This sources sought response form and related federal contract opportunity seek information from contractors interested in the Three Rivers Phase 2 Construction project in Arkansas. The project includes constructing a 2.3 mile soil-cement containment structure, excavating, installing riprap, replacing culverts, and removing an existing bridge bypass. Firms must demonstrate experience with projects over $65 million involving hydraulic structures, soil cement, concrete, and large riprap construction. Responses are due February 12, 2024 and must include the firm's capabilities, three past project examples, experience with large and complex horizontal construction and difficult conditions, bonding capacity, and interest in the future solicitation. The estimated $65-75 million design-build contract would be awarded in September 2024 by the US Army Corps of Engineers Little Rock District, with completion expected in December 2027.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: Design-Bid-Build of Three Rivers, Phase 2 Construction C-157 Containment Structure, La Grues 36" and 60" Culvert Replacement, and Owens Weir Bridge Culvert Near Montgomery Point, AR

Business Name & Address:

UEI Number: CAGE Code:

Point of Contact (POC) Name:

Phone :

E-Mail Address:

Business Size: Mark ALL That Apply

Capabilities:

Provide examples of the firm's capability to perform a contract of this magnitude and complexity (include contracts performed with a similar scope and comparable work performed within the past 5 years. Provide at least 3 examples below.

Sources Sought U.S. Army Corp of Engineers

Little Rock District

Small Business

SBA Certified 8A Program Participant

SBA Certified Historically Underutilized Business Zones (HUB-Zone)

Service-Disabled Veteran-Owned Small Business (SDVOSB)

Woman-Owned Small Business (WOSB)

Large Business

M4CT9LSR

Highlight

PROJECT 1

Include a brief description of the project, customer name, timeliness of performance, customer satisfaction, and dollar value of the project.

PROJECT 2

PROJECT 3

Small Businesses are Reminded: In accordance with FAR 52.219-14, Limitations on Subcontracting, at least 50% of the cost of contract performance incurred for personnel shall be expended for employees of the concern.

Statement of Interest:

Yes, this firm is interested in bidding on the solicitation when it is issued.

Describe your experience in Horizontal Construction in excess of $65,000,000.00 and identify your firm's role in the endeavor.

Discuss your proposed teaming arrangement... Self perform, joint venture, Mentor Protégés etc.

Describe your experience in working in challenging topographic condititions.

Describe your experience in working in areas that experience seasonal inundation (flooding).

Provide Bonding Capacity

Additional Comments:

Form Completed by Name & Title:

Signature:

business name and address:
project 2:
project 3:
project 1:
additional comments: *
CAGE:
DUNS:
PHONE:
EMAIL ADDRESS:
BOX PG1:
0: Off
1: Off
2: Off
3: Off
4: Off
poc name:
name & title:
Check Box1: Off
Text2:

File details come from the government source that posted it. Updated .