Solicitation, Submission and Evaluation Factors, Clauses, and Provisions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.8.6_Am-0002.pdf | ||
| A.8.6_Am-0001_2May17.pdf | ||
| Division_1_General_Requirements_07Apr17.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal No. W9128A-17-R-0002
$200M Multiple Award Task Order Contracts (MATOC) for
Design-Bid-Build (DB) and Design-Bid-Build (DBB)
Construction Services for Kwajalein Atoll, Republic of the Marshall Islands
U.S. Army Corps of Engineers
HONOLULU DISTRICT
W9128A-17-R-0002 Section 00 01 10
Section 00 01 10 - Table of Contents
MAIN TABLE OF CONTENTS
Request for Proposal (RFP) No. W9128A-17-R-0002, $200M Multiple Award Task Order Contract (MATOC) for Design-Build (DB) and Design-Bid-Build (DBB) Construction Services for Kwajalein Atoll, Republic of the Marshall Islands
Section 00 10 00 SF 1442
Section 00 21 16 Instructions to Proposers – Phase 1 Submission and Evaluation Factors
Section 00 22 16 Supplemental Instructions to Proposers – Phase 2 Submission and Evaluation
Phase 2 Seed Project: Request for Proposal Statement of Work, PN 88862 Repair Building 803 Vehicle Maintenance Shop, U.S. Army Garrison, Kwajalein Atoll, Republic of the Marshall Islands dated 03 March 2017
Section 01 90 01 Task Order Specific Task Order Provision
Section 00 10 00 Proposal Schedule for the Seed Project
Section 00 45 00 Representations and Certifications
Section 00 70 00 Conditions of the Contract
Section 00 72 00 General Conditions
Attachment A, Financial Policy and Rate Manual
Section 00 73 00 Supplementary Conditions
Division 01 Technical General Requirements
INSTRUCTIONS TO OFFERORS:
1. This procurement method is an unrestricted Multiple Award Task Order Contract (MATOC) design-build and design-bid-build procurement.
2. The Offeror is REQUIRED to COMPLETE AND RETURN: See Section 00 21 16, Phase 1, Instructions to Proposers – Phase 1 of 2.
3. Offeror must have and/or maintain an active registration with the System for Award Management (SAM) website. To register in SAM, go to http://www.sam.gov. Please note that the representations and certifications must also be completed electronically via System for Award Management (SAM) website.
4. The offeror when requested shall submit Subcontracting and Hiring Plan in accordance with Section 00 73 00, K-7, Utilization of Marshall Islands Subcontractors and Employment of Marshall Island Personnel.
5. Requests for Information (RFIs) shall be sent to W9128A-17-R-0002@usace.army.mil. The last day to submit RFIs is 18 April 2017 at 2:00 pm., Hawaiian Standard Time.
MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR DESIGN BUILD (DB) AND DESIGN-BID-BUILD (DBB) CONSTRUCTION SERVICES
FOR KWAJALEIN ATOLL, REPUBLIC OF THE MARSHALL ISLANDS
OFFERORS MUST SUBMIT A COMPLETE PHASE 1 PROPOSAL TO BE CONSIDERED FOR PHASE 2.
PHASE 1 DOES NOT INVOLIVE PRICING SUBMISSION.
JENNIFER KO 808-835-4378
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
07-Apr-2017
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______7 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________17 May 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CECT - CONTRACTING DIVISION
USACE, HONOLULU DISTRICT
BLDG 252 (CECT-POH)
FT. SHAFTER HI 96858-5440
W9128A
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
12:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W9128A-17-R-0002 191 j3ct9jik Typewritten Text j3ct9jik Typewritten Text *To be provided in Phase 2 Amendment* j3ct9jik Typewritten Text
(HST)
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
KWAJALEIN MATOC (5 YEARS BASE PERIOD)
FFP
The MATOC will support U.S. Forces Space and Missile Defense Command (SMDC), US Army Garrison, Kwajalein Atoll (USAG-KA), and other Department of Defense (DoD) customers for various construction projects within the Kwajalein Atoll. The MATOC contract(s) will consist of a two-year base period with three option year periods.
Typical types of work will include new construction and restoration/and or modernization of buildings, utilities infrastructure, airfield and port facilities, shore protection, water treatment and wastewater treatment facilities, fuel storage and piping systems, fire protection, interior renovation, anti-terrorism/force protection, roadways, parking lots, sidewalks, landscaping, etc.
Section 00 21 16
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2016 52.211-6 Brand Name or Equal AUG 1999 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.215-20 Requirements for Certified Cost or Pricing Data or
Information Other Than Certified Cost or Pricing Data
OCT 2010
52.215-22 Limitations on Pass-Through Charges--Identification of Subcontract Effort
OCT 2009
52.222-24 Preaward On-Site Equal Opportunity Compliance Evaluation
FEB 1999
52.232-13 Notice Of Progress Payments APR 1984 52.236-28 Preparation of Proposals--Construction OCT 1997 252.209-7002 Disclosure Of Ownership Or Control By A Foreign
Government
JUN 2010
CLAUSES INCORPORATED BY FULL TEXT
S-36.2 MAGNITUDE OF THE PROPOSED PROJECT [FAR 36.204]
(As applicable for individual task orders)
(a) Physical Characteristics:
Type in physical characteristics
(b) Estimated Price Range: The estimated price range of this work is:
Input range [End of Statement]
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY
PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
(As applicable for individual task orders)
Any contract awarded as a result of this solicitation will be ____ DX rated order; ___ DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm fixed-price construction contract resulting from this solicitation.
52.216-27 SINGLE OR MULTIPLE AWARDS (OCT 1995)
The Government may elect to award a single delivery order contract or task order contract or to award multiple delivery order contracts or task order contracts for the same or similar supplies or services to two or more sources under this solicitation.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
69.1% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects.
The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Kwajalein Atoll, Republic of Marshall Islands.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S. Army Corps of Engineers, Honolulu District Contracting Division, ATTN: Contracting Officer (W9128A-17-R-0002) Otake Street, Building 230 Fort Shafter, Hawaii 96858-5440
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/ http://farsite.hill.af.mil/vfdfara.htm
252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD
OFFICIALS (NOV 2011)
(a) Definition. Covered DoD official is defined in the clause at 252.203-7000, Requirements Relating to Compensation of Former DoD Officials.
(b) By submission of this offer, the offeror represents, to the best of its knowledge and belief, that all covered DoD officials employed by or otherwise receiving compensation from the offeror, and who are expected to undertake activities on behalf of the offeror for any resulting contract, are presently in compliance with all post-employment restrictions covered by 18 U.S.C. 207, 41 U.S.C. 2101-2107, and 5 CFR parts 2637 and 2641, including Federal Acquisition Regulation 3.104-2.
252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)
(a) Definitions. As used in this provision—
“System for Award Management (SAM) database” means the primary Government repository for contractor information required for the conduct of business with the Government.
“Commercial and Government Entity (CAGE) code” means—
(1) A code assigned by the Defense Logistics Information Service (DLIS) to identify a commercial or Government entity; or
(2) A code assigned by a member of the North Atlantic Treaty Organization that DLIS records and maintains in the CAGE master file. This type of code is known as an “NCAGE code.”
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System +4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see FAR 32.11) for the same parent concern.
“Registered in the System for Award Management (SAM) database” means that—
(1) The contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, and Contractor and Government Entity (CAGE) code into the SAM database; and
(2) The contractor has completed the Core Data, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as part of the SAM registration process; and
(4) The Government has marked the record “Active.”
(b) (1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering.
Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) Offerors may obtain information on registration at https://www.acquisition.gov.
(End of Provision)
252.222-7007 REPRESENTATION REGARDING COMBATING TRAFFICKING IN PERSONS
(JAN 2015)
By submission of its offer, the Offeror represents that it--
(a) Will not engage in any trafficking in persons or related activities, including but not limited to the use of forced labor, in the performance of this contract;
(b) Has hiring and subcontracting policies to protect the rights of its employees and the rights of subcontractor employees and will comply with those policies in the performance of this contract; and
(c) Has notified its employees and subcontractors of--
(1) The responsibility to report trafficking in persons violations by the Contractor, Contractor employees, or subcontractor employees, at any tier; and
(2) Employee protection under 10 U.S.C. 2409, as implemented in DFARS subpart 203.9, from reprisal for whistleblowing on trafficking in persons violations.
S-19A U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS
MANUAL, EM 385-1-1 (Nov 2015)
This paragraph applies to contracts and purchase orders that require the contractor to comply with EM 385-1-1 (e.g., contracts that include the Accident Prevention clause at FAR 52.236-13 and/or other safety provisions.) EM 385-1-1 and its changes are available at the following web site:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
Per EM 385-1-1 (latest version) Contractors shall ensure timely accident reporting is strictly adhered to.
PODR 265 will be completed within 24 hours of all accidents (excluding first aid injuries). ENG 3394 forms will be completed within 5 days of lost time accident and forwarded to the Contracting Officer or Contracting Officer Representative. All accidents will be reported through the Honolulu Engineer District Safety Office, (808) 835-4009 within 24 hours of the incident.
S-36.18 ACCIDENT PREVENTION PLAN (DEC 1998)
Within 15 days after receipt of Notice of Award of the contract, and at least 7 days prior to the preconstruction conference, four copies of the Accident Prevention Program shall be submitted to the Contracting Officer for review and acceptance. The program shall consist of the following forms and documents:
(a) An executed POD Form 248-R Rev (1 Jun 98), Accident Prevention Program, Administrative Plan.
(b) An executed POD Form 184-R Rev (16 Oct 98), Activity Hazard Analysis. (At the Contracting Officer's discretion, the Contractor may submit its Activity Hazard Analysis only for the first phase of construction provided that it is accompanied by an outline of the remaining phases of construction. All remaining phases shall be submitted and accepted prior to the beginning of work in each phase.)
(c) A copy of company policy statement of accident prevention and any other guidance statements normally provided new employees.
Contractor shall not commence physical work at the site until the program has been accepted by the Contracting Officer, or his authorized representative. In developing and implementing its Accident Prevention Program, the Contractor is also responsible for reviewing Section 1 of the most current edition of US Army Corps of Engineers Safety and Health Requirements Manual, Engineer Manual 385-1-1.
[See paragraph entitled, SAFETY STANDARDS, in Section 00 70 00]
TABLE OF CONTENTS
Instructions to Proposers – PHASE 1 of 2
1.0 Overview – Phase 1
2.0 General Proposal Submission Instructions
3.0 Proposal Format And Submittal Requirements
3.1 General Information
3.2 Proposal Characteristics
4.0 Inquiries/Questions
5.0 Joint Ventures (Submissions)
1) A certified copy of their Joint Venture agreement
2) A detailed statement outlining the following in terms of percentages, where appropriate
6.0 Basis for Award
7.0 Source Selection Process
8.0 Technical Rating and Risk
9.0 Definitions
10.0 Debriefing Offerors
11.0 Technical Factors to be Evaluated in Phase 1
• Volume 1, Tab B – Factor 1, Experience o Sub-factor 1, Construction Experience Submission Requirements Evaluation Criteria o Sub-factor 2, Design Experience Submission Requirements Evaluation Criteria
• Volume 1, Tab C – Factor 2, Past Performance o Submission Requirements o Evaluation Criteria
• Performance Confidence Assessment
• Sample Transmittal Letter and Past Performance Questionnaire
• Volume 1, Tab D – Factor 3, Management Plan o Submission Requirements o Evaluation Criteria
12.0 Attachments
• Attachment A – Construction Project information Sheet
• Attachment B – Design Project Information Sheet
• Attachment C – NAVFAC/USACE Past Performance Questionnaire
SECTION 00 21 16: PHASE 1 OF 2
1.0 OVERVIEW
In Phase 1 of the two phase selection procedure, Offerors will submit certain specified performance capability proposals, demonstrating their capability to successfully execute design-build and design-bid- build construction work under the contract resulting from this solicitation. The Government will evaluate the qualifications and intends to invite a maximum of five most highly qualified Phase 1 offerors who submitted proposals to compete for the base MATOC pool contracts and one construction seed task order contract for Repair Vehicle Maintenance Shop, Building 803 Kwajalein Atoll.
Offerors must submit a complete Phase 1 proposal to be considered for Phase 2. PHASE 1 DOES NOT
INVOLVE A PRICING SUBMISSION.
Prior to Phase 2, an amendment will be issued to only the selected offerors from Phase 1 inviting them to submit a design-build technical approach and price proposals for consideration. The amendment will request additional information needed to complete the submission of Phase 2 proposals. In Phase 2, the Contracting Officer will award a target of three contracts to the offerors whose proposals represent the best value to the Government, considering the price and non-price factors described in Phase 2.
Offerors must submit a complete Phase 2 proposal to be considered for award of a contract. Failure to submit a complete proposal may result in the entire proposal being rejected.
2.0 GENERAL PROPOSAL SUBMISSION INSTRUCTIONS
For Phase 1, all offerors are required to submit a proposal with the minimum content as specified herein.
Proposals without the minimum content may be rejected. Proposals will be received until the date and time indicated on Standard Form 1442 at the following address:
Proposals submitted via courier service or hand delivered shall be presented to U.S. Army Corps of Engineers, Honolulu District Contracting Division, ATTN: Jennifer Ko Building 252, Walker Drive Fort Shafter, Hawaii, 96858-5440
Proposals submitted via U.S. Postal Service should be mailed to:
Contracting Division, ATTN: Jennifer Ko Building 230, Otake Street
3.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS
1. In order to be considered for award of a contract in response to this solicitation, the offeror must submit a proposal with its offer. Failure to submit a complete proposal may result in the entire offer being rejected. The proposals shall be submitted in Volumes as follows:
Phase 1
Submit the Phase 1 proposal in a tabbed, three-ring binder identified by the Solicitation Number (W9128A-17-R-0002), project title (MATOC for Design-Build and Design-Bid- Build Construction Services for Kwajalein Atoll, Republic of Marshall Islands), name, address, and telephone number of the Offeror. Arrange tabs as follows:
Volume 1, Technical Proposal:
TAB A, Completed SF 1442, Surety Letter, and Joint Venture Teaming Agreement TAB B, FACTOR 1 Experience TAB B, Factor 1, Subfactor 1 – Construction Experience TAB B, Factor 1, Subfactor 2 – Design Experience TAB C, FACTOR 2 Past Performance TAB D, FACTOR 3 Management Plan
Phase 2: Submittal requirements for Phase 2 will be described in the forthcoming amendment.
2. Proposal Characteristics
a) Submit original and 3 copies of the complete proposal. An electronic copy shall also be provided on one CD/DVD in PDF format and be *Optical Character Recognition (OCR) compatible. Each Volume shall contain a table of contents and all pages of each factor shall be sequentially numbered. All text must be legible and easily read. The page size of the offeror’s proposal shall not exceed 8-1/2 by 11 inches. Diagrams, charts and tables shall conform to the paper size. All text shall be typed single-spaced with a minimum size 10 font.
Margins (1-inch) shall be clean and clear. If fold-out charts are unavoidable, and are to be utilized, all sheets shall be reproduced on 11 by 17 inch, and folded to 8-1/2 by 11 inch size.
Submit the SF 1442, completed and signed by a person authorized by the offeror.
*OCR is a common method of digitizing printed texts so that they can be electronically searched, stored more compactly, displayed on-line, and used in machine processes such as machine translation, text-to-speech, key data extraction and text mining.
b) Offeror shall submit a cover letter containing:
i. Solicitation number.
ii. Names, title, email, and telephone and fax numbers of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP.
iii. Name, title and signature of the person authorized to sign the proposal.
iv. A statement specifying agreement with all terms, conditions and provisions included in the RFP.
c) For Joint Ventures, the information required by paragraph “Joint Ventures”.
d) Acknowledgement of all amendments to the RFP in accordance with the instructions on the Standard Form 30 (amendment form).
e) The completed Section 00 45 00 of the RFP (Representations and Certifications), including the (Offerors System for Award Management extract will suffice) shall be placed in a separate envelope labeled “Representation and Certifications” with one copy.
f) Letter from Surety stating Offer is capable of providing a payment and performance bond for in the minimum and maximum task order limitations amount of $500,000 and $25,000,000 as required in FAR 52.228-1. Failure to provide bonding capability will make the offer ineligible to move forward to Phase 2.
4.0 INQUIRIES/QUESTIONS
Technical inquiries and questions relating to this solicitation shall be submitted to the Contracting Division POC listed below. This may be done via e-mail or in writing.
Contracting Division (Jennifer Ko) Fort Shafter, Hawaii 96858-5440 Telephone No. (808) 835-4378
E-Mail: W9128A-17-R-0002@usace.army.mil
All inquiries/questions should reach the Contracting Division POC no later than ten working days prior to the date set for receipt of proposals.
5.0 JOINT VENTURES
Joint Ventures shall submit the following additional documentation regarding their business entities:
1) A certified copy of their Joint Venture agreement.
2) A detailed statement outlining the following in terms of percentages, where appropriate.
a. The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.
b. The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the Joint Venture and perform the duties necessary to complete the work.
c. The structure of the joint venture and decision-making responsibilities of the Joint
Venture parties in terms of who will control the manner and method of performance of the work.
d. The bonding responsibilities of the Joint Venture parties.
e. Identification of the key personnel having authority to legally bind the Joint Venture to subcontracts and state who will provide or contract for the labor and materials for the Joint Venture.
f. Identification of party maintaining the Joint Venture bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the Joint Venture.
g. Identification of party furnishing the facilities, such as office supplies and telephone service.
h. Identification of party having overall control of the Joint Venture.
Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual Joint Venture parties and identify the party, or hired as employees of the Joint Venture.
If one of the Joint Venture parties possesses experience and/or past performance as a Federal Government contractor or as a Corps of Engineers contractor, that experience and/or past experience shall be included as the experience and/or past experience of the Joint Venture.
6.0 BASIS FOR AWARD
The agency will use a Two-phase Design-Build Selection Procedures authorized by FAR 36.301.
In Phase 1, the Government intends to select a maximum of five of the most highly qualified offerors to compete in Phase 2. The selection will be based on evaluation of the following technical factors.
Factor 1 - Experience; Factor 2 - Past Performance; and Factor 3 - Management Plan. Price will not be considered during Phase 1. Only those offerors selected in Phase 1 will be invited to submit a proposal in Phase 2.
In Phase 2, the Government intends to award no more than three MATOC contracts to the responsible offerors whose proposals conform to the solicitation and proposes the Best Value to the Government under a Traditional Subjective Tradeoff Process under FAR 15.101-1
7.0 SOURCE SELECTION PROCESS
All proposals received in response to this solicitation will be evaluated in accordance with formal source selection procedures. The principal objective of this process is to select a responsible offeror whose proposal represents the Best Value to the Government. The process is designed to ensure the impartial, equitable, and comprehensive evaluation of all proposals received in response to this solicitation.
Selection of the most highly qualified offerors will be based on overall evaluation of proposal after consideration of the following factors: Experience, Past Performance, and Management Plan. The Government reserves the right to reject any or all proposals with a technical factor rating of Unacceptable on any factor regardless of the number of other proposals or their ratings.
The Government is not responsible for information overlooked during the evaluation which is not located in the appropriate proposal section. To ensure the evaluation credit is appropriately received for proposal material submitted, do not incorporate by reference documents not contained in the proposal. References to sections of the proposal shall be by specific paragraph number (and name, if applicable), page number, and section.
8.0 COMBINED TECHNICAL/RISK RATING METHOD
The offeror’s technical solution will be rated by the combined technical/risk rating includes consideration of risk in conjunction with the strengths, weaknesses, significant weaknesses, uncertainties, and deficiencies in determining technical ratings. The adjectival ratings shall be assigned, using the following criteria, which incorporates a proposal risk assessment for Factor 1 (Experience) and Factor 4 (Management Plan).
Combined Technical/Risk Rating Method
Color Rating Description
Blue
Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weakness. Risk of unsuccessful performance is very low.
Purple
Good
Proposal indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Green
Acceptable
Proposal meets requirements and indicate an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance.
Risk of unsuccessful performance is no worse than moderate.
Yellow
Marginal
Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
Red
Unacceptable
Proposal does not meet requirements and contains one or more deficiencies. Proposal is unawardable.
9.0 DEFINITIONS
Rating: The rating for the Technical factor will be expressed as an adjectival assessment of Outstanding, Good, Acceptable, Marginal, or Unacceptable.
Deficiency: A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
Strength: Any aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Significant Strength: A significant strength appreciably enhances the merit or specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance.
Significant Weakness: A flaw that appreciably increases the risk of unsuccessful contract performance.
10.0 DEBRIEFING OFFERORS
Offerors may request a debriefing in accordance with FAR 15.505 Pre-award Debriefing of offerors, and FAR 15.506 Post-award Debriefing of offerors.
11.0 TECHNICAL FACTORS TO BE EVALUATED IN PHASE 1
The Government intends to select a maximum of five offerors based on their overall merit after consideration of the evaluation factors described below. The relative weight given to the evaluation factors is described in the table below.
Table 3. PHASE 1 – RELATIVE WEIGHT OF EVALUATION FACTORS
Location Factor Number Description Relative Importance Tab A SF 1442, Surety Letter and
Joint Venture Teaming Agreement N/A
Tab B 1 Experience Most important Factor
TAB B Subfactor 1 Construction Experience More important than Factor 1, Subfactor 2 – Design-Build Experience
TAB B Subfactor 2 Design Build Experience Less important than Factor 1, Subfactor 1, Construction Experience)
Tab C 2 Past Performance Less important than Factor 1
Tab D 3 Management Plan Approximately equal to Factor 1
VOLUME 1, TAB B – FACTOR 1 – Experience
Sub-factor 1, Construction Experience is more important than Sub-factor 2, Design Experience. The Sub-factors will be rolled up into Factor 1 for an overall rating of Factor 1.
Sub-factor 1. Construction Experience
Submission Requirements Use Attachment A, Construction Project Information Sheet to identify a minimum of two but no more than five relevant Construction projects. If more than five projects are submitted, only the first five projects will be considered for evaluation. The sixth and any additional projects will not be considered for evaluation regardless of whether or not the first five projects are classified as “relevant” or “not relevant” by Government evaluators.
Limit proposals to a maximum of 10 pages for Factor 1, subfactor 1. Any pages over this limit will not be considered for evaluation. A page is defined as text or information on one side of the paper.
If it is printed double-sided, each face will be counted as a page.
Multiple Award Task Order Contracts (MATOCs) or any other type of task-order contracts that provide for the issuance of orders for the performance of tasks will not be considered projects for the purposes of this evaluation; only individual task orders issued under such contracts will be evaluated as projects.
Only relevant construction projects will be considered for evaluation. In order to be considered relevant, a project must possess the following features:
1) It must have been a construction projects
2) It must have been awarded for $1.5 million or more. The Government intends to give greater weight for award greater than $13 million.
3) It must have been substantially complete within seven years from the date of this solicitation.
The project will be considered substantially completed if it is 95% or more complete. If an Offeror presents a project that is less than 95% complete, the proposal must include an explanation why that project should be considered substantially complete. The Government will determine whether the explanation is sufficient to consider the project substantially complete, and
4) It must be awarded to an Offeror as the prime contractor.
Note: For purposes of evaluating construction experience as a prime contractor, the offeror and prime contractor are defined as the contractor identified in Block 14 of the SF 1442. If a Joint Venture (JV) is identified in Block 14 of the SF 1442, then, a signed joint venture agreement must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM).
a) The offeror may demonstrate prime contractor experience through one or more of the members to the JV.
b) Projects performed by contractors other than the offeror (such as teaming partners) will be not be evaluated as construction experience by a prime contractor unless those other contractors are part of a joint venture for this solicitation as demonstrated by a signed JV agreement.
c) For projects in which your firm or a JV partner firm performed the role of a subcontractor, this will not count as construction experience as a prime contractor.
d) The Government will not consider prior projects completed by a JV prime contractor as construction experience by the prime contractor unless the offeror is the same JV entity that performed the work as the prime contractor on the prior project.
Evaluation Criteria The Government will evaluate how the projects identified by the Offeror demonstrate the extent of the offeror’s Experience that is similar to the solicitation’s Statement of Work. The Government will evaluate the extent of experience of the prime contractor.
The Government will evaluate the content of each offerors' submitted construction experience and will assign strengths, weaknesses, and/or deficiencies based on how well each offeror's proposal demonstrates the following:
a) Projects with higher contract value and complexity.
b) Projects involving new vertical construction with similar scope and magnitude as projects expected under this MATOC.
c) Demonstrate construction experience with sustainment, renovation and modernization projects
d) Experience performing multiple projects simultaneously
e) Experience with Design-Build projects
f) Experience with projects requiring extensive structural assessment and retrofit construction for the intended use.
g) Experience managing projects where the customer continues to occupy the area demanding phased construction or specified disruptions in the sequencing of work.
h) Experience with complex projects involving disparate disciplines and/or technically challenging work task and that require the coordination of multiple priorities.
A higher rating may be given to an Offeror that demonstrates experience performing in remote Pacific Island locations with secure operations, extremely corrosive atmospheric environments and limited services, to include locations such as Kwajalein Atoll, Johnston Atoll, Wake Island, Midway Island, and the Republic of the Marshall Islands.
Sub-factor 2. Design Experience
Use Attachment B, Design Project Information Sheet to submit a minimum of two but no more than five relevant design projects. If more than five projects are submitted, only the first five projects will be considered for evaluation. The sixth and any additional projects will not be considered for evaluation. This is regardless whether or not the first five projects are classified as “relevant” or “not relevant” by Government evaluators.
Offerors shall limit proposals to a maximum of 10 pages for Factor 1, Sub-factor 2. Any pages over the limit will not be considered for evaluation. A page is defined as text or information on one side of the paper. If it is printed double-sided, each face will be counted as a page.
Multiple Award Task Order Contracts (MATOCs) or any other type of task-order contracts that provide for the issuance of orders for the performance of tasks will not be considered projects for the purposes of this evaluation; only individual task orders issued under such contracts will be evaluated as projects.
Only relevant design projects will be considered for evaluation. Relevant projects are projects that:
1) It must have been for design of construction projects, in which the construction cost was estimated to be $1.5 million or more. The Government intends to give greater weight for award greater than $13 million.
2) It must have been completed within seven years from the date of this solicitation.
3) It must have been for design of public works construction or rehabilitation
4) It must have been completed by the Offeror, Joint Venture Teaming Member on this RFP
(shown in a signed JV Agreement), or by the Offeror’s proposed design subcontractor (on this RFP), as the Designer of Record (DOR)
The Offeror acknowledges that the proposed subcontractors under this Sub-factor shall become contractually binding in accordance with local requirement 5152.236-9001, Personnel, Subcontractors, and Outside Associates or Consultants.
If the Offeror accomplished both design and construction for a Design-Build project which meets both the relevancy criteria for Sub-factor 1, Construction Experience and Sub-factor 2, Design Experience, the offeror may submit both Attachment A and B for the same project.
Evaluation Criteria The Government will evaluate how the projects identified by the Offeror demonstrate the extent of the offeror’s Experience that is similar to the solicitation’s Statement of Work.
The Government will evaluate the content of each offerors' submitted design experience and will assign strengths, weaknesses, and/or deficiencies based on how well each offeror’s proposal demonstrates the following:
a) Experience completing designs for Design-Build construction projects.
b) Demonstrate design experience with projects involving new vertical construction with similar scope and magnitude as projects expected under this MATOC.
c) Demonstrate design experience with sustainment, renovation and modernization projects.
d) Experience performing structural assessments and designing retrofits for buildings in similar condition to those anticipated under this MATOC.
A higher rating may be given to an Offeror that demonstrates experience performing designs in remote Pacific Island locations with secure operations, extremely corrosive atmospheric environments and limited services, such as Kwajalein Atoll, Johnston Atoll, Wake Island, Midway, and other islands of the Republic of the Marshall Islands.
VOLUME 1, TAB C – FACTOR 2 – Past Performance
For each of the projects submitted under Factor 1 (Subfactors 1 and 2), the offeror shall furnish a Past Performance Questionnaire (Attachment C, Form PPQ-0) to a representative of the owner who can provide the owner’s opinion of the offeror’s past performance for the project. Completed PPQ-0 forms should be submitted with your proposal. A copy of a previously completed PPQ can be submitted if it reflects a substantially complete evaluation of the project. The PPQ-0 does not have to be sent directly from the client. If the offeror is unable to obtain a completed PPQ-0 from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ-0, which will provide contract and client information for the respective project(s). Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Jennifer Ko, via email at W9128A-17-R- 0002@usace.army.mil prior to proposal closing date. The offeror is responsible for ensuring that the completed questionnaires are submitted by the closing date. If you have questions regarding the attached questionnaire, or require assistance, please contact the Contract Specialist at (808)-835-4378.
For each of the projects submitted under Factor 1, to ensure the agency has all relevant past performance information, the offeror also should submit copies of Federal/DoD/Navy/Army performance reviews that are likely already in the agency’s databases or likely within the agency’s arm’s reach, i.e., Contractor’s copy of CCASS or CPARS evaluations. To improve accuracy of database searches, the offeror will also provide the CAGE Codes for the prime contractor and all teaming partners, (i.e. design firms, key subcontractors, Joint Venture Partners) whose experience is being relied on Factor 1. If a submitted proposal includes a final CCASS/CPARS evaluation for a Factor 1 Experience project, it is not necessary to submit a completed PPQ for the same project.
Offerors should organize all Past Performance Information based on the Factor 1 Projects, which normally have project titles and are numbered 1-5, so that reviewers can match the owner’s opinion with the corresponding Factor 1 Project. All Past Performance Information presented will be identified in the top left hand corner of each page with the Corresponding Project Number and Title from Factor 1. There is no page limit for Factor 2.
The Government will evaluate the responses from the customers from which Past Performance Questionnaires have been received. The Government may contact and interview the owner’s representative on the PPQ-0, and reserves the right to interview other individuals acting for the owner’s representative, if the owner’s representative is not available. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Past performance information may be obtained from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Contractor Performance Assessment Reporting System (CPARS),…