Architect-Engineering (AE)
Indefinite Delivery Contracts (IDC) in Support of the Little Rock District and
Southwest Division, Corps of Engineers, Civil & Military Requirements
W9127S-23-R-6010
AMENDMENT 01
US ARMY CORPS OF ENGINEERS
LITTLE ROCK DISTRICT
The purpose of this amendment is to:
1. Provide Projnet Bidder inquiry Questions and Government Responses.
2. Provide additional information concerning required resumes.
a. A person may fulfill multiple disciplines (role / position). If a person fulfills more than one position, their resume must be submitted under each discipline.
b. Resumes must be listed in the order shown below. Master Planner has also been added.
Program Management, Project Management, Anti- Terrorism/Force Protection Designer
Architect, BIM specialist, CADD Specialist, Civil Engineer, Commissioning Agent, Construction Engineer, Construction Quality Assurance Representative, Construction Representative, Cost Engineer, Electrical Engineer, Engineering Technician, Environmental Engineer, Fire Protection Engineer, Geologist, Geotechnical Engineer, Industrial Hygienist, Interior Designer, Landscape Architect, LEED Accredited Professional, Licensed Project Engineer, Master Planner
Mechanical Engineer, Project Scheduler (Primavera proficiency required), Registered Communications Distribution Designer, Registered Professional Land Surveyors, Structural Engineer, Technical Writer, and
Value Engineer
3. Extend SF330 Due Date / Time:
The due date / time for submitting SF330s has been extended to Thursday, December 8, 2022 at 11:00 AM Central time.
Bid Inquiry Contractor Report All Inquiries
Id Discipline Sheet Detail Spec
9985750 General Solicitation Solicitation Solicitation
Comment Classification: Controlled Unclassified Information (CUI)
In Section 3.b.(1) it indicates that the following should be included for each Section E
Resume..."experience in medical planning and design", yet medical planning and design are not listed in specialized experience and technical competence, or anywhere else in the solicitation. Please confirm if medical planning and design is part of this solicitation and should be addressed in each Section E Resume. Thanks!
On: Nov 08 2022.
Government Response. . Medical planning and design are NOT required for this solicitation. On: Nov 17 2022
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9988699 General 8 Submission Requirements
Comment Classification: Public (Public)
4.2 indicates a DUNS number is required. The website listed for obtaining one no longer exists, so is that an outdated request?
On: Nov 10 2022.
Government Response. . A DUNS number is NOT required for this solicitation.
On: Nov 17 2022
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9990179 General Solicitation Solicitation Solicitation
Comment Classification: Controlled Unclassified Information (CUI)
Section F Projects: Can we propose projects 50% AE design complete.
On: Nov 11 2022.
Government Response. . Yes, projects in which 50% of the AE design is complete may be included. On: Nov 17 2022 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=SpecText
9993823 Engineering Support
General General General
Comment Classification: Controlled Unclassified Information (CUI)
Under Section E, is Project Scheduler is same as Construction Scheduler.
On: Nov 16 2022.
Government Response. . Yes, the Project Scheduler is the same as a Construction Scheduler. On: Nov 21 2022
9993832 Engineering Support
General General General
Comment Classification: Controlled Unclassified Information (CUI)
Under Section E: Please define the role of Licensed Project Engineer
Government Response. . A licensed engineer (any discipline) who works closely with the project stakeholder and the project design team.
The project engineer will work with the project manager to plan and manage the engineering and technical requirements of the project. They will coordinate with the design team to minimize the risks associated with projects. On: Nov 21 2022
9994665 General Solicitation Solicitation Solicitation
Comment Classification: UNCLASSIFIED (U)
On Page 9, Section 5.b. it states when supplying information for forms, fonts should be Times
New Roman no smaller than 12 points. Would you consider Arial Narrow or smaller Times
New Roman font size? Times New Roman 12 pt is quite large font, particularly for organization chart, Section E one-page resumes, and Section G matrix projects list.
Government Response. . Times New Roman 10 pt may be used. On: Nov 21
9994667 General Solicitation Solicitation Solicitation
Comment Classification: Public (Public)
On Page 9, Section 5.b. it states when supplying information for forms, fonts should be Times
New Roman no smaller than 12 points. Would you consider Arial Narrow or smaller Times
New Roman font size? Times New Roman 12 pt is quite large font, particularly for organization chart, Section E one-page resumes, and Section G matrix projects list.
Government Response. . Times New Roman 10 pt may be used. On: Nov 21
9994881 General Solicitation Solicitation Solicitation
Comment Classification: Public (Public)
Respectfully request with the Thanksgiving holidays in the mix and many folks traveling, would you consider extending the due date for the solicitation?
On: Nov 17 2022.
Government Response. . The due date / time for submitting SF330s has been extended to Thursday, December 8, 2022 at 11:00 AM Central time. On: Nov 21
9994919 Architectural Sheet 6-7
Comment Classification: Controlled Unclassified Information (CUI)
1. what are the technical details for the technical writer role identified in the solicitation?
2. The CPARs mentions a 5-year limit. Do the project sheets need to be within 5 years, or can they be within 10 years?
Government Response. .
1. The technical writer will work with the engineers, perform research, organize and maintain resources required to write technical documents needed for the project. The technical writer should be detail oriented, possess excellent writing and communication skills and understand the technical terminology related to the project.
2. The work needs to have been done in the last 5 years. On: Nov 21 2022
9995855 Architectural 3.b. Professional Qualifications
Resume
Comment Classification: Public (Public)
Please provide clarification if a resume is required for each role listed or if a person can fulfill more than one required position / capability (e.g., Electrical Engineer / RCDD or Architect /
LEED AP).
Government Response. . Resumes must be listed in the order shown in 3b of the solicitation. If a person fulfills more than one position, their resume must be submitted under each role / position fulfilled. On: Nov 21 2022
9995860 Master Planning 3.a. Professional Qualifications
Resume
Comment Classification: Public (Public)
Is a resume required for a Master Planner in order to meet the criteria to "demonstrate experience in Military Master Planning"?
Government Response. . Yes, a resume is required for a Master Planner. On:
Nov 21 2022