-AWARD INFORMATION

8 EVALUATION PROCEDURES

8.1 SOURCE SELECTION EVALUATION BOARD (SSEB)

8.2 EVALUATION

8.3 DEFINITIONS

8.4 EVALUATION RATING SYSTEM

8.5 PAST PERFORMANCE RISK RATINGS

ATTACHMENTS

1 - NOT USED

2 - NOT USED

3 - COMPANY SPECIALIZED EXPERIENCE CONSTRUCTION OR PRIME CONTRACTOR

4 - COMPANY SPECIALIZED EXPERIENCE DESIGN FIRM OR IN-HOUSE DESIGN

CAPABILITY

5 - COMPANY SPECIALIZED EXPERIENCE KEY SUBCONTRACTOR (OR PRIME IF WORK

NOT TO BE SUBCONTRACTED)

6 - PAST PERFORMANCE EVALUATION TELEPHONE INTERVIEW QUESTIONNAIRE7 - KEY

PERSONNEL RESUME

8 - LETTER OF COMMITMENT FOR KEY PERSONNEL

9 - LETTER OF COMMITMENT FOR (DESIGN FIRM OR KEY SUBCONTRACTOR)

10 - PROPOSAL DATA SHEETS

Section 00 22 11 Page 3

1.0 OVERVIEW

1.1. The Government is looking for ways to streamline construction, manage labor and other resource constraints in an effort to reduce costs and achieve an aggressive schedule in executing task orders to meet the Army’s Transformation program goals of faster project execution at lower cost, while taking advantage of industry standards, means and methods.

1.2 This is a “Best Value” solicitation for the Design and Construction of a Permanent Party Chapel located at Fort Lee, Virginia. The Government will evaluate the proposals in accordance with the criteria described herein, and award a firm fixed price contract to the responsible Offeror, whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government.

1.3 PROPOSAL FORMAT

The Packaging that contains the Proposals shall be marked:

“Proposals for Solicitation No. W9128F-08-R-0034, To be opened by Contracting Personnel Only”

Written materials: 8 ½” x 11” format in bound volumes, using 3-ring binders. For each volume, provide a title sheet on the cover, table of contents and labeled tabs matching this documents’ Table of Contents. Provide a title sheet within each volume identifying the prime, consortium, or joint venture’s name, address, telephone, fax and email address and point of contact. Include the signature, title and contact information of the official that can bind the firm.

On the bottom of each page provide volume number and tab section.

Drawing sheets: Use 22” x 34” full size drawings.

Electronic Format: Provide two CD’s in read-only format, preferably using .PDF files.

Number of copies: Submit one original and five (5) copies of drawings and volumes, as well as two CD’s. Submit Pro Forma material and price proposal in a sealed envelope (Include original and one copy).

2.0 BASIS OF AWARD

2.1. The Contracting Officer will award a firm fixed-price contract to that responsible Offeror whose proposal the Source Selection Authority has determined conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering all non-price factors described herein, and price. All evaluation factors, other than price, when combined, are considered approximately equal to price, however the Contract award should not exceed the cost limitation described in Section 00 21 00 for this project. The intent of this solicitation is to obtain the best proposal within the cost limitation. There is no obligation to approach or match the cost limitation in the offer. After the Government individually evaluates and rates each proposal, the Contracting Officer/Source Selection Authority will compare the RFP requirements to determine

Section 00 22 11 Page 4 which proposal represents the best value. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. The Government will not award a contract to an Offeror whose proposal contains a deficiency, as defined in FAR 15.001. If there is a lower priced, conforming offer(s), the Contracting Officer/Source Selection Official must determine that the added value of a more expensive proposal (within the cost limitation) would justify award to that offeror.

2.2 As part of the evaluation, the Government will evaluate betterments in proposals relative to the minimum standards in the RFP to determine if they offer additional value to the Government. In addition, innovations in proposals will be evaluated to determine if creative ideas of the Offeror are a better value to the Government compared to the minimum criteria.

3.0 GENERAL INSTRUCTIONS

3.1. Proposals should be submitted initially on the most favorable terms from a price and technical standpoint. Do not assume that offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.

3.2. Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors. Any legally organized Hubzone small business Offeror may submit a proposal, provided that the Offeror or Offeror’s team member has or will have professional architects and engineers, registered in the appropriate technical disciplines and provided that the requirements specified in Contract clause, “Requirements for Registration of Designers”, are met. All designs must be under the direct supervision of appropriately licensed professionals for each discipline involved.

3.3 Submit proposals in tabbed, three-ring binders. Note that the Government will not evaluate any material that exceeds the page limits, where indicated below.

Section 00 22 11 Page 5

4.0 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS, SUBFACTORS

AND ELEMENTS

4.1. VOLUME 1 – DESIGN TECHNICAL

Factor/Sub Factor Location Description Relative Importance

FACTOR 1 DESIGN TECHNICAL Most Important Factor

Sub-factor 1 Vol. 1 TAB A Building Functional and Aesthetics

Most Important Sub-factor

Sub-factor 2 Vol. 1 TAB B Quality of Building Systems and Materials

Equally Important with Sub-factor 1

Sub-factor 3 Vol. 1 TAB C Site Design

3rd Most Important Sub-factor (slightly less important than Sub-factors 1 and 2.)

Sub-factor 4 Vol. 2 TAB D Sustainability

4th Most Important Sub-factor (slightly less important than Sub-factor 3)

4.2. VOLUME 2 – PERFORMANCE CAPABILITY AND SMALL BUSINESS UTILIZATION

Factor Location Description Relative Importance

FACTOR 2

PERFORMANCE

CAPABILITY

2nd Most Important Factor (slightly less important than Factor 1)

Sub-factor 1 Vol. 2 TAB A Specialized Experience Most Important Sub-factor

Sub-factor 2 Vol. 2 TAB B Past Performance

2nd Most Important sub-factor (slightly less important than Sub-factor 1)

Sub-factor 3 Vol. 2 TAB C Proposed Performance Duration and Summary Schedule

3rd Most Important Sub-factor (slightly less important than Sub-factor 2. Equal to Sub-factors 4 and 5).

Section 00 22 11 Page 6

Factor/Sub Factor Location Description Relative Importance

Sub-factor 4 Vol. 2 TAB D Organization/Technical Approach

3rd Most Important Sub-factor (slightly less important than Sub-factor 2. Equal to Sub-factors 3 and 5).

Sub-factor 5 Vol. 2 TAB E Key Personnel Capabilities and Experience

3rd Most Important Sub-factor (slightly less important than Sub-factor 2. Equal to Sub-factors 3 and 4).

4.3. VOLUME 3 – PRICE AND PRO FORMA INFORMATION)

FACTOR 3 Vol. 3 TAB A

Price (Standard Form 1442, Proposal Data Sheet And Contract Line Item Schedule)

All evaluation factors, other than price, when combined, are considered approximately equal to price

N/A Vol. 3 TAB B

Evidence of Bondability Not Rated

N/A Vol. 3 TAB C Required Pre-Award Information Not Rated

NOTE: 8(a) Joint Venture Offeror or Offeror submitting Proposal as HubZone Joint Venture shall submit evidence from Offerors SBA Servicing Agency indicating that the Offeror has notified and discussed the proposed joint venture for this specific project with the appropriate SBA Representative or Business Opportunity Specialist

5.0 VOLUME 1– FACTOR 1 – DESIGN TECHNICAL

5.1. GENERAL: The design-technical factor consists of conceptual level presentation drawings, technical approach narratives and information regarding material and system quality. It must clearly define the proposed scope and quality levels that the design-build team is offering to the Government in enough detail for the Government and the Offeror to mutually understand the whether or not the proposal meets or exceeds

Section 00 22 11 Page 7 the minimum solicitation requirements. Fully developed drawings, details, or specifications are not desired or required. The Offeror shall identify what it considers to be Betterments in its proposal for Subfactors 1-4 (See Section 00 73 00, SCR “Proposed Betterments“). The Offeror shall identify what it considers deficiencies in its proposal for all applicable factors and sub-factors.

5.2. VOLUME 1 - TAB A –SUBFACTOR 1 - BUILDING FUNCTIONAL, AESTHETICS AND SPACE

5.2.1. Submission Requirements:

5.2.1.1. Presentation Drawings:

(a) Presentation Exterior Elevation(s) of the primary elevation(s) of the facility clearly noting proposed materials and colors - maximum of 1 sheet

(b) At least one (1) Exterior Perspective Rendering – maximum of 1 sheet - (may be CADD rendering) for the facility type included in the contract with enough detail to aid in the evaluation of the exterior building aesthetics, as described in paragraph 5.2.2.2 (a), below. Rendering should be at least 11" x 17" in order to show a detailed perspective view of the building. Rendering shall reflect the proposal materials and quality of the Base Offer, which is within the CCL.

(c) Typical building or wall sections with appropriate details for the building type to depict proposed story height – maximum of 1 sheet.

(d) Not Used

(e) A color board including primary interior and exterior finish materials - maximum of two boards.

Board size shall be manageable, no larger than 20” x 32”. As an alternative to color boards, color board binders can be provided. The board binders shall consist of no more than eleven 8 ½” x 11” inserts located in no more than two binders. Provide Actual samples on color boards.

5.2.1.2. Technical Approach Narratives

Provide technical approach narratives, qualitatively and quantitatively, defining the elements of the proposal. Preface the narratives with a design concepts narrative, providing the design rationale and basis of the proposal.

(a) Minimum Space and Facility Size. This is a COS Standard facility type and no adjustments to the standard are allowed.

(b) Architectural Theme and Materials. This narrative shall be no longer than 3 typewritten pages.

Describe the architectural themes of the various facilities and spaces which demonstrate how the proposal achieves the results desired by the Statement of Work. Narrative should address how the selection of materials and colors enhances the exterior and interior aesthetics of the facilities and improves the working conditions for the soldier populations who will utilize the facility. This narrative is not intended to be a material listing, but to explain/reflect how the selections were made and how they address the requirements.

5.2.2. Evaluation Criteria:

Section 00 22 11 Page 8

5.2.2.1. Building Functional Arrangement: This is a COS Standard facility type and no adjustments to the standard are allowed

5.2.2.2. Building Aesthetics: This element considers the overall “appeal” of the facility and the desire that both the interior and exterior of the facilities present a professional, attractive appearance. The following two areas will be considered under this element and are equal in importance (not rated separately):

(a) Exterior Considerations:

• Proposals shall be evaluated on design of facades, roof lines, delineation of entrances, proportions of fenestration in relation to elevations, shade and shadow effects, materials, textures, exterior color schemes.

• Is the buildings scale and proportion complimentary of the adjacent structures?

• Is the building an attractive addition to the Installation?

• How well does the building harmonize with its environment, including surrounding facilities?

• Has the proposer addressed/coordinated the arrangement of stacks, louvers, vents, and roof mounted equipment, etc. to provide a visually attractive structure?

(b) Interior Considerations:

• Are the proposed colors and material finishes conducive to the working environment of the facility?

• For administrative areas, does the interior design provided establish a positive working environment?

• Has the proposal addressed/provided for natural and artificial light in the working spaces and is the arrangement of fenestration and lighting fixtures in the spaces conducive to furniture placement and space usage?

• Do the proposed ceiling material, elevation, and design enhance the environment?

• Has “support item” placement been considered and addressed in the proposal to enhance the environment? For example: placement of supply/exhaust devices, placement of electrical panels, and placement of exhaust fans, etc.

• Does the proposal provide for acoustic control of noise from service/support spaces to administrative and worship areas?

5.2.2.3. Minimum Space and Facility Size

This is a COS Standard facility type and no adjustments to the standard are allowed

5.3. VOLUME 1- TAB B – SUBFACTOR 2 - QUALITY OF BUILDING SYSTEMS AND MATERIALS

5.3.1. General. Section 01 10 00 Statement of Work identifies certain items as being preferred or desirable. These items, along with any Offeror-identified betterment, will be rated more favorably provided that they are included within the contract cost limitation (CCL) identified in the Solicitation.

5.3.2. Submission Requirements:

5.3.2.1. Presentation Drawings

(1) There are no specific drawings requirements for this Sub-factor. However, the offeror has

Section 00 22 11 Page 9 the option of providing concept level drawing information for specific materials and/or systems which the offeror feels are necessary to describe the proposed systems or materials. A maximum of 2 drawings are allowed for this tab.

5.3.2.2. Technical Approach Narratives:

Provide technical approach narratives, qualitatively and quantitatively, defining the elements of the proposal. It is acceptable to include all the sub-items shown below into a single combined narrative for the entire facility. It is the responsibility of the proposer to ensure that all aspects identified in the evaluation criteria below are addressed. Whether individual narratives or a single combined narrative is provided, the maximum total length for entire technical approach narratives shall be twenty (20) typewritten pages.

(a) Architectural Finishes: Describe how the materials selected provide for a suitable environment for the expected population of the facility. Discuss how these selections provide value to the Government and how they address the minimum requirements of the solicitation. Narrative should focus on aesthetics, durability and maintenance of the finishes proposed.

(b) Furniture Systems: Not Used

(c) Mechanical Systems: Describe how the mechanical systems selected provide for a highly efficient environmental control system including information about provisions for indoor air quality maintenance. Discuss how these selections provide value to the Government and how they address the minimum requirements of the solicitation. Narrative should focus on maintenance considerations, limiting energy consumption, and suitability of the proposed systems for the expected usage.

(d) Plumbing Systems: Describe how the plumbing systems selected provide for a highly efficient domestic hot water system and an efficient piping system. Discuss how these selections provide value to the Government and how they address the minimum requirements of the solicitation.

Narrative should focus on maintenance considerations, energy consumption, and suitability of the proposed systems for the expected usage.

(e) Electrical Systems: Describe how the electrical power and lighting systems, telephone, data, and cable television systems selected provide for a highly efficient electrical system. Discuss how these selections provide value to the Government and how they address the minimum requirements of the solicitation. Narrative should focus on maintenance considerations, energy consumption, and suitability of the proposed systems for the expected usage.

(f) ATFP Considerations: Describe how the proposed materials, systems, and designs address the mandatory building ATFP requirements included in the Statement of Work.

(g) Site Utilities and Site Systems: Describe how the site utility systems selected provide for an efficient piping system. Discuss how these selections provide value to the Government and how they address the minimum requirements of the solicitation. Narrative should focus on maintenance considerations and suitability of the proposed systems for the expected usage. Include information regarding coordination with privatized utility providers where applicable.

(h) Interoperability: Describe how systems integrated into the new facility which require connection

Section 00 22 11 Page 10 and interface with existing Installation wide systems will be accommodated in the proposed project.

Narrative should address the following systems as minimum: Fire Alarm, Telephone, Cable Television, UMCS, and privatized utility companies where applicable.

5.3.2.3. Proposed Material Identifications: In order to evaluate and rate the quality of the materials being proposed, including any material or equipment warranties exceeding the one year warranty in the contract clause “Warranty of Construction”, the offeror shall include in the proposal material identification for major materials in each of the areas shown below. Provide this information in tabular form, supported, if necessary to clearly identify level of proposed quality, by catalog information (may provide on CD-ROM). Table should include manufacturer’s name, model number, length of warranty, size/capacity (where available), efficiency (where applicable), and any other notes or information selected by the Offeror. The Government will evaluate and consider materials and equipment proposed by brand name and model number as a quality standard.

Unless substitution of a manufacturer, brand name or model is otherwise specifically prohibited in the contract, if the successful Offeror desires to substitute manufacturers, brand names or models after award, the substituted product must meet the contract requirements and be approved by the designer of record and the Government as equal in function, performance, quality and salient features to that initially proposed. Acceptance of the proposal is not a guaranty that the proposed products meet the contractual requirements.

(a) . Architectural Finishes and Components

• Interior Walls

• Floors

• Ceilings

• Exterior Walls

• Any Special Features

• Hardware systems (not individual hardware sets)

• Door systems/types (not individual doors)

• Window systems/types (not individual windows)

• Roofing Systems

• Worship Furniture Components

• Baptismal Pool

• Steeple Assembly

(b) Furniture Systems: Not Used

(c) Mechanical Systems

• Central Heating/Cooling Equipment

• Pumps

• Air Handling Equipment

• HVAC System Control Equipment

• Energy Conservation Features

(d) Plumbing Systems

Section 00 22 11 Page 11

• Fixtures

• Domestic Hot Water Generator

(e) Electrical Systems

• Lighting Fixtures

• Main Switchgear and Panels

• Media Control Console

• Data, Telephone, Cable TV, Intercom, CCTV, or Other Special Systems as Identified in the

Statement of Work

5.3.2.4. Quality Betterments: Provide a list of quality improvements that are above the minimum stated with the performance specifications. Develop the following table, or similar, to identify quality betterments.

Improved Quality

Concise description of improved quality of items within the CCL

Arch.

Finishes

N/A N/A

Etc.

5.3.3. Evaluation Criteria:

5.3.3.1. General: It is the Army’s objective that these buildings will have a 25-year useful design life before a possible reuse/repurpose or renovation, to include normal sustainment, restoration, modernization activities and a 50-year building replacement life. Within this overriding theme the Government will evaluate the selected systems and components proposed in terms of warranties provided, maintenance considerations (frequency, estimated cost, access, equipment locations), operability (ease of use, placement of control features, simplicity), durability (withstand troop usage, ease of cleaning), sustainability, and energy consumption (HVAC, lighting, power). The minimum acceptable level of quality for finishes and materials for these buildings are those materials suitable for the expected population and usage. Residential or similar grade finishes and materials are not acceptable.

5.3.3.2. The Government encourages the Offeror to place emphasis on those design features which optimize and emphasize functional/operational requirements; interior/exterior finishes and systems;

and life cycle/ energy efficiency. The Offeror may choose the least costly “Type of Construction” allowed by Building Codes for this occupancy/project and instead provide money into durable finishes and efficient systems. The features that the Government has identified in the Statement of Work and example features below as desirable features will be rated more favorably. The items that the Government has identified in paragraph 5.3.1 as preferable will be rated more favorably, provided that they are included within the contract cost limitation identified in the Solicitation.

Offeror-identified betterments may also be rated more favorably, provided that they are included within the contract cost limitation identified in the solicitation. The order of importance for proposed

Section 00 22 11 Page 12 betterments for rating purposes is as follows: desirable features, preferable items and other Offeror identified betterments. Unsubstantiated claims or narrative information will not be evaluated more favorably. The following criteria (not rated separately) will be considered in the evaluation of the building systems and materials:

(a) Architectural Finishes, Components and Systems:

Satisfactory proposals include finishes which provide usable spaces for the intended purposes.

Proposals will be rated more favorably that offer materials that include extended warranties, longer life expectancies, sustainability, durability (stand up to troop usage), have low maintenance requirements, and enhance the overall life cycle cost efficiency of the facility.

Specific examples of desirable features: solid wood cabinetry; solid surface counter tops; ceramic tile; 25 year non-pro-rated, no-leak roof warranty; high efficiency windows and doors.

(b) Furniture Systems: Not Used

(c) Mechanical Components and Systems:

Satisfactory proposals include components and systems that provide the basic environmental control function. Proposals will be evaluated more favorably that offer components and systems that include extended warranties, longer life expectancies, reduce energy consumption, sustainability, maintainability (cyclical maintenance, access, equipment placement), and enhance the overall life cycle cost efficiency of the facility.

Specific examples of desirable features: sheet metal ductwork systems; high efficiency equipment (i.e. variable speed pumping and air handlers, etc.)

(d) Plumbing Components and Systems:

Satisfactory proposals include components and systems that provide the basic function. Proposals will be evaluated more favorably that offer components and systems that include extended warranties, longer life expectancies, sustainability, durability (stand up to troop usage), have low maintenance requirements, and enhance the overall life cycle cost efficiency of the facility.

Specific examples of desirable features: lifetime domestic hot water storage tank warranty; high efficiency equipment; easy/local availability of replacement/repair parts; zoned/valved sub-systems to allow repair without building shutdown.

(e) Electrical Components and Systems:

Satisfactory proposals include components and systems that provide the basic function. Proposals will be evaluated more favorably that offer components and systems that include extended warranties, longer life expectancies, sustainability, durability (stand up to troop usage), have low maintenance requirements, and enhance the overall life cycle cost efficiency of the facility.

Specific examples of desirable features: all copper conductors; additional telephone/data/cable TV outlets;.

(f) ATFP Considerations: This consideration verifies the inclusion/compliance with the building related (laminate windows, etc.) ATFP minimum standard constraints included in the Statement of Work. All proposals must be compliant with the ATFP requirements of the Statement of Work to be considered for award. Satisfactory proposals are compliant with all ATFP requirements.

Section 00 22 11 Page 13

(g) Site Utilities Components and Site Systems:

Satisfactory proposals include components and systems that provide the basic function. Proposals will be evaluated more favorably that offer components and systems that include extended warranties, longer life expectancies, sustainability, have low maintenance requirements, and enhance the overall life cycle cost efficiency of the facility.

Specific examples of desirable features: enhanced parking/roadway construction/surfaces;

sidewalks above the minimum size and construction required; corrosion resistance; valves for isolation/repair of fluid systems; placement to allow future replacement/maintenance without significant impact to other systems or access to facilities.

(h) Interoperability: Fire Alarm, Telephone, Cable Television, UMCS, and privatized utility systems (where applicable) must be integrated into the new facility which require connection and interface with existing installation-wide systems must be accommodated in the proposed project.

5.4. TAB C – SUBFACTOR 3 - SITE DESIGN

5.4.1. Submission Requirements:

5.4.1.1. Presentation Drawings:

(1) Conceptual Site Plans showing improvements for grading, drainage, power, utilities, buildings, paving, walks, site lighting, and landscaping. Indicate all building setbacks and separations, which must meet antiterrorism design requirements. No more than two (2) drawings shall be submitted.

(2) Schematic site/land-use plan showing facility placement and orientation, vehicular circulation, pedestrian circulation, and other site improvements. This plan should demonstrate soldier/occupant considerations in the site design and the advantages included in the proposal with respect to pedestrian and vehicle circulation within the site and integration into the surrounding community.

5.4.1.2. Technical Approach Narrative:

Provide technical approach narrative, qualitatively and quantitatively, defining the elements of the proposal. Preface the narratives with a design concepts narrative, providing the design rationale and basis of the proposal. It is acceptable to include all the sub-items shown below into a single combined narrative for the entire project. It is the responsibility of the proposer to ensure that all evaluation criteria below are addressed. Whether individual narratives or a single combined narrative is provided, the maximum total length for narratives shall be five (5) typewritten pages.

(a) Grading

• Cut/Fill Considerations

• Positive Drainage

(b) Landscaping

• Plant Material Selection

• Other Feature Selection

(c) Pedestrian Circulation

• Development of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .