14b0004-Am-0007.pdf

PDF 261 KB Posted

Attached to
O&M Repairs for Nawiliwili Small Boat Harbor, Kauai, Hawaii
Solicitation number
W9128A-14-B-0004
Issued by

About this file

Am-0007

View the file

Other files

File Type Posted
14-B-0004_Bid_Abstract.pdf PDF
Am-0013.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

O&M Repairs Nawiliwili Small Boat Harbor, Island of Kauai, Hawaii

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A-14-B-0004

X 9B. DATED (SEE ITEM 11)

05-Aug-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Nov-2014

CODE

CECT - CONTRACTING DIVISION

USAED, HONOLULU

BLDG 230, ROOM 103

FT. SHAFTER HI 96858-5440

W9128A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

W9128A-14-B-0003

(Am-0007)

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

1. CHANGES TO THE SOLICITATION. Attached hereto are the new sections and revised pages to the specifications. Revised pages replace like-numbered pages. The revision mark “Am-0007” is shown on each new section and revised page.

a. REVISED SECTIONS. The following items are revised sections to the solicitation, and are indicated in bold.

Section 00900, Appendix B, Requests for Information, Answers 6, 7, 8, 9, 12, 22a, 23, 25, 26, 27, 29, 30, 32, 33, 34, 35a, and 35c

b. REVISED SECTIONS. The following sections are revised sections to the solicitation.

Section 00700, Appendix A, Davis Bacon Wage Rates changed from September 12, 2014 to

November 14, 2014

2. BID OPENING DATE: The bid opening date is extended from November 24, 2014 at 2:00 p.m., Hawaiian Standard Time to December 17, 2014 at 2:00 p.m.

W9128A-14-B-0004

Section 00700, Appendix A, Davis Bacon Wage Rates

General Decision Number: HI140001 11/14/2014 HI1

Superseded General Decision Number: HI20130001

State: Hawaii

Construction Types: Building, Heavy (Heavy and Dredging), Highway and Residential

Counties: Hawaii Statewide.

BUILDING CONSTRUCTION PROJECTS; RESIDENTIAL CONSTRUCTION

PROJECTS (consisting of single family homes and apartments up to and including 4 stories); HEAVY AND HIGHWAY CONSTRUCTION

PROJECTS AND DREDGING

Modification Number Publication Date

0 01/03/2014

1 02/07/2014

2 03/14/2014

3 04/18/2014

4 05/02/2014

5 06/13/2014

6 06/27/2014

7 07/11/2014

8 07/18/2014

9 07/25/2014

10 09/05/2014

11 09/12/2014

12 10/31/2014

13 11/07/2014

14 11/14/2014

ASBE0132-001 08/29/2010

Rates Fringes

Asbestos Workers/Insulator

Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of fire stopping material for wall openings and penetrations in walls, (Am-0007) floors, ceilings and curtain walls...............$ 36.65 22.24

BOIL0627-005 01/01/2013

BOILERMAKER......................$ 35.20 27.35

BRHI0001-001 09/03/2012

BRICKLAYER

Bricklayers and Stonemasons.$ 35.35 22.92

Pointers, Caulkers and

Weatherproofers.....................$ 35.60 22.92

BRHI0001-002 09/02/2013

Tile, Marble & Terrazzo Worker

Terrazzo Base Grinders......$ 35.29 23.22

Terrazzo Floor Grinders and Tenders........................$ 32.24 23.22

Tile, Marble and Terrazzo

Workers..............................$ 37.10 23.22

CARP0745-001 09/01/2014

Carpenters:

Carpenters; Hardwood Floor

Layers; Patent Scaffold

Erectors (14 ft. and over); Piledrivers;

Pneumatic Nailers; Wood

Shinglers and Transit and/or Layout Man...........$ 42.25 20.71

Millwrights and Machine

Erectors............................$ 42.50 20.71

Power Saw Operators (2 h.p. and over)...................$ 42.40 20.71

CARP0745-002 09/01/2014

(Am-0007)

Drywall and Acoustical

Workers and Lathers..............$ 42.50 20.71

ELEC1186-001 08/24/2014

Electricians:

Cable Splicers................$ 46.53 27.74

Electricians....................$ 42.30 26.45

Telecommunication worker....$ 23.20 17%+6.35

ELEC1186-002 08/24/2014

Line Construction:

Cable Splicers.........................$ 46.53 27.74

Groundmen/Truck Drivers......$ 31.73 23.21

Heavy Equipment Operators....$ 38.07 25.15

Linemen..................................$ 42.30 26.45

Telecommunication worker....$ 23.20 17%+$6.35

ELEV0126-001 01/01/2014

ELEVATOR MECHANIC................$ 52.10 26.785

a. VACATION: Employer contributes 8% of basic hourly rate for

5 years service and 6% of basic hourly rate for 6 months to

5 years service as vacation pay credit.

b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

ENGI0003-002 09/01/2014

Diver (Aqua Lung) (Scuba))

Diver (Aqua Lung) (Scuba)

(over a depth of 30 feet)...$ 61.50 27.06

Diver (Aqua Lung) (Scuba)

(up to a depth of 30 feet)..$ 52.13 27.06

Stand-by Diver (Aqua Lung)

(Scuba)............................$ 42.75 27.06

Diver (Other than Aqua Lung)

(Am-0007)

Diver (Other than Aqua

Lung)...........................$ 61.50 27.06

Diver Tender (Other than

Aqua Lung)..................$ 39.72 27.06

Stand-by Diver (Other than

Aqua Lung)..................$ 42.75 27.06

Helicopter Work

Airborne Hoist Operator for Helicopter..............$ 41.30 27.06

Co-Pilot of Helicopter......$ 41.44 27.06

Pilot of Helicopter.........$ 41.61 27.06

Power equipment operator -tunnel work

GROUP 1....................$ 37.74 27.06

GROUP 2....................$ 37.85 27.06

GROUP 3....................$ 38.02 27.06

GROUP 4....................$ 38.29 27.06

GROUP 5....................$ 38.60 27.06

GROUP 6....................$ 39.25 27.06

GROUP 7....................$ 39.57 27.06

GROUP 8....................$ 39.68 27.06

GROUP 9....................$ 39.79 27.06

GROUP 9A.................$ 40.02 27.06

GROUP 10...................$ 40.08 27.06

GROUP 10A.................$ 40.23 27.06

GROUP 11....................$ 40.38 27.06

GROUP 12....................$ 40.74 27.06

GROUP 12A.................$ 41.10 27.06

Power equipment operators:

GROUP 1....................$ 37.44 27.06

GROUP 2....................$ 37.55 27.06

GROUP 3....................$ 37.72 27.06

GROUP 4....................$ 37.99 27.06

GROUP 5....................$ 38.30 27.06

GROUP 6....................$ 38.95 27.06

GROUP 7....................$ 39.27 27.06

GROUP 8....................$ 39.38 27.06

GROUP 9....................$ 39.49 27.06

GROUP 9A.................$ 39.72 27.06

GROUP 10...................$ 39.78 27.06

GROUP 10A................$ 39.93 27.06

GROUP 11...................$ 40.08 27.06

GROUP 12...................$ 40.44 27.06

GROUP 12A................$ 40.80 27.06

GROUP 13...................$ 37.72 27.06

GROUP 13A.................$ 37.99 27.06

GROUP 13B.................$ 38.30 27.06

GROUP 13C.................$ 38.95 27.06

GROUP 13D.................$ 39.27 27.06

GROUP 13E…..............$ 39.38 27.06

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Fork Lift (up to and including 10 tons); Partsman

(heavy duty repair shop parts room when needed).

GROUP 2: Conveyor Operator (Handling building material);

Hydraulic Monitor; Mixer Box Operator (Concrete Plant).

GROUP 3: Brakeman; Deckhand; Fireman; Oiler;

Oiler/Gradechecker; Signalman; Switchman; Highline Cableway

Signalman; Bargeman; Bunkerman; Concrete Curing Machine

(self-propelled, automatically applied unit on streets, highways, airports and canals); Leveeman; Roller (5 tons and under); Tugger Hoist.

GROUP 4: Boom Truck or dual purpose "A" Frame Truck (5 tons or less); Concrete Placing Boom (Building Construction);

Dinky Operator; Elevator Operator; Hoist and/or Winch (one drum); Straddle Truck (Ross Carrier, Hyster and similar).

GROUP 5: Asphalt Plant Fireman; Compressors, Pumps, Generators and Welding Machines ("Bank" of 9 or more, individually or collectively); Concrete Pumps or Pumpcrete

Guns; Lubrication and Service Engineer (Grease Rack);

Screedman.

GROUP 6: Boom Truck or Dual Purpose "A” Frame Truck (over 5 tons); Combination Loader/Backhoe (up to and including 3/4

cu. yd.); Concrete Batch Plants (wet or dry); Concrete

Cutter, Groover and/or Grinder (self-propelled unit on streets, highways, airports, and canals); Conveyor or

Concrete Pump (Truck or Equipment Mounted); Drilling

Machinery (not to apply to waterliners, wagon drills or jack hammers); Fork Lift (over 10 tons); Loader (up to and including 3 and 1/2 cu. yds); Lull High Lift (under 40 feet); Lubrication and Service Engineer (Mobile); Maginnis

Internal Full Slab Vibrator (on airports, highways, canals and warehouses); Man or Material Hoist; Mechanical Concrete

Finisher (Large Clary, Johnson Bidwell, Bridge Deck and similar); Mobile Truck Crane Driver; Portable Shotblast

Concrete Cleaning Machine; Portable Boring Machine (under streets, highways, etc.); Portable Crusher; Power Jumbo

Operator (setting slip forms, etc., in tunnels); Rollers

(over 5 tons); Self-propelled Compactor (single engine);

Self-propelled Pavement Breaker; Skidsteer Loader with attachments; Slip Form Pumps (Power driven by hydraulic, electric, air, gas, etc., lifting device for concrete forms); Small Rubber Tired Tractors; Trencher (up to and including 6 feet); Underbridge Personnel Aerial Platform

(50 feet of platform or less).

GROUP 7: Crusher Plant Engineer, Dozer (D-4, Case 450, John

Deere 450, and similar); Dual Drum Mixer, Extend Lift;

Hoist and/or Winch (2 drums); Loader (over 3 and 1/2 cu.

yds. up to and including 6 yards.); Mechanical Finisher or

Spreader Machine (asphalt), (Barber Greene and similar)

(Screedman required); Mine or Shaft Hoist; Mobile Concrete

Mixer (over 5 tons); Pipe Bending Machine (pipelines only);

Pipe Cleaning Machine (tractor propelled and supported);

Pipe Wrapping Machine (tractor propelled and supported);

Roller Operator (Asphalt); Self-Propelled Elevating Grade

Plane; Slusher Operator; Tractor (with boom) (D-6, or similar); Trencher (over 6 feet and less than 200 h.p.);

Water Tanker (pulled by Euclids, T-Pulls, DW-10, 20 or 21, or similar); Winchman (Stern Winch on Dredge).

GROUP 8: Asphalt Plant Operator; Barge Mate (Seagoing);

Cast-in-Place Pipe Laying Machine; Concrete Batch Plant

(multiple units); Conveyor Operator (tunnel); Deckmate;

Dozer (D-6 and similar); Finishing Machine Operator

(airports and highways); Gradesetter; Kolman Loader (and similar); Mucking Machine (Crawler-type); Mucking Machine

(Conveyor-type); No-Joint Pipe Laying Machine; Portable

Crushing and Screening Plant; Power Blade Operator (under

12); Saurman Type Dragline (up to and including 5 yds.);

Stationary Pipe Wrapping, Cleaning and Bending Machine;

Surface Heater and Planer Operator, Tractor (D-6 and similar); Tri-Batch Paver; Tunnel Badger; Tunnel Mole and/or Boring Machine Operator Underbridge Personnel Aerial

Platform (over 50 feet of platform).

GROUP 9: Combination Mixer and Compressor (gunite); Do-Mor

Loader and Adams Elegrader; Dozer (D-7 or equal); Wheel and/or Ladder Trencher (over 6 feet and 200 to 749 h.p.).

GROUP 9A: Dozer (D-8 and similar); Gradesetter (when required by the Contractor to work from drawings, plans or specifications without the direct supervision of a foreman or superintendent); Push Cat; Scrapers (up to and including

20 cu. yds); Self-propelled Compactor with Dozer;

Self-Propelled, Rubber-Tired Earthmoving Equipment (up to and including 20 cu. yds) (621 Band and similar); Sheep's

Foot; Tractor (D-8 and similar); Tractors with boom (larger than D-6, and similar).

GROUP 10: Chicago Boom; Cold Planers; Heavy Duty Repairman or

Welder; Hoist and/or Winch (3 drums); Hydraulic Skooper

(Koehring and similar); Loader (over 6 cu. yds. up to and including 12 cu. yds.); Saurman type Dragline (over 5 cu.

(Am-0007) yds.); Self-propelled, rubber-tired Earthmoving Equipment

(over 20 cu. yds. up to and including 31 cu. yds.) (637D and similar); Soil Stabilizer (P & H or equal); Sub-Grader

(Gurries or other automatic type); Tractors (D-9 or equivalent, all attachments); Tractor (Tandem Scraper);

Watch Engineer.

GROUP 10A: Boat Operator; Cable-operated Crawler Crane (up to and including 25 tons); Cable-operated Power Shovel, Clamshell, Dragline and Backhoe (up to and including 1 cu.

yd.); Dozer D9-L; Dozer (D-10, HD41 and similar) (all attachments); Gradall (up to and including 1 cu. yd.);

Hydraulic Backhoe (over 3/4 cu. yds. up to and including 2

cu. yds.); Mobile Truck Crane Operator (up to and including

25 tons) (Mobile Truck Crane Driver Required);

Self-propelled Boom Type Lifting Device (Center Mount) (up to and including 25 tons) (Grove, Drott, P&H, Pettibone and similar; Trencher (over 6 feet and 750 h.p. or more); Watch

Engineer (steam or electric).

GROUP 11: Automatic Slip Form Paver (concrete or asphalt);

Band Wagon (in conjunction with Wheel Excavator);

Cable-operated Crawler Cranes (over 25 tons but less than

50 tons); Cable-operated Power Shovel, Clamshell, Dragline and Backhoe (over 1 cu. yd. up to 7 cu. yds.); Gradall

(over 1 cu. yds. up to 7 cu. yds.); DW-10, 20, etc.

(Tandem); Earthmoving Machines (multiple propulsion power units and 2 or more Scrapers) (up to and including 35 cu.

yds., "struck" m.r.c.); Highline Cableway; Hydraulic

Backhoe (over 2 cu. yds. up to and including 4 cu. yds.);

Leverman; Lift Slab Machine; Loader (over 12 cu. yds);

Master Boat Operator; Mobile Truck Crane Operator (over 25 tons but less than 50 tons); (Mobile Truck Crane Driver required); Pre-stress Wire Wrapping Machine; Self-propelled

Boom-type Lifting Device (Center Mount) (over 25 tons m.r.c.); Self-propelled Compactor (with multiple-propulsion power units); Single Engine Rubber Tired Earthmoving

Machine (with Tandem Scraper); Tandem Cats; Trencher

(pulling attached shield).

GROUP 12: Clamshell or Dipper Operator; Derricks; Drill Rigs;

Multi-Propulsion Earthmoving Machines (2 or more Scrapers)

(over 35 cu. yds "struck" m.r.c.); Operators (Derricks, Piledrivers and Cranes); Power Shovels and Draglines (7 cu.

yds. m.r.c. and over); Self-propelled rubber-tired

Earthmoving equipment (over 31 cu. yds.) (657B and similar); Wheel Excavator (up to and including 750 cu. yds.

per hour); Wheel Excavator (over 750 cu. yds. per hour).

GROUP 12A: Dozer (D-11 or similar or larger); Hydraulic

(Am-0007)

Excavators (over 4 cu. yds.); Lifting cranes (50 tons and over); Pioneering Dozer/Backhoe (initial clearing and excavation for the purpose of providing access for other equipment where the terrain worked involves 1-to-1 slopes that are 50 feet in height or depth, the scope of this work does not include normal clearing and grubbing on usual hilly terrain nor the excavation work once the access is provided); Power Blade Operator (Cat 12 or equivalent or over); Straddle Lifts (over 50 tons); Tower Crane, Mobile;

Traveling Truss Cranes; Universal, Liebher, Linden, and similar types of Tower Cranes (in the erection, dismantling, and moving of equipment there shall be an additional Operating Engineer or Heavy Duty Repairman);

Yo-Yo Cat or Dozer.

GROUP 13: Truck Driver (Utility, Flatbed, etc.)

GROUP 13A: Dump Truck, 8 cu.yds. and under (water level);

Water Truck (up to and including 2,000 gallons).

GROUP 13B: Water Truck (over 2,000 gallons); Tandem Dump

Truck, over 8 cu. yds. (water level).

GROUP 13C: Truck Driver (Semi-trailer. Rock Cans, Semi-Dump or Roll-Offs).

GROUP 13D: Truck Driver (Slip-In or Pup).

GROUP 13E: End Dumps, Unlicensed (Euclid, Mack, Caterpillar or similar); Tractor Trailer (Hauling Equipment); Tandem

Trucks hooked up to Trailer (Hauling Equipment)

BOOMS AND/OR LEADS (HOURLY PREMIUMS):

The Operator of a crane (under 50 tons) with a boom of 80 feet or more (including jib), or of a crane (under 50 tons) with leads of 100 feet or more, shall receive a per hour premium for each hour worked on said crane (under 50 tons) in accordance with the following schedule:

Booms of 80 feet up to but not including 130 feet or

Leads of 100 feet up to but not including 130 feet 0.50

Booms and/or Leads of 130 feet up to but not including 180 feet 0.75

Booms and/or Leads of 180 feet up to and including 250 feet 1.15

Booms and/or Leads over 250 feet 1.50

The Operator of a crane (50 tons and over) with a boom of 180 feet or more (including jib) shall receive a per hour premium for each hour worked on said crane (50 tons and over) in accordance with the following schedule:

Booms of 180 feet up to and including 250 feet 1.25

Booms over 250 feet 1.75

ENGI0003-004 09/01/2014

Dredging: (Boat Operators)

Boat Deckhand..................$ 37.72 27.06

Boat Operator....................$ 39.93 27.06

Master Boat Operator........$ 40.08 27.06

Dredging: (Clamshell or

Dipper Dredging)

GROUP 1.....................$ 40.44 27.06

GROUP 2.....................$ 39.78 27.06

GROUP 3.....................$ 39.38 27.06

GROUP 4.....................$ 37.72 27.06

Dredging: (Derricks)

GROUP 1.....................$ 40.44 27.06

GROUP 2.....................$ 39.78 27.06

GROUP 3.....................$ 39.38 27.06

GROUP 4.....................$ 37.72 27.06

Dredging: (Hydraulic Suction

Dredges)

GROUP 1.....................$ 40.08 27.06

GROUP 2.....................$ 39.93 27.06

GROUP 3.....................$ 39.78 27.06

GROUP 4.....................$ 39.72 27.06

GROUP 5.....................$ 37.88 26.76

Group 5.........................$ 39.38 27.06

GROUP 6.....................$ 37.77 26.76

Group 6........................$ 39.27 27.06

GROUP 7.....................$ 36.22 26.76

Group 7........................$ 37.72 27.06

CLAMSHELL OR DIPPER DREDGING CLASSIFICATIONS

GROUP 1: Clamshell or Dipper Operator.

GROUP 2: Mechanic or Welder; Watch Engineer.

GROUP 3: Barge Mate; Deckmate.

GROUP 4: Bargeman; Deckhand; Fireman; Oiler.

HYDRAULIC SUCTION DREDGING CLASSIFICATIONS

GROUP 1: Leverman.

GROUP 2: Watch Engineer (steam or electric).

GROUP 3: Mechanic or Welder.

GROUP 4: Dozer Operator.

GROUP 5: Deckmate.

GROUP 6: Winchman (Stern Winch on Dredge)

GROUP 7: Deckhand (can operate anchor scow under direction of

Deckmate); Fireman; Leveeman; Oiler.

DERRICK CLASSIFICATIONS

GROUP 1: Operators (Derricks, Piledrivers and Cranes).

GROUP 2: Saurman Type Dragline (over 5 cubic yards).

GROUP 3: Deckmate; Saurman Type Dragline (up to and including 5 yards).

GROUP 4: Deckhand, Fireman, Oiler.

ENGI0003-044 09/02/2013

Power Equipment Operators

(PAVING)

(10) Cold Planer............$ 38.25 26.98

(10)Loader (2 1/2 cu. yds.

and under).....................$ 37.42 26.98

(10)Soil Stabilizer.........$ 38.25 26.98

(11)Loader (over 2 1/2 cu.

yds. to and including 5

cu. yds.)..........................$ 37.74 26.98

(3)Roller Operator (five tons and under)...............$ 36.19 26.98

(5)Screed Person.............$ 37.42 26.98

(6)Combination

Loader/Backhoe (up to 3/4 cu.yd.).............................$ 35.48 26.98

(6)Concrete Saws and/or

Grinder (self-propelled unit on streets, highways, airports and canals)........$ 37.42 26.98

(6)Roller Operator (over five tons)........................$ 37.62 26.98

(7)Combination

Loader/Backhoe (over 3/4 cu.yd.)............................$ 36.46 26.98

(8) Asphalt Plant Operator..$ 37.89 26.98

Asphalt Concrete Material

(Am-0007)

Transfer........................$ 37.42 26.98

Asphalt Raker...............$ 36.46 26.98

Asphalt Spreader Operator...$ 37.94 26.98

Grader...........................$ 38.25 26.98

Laborer, Hand Roller.....$ 35.96 26.98

IRON0625-001 09/01/2013

Ironworkers:.....................$ 34.75 28.41

a. Employees will be paid $.50 per hour more while working in tunnels and coffer dams; $1.00 per hour more when required to work under or are covered with water (submerged) and when they are required to work on the summit of Mauna Kea, Mauna Loa or

Haleakala.

* LABO0368-001 09/01/2014

Laborers:

Driller.......................$ 34.30 16.71

Final Clean Up.........$ 24.70 12.54

Gunite Operator & High

Scaler........................$ 33.80 16.71

Laborer I...................$ 33.30 16.71

Laborer II..................$ 30.70 16.71

Powderman...............$ 34.30 16.71

Window Washer (bosun chair).$ 32.80 16.71

LABORERS CLASSIFICATIONS

Laborer I: Air Blasting run by electric or pneumatic compressor; Asphalt Laborer, Ironer, Raker, Luteman, and

Handroller, and all types of Asphalt Spreader Boxes;

Asphalt Shoveler; Assembly and Installation of Multiplates, Liner Plates, Rings, Mesh, Mats; Batching Plant (portable and temporary); Boring Machine Operator (under streets and sidewalks); Buggymobile; Burning and Welding; Chainsaw, Faller, Logloader, and Bucker; Compactors (Jackson Jumping

Jack and similar); Concrete Bucket Dumpman; Concrete

Chipping; Concrete Chuteman/Hoseman (pouring concrete) (the handling of the chute from ready-mix trucks for such jobs as walls, slabs, decks, floors, foundations, footings, curbs, gutters, and sidewalks); Concrete Core Cutter

(Walls, Floors, and Ceiling); Concrete Grinding or Sanding;

Concrete: Hooking on, signaling, dumping of concrete for extreme work over water on caissons, pilings, abutments, etc.; Concrete: Mixing, handling, conveying, pouring, (Am-0007) vibrating, otherwise placing of concrete or aggregates or by any other process; Concrete: Operation of motorized wheelbarrows or buggies or machines of similar character, whether run by gas, diesel, or electric power; Concrete

Placement Machine Operator: operation of Somero Hammerhead, Copperheads, or similar machines; Concrete Pump Machine

(laying, coupling, uncoupling of all connections and cleaning of equipment); Concrete and/or Asphalt Saw

(Walking or Handtype) (cutting walls or flatwork) (scoring old or new concrete and/or asphalt) (cutting for expansion joints) (streets and ways for laying of pipe, cable or conduit for all purposes); Concrete Shovelers/Laborers (Wet or Dry); Concrete Screeding for Rough Strike-Off: Rodding or striking-off, by hand or mechanical means prior to finishing; Concrete Vibrator Operator; Coring Holes: Walls, footings, piers or other obstructions for passage of pipes or conduits for any purpose and the pouring of concrete to secure the hole; Cribbers, Shorer, Lagging, Sheeting, and

Trench Jacking and Bracing, Hand-Guided Lagging Hammer

Whaling Bracing; Curbing (Concrete and Asphalt); Curing of

Concrete (impervious membrane and form oiler) mortar and other materials by any mode or method; Cut Granite Curb

Setter (setting, leveling and grouting of all precast concrete or stone curbs); Cutting and Burning Torch

(demolition); Dri Pak-It Machine; Environmental Abatement:

removal of asbestos, lead, and bio hazardous materials (EPA and/or OSHA certified); Falling, bucking, yarding, loading or burning of all trees or timber on construction site;

Forklift (9 ft. and under); Gas, Pneumatic, and Electric tools; Grating and Grill work for drains or other purposes;

Green Cutter of concrete or aggregate in any form, by hand, mechanical means, grindstone or air and/or water; Grout:

Spreading for any purpose; Guinea Chaser (Grade Checker) for general utility trenches, sitework, and excavation;

Headerboard Man (Asphalt or Concrete); Heat Welder of

Plastic (Laborers' AGC certified workers) (when work involves waterproofing for waterponds, artificial lakes and reservoir) heat welding for sewer pipes and fusion of HDPE pipes; Heavy Highway Laborer (Rigging, signaling, handling, and installation of pre-cast catch basins, manholes, curbs and gutters); High Pressure Nozzleman - Hydraulic Monitor

(over 100# pressure); Jackhammer Operator; Jacking of slip forms: All semi and unskilled work connected there within;

Laying of all multi-cell conduit or multi-purpose pipe;

Magnesite and Mastic Workers (Wet or Dry)(including mixer operator);Mortar Man; Mortar Mixer (Block, Brick, Masonry, and Plastering); Nozzleman (Sandblasting and/or Water

Blasting): handling, placing and operation of nozzle;

Operation, Manual or Hydraulic jacking of shields and the use of such other mechanical equipment as may be necessary;

(Am-0007)

Pavement Breakers; Paving, curbing and surfacing of streets, ways, courts, under and overpasses, bridges, approaches, slope walls, and all other labor connected therewith; Pilecutters; Pipe Accessment in place, bolting and lining up of sectional metal or other pipe including corrugated pipe; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, HDPE, metallic or non-metallic, conduit, and any other stationary-type of tubular device used for conveying of any substance or element, whether water, sewage, solid, gas, air, or other product whatsoever and without regard to the nature of material from which tubular material is fabricated; No-joint pipe and stripping of same, Pipewrapper, Caulker, Bander, Kettlemen, and men applying asphalt, Laykold, treating Creosote and similar-type materials (6-inch) pipe and over); Piping: resurfacing and paving of all ditches in preparation for laying of all pipes; Pipe laying of lateral sewer pipe from main or side sewer to buildings or structure (except Contactor may direct work be done under proper supervision); Pipe laying, leveling and marking of the joint used for main or side sewers and storm sewers; Laying of all clay, terra cotta, ironstone, vitrified concrete, HDPE or other pipe for drainage; Placing and setting of water mains, gas mains and all pipe including removal of skids; Plaster Mortar

Mixer/Pump; Pneumatic Impact Wrench; Portable Sawmill

Operation: Choker setters, off bearers, and lumber handlers connected with clearing; Posthole Digger (Hand Held, Gas, Air and Electric); Powderman's Tender; Power Broom Sweepers

(Small); Preparation and Compaction of roadbeds for railroad track laying, highway construction, and the preparation of trenches, footings, etc., for cross-country transmission by pipelines, electrical transmission or underground lines or cables (by mechanical means); Raising of structure by manual or hydraulic jacks or other methods and resetting of structure in new locations, including all concrete work; Ramming or compaction; Rigging in connection with Laborers' work (except demolition), Signaling

(including the use of walkie talkie) Choke Setting, tag line usage; Tagging and Signaling of building materials into high rise units; Riprap, Stonepaver, and Rock Slinger

(includes placement of stacked concrete, wet or dry and loading, unloading, signaling, slinging and setting of other similar materials); Rotary Scarifier (including multiple head concrete chipping Scarifier); Salamander

Heater, Drying of plaster, concrete mortar or other aggregate; Scaffold Erector Leadman; Scaffolds: (Swing and hanging) including maintenance thereof; Scaler; Septic

(Am-0007)

Tank/Cesspool and Drain Fields Digger and Installer;

Shredder/Chipper (tree branches, brush, etc.); Stripping and Setting Forms; Stripping of Forms: Other than panel forms which are to be re-used in their original form, and stripping of forms on all flat arch work; Tampers (Barko, Wacker, and similar type); Tank Scaler and Cleaners;

Tarman; Tree Climbers and Trimmers; Trencher (includes hand-held, Davis T-66 and similar type); Trucks (flatbed up to and including 2 1/2 tons when used in connection with on-site Laborers’ work; Trucks (Refuse and Garbage Disposal)

(from job site to dump); Vibra-Screed (Bull Float in connection with Laborers' work); Well Points, Installation of or any other dewatering system.

Laborer II: Asphalt Plant Laborer; Backfilling, Grading and all other labor connected therewith; Boring Machine Tender;

Bridge Laborer; Burning of all debris (crates, boxes, packaging waste materials); Chainman, Rodmen, and Grade

Markers; Cleaning, clearing, grading and/or removal for streets, highways, roadways, aprons, runways, sidewalks, parking areas, airports, approaches, and other similar installations; Cleaning or reconditioning of streets, ways, sewers and waterlines, all maintenance work and work of an unskilled and semi-skilled nature; Concrete Bucket Tender

(Groundman) hooking and unhooking of bucket; Concrete

Forms; moving, cleaning, oiling and carrying to the next point of erection of all forms; Concrete Products Plant

Laborers; Conveyor Tender (conveying of building materials); Crushed Stone Yards and Gravel and Sand Pit

Laborers and all other similar plants; Demolition, Wrecking and Salvage Laborers: Wrecking and dismantling of buildings and all structures, with use of cutting or wrecking tools, breaking away, cleaning and removal of all fixtures, All hooking, unhooking, signaling of materials for salvage or scrap removed by crane or derrick; Digging under streets, roadways, aprons or other paved surfaces; Driller's Tender;

Chuck Tender, Outside Nipper; Dry-packing of concrete

(plugging and filling of she-bolt holes); Fence and/or

Guardrail Erector: Dismantling and/or re-installation of all fence; Finegrader; Firewatcher; Flagman (Coning, preparing, establishing and removing portable roadway barricade devices); Signal Men on all construction work defined herein, including Traffic Control Signal Men at construction site; General Excavation, Backfilling and

Grading (all labor connected therewith); Digging of trenches, ditches and manholes and the leveling, grading and other preparation prior to laying pipe or conduit for any purpose; Excavations and foundations for buildings, piers, foundations and holes, and all other construction.

Preparation of street ways and bridges; General Laborer:

(Am-0007)

Cleaning and Clearing of all debris and surplus material.

Clean-up of right-of-way. Clearing and slashing of brush or trees by hand or mechanical cutting. General Clean up:

sweeping, cleaning, wash-down, wiping of construction facility and equipment (other than "Light Clean up

(Janitorial) Laborer. Garbage and Debris Handlers and

Cleaners. Scraping of floors. Appliance Handling (job site)

(after delivery unlading in storage area); Ground and Soil

Treatment Work (Pest Control); Gunite or Shotcrete Operator

Tender; Junk Yard Laborers (same as Salvage Yard); Laser

Beam "Target Man" in connection with Laborers' work; Layout

Person for Plastic (when work involves waterproofing for waterponds, artificial lakes and reservoirs); Limbers, Brush Loaders, and Pilers; Loading, Unloading, carrying, distributing and handling of all rods and material for use in reinforcing concrete construction (except when a derrick or outrigger operated by other than hand power is used);

Loading, unloading, sorting, stockpiling, handling and distribution of water mains, gas mains and all pipes;

Loading and unloading of all materials, fixtures, furnishings and appliances from point of delivery to stockpile to point of installation; hooking and signaling from truck, conveyance or stockpile; Material Yard

Laborers; Pipelayer Tender; Pipewrapper, Caulker, Bander, Kettlemen, and men applying asphalt, Laykold, Creosote, and similar-type materials (pipe under 6 inches); Plasterer

Laborer; Preparation, construction and maintenance of roadbeds and sub-grade for all paving, including excavation, dumping, and spreading of sub-grade material;

Prestressed or precast concrete slabs, walls, or sections:

all loading, unloading, stockpiling, hooking on of such slabs, walls or sections; Quarry Laborers; Railroad, Streetcar, and Rail Transit Maintenance and Repair;

Roustabout; Rubbish Trucks in connection with Building

Construction Projects (excluding clearing, grubbing, and excavating); Salvage Yard: All work connected with cutting, cleaning, storing, stockpiling or handling of materials, all cleanup, removal of debris, burning, back-filling and landscaping of the site; Sandblasting Tender (Pot Tender):

Hoses and pots or markers; Scaffolds: Erection, planking and removal of all scaffolds used for support for lathers, plasters, brick layers, masons, and other construction trades crafts; Scaffolds: (Specially designed by carpenters) laborers shall tend said carpenter on erection and dismantling thereof, preparation for foundation or mudsills, maintenance; Scraping of floors; Screeds:

Handling of all screeds to be reused; handling, dismantling and conveyance of screeds; Setting, leveling and securing or bracing of metal or other road forms and expansion joints; Sheeting Piling/trench shoring (handling and

(Am-0007) placing of skip sheet or wood plank trench shoring); Ship

Scalers; Shipwright Tender; Sign Erector (subdivision traffic, regulatory, and street-name signs); Sloper; Slurry

Seal Crews (Mixer Operator, Applicator, Squeegee Man, Shuttle Man, Top Man); Snapping of wall ties and removal of tie rods; Soil Test operations of semi and unskilled labor such as filling sand bags; Striper (Asphalt, Concrete or other Paved Surfaces); Tool Room Attendant (Job Site);

Traffic Delineating Device Applicator; Underpinning, lagging, bracing, propping and shoring, loading, signaling, right-of-way clearance along the route of movement, The clearance of new site, excavation of foundation when moving a house or structure from old site to new site; Utilities employees; Water Man; Waterscape/Hardscape Laborers; Wire

Mesh Pulling (all concrete pouring operations); Wrecking, stripping, dismantling and handling concrete forms an false work.

LABO0368-002 09/01/2014

Landscape & Irrigation

Laborers

GROUP 1.....................$ 23.20 10.11

GROUP 2.....................$ 23.70 10.11

GROUP 3.....................$ 19.70 10.11

LABORERS CLASSIFICATIONS

GROUP 1: Installation of non-potable permanent or temporary irrigation water systems performed for the purposes of

Landscaping and Irrigation architectural horticultural work; the installation of drinking fountains and permanent or temporary irrigation systems using potable water for

Landscaping and Irrigation architectural horticultural purposes only. This work includes (a) the installation of all heads, risers, valves, valve boxes, vacuum breakers

(pressure and non-pressure), low voltage electrical lines and, provided such work involves electrical wiring that will carry 24 volts or less, the installation of sensors, master control panels, display boards, junction boxes, conductors, including all other components for controllers,

(b) and metallic (copper, brass, galvanized, or similar) pipe, as well as PVC or other plastic pipe including all work incidental thereto, i.e., unloading, handling and distribution of all pipes fittings, tools, materials and equipment, (c) all soldering work in connection with the above whether done by torch, soldering iron, or other

(Am-0007) means; (d) tie-in to main lines, thrust blocks (both precast and poured in place), pipe hangers and supports incidental to installation of the entire irrigation system,

(e) making of pressure tests, start-up testing, flushing, purging, water balancing, placing into operation all irrigation equipment, fixtures and appurtenances installed under this agreement, and (f) the fabrication, replacement, repair and servicing of landscaping and irrigation systems.

Operation of hand-held gas, air, electric, or self-powered tools and equipment used in the performance of Landscape and Irrigation work in connection with architectural horticulture; Choke-setting, signaling, and rigging for equipment operators on job-site in the performance of such

Landscaping and Irrigation work; Concrete work (wet or dry) performed in connection with such Landscaping and

Irrigation work. This work shall also include the setting of rock, stone, or riprap in connection with such

Landscape, Waterscape, Rockscape, and Irrigation work;

Grubbing, pick and shovel excavation, and hand rolling or tamping in connection with the performance of such

Landscaping and Irrigation work; Sprigging, handseeding, and planting of trees, shrubs, ground covers, and other plantings and the performance of all types of gardening and horticultural work relating to said planting; Operation of flat bed trucks (up to and including 2 1/2 tons).:

GROUP 2. Layout of irrigation and other non-potable irrigation water systems and the layout of drinking fountains and other potable irrigation water systems in connection with such Landscaping and Irrigation work. This includes the layout of all heads, risers, valves, valve boxes, vacuum breakers, low voltage electrical lines, hydraulic and electrical controllers, and metallic

(coppers, brass, galvanized, or similar) pipe, as well as

PVC or other plastic pipe. This work also includes the reading and interpretation of plans and specifications in connection with the layout of Landscaping, Rockscape, Waterscape, and Irrigation work; Operation of

Hydro-Mulching machines (sprayman and driver), Drillers, Trenchers (riding type, Davis T-66, and similar) and fork lifts used in connection with the performance of such

Landscaping and Irrigation work; Tree climbers and chain saw tree trimmers, Sporadic operation (when used in connection with Landscaping, Rockscape, Waterscape, and

Irrigation work) of Skid-Steer Loaders (Bobcat and similar), Cranes (Bantam, Grove, and similar), Hoptos, Backhoes, Loaders, Rollers, and Dozers (Case, John Deere, and similar), Water Trucks, Trucks requiring a State of

Hawaii Public Utilities Commission Type 5 and/or type 7 license, sit-down type and "gang" mowers, and other

(Am-0007) self-propelled, sit-down operated machines not listed under

Landscape & Irrigation Maintenance Laborer; Chemical spraying using self-propelled power spraying equipment (200 gallon capacity or more).

GROUP 3: Maintenance of trees, shrubs, ground covers, lawns and other planted areas, including the replanting of trees, shrubs, ground covers, and other plantings that did not

"take" or which are damaged; provided, however, that re-planting that requires the use of equipment, machinery, or power tools shall be paid for at the rate of pay specified under Landscape and Irrigation Laborer, Group 1;

Raking, mowing, trimming, and running, including the use of

"weed eaters", hedge trimmers, vacuums, blowers, and other hand-held gas, air, electric, or self-powered tools, and the operation of lawn mowers (Note: The operation of sit-down type and "gang" mowers shall be paid for at the rate of pay specified under Landscape & Irrigation Laborer, Group 2); Guywiring, staking, propping, and supporting trees; Fertilizing, Chemical spraying using spray equipment with less than 200 gallon capacity, Maintaining irrigation and sprinkler systems, including the staking, clamping, and adjustment of risers, and the adjustment and/or replacement of sprinkler heads, (Note: the cleaning and gluing of pipe and fittings shall be paid for at the rate of pay specified under Landscape & Irrigation Laborer(Group 1); Watering by hand or sprinkler system and the performance of other types of gardening, yardman, and horticultural-related work.

LABO0368-003 09/02/2013

Underground Laborer

GROUP 1.....................$ 32.90 15.96

GROUP 2.....................$ 34.40 15.96

GROUP 3.....................$ 34.90 15.96

GROUP 4.....................$ 35.90 15.96

GROUP 5.....................$ 36.25 15.96

GROUP 6.....................$ 36.50 15.96

GROUP 7.....................$ 36.95 15.96

GROUP 1: Watchmen; Change House Attendant.

GROUP 2: Swamper; Brakeman; Bull Gang-Muckers, Trackmen;

Dumpmen (any method); Concrete Crew (includes rodding and spreading); Grout Crew; Reboundmen

GROUP 3: Chucktenders and Cabletenders; Powderman (Prime

House); Vibratorman, Pavement Breakers

GROUP 4: Miners - Tunnel (including top and bottom man on shaft and raise work); Timberman, Retimberman (wood or steel or substitute materials thereof); Blasters, Drillers, Powderman (in heading); Microtunnel Laborer; Headman;

Cherry Pickerman (where car is lifted); Nipper; Grout

Gunmen; Grout Pumpman & Potman; Gunite, Shotcrete Gunmen &

Potmen; Concrete Finisher (in tunnel); Concrete Screed Man;

Bit Grinder; Steel Form Raisers & Setters; High Pressure

Nozzleman; Nozzleman (on slick line); Sandblaster-Potman

(combination work assignment interchangeable); Tugger

GROUP 5: Shaft Work & Raise (below actual or excavated ground level); Diamond Driller; Gunite or Shotcrete Nozzleman;

Rodman; Groundman

GROUP 6: Shifter

GROUP 7: Shifter (Shaft Work & Raiser)

PAIN1791-001 07/01/2014

Painters:

Brush..............................$ 34.35 26.20

Sandblaster; Spray..........$ 34.35 26.20

PAIN1889-001 07/01/2014

Glaziers...............................$ 34.10 27.29

PAIN1926-001 02/24/2013

Soft Floor Layers................$ 29.14 22.91

PAIN1944-001 01/01/2014

Taper..................................$ 40.00 20.45

PLAS0630-001 09/02/2013

PLASTERER........................$ 37.64 23.22

PLAS0630-002 09/02/2013

Cement Masons:

Cement Masons.....................$ 36.80 23.22

Trowel Machine Operators....$ 36.95 23.22

PLUM0675-001 07/06/2014

Plumber, Pipefitter, Steamfitter & Sprinkler Fitter….$ 38.85 24.11

ROOF0221-001 09/07/2014

Roofers (Including Built Up, Composition and Single Ply)......$ 38.10 17.13

SHEE0293-001 09/01/2013

Sheet metal worker......................$ 37.25 22.73

SUHI1997-002 09/15/1997

Drapery Installer................$ 13.60 1.20

FENCE ERECTOR (Chain Link

Fence)..................................$ 9.33 1.65

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after

(Am-0007) award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Section 00900, Appendix B, Request for Information

(Am-0007)

RFI # RFI Response 6 Will we be required to install a turbidity barrier or other BMP’s? The contractor must include measures that minimize construction-related turbidity in near shore waters in accordance with Environmental Protection Plan requirements, Section 01 57 20, Para 1.7.2.f. This will allow the field to determine and/or enforce use of a silt curtain.

7 Confirm that the work does not extend below the waterline. See Note 1 on Sheet CS101. All work will be conducted above MLLW = 0.0'

8 Confirm that the new rock section is to be 3.5 feet thick (1.5’ thick underlayer + 2.0’ thick armor).

See Note 3 on Sheet C-501. For repairs between Sta. 7+36.22 to Sta.

18+43.57, the bedding stone layer will be 1.5 thick between elevations 0.0' to 1.0' MLLW.

9 Is there a staging area that we can use at the harbor? Proposed area is located on the revetted dike between Stations 5+00 and 6+00 as shown on Sheet CS101. However, the staging area will be coordinated with the Department of Land and Natural Resources (DLNR) Division of Boating and Ocean Recreation (DOBOR) and who will make the final determination.

12 Confirm that a field office is not required for this job. Confirmed. However, a small modular office for the Contractor is permitted. A working space for the Government representative is required per Section 01 90 00, para 1.12. Contractor will coordinate with the State of Hawaii Department of Land and Natural Resources (DLNR) Division of Boating and Ocean Recreation (DOBOR) for an available space.

22a To what extent is there Environmental protection? Contractor must comply with all regulations in Section 01 57 20, para 1.1 Reference.

23 The "Notes" contained on sheet CS101 of the drawings, in part, contain the following statement: "All Work shall be conducted above the mean lower low waterline." However, the cross section drawing on page C 501, as wellas Note 3 on page C501, indicate additional bedding and/or amor stone to be placed well below the MLLW. Which requirement is correct?

See sheet C501. Refer to Sheet CS101, All work will be conducted above MLLW.

25 The acual inner and outer slopes of the revetment vary significantly from the 2 to 1 slopw shown on the drawings. In paragraph 3.2.2, on page C-001, titled "Placement," in part states, "Stone tolerance of plus or minus 6 inches from the lines, grades and elevations indicated is allowed." In order to reestablish the 2 to 1 slope specified, AND provide the surface profile currently specified, an indeterminate amount of stone realignment will be necessary for the entire elngth of the revement, in conjunction with the addition, and/or replacement of stones to achieve the specified slope, and comply with that portion of the placement specification that states:

"States shall be generally rectangular in cross-section, the least dimension of any stone being not less than one-third of its greatest dimension.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .