1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0004 15 Jul 10

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Contracting Division USAED, Honolulu, Bldg 230 Ft Shafter, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A-10-R-0014 X

9B. DATED (SEE ITEM 11)

6/21/10

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Service Disabled Veteran Owned Small Business (SDVOSB) Multiple Award Task Order Contract (MATOC) for Design- Bid-Build and Design-Build Construction Services within the Honolulu Engineer District Area of Responsibility

See Page 2 of 2 for more detailed information.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RFP No. W9128A-10-R-0014 Standard Form 30 Amendment No. AM-0004 Page 2 of 2 Item No. 14 (Continued)

CHANGES TO THE SOLICITATION. Attached hereto are new and revised pages to the solicitation.

The revision marked “(AM-0004)” is shown on each page. Six (6) pages are attached with this amendment.

1. This solicitation is changed with this amendement 0004. This amendment has incorporated Questions and Answers (Q&A) from RFI requests in SECTION 00900.

2. This amendment will change SECTION 00010 Proposal Schedule CLIN 0001 ‘Project Engineer’ to ‘Project Manager’.

3. The proposal due date of July 22, 2010, 2:00 P.M., Hawaiian Standard Time, remains unchanged.

AM-0004

W9128A- 10-R-0014 00010-3

Section 00010 - Proposal Schedule

SOLICITATION NO. W9128A-10-R-0014

PROPOSAL SCHEDULE

CLIN DESCRIPTION RATES MANDAYS TOTAL

0001 Project Manager $_______ 200 $_______________

0002 Quality Control Representative $_______ 200 $_______________

0003 Site Safety and Health Officer $_______ 200 $_______________

Subtotal $_______________

Home Office Overhead Rate ________% $_______________

Total $_______________

_____ Proposals for task order solicitations will include Facilities Capital Cost of Money

_____ Proposals for task order solicitations will not include Facilities Capital Cost of Money

J4CTSMJA

Typewritten Text

J4CTSMJA

Typewritten Text

J4CTSMJA

Line

J4CTSMJA

Typewritten Text

(AM-0004)

J4CTSMJA

Typewritten Text

J4CTSMJA

Typewritten Text

J4CTSMJA

Typewritten Text

Typewritten Text

RFP No W9128A-10-R-0014

SECTION 00900

Questions and Answers

(AM-0004)

Q # Date Question Answer 1 July 12, In Volume 1 of our Proposal, should the Surety Letter or the JV/Teaming Agreements occupy Tab 1?

At the moment we are planning our tab breakdown as follows:

Volume 1, Non-Price Proposal Tab 1: JV/Teaming Agreements Tab 2: Surety Letters Tab 3: Experience and Performance Risk Tab 4: Past Performance

Volume 2, Price Tab 1: SF 1442 Tab 2: Price Proposal Schedule Tab 3: Representations and Certifications Tab 4: SF LLL

See AM-0001, SECTION 00120, See 2.0 Proposal Format

2 July 12, Can you kindly clarify if the 5 projects should be shown for only the prime contractor or if all team members should be showing project examples, and past performance?

See AM-0001, SECTION 00120, 2.5.1 Relevant Contracts, paragraph 4, Joint Venture Offerors may submit a maximum of 5 relevant contracts.

3 July 12, On solicitation W9128A-10-R-0014 are there any specific qualification requirements for the three Proposal Schedule individuals listed: Project Engineer, Quality Control Representative, and Site Safety & Health Officer and if so will they be distributed by amendment?

Please reference Amendment 0002, Division 1 Specs:

Section 01 45 04 Quality Control Representative

Section 01 35 29 Site Safety and Health Officer 1.6.1.2

Section 01 90 00 Project Manager 1.2.4

Please see AM-0004, item 2 for Proposal Schedule CLIN 0001 change.

4 July 12, Per the original RFP as well as Amendment 1, under section 00120, 2.1.1 it states that Volume I, Non-Price Proposal requires a submission of 1 original and 5 copies. It also states that Volume 1 shall also include 1 Original and 2 copies (certified as a true copy) of the Offeror's Joint Venture Agreement.

Does this mean that we (the Contractors) are to submit 3 JV Agreements in each of the 6 binders? This would mean that the Government would have 18 originals/copies of the JV Agreements.

See AM-0001, SECTION 00120, 2.1.1 Volume 1, Non-Price Proposal. Offeror shall submit 1 original + 5 copies of the proposal package.

The ORIGINAL Volume 1 package must also include one (1) original and additional certified (2) copies of the JV agreement which will be incorporated in the ‘Original’ volume only.

No copy of the JV agreement is necessary for the submission copies.

5 July 12, In reference to W9128A-10-R-0014, AM-0001, SECTION 00900-22, 00120-7, 2.5.2.2. Submission Requirements (2). The Offeror shall submit a letter from their proposed surety stating the maximum single contract bonding amount (minimum of $500,000) and the aggregate amount for all contracts (minimum of $1.5M).

Question: Is FAR 28.203-1 Security interests by an individual surety…(1) An escrow account with a federally insured financial institution……..acceptable for this MATOC solicitation?

See AM-0001, SECTION 00120, 2.5.2.2 Submission Requirements item (2). Sureties names must appear on the list contained in Treasury Department Circular 570. This circular may be found at:

U.S. Department of Treasury Financial Management Service Surety Bond Branch 3700 East West Highway, Room 6F01 Hyattsville, MD 20782 Or via the internet at http://www.fms.treas.gov/c57 0/

Please refer to the most recent amendment for possible changes to the proposal due date and time.

http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.fms.treas.gov/c570/� http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.fms.treas.gov/c570/�

6 July 12, Are formal teaming agreements, which are not JV's, allowed, where the prime SDVOSB company acts as Team Leader and prime contractor and the other team members are key subcontractors? If so, can the contract experience and past performance references of the other team members then be used in the proposal?

See AM-0001, SECTION 00120, 2.5.1 Relevant Contracts, paragraph 4.

See AM-0001, SECTION 00120, 2.5.2 Factor 1, Experience and Performance Risk, paragraph 6.

A Joint Venture is a contractual agreement joining together two or more parties for the purpose of executing a particular business undertaking. JV’s will have a single DUNS, Cage Code and TAX ID.

The Offeror must be a legal Joint Venture to receive the privileges of sharing past performance information.

7 July 12, Amendment 1 in block 11 of SF 30, states that the hour and date for receipt of Offers is not extended, however, page 2, paragraph 4, states that "The proposal due date of July 22, 2010, 2:00 P.M., Hawaiian Standard Time, remains unchanged.". The SF1442 included in the solicitation RFP listed in block 13A, stated a due date of 2010.07.21.14:00 HST. Please clarify.

See Amendments 0001, item 4; 0002, item 3;

0003, item 4; 0004. Item 2.

8 July 13,

1. Can you confirm that the rates we are to quote in the Proposal Schedule DO NOT include profit or general & administrative costs?

Answer to Q1:

Reference page 00010-4, Para 4 (a), (AM- 0003). CLINS are to only include what is stated in page 00010-4, para 4(a). Profit and General & Administrative costs are not to be included.

http://www.businessdictionary.com/definition/agreement.html� http://www.investorwords.com/3610/party.html� http://www.businessdictionary.com/definition/executing.html� http://www.investorwords.com/623/business.html� http://www.businessdictionary.com/definition/undertaking.html�

2. Is there a definition of what can (or must be) included in the quoted overhead rate? Is insurance to be included? What about the performance and payment bonds?

3. The RFP doesn’t require listing of all expected subcontractors, but the amendment #2 (draft contract) requires subs to be approved. Are subs required to be listed in the proposal, or will they be approved during negotiations for final award?

Answer to Q2:

Reference page 00010-4, Para 4 (a), (AM- 0003). The Government has stated only what should NOT be included in the Home Office Overhead Rate in page 00010-4, para 4(b).

Performance and payment bonds are usually a direct cost to a contract.

Answer to Q3:

No expected subcontractors submissions are required to be included in response to this RFP. However, See SECTION 00800, page 2, DB-13 KEY PERSONNEL, SUBCONTRACTORS AND OUTSIDE

ASSOCIATES OR CONSULTANTS (MAY

2006) that may be applicable to specific Design Build Task Order RFPs.

9 14 July

W9128A-10-R-0014 RFP, Section 00120, 2.1.2, states:

2.1.2 Volume II, Price Proposal

The second envelope shall be clearly marked, “VOLUME II, PRICE PROPOSAL, RFP NO. W9128A-10-R-0014.

Volume II shall also include the following:

• Original and two copies of the Offeror’s completed Standard Form (SF) 1442, using a printed copy of the SF 1442 included in this solicitation for the contract.

tamit

• Original and two copies of Section 00010, Price Proposal Schedule. Indicate whether or not Facilities Capital Cost of Money is included in the Offeror’s costs of performing the work.

Proposals that state that Facilities Capital Cost of Money is not included, or proposal that do not address Facilities Capital Cost of Money, will be deemed to have waived Facilities Capital Cost of

See SECTION 00120,(AM-0001), 2.1.2

The Offeror shall submit an ‘original and 2 copies’ for Volume II for a total of 3.

Money.

• Original and two copies of the Offeror’s completed Section 00600, Representations and Certifications, using a printed copy of Section 00600 included in this solicitation. Please note that the representations and certifications must also be completed electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov.

• Original and two copies of the Offeror’s completed, if applicable, SF LLL, Disclosure of Lobbying Activities, using a printed copy of the SF LLL included as Appendix A in Section 00600.

QUESTION:

Is the Contracting office looking for (3) Individually bound books, each containing each of the items above?

Much like, one original book containing the four original documents (tabbed), with two copies of that original book (tabbed)? Much like the bounding format of Volume 1?

-OR-

Is the Contracting office looking for a total of (12) individually bound books of each original and the associated copies (x2)

--------------------------------------------------------End---------------------http://orca.bpn.gov/�

Typewritten Text NOTE to Offerors: The Federal Government is not responsible for notifying offerors or potential offerors when amendments to this or any solicitation are posted. Please due diligence and check FedBizOps (FBO) daily for amendment updates (as applicable) and thoroughly read all amendment material posted.

Typewritten Text